Tube, Pipe & Profile Forming worked example
Cost Per Formed Tube at 58% share of cost that is chargeable: a worked example
This worked example runs the cost per formed tube numbers for a tougher week than the baseline: 58% share of cost that is chargeable instead of the typical 80%. Cost Per Formed Tube converts a run's variable forming cost, a chargeable-cost factor and fixed setup into a defensible piece price for bent, roll-formed or end-formed tube.
The inputs for this scenario
- Formed tubes in the run: 100 units (held at the documented default)
- Variable forming cost per tube: 45 $ / unit (held at the documented default)
- Share of cost that is chargeable: 58 % (the input this scenario stresses; the baseline uses 80)
- Fixed setup & tooling amortization: 250 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Cost Per Formed Tube cost = quantity × rate × capture factor + fixed cost.
- Weighted cost works out to 2,860 $ at these inputs, and this is the headline figure for the scenario.
- Per piece value works out to 28.6 $ / piece at these inputs.
- Captured value works out to 2,610 $ at these inputs.
- Fixed adjustment works out to 250 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where share of cost that is chargeable sits at 80% and the headline result is 3,850 $, this scenario comes in 25.71% below the baseline at 2,860 $.
- Use it when quoting a tube-forming job, comparing short versus long run economics, or checking how setup amortization moves piece price. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Weighted cost: 2,860 $ (headline result)
- Per piece value: 28.6 $ / piece
- Captured value: 2,610 $
- Fixed adjustment: 250 $
Run it with your numbers
- To rerun this with your own numbers, open the live Cost Per Formed Tube calculator, set share of cost that is chargeable to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.