Vending, Kiosk & Self-Service Equipment worked example
Packaging Cost at 110% share of machines needing full crating: a worked example in vending, kiosk & self-service equipment
This scenario runs the packaging cost calculation on the strong side: 110% share of machines needing full crating, with every other input held at its documented default. A logistics cost planner sizes per-machine packaging spend before shipping a kiosk order to protect tall, top-heavy units in transit.
The inputs for this scenario
- Machines shipped: 400 machines (unchanged)
- Crate and protective materials cost: 165 $/machine (unchanged)
- Share of machines needing full crating: 110 % (raised for this scenario; the documented default is 100)
- One-time packaging design and tooling cost: 4,500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Packaging Cost = Machines Shipped x Crate & Materials Cost x Protective Share% + Packaging Design) to the inputs above produces each figure below.
- At this operating point the engine returns 77,100 $ for total packaging cost, the number this scenario is built around.
- At this operating point the engine returns 193 $ / piece for packaging cost per unit.
- At this operating point the engine returns 72,600 $ for variable packaging cost.
- At this operating point the engine returns 4,500 $ for fixed packaging cost adder.
How this compares with the baseline
- Against the tool's baseline example, where share of machines needing full crating sits at 100% and the headline result is 70,500 $, this scenario comes in 9.36% above the baseline at 77,100 $.
- Use it when quoting a shipment, evaluating custom crate tooling, or allocating packaging spend across a production run. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total packaging cost: 77,100 $ (headline result)
- Packaging cost per unit: 193 $ / piece
- Variable packaging cost: 72,600 $
- Fixed packaging cost adder: 4,500 $
Run it with your numbers
- Every input above is editable in the live Packaging Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.