Traceability, Serialization & Lot Genealogy worked example
Lot Genealogy Completeness at 35% record completeness gap: a worked example
What does the result look like when record completeness gap reaches 35%? The full calculation is worked below with real intermediate numbers. A traceability engineer uses it to budget the effort to remediate incomplete lot linkage ahead of an audit or recall readiness review.
The inputs for this scenario
- Production lots to reconstruct: 300 lots (unchanged)
- Cost per lot reconstruction: 40 $/lot (unchanged)
- Record completeness gap: 35 % (raised for this scenario; the documented default is 30)
- System and audit adder: 2,500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Genealogy gap cost = lots x cost per lot x completeness gap% + system adder) to the inputs above produces each figure below.
- At this operating point the engine returns 6,700 $ for total lot genealogy completeness cost, the number this scenario is built around.
- At this operating point the engine returns 22.33 $ / piece for lot genealogy completeness cost per unit.
- At this operating point the engine returns 4,200 $ for variable lot genealogy completeness cost.
- At this operating point the engine returns 2,500 $ for fixed lot genealogy completeness adder.
How this compares with the baseline
- Against the tool's baseline example, where record completeness gap sits at 30% and the headline result is 6,100 $, this scenario comes in 9.84% above the baseline at 6,700 $.
- A figure at this level is achievable when record completeness gap is genuinely sustained, not just peaked for a shift. It assumes a uniform per-lot reconstruction cost — deeply broken lots requiring supplier data pulls cost far more than the average implies.
Results at a glance
- Total lot genealogy completeness cost: 6,700 $ (headline result)
- Lot genealogy completeness cost per unit: 22.33 $ / piece
- Variable lot genealogy completeness cost: 4,200 $
- Fixed lot genealogy completeness adder: 2,500 $
Run it with your numbers
- Every input above is editable in the live Lot Genealogy Completeness calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.