Tooling, Fixtures, Dies & Mold Economics worked example

Tool Crib Inventory with average perishable tools consumed per day of 3,000 units / day: a worked example

This scenario runs the tool crib inventory calculation on the strong side: average perishable tools consumed per day of 3,000 units / day, with every other input held at its documented default. Use it when tool crib inventory in tooling, fixtures, dies and mold economics is being sized for a buffer or safety stock review.

The inputs for this scenario

  • Average perishable tools consumed per day: 3,000 units / day (raised for this scenario; the documented default is 1,200)
  • Supplier replenishment lead time: 85 days (unchanged)
  • Safety stock buffer multiplier: 1.1 units (unchanged)

Working through the calculation

  • Applying the documented formula (Tool crib inventory cycle stock = tool crib inventory daily usage × tool crib inventory lead time) to the inputs above produces each figure below.
  • At this operating point the engine returns 32.09 days for protected days of supply, the number this scenario is built around.
  • At this operating point the engine returns 35.29 days for unprotected days.
  • At this operating point the engine returns 3,000 pieces for inventory.
  • At this operating point the engine returns 85 pieces / day for daily usage.

How this compares with the baseline

  • Against the tool's baseline example, where average perishable tools consumed per day sits at 1,200 units / day and the headline result is 12.83 days, this scenario comes in 150% above the baseline at 32.09 days.
  • Use it when setting reorder points and min/max levels for high-runner perishable tooling in the crib, or auditing whether current stock covers supplier lead time. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Protected days of supply: 32.09 days (headline result)
  • Unprotected days: 35.29 days
  • Inventory: 3,000 pieces
  • Daily usage: 85 pieces / day

Run it with your numbers

  • Every input above is editable in the live Tool Crib Inventory calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.