Semiconductor Advanced Packaging & Test worked example
Packaging Rework Cost at 81% share of pulled units actually reworkable: a worked example
What does the result look like when share of pulled units actually reworkable reaches 81%? The full calculation is worked below with real intermediate numbers. An OSAT or fab packaging team sizing the dollar exposure of a flip-chip or fan-out lot that failed final test before deciding to rework or scrap.
The inputs for this scenario
- Failed units pulled for rework: 500 units (unchanged)
- Rework labor and material per device: 18.5 $/unit (unchanged)
- Share of pulled units actually reworkable: 81 % (raised for this scenario; the documented default is 70)
- Line changeover and setup charge: 1,200 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total rework cost = units x per-device rework x reworkable% + setup charge) to the inputs above produces each figure below.
- At this operating point the engine returns 8,693 $ for total packaging rework cost, the number this scenario is built around.
- At this operating point the engine returns 17.39 $ / piece for packaging rework cost per unit.
- At this operating point the engine returns 7,493 $ for variable packaging rework cost.
- At this operating point the engine returns 1,200 $ for fixed packaging rework cost adder.
How this compares with the baseline
- Against the tool's baseline example, where share of pulled units actually reworkable sits at 70% and the headline result is 7,675 $, this scenario comes in 13.26% above the baseline at 8,693 $.
- A figure at this level is achievable when share of pulled units actually reworkable is genuinely sustained, not just peaked for a shift. It applies one flat per-device rework rate and does not model multi-pass rework, escalating cost by defect type, or the risk that reworked units fail again downstream.
Results at a glance
- Total packaging rework cost: 8,693 $ (headline result)
- Packaging rework cost per unit: 17.39 $ / piece
- Variable packaging rework cost: 7,493 $
- Fixed packaging rework cost adder: 1,200 $
Run it with your numbers
- Every input above is editable in the live Packaging Rework Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.