Supplier Quality, Development & Audits worked example
Supplier Qualification Cost at 86% first-pass yield: a worked example in supplier quality, development & audits
This scenario runs the supplier qualification cost calculation on the strong side: 86% first-pass yield, with every other input held at its documented default. An advanced quality engineer uses it to budget the qualification effort for onboarding a new supplier source.
The inputs for this scenario
- Qualification test runs: 6 runs (unchanged)
- Cost per qualification run: 2,200 $/run (unchanged)
- First-pass yield: 86 % (raised for this scenario; the documented default is 75)
- Documentation and PPAP adder: 4,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total qualification cost = test runs x cost per run x first-pass yield% + documentation adder) to the inputs above produces each figure below.
- At this operating point the engine returns 15,352 $ for total supplier qualification cost, the number this scenario is built around.
- At this operating point the engine returns 2,559 $ / piece for supplier qualification cost per unit.
- At this operating point the engine returns 11,352 $ for variable supplier qualification cost.
- At this operating point the engine returns 4,000 $ for fixed supplier qualification cost adder.
How this compares with the baseline
- Against the tool's baseline example, where first-pass yield sits at 75% and the headline result is 13,900 $, this scenario comes in 10.45% above the baseline at 15,352 $.
- Use it during sourcing and APQP to budget onboarding, compare supplier bids on a total-qualification basis, or justify requalifying an incumbent instead. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total supplier qualification cost: 15,352 $ (headline result)
- Supplier qualification cost per unit: 2,559 $ / piece
- Variable supplier qualification cost: 11,352 $
- Fixed supplier qualification cost adder: 4,000 $
Run it with your numbers
- Every input above is editable in the live Supplier Qualification Cost calculator, which recalculates instantly and can be shared with the inputs intact.