Thermal Spray, Hardfacing & Wear Coatings worked example
Robot Path Time at 12% indexing + reposition allowance: a worked example
What does the result look like when indexing + reposition allowance reaches 12%? The full calculation is worked below with real intermediate numbers. Use it when robot path time in thermal spray, hardfacing and wear coatings needs a defensible run time before a quote goes out.
The inputs for this scenario
- Total spray path length to traverse: 120 units (unchanged)
- Robot traverse / deposition rate: 12 units / hr (unchanged)
- Indexing + reposition allowance: 12 % (raised for this scenario; the documented default is 10)
Working through the calculation
- Applying the documented formula (Base robot path time time = required work รท processing rate) to the inputs above produces each figure below.
- At this operating point the engine returns 11.2 hr for adjusted run time, the number this scenario is built around.
- At this operating point the engine returns 10 hr for base run time.
- At this operating point the engine returns 12 % for allowance applied.
- At this operating point the engine returns 12 pieces / min for process rate.
How this compares with the baseline
- Against the tool's baseline example, where indexing + reposition allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
- A figure at this level is achievable when indexing + reposition allowance is genuinely sustained, not just peaked for a shift. It uses a single average traverse rate; complex geometries with many slow index moves or variable standoff deviate from that average.
Results at a glance
- Adjusted run time: 11.2 hr (headline result)
- Base run time: 10 hr
- Allowance applied: 12 %
- Process rate: 12 pieces / min
Run it with your numbers
- Every input above is editable in the live Robot Path Time calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.