Textiles & Apparel Manufacturing worked example

Dye Recipe Scaling at 12% setup, weighing, and delay allowance: a worked example

This scenario runs the dye recipe scaling calculation on the strong side: 12% setup, weighing, and delay allowance, with every other input held at its documented default. Use it when dye recipe scaling in textiles and apparel manufacturing is changing rate or allowance and you want to see the impact.

The inputs for this scenario

  • Fabric weight to dye in the batch: 120 units (unchanged)
  • Weighing and dosing throughput: 12 units / min (unchanged)
  • Setup, weighing, and delay allowance: 12 % (raised for this scenario; the documented default is 10)

Working through the calculation

  • Applying the documented formula (Base dye recipe scaling time = dye recipe scaling workload รท dye recipe scaling completion rate) to the inputs above produces each figure below.
  • At this operating point the engine returns 11.2 hr for required dye recipe scaling time, the number this scenario is built around.
  • At this operating point the engine returns 10 hr for base dye recipe scaling time.
  • At this operating point the engine returns 12 % for dye recipe scaling allowance applied.
  • At this operating point the engine returns 12 pieces / min for dye recipe scaling completion rate.

How this compares with the baseline

  • Against the tool's baseline example, where setup, weighing, and delay allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
  • Use it when scheduling the color kitchen against machine availability so recipe prep does not become the bottleneck feeding the dye line. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Required dye recipe scaling time: 11.2 hr (headline result)
  • Base dye recipe scaling time: 10 hr
  • Dye recipe scaling allowance applied: 12 %
  • Dye recipe scaling completion rate: 12 pieces / min