Supplier Quality, Development & Audits worked example
Supplier Capability Gap with capability gap impact severity of 15 score: a worked example
This scenario runs the supplier capability gap calculation on the strong side: capability gap impact severity of 15 score, with every other input held at its documented default. Use it when supplier capability gap in supplier quality, development and audits needs a defensible ranking against other supplier quality, development and audits risks for the next review.
The inputs for this scenario
- Capability gap impact severity (1-10): 15 score (raised for this scenario; the documented default is 6)
- Capability gap occurrence likelihood (1-10): 4 score (unchanged)
- Capability gap detection difficulty (1-10): 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Supplier capability gap risk score = supplier capability gap severity score × supplier capability gap occurrence score × supplier capability gap detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for supplier capability gap risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for supplier capability gap severity score.
- At this operating point the engine returns 4 score for supplier capability gap occurrence score.
- At this operating point the engine returns 3 score for supplier capability gap detection score.
How this compares with the baseline
- Against the tool's baseline example, where capability gap impact severity sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it after a capability audit or PPAP review to prioritize which supplier gaps to close, and to track whether corrective actions actually lower the score. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Supplier capability gap risk score: 8.15 score (headline result)
- Supplier capability gap severity score: 15 score
- Supplier capability gap occurrence score: 4 score
- Supplier capability gap detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Supplier Capability Gap calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.