Thermoforming & Vacuum Formed Products worked example

Forming Cycle Time at 7.2% cooling and index allowance: a worked example in thermoforming & vacuum formed products

This worked example runs the forming cycle time numbers for a tougher week than the baseline: 7.2% cooling and index allowance instead of the typical 10%. Forming Cycle Time estimates how long a thermoforming machine needs to form a required quantity of parts, including the extra time that cooling, indexing, and clamp cycling add on top of pure forming.

The inputs for this scenario

  • Parts required this run: 120 units (held at the documented default)
  • Forming stations cycled per hour: 12 units / hr (held at the documented default)
  • Cooling and index allowance: 7.2 % (the input this scenario stresses; the baseline uses 10)

Working through the calculation

  • The calculation starts from the formula this tool documents: Base forming cycle time time = required work รท processing rate.
  • Adjusted run time works out to 10.72 hr at these inputs, and this is the headline figure for the scenario.
  • Base run time works out to 10 hr at these inputs.
  • Allowance applied works out to 7.2 % at these inputs.
  • Process rate works out to 12 pieces / min at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where cooling and index allowance sits at 10% and the headline result is 11 hr, this scenario comes in 2.55% below the baseline at 10.72 hr.
  • Use it when scheduling a thermoforming press or estimating machine hours for a quote, before committing to a delivery date. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Adjusted run time: 10.72 hr (headline result)
  • Base run time: 10 hr
  • Allowance applied: 7.2 %
  • Process rate: 12 pieces / min

Run it with your numbers

  • To rerun this with your own numbers, open the live Forming Cycle Time calculator, set cooling and index allowance to your actual value, and adjust the remaining inputs to match your operation.