Thermal Spray, Hardfacing & Wear Coatings worked example
Powder Consumption at 98% deposit efficiency: a worked example
Push deposit efficiency up to 98% and the picture changes. This example computes every intermediate figure at that operating point. Use it when powder consumption in thermal spray, hardfacing and wear coatings needs a buy quantity for the next thermal spray, hardfacing and wear coatings run and you do not want to short the line.
The inputs for this scenario
- Total surface area to coat: 500 units (unchanged)
- Powder needed per unit area (as-deposited): 0.08 units (unchanged)
- Deposit (transfer) efficiency: 98 % (raised for this scenario; the documented default is 85)
Working through the calculation
- Applying the documented formula (Required powder consumption = covered amount × use per unit ÷ transfer efficiency) to the inputs above produces each figure below.
- At this operating point the engine returns 40.82 units for required quantity, the number this scenario is built around.
- At this operating point the engine returns 40 units for theoretical amount.
- At this operating point the engine returns 0.82 units for loss allowance.
- At this operating point the engine returns 98 % for efficiency.
How this compares with the baseline
- Against the tool's baseline example, where deposit efficiency sits at 85% and the headline result is 47.06 units, this scenario comes in 13.27% below the baseline at 40.82 units.
- It computes the total powder mass you must feed to deposit a coating over a defined area, then breaks out the theoretical on-part amount and the overspray loss allowance. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Required quantity: 40.82 units (headline result)
- Theoretical amount: 40 units
- Loss allowance: 0.82 units
- Efficiency: 98 %