Sheet Metal Stamping & Press Lines worked example

Die Changeover Cost at 58% cost capture factor: a worked example in sheet metal stamping & press lines

This worked example runs the die changeover cost numbers for a tougher week than the baseline: 58% cost capture factor instead of the typical 80%. A die changeover ties up a press, a setter, and often a forklift while the line makes zero parts, so its true cost blends variable machine time with a fixed setup charge.

The inputs for this scenario

  • Parts run before the changeover: 100 units (held at the documented default)
  • Machine cost rate: 45 $ / unit (held at the documented default)
  • Cost capture factor: 58 % (the input this scenario stresses; the baseline uses 80)
  • Fixed setup cost: 250 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Die Changeover Cost cost = quantity × rate × capture factor + fixed cost.
  • Weighted cost works out to 2,860 $ at these inputs, and this is the headline figure for the scenario.
  • Per piece value works out to 28.6 $ / piece at these inputs.
  • Captured value works out to 2,610 $ at these inputs.
  • Fixed adjustment works out to 250 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where cost capture factor sits at 80% and the headline result is 3,850 $, this scenario comes in 25.71% below the baseline at 2,860 $.
  • Use it when sizing production batches, building a quote, or ranking changeovers for a SMED reduction effort. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Weighted cost: 2,860 $ (headline result)
  • Per piece value: 28.6 $ / piece
  • Captured value: 2,610 $
  • Fixed adjustment: 250 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Die Changeover Cost calculator, set cost capture factor to your actual value, and adjust the remaining inputs to match your operation.