Supplier Quality, Development & Audits worked example
Supplier Claim Recovery at 75% expected claim approval rate: a worked example
What does the result look like when expected claim approval rate reaches 75%? The full calculation is worked below with real intermediate numbers. A supplier quality engineer uses it to forecast realistic recovery before filing a chargeback against a defective shipment.
The inputs for this scenario
- Claimable defective units: 1,200 units (unchanged)
- Recoverable value per defective unit: 18 $/unit (unchanged)
- Expected claim approval rate: 75 % (raised for this scenario; the documented default is 65)
- Claim processing and admin adder: 500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Net recovery = claimable units x recoverable value x approval rate% + processing adder) to the inputs above produces each figure below.
- At this operating point the engine returns 16,700 $ for total supplier claim recovery cost, the number this scenario is built around.
- At this operating point the engine returns 13.92 $ / piece for supplier claim recovery cost per unit.
- At this operating point the engine returns 16,200 $ for variable supplier claim recovery cost.
- At this operating point the engine returns 500 $ for fixed supplier claim recovery adder.
How this compares with the baseline
- Against the tool's baseline example, where expected claim approval rate sits at 65% and the headline result is 14,540 $, this scenario comes in 14.86% above the baseline at 16,700 $.
- A figure at this level is achievable when expected claim approval rate is genuinely sustained, not just peaked for a shift. The approval rate is an estimate; a hardened supplier legal team or a weak PPAP paper trail can drop actual approvals well below your assumed percentage, and the model ignores the labor cost of chasing the claim beyond the fixed adder.
Results at a glance
- Total supplier claim recovery cost: 16,700 $ (headline result)
- Supplier claim recovery cost per unit: 13.92 $ / piece
- Variable supplier claim recovery cost: 16,200 $
- Fixed supplier claim recovery adder: 500 $