Textiles & Apparel Manufacturing worked example

Cut and Sew Labor with upfront cost of the cut-and-sew automation of 62,500 $: a worked example

This scenario runs the cut and sew labor calculation on the strong side: upfront cost of the cut-and-sew automation of 62,500 $, with every other input held at its documented default. Use it when cut and sew labor in textiles and apparel manufacturing is being put in front of a capital committee and the savings story needs to hold up.

The inputs for this scenario

  • Upfront cost of the cut-and-sew automation: 62,500 $ (raised for this scenario; the documented default is 25,000)
  • Annual direct labor cost avoided: 18,000 $ / yr (unchanged)
  • Annual maintenance and operator support cost: 2,500 $ / yr (unchanged)

Working through the calculation

  • Applying the documented formula (Net annual cut and sew labor savings = annual cut and sew labor savings - annual cut and sew labor support cost) to the inputs above produces each figure below.
  • At this operating point the engine returns 4.03 yr for cut and sew labor payback period, the number this scenario is built around.
  • At this operating point the engine returns 15,500 $ / yr for net annual cut and sew labor savings.
  • At this operating point the engine returns 62,500 $ for cut and sew labor investment.
  • At this operating point the engine returns 15,000 $ for five-year net cut and sew labor value.

How this compares with the baseline

  • Against the tool's baseline example, where upfront cost of the cut-and-sew automation sits at 25,000 $ and the headline result is 1.61 yr, this scenario comes in 150% above the baseline at 4.03 yr.
  • Use it when justifying capital for cut-room or sewing-line automation, comparing two equipment options, or setting a payback hurdle for a lean project. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Cut and sew labor payback period: 4.03 yr (headline result)
  • Net annual cut and sew labor savings: 15,500 $ / yr
  • Cut and sew labor investment: 62,500 $
  • Five-year net cut and sew labor value: 15,000 $

Run it with your numbers

  • Every input above is editable in the live Cut and Sew Labor calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.