Thermal Spray, Hardfacing & Wear Coatings worked example

Batch Throughput at 99% spray-line efficiency: a worked example in thermal spray, hardfacing & wear coatings

Push spray-line efficiency up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when batch throughput in thermal spray, hardfacing and wear coatings is being committed and you need a throughput number you can defend.

The inputs for this scenario

  • Parts coated in the run: 1,200 units (unchanged)
  • Booth runtime for the batch: 8 hr (unchanged)
  • Spray-line efficiency (uptime vs. scheduled): 99 % (raised for this scenario; the documented default is 90)

Working through the calculation

  • Applying the documented formula (Raw batch throughput = completed output รท runtime) to the inputs above produces each figure below.
  • At this operating point the engine returns 149 units / hr for effective throughput, the number this scenario is built around.
  • At this operating point the engine returns 150 units / hr for raw throughput.
  • At this operating point the engine returns 99 % for efficiency.
  • At this operating point the engine returns 8 hr for runtime.

How this compares with the baseline

  • Against the tool's baseline example, where spray-line efficiency sits at 90% and the headline result is 135 units / hr, this scenario comes in 10% above the baseline at 149 units / hr.
  • It divides completed output by runtime for a raw rate, then multiplies by an efficiency factor to give effective parts coated per hour. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Effective throughput: 149 units / hr (headline result)
  • Raw throughput: 150 units / hr
  • Efficiency: 99 %
  • Runtime: 8 hr

Run it with your numbers

  • Every input above is editable in the live Batch Throughput calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.