Trailers, Truck Bodies & Specialty Vehicles worked example
Delivery Capacity at 99% equipment uptime: a worked example in trailers, truck bodies & specialty vehicles
This scenario runs the delivery capacity calculation on the strong side: 99% equipment uptime, with every other input held at its documented default. Use it when delivery capacity in trailers, truck bodies and specialty vehicles is being asked to take on more work and you need to know if there is room.
The inputs for this scenario
- Trailers built per production cycle: 4 units / cycle (unchanged)
- Available production cycles in the horizon: 480 cycles (unchanged)
- Equipment uptime: 99 % (raised for this scenario; the documented default is 90)
- First-pass yield: 97 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross delivery capacity capacity = units per cycle × available cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 1,844 units for good output capacity, the number this scenario is built around.
- At this operating point the engine returns 1,920 units for gross capacity.
- At this operating point the engine returns 19.2 units for uptime loss.
- At this operating point the engine returns 57.02 units for yield loss.
How this compares with the baseline
- Against the tool's baseline example, where equipment uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
- Use it during S&OP, when committing to a large fleet order, or when deciding whether an uptime or yield problem is capping your ship rate. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Good output capacity: 1,844 units (headline result)
- Gross capacity: 1,920 units
- Uptime loss: 19.2 units
- Yield loss: 57.02 units
Run it with your numbers
- Every input above is editable in the live Delivery Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.