Sheet Metal Stamping & Press Lines worked example
Blank Size Optimization at 99% nesting layout efficiency: a worked example
This scenario runs the blank size optimization calculation on the strong side: 99% nesting layout efficiency, with every other input held at its documented default. Use it when blank size optimization in sheet metal stamping and press lines is being committed and you need a throughput number you can defend.
The inputs for this scenario
- Optimized blanks nested from stock: 1,200 units (unchanged)
- Sheet or coil processing time: 8 hr (unchanged)
- Nesting layout efficiency: 99 % (raised for this scenario; the documented default is 90)
Working through the calculation
- Applying the documented formula (Raw blank size optimization = completed output รท runtime) to the inputs above produces each figure below.
- At this operating point the engine returns 149 units for effective throughput, the number this scenario is built around.
- At this operating point the engine returns 150 units for raw throughput.
- At this operating point the engine returns 99 % for efficiency.
- At this operating point the engine returns 8 hr for runtime.
How this compares with the baseline
- Against the tool's baseline example, where nesting layout efficiency sits at 90% and the headline result is 135 units, this scenario comes in 10% above the baseline at 149 units.
- Use it when comparing two blank layouts, validating a nesting software estimate against actual output, or sizing a blanking job against line capacity. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Effective throughput: 149 units (headline result)
- Raw throughput: 150 units
- Efficiency: 99 %
- Runtime: 8 hr
Run it with your numbers
- Every input above is editable in the live Blank Size Optimization calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.