Safety & Workforce worked example

TRIR Calculator with recordable cases of 2.5 cases: a worked example

This worked example runs the trir calculator numbers for a tougher week than the baseline: recordable cases of 2.5 cases instead of the typical 5 cases. Calculate TRIR (total recordable incident rate) for Safety & Workforce from recordable cases and total hours worked, using the OSHA 200,000-hour basis.

The inputs for this scenario

  • Recordable cases (OSHA): 2.5 cases (the input this scenario stresses; the baseline uses 5)
  • Total hours worked: 500,000 hr (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: TRIR = recordable cases × 200,000 ÷ total hours worked.
  • TRIR works out to 1 per 100 workers at these inputs, and this is the headline figure for the scenario.
  • Cases works out to 2.5 cases at these inputs.
  • Hours worked works out to 500,000 hr at these inputs.
  • Full-time equivalents works out to 250 FTE at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where recordable cases sits at 5 cases and the headline result is 2 per 100 workers, this scenario comes in 50% below the baseline at 1 per 100 workers.
  • Use it for annual or rolling safety reporting, OSHA and customer prequalification submissions, and benchmarking your rate against NAICS industry averages. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • TRIR: 1 per 100 workers (headline result)
  • Cases: 2.5 cases
  • Hours worked: 500,000 hr
  • Full-time equivalents: 250 FTE

Run it with your numbers

  • To rerun this with your own numbers, open the live TRIR Calculator calculator, set recordable cases to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.