Rubber, Tires, Foam & Elastomer Manufacturing worked example
Compound Moisture Risk with moisture defect severity rating of 15 score: a worked example
This scenario runs the compound moisture risk calculation on the strong side: moisture defect severity rating of 15 score, with every other input held at its documented default. Use it when compound moisture risk in rubber, tires, foam and elastomer manufacturing needs a defensible ranking against other rubber, tires, foam and elastomer manufacturing risks for the next review.
The inputs for this scenario
- Moisture defect severity rating: 15 score (raised for this scenario; the documented default is 6)
- Moisture ingress occurrence rating: 4 score (unchanged)
- Moisture detection difficulty rating: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Compound moisture risk score = compound moisture risk severity score × compound moisture risk occurrence score × compound moisture risk detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for compound moisture risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for compound moisture risk severity score.
- At this operating point the engine returns 4 score for compound moisture risk occurrence score.
- At this operating point the engine returns 3 score for compound moisture risk detection score.
How this compares with the baseline
- Against the tool's baseline example, where moisture defect severity rating sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it when ranking moisture-related defect modes in a compounding FMEA or deciding which materials or steps get drying and moisture-control investment first. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Compound moisture risk score: 8.15 score (headline result)
- Compound moisture risk severity score: 15 score
- Compound moisture risk occurrence score: 4 score
- Compound moisture risk detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Compound Moisture Risk calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.