Supplier Quality, Development & Audits worked example
Source Inspection Cost at 99% lot coverage inspected on the visit: a worked example in supplier quality, development & audits
This scenario runs the source inspection cost calculation on the strong side: 99% lot coverage inspected on the visit, with every other input held at its documented default. A receiving quality lead uses it to budget source inspection for a critical lot that cannot be reworked after delivery.
The inputs for this scenario
- On-site inspection hours per visit: 8 hours (unchanged)
- Loaded inspector hourly rate: 95 $/hr (unchanged)
- Lot coverage inspected on the visit: 99 % (raised for this scenario; the documented default is 90)
- Coordination and travel adder: 600 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total source inspection cost = inspection hours x hourly rate x lot coverage% + coordination adder) to the inputs above produces each figure below.
- At this operating point the engine returns 1,352 $ for total source inspection cost, the number this scenario is built around.
- At this operating point the engine returns 169 $ / piece for source inspection cost per unit.
- At this operating point the engine returns 752 $ for variable source inspection cost.
- At this operating point the engine returns 600 $ for fixed source inspection cost adder.
How this compares with the baseline
- Against the tool's baseline example, where lot coverage inspected on the visit sits at 90% and the headline result is 1,284 $, this scenario comes in 5.33% above the baseline at 1,352 $.
- Use it to decide between source inspection and incoming inspection, or to quote customer-directed source inspection accurately. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total source inspection cost: 1,352 $ (headline result)
- Source inspection cost per unit: 169 $ / piece
- Variable source inspection cost: 752 $
- Fixed source inspection cost adder: 600 $
Run it with your numbers
- Every input above is editable in the live Source Inspection Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.