Tooling, Fixtures, Dies & Mold Economics worked example
Tooling Storage Cost at 110% occupancy share: a worked example
This scenario runs the tooling storage cost calculation on the strong side: 110% occupancy share, with every other input held at its documented default. A supply chain planner uses it to price the carrying cost of inactive molds and dies held against future service or repeat orders.
The inputs for this scenario
- Storage Duration: 24 months (unchanged)
- Monthly Slot Rate: 45 $/month (unchanged)
- Occupancy Share: 110 % (raised for this scenario; the documented default is 100)
- Preservation & Handling Fee: 300 $ (unchanged)
Working through the calculation
- Applying the documented formula (Storage cost = months x monthly slot rate x occupancy share% + preservation fee) to the inputs above produces each figure below.
- At this operating point the engine returns 1,488 $ for total tooling storage cost, the number this scenario is built around.
- At this operating point the engine returns 62 $ / piece for tooling storage cost per unit.
- At this operating point the engine returns 1,188 $ for variable tooling storage cost.
- At this operating point the engine returns 300 $ for fixed tooling storage cost adder.
How this compares with the baseline
- Against the tool's baseline example, where occupancy share sits at 100% and the headline result is 1,380 $, this scenario comes in 7.83% above the baseline at 1,488 $.
- Use it during storage-vs-scrap reviews, customer tooling-ownership audits, or annual inventory carrying-cost analysis. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total tooling storage cost: 1,488 $ (headline result)
- Tooling storage cost per unit: 62 $ / piece
- Variable tooling storage cost: 1,188 $
- Fixed tooling storage cost adder: 300 $
Run it with your numbers
- Every input above is editable in the live Tooling Storage Cost calculator, which recalculates instantly and can be shared with the inputs intact.