Tube, Pipe & Profile Forming worked example
End-Forming Cost at 92% value-add capture factor for the operation: a worked example
This scenario runs the end-forming cost calculation on the strong side: 92% value-add capture factor for the operation, with every other input held at its documented default. Use it when end-forming cost in tube, pipe and profile forming is being put through a tube, pipe and profile forming weighted-cost review.
The inputs for this scenario
- Tube ends processed in the batch: 100 units (unchanged)
- End-forming cost per tube end: 45 $ / unit (unchanged)
- Value-add capture factor for the operation: 92 % (raised for this scenario; the documented default is 80)
- Fixed setup and tooling charge: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (End-Forming Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where value-add capture factor for the operation sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it when quoting flare, bead, expansion, reduction or swage operations, or when deciding a minimum order quantity that keeps the fixed setup from dominating the per-piece price. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live End-Forming Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.