Switchgear, Panelboards & Electrical Distribution worked example
Inspection Burden at 92% chargeable inspection portion: a worked example
What does the result look like when chargeable inspection portion reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when inspection burden in switchgear, panelboards and electrical distribution is being put through a switchgear, panelboards and electrical distribution weighted-cost review.
The inputs for this scenario
- Assemblies passing through inspection: 100 units (unchanged)
- Inspection labor & test cost per assembly: 45 $ / unit (unchanged)
- Chargeable inspection portion: 92 % (raised for this scenario; the documented default is 80)
- Fixed calibration & setup cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Inspection Burden cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where chargeable inspection portion sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when chargeable inspection portion is genuinely sustained, not just peaked for a shift. The chargeable factor is a single percentage, so it won't separately model a re-inspection loop on failed units, which can add cost that scales with defect rate rather than volume.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Inspection Burden calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.