Surgical Robotics Manufacturing worked example
Supplier Risk with supplier-failure severity of 3 score: a worked example in surgical robotics manufacturing
Suppose supplier-failure severity falls to 3 score. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimate supplier risk for surgical robotics manufacturing using production-ready inputs so teams can rank risks and decide which issue needs containment, controls, or escalation first.
The inputs for this scenario
- Supplier-failure severity (impact on the surgical system): 3 score (the input this scenario stresses; the baseline uses 6)
- Supplier-failure occurrence (likelihood of nonconformance or disruption): 4 score (held at the documented default)
- Supplier-failure detection (chance incoming QC catches it): 3 score (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Supplier risk score = supplier risk severity score × supplier risk occurrence score × supplier risk detection score.
- Supplier risk score works out to 3.35 score at these inputs, and this is the headline figure for the scenario.
- Supplier risk severity score works out to 3 score at these inputs.
- Supplier risk occurrence score works out to 4 score at these inputs.
- Supplier risk detection score works out to 3 score at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where supplier-failure severity sits at 6 score and the headline result is 4.55 score, this scenario comes in 26.37% below the baseline at 3.35 score.
- It computes a risk priority number by multiplying the severity, occurrence, and detection scores for a specific supplier or purchased-part failure mode. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Supplier risk score: 3.35 score (headline result)
- Supplier risk severity score: 3 score
- Supplier risk occurrence score: 4 score
- Supplier risk detection score: 3 score
Run it with your numbers
- To rerun this with your own numbers, open the live Supplier Risk calculator, set supplier-failure severity to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.