Space Payload & Avionics Manufacturing worked example
Harness Routing Labor at 12% access and handling allowance: a worked example in space payload & avionics manufacturing
This scenario runs the harness routing labor calculation on the strong side: 12% access and handling allowance, with every other input held at its documented default. Use it when harness routing labor in space payload and avionics manufacturing needs a defensible run time before a quote goes out.
The inputs for this scenario
- Harness segments to route and lace: 120 units (unchanged)
- Technician routing rate per minute: 12 units / min (unchanged)
- Access and handling allowance: 12 % (raised for this scenario; the documented default is 10)
Working through the calculation
- Applying the documented formula (Base harness routing labor time = harness routing labor workload รท harness routing labor completion rate) to the inputs above produces each figure below.
- At this operating point the engine returns 11.2 hr for required harness routing labor time, the number this scenario is built around.
- At this operating point the engine returns 10 hr for base harness routing labor time.
- At this operating point the engine returns 12 % for harness routing labor allowance applied.
- At this operating point the engine returns 12 pieces / min for harness routing labor completion rate.
How this compares with the baseline
- Against the tool's baseline example, where access and handling allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
- Use it when staffing a harness build cell, quoting integration labor, or forecasting when wiring will clear for functional test and closeout. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Required harness routing labor time: 11.2 hr (headline result)
- Base harness routing labor time: 10 hr
- Harness routing labor allowance applied: 12 %
- Harness routing labor completion rate: 12 pieces / min
Run it with your numbers
- Every input above is editable in the live Harness Routing Labor calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.