Switchgear, Panelboards & Electrical Distribution worked example
Test Bay Capacity at 99% test bay uptime: a worked example
This scenario runs the test bay capacity calculation on the strong side: 99% test bay uptime, with every other input held at its documented default. Use it when test bay capacity in switchgear, panelboards and electrical distribution is being asked to take on more work and you need to know if there is room.
The inputs for this scenario
- Units tested per bay cycle: 4 units / cycle (unchanged)
- Available test cycles in the period: 480 cycles (unchanged)
- Test bay uptime: 99 % (raised for this scenario; the documented default is 90)
- First-pass test yield: 97 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross test bay capacity capacity = units per cycle × available cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 1,844 units for good output capacity, the number this scenario is built around.
- At this operating point the engine returns 1,920 units for gross capacity.
- At this operating point the engine returns 19.2 units for uptime loss.
- At this operating point the engine returns 57.02 units for yield loss.
How this compares with the baseline
- Against the tool's baseline example, where test bay uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
- Use it for capacity planning, ship-date commitments, and deciding when to add test bays or shifts on a switchgear line. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Good output capacity: 1,844 units (headline result)
- Gross capacity: 1,920 units
- Uptime loss: 19.2 units
- Yield loss: 57.02 units
Run it with your numbers
- Every input above is editable in the live Test Bay Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.