Sheet Metal Stamping & Press Lines worked example

Lubricant Usage at 98% roll and spray transfer efficiency to strip: a worked example

Push roll and spray transfer efficiency to strip up to 98% and the picture changes. This example computes every intermediate figure at that operating point. Use it when lubricant usage in sheet metal stamping and press lines needs a buy quantity for the next sheet metal stamping and press lines run and you do not want to short the line.

The inputs for this scenario

  • Coil or blank surface area covered per shift: 500 units (unchanged)
  • Lubricant applied per unit of surface: 0.08 units (unchanged)
  • Roll/spray transfer efficiency to strip: 98 % (raised for this scenario; the documented default is 85)

Working through the calculation

  • Applying the documented formula (Required lubricant usage = covered amount × use per unit ÷ transfer efficiency) to the inputs above produces each figure below.
  • At this operating point the engine returns 40.82 units for required quantity, the number this scenario is built around.
  • At this operating point the engine returns 40 units for theoretical amount.
  • At this operating point the engine returns 0.82 units for loss allowance.
  • At this operating point the engine returns 98 % for efficiency.

How this compares with the baseline

  • Against the tool's baseline example, where roll and spray transfer efficiency to strip sits at 85% and the headline result is 47.06 units, this scenario comes in 13.27% below the baseline at 40.82 units.
  • It computes the gross lubricant quantity you must dispense so that after transfer losses the strip receives the theoretical amount needed for the covered surface. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Required quantity: 40.82 units (headline result)
  • Theoretical amount: 40 units
  • Loss allowance: 0.82 units
  • Efficiency: 98 %

Run it with your numbers

  • Every input above is editable in the live Lubricant Usage calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.