S&OP, Demand Planning & Forecasting worked example
Schedule Stability Score with severity of schedule change impact of 15 score: a worked example
This scenario runs the schedule stability score calculation on the strong side: severity of schedule change impact of 15 score, with every other input held at its documented default. Use it when schedule stability in s and op, demand planning and forecasting needs a defensible ranking against other s and op, demand planning and forecasting risks for the next review.
The inputs for this scenario
- Severity of schedule change impact: 15 score (raised for this scenario; the documented default is 6)
- Likelihood of schedule change occurring: 4 score (unchanged)
- Ability to detect the change before it hits: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Schedule stability risk score = schedule stability severity score × schedule stability occurrence score × schedule stability detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for schedule stability risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for schedule stability severity score.
- At this operating point the engine returns 4 score for schedule stability occurrence score.
- At this operating point the engine returns 3 score for schedule stability detection score.
How this compares with the baseline
- Against the tool's baseline example, where severity of schedule change impact sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it to prioritize which schedule-instability drivers to mitigate during S&OP or master-scheduling reviews. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Schedule stability risk score: 8.15 score (headline result)
- Schedule stability severity score: 15 score
- Schedule stability occurrence score: 4 score
- Schedule stability detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Schedule Stability Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.