Surgical Robotics Manufacturing worked example
Precision Gearbox Yield at 99% target first-pass yield: a worked example
This scenario runs the precision gearbox yield calculation on the strong side: 99% target first-pass yield, with every other input held at its documented default. Use it when precision gearbox yield in surgical robotics manufacturing needs a clean rate and gap-to-target you can put on a tier board.
The inputs for this scenario
- Gearboxes passing precision inspection: 8 count (unchanged)
- Gearboxes inspected: 250 count (unchanged)
- Target first-pass yield: 99 % (raised for this scenario; the documented default is 95)
Working through the calculation
- Applying the documented formula (Precision gearbox yield rate = precision gearbox yield count ÷ total precision gearbox yield population × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 3.2 % for precision gearbox yield rate, the number this scenario is built around.
- At this operating point the engine returns 95.8 points for precision gearbox yield gap to target.
- At this operating point the engine returns 8 count for precision gearbox yield count.
- At this operating point the engine returns 250 count for total precision gearbox yield population.
How this compares with the baseline
- Against the tool's baseline example, where target first-pass yield sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
- Use it during incoming inspection, supplier scorecarding, or process-capability reviews of a precision-gear line. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Precision gearbox yield rate: 3.2 % (headline result)
- Precision gearbox yield gap to target: 95.8 points
- Precision gearbox yield count: 8 count
- Total precision gearbox yield population: 250 count
Run it with your numbers
- Every input above is editable in the live Precision Gearbox Yield calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.