Vending, Kiosk & Self-Service Equipment worked example
Service Parts Buffer with daily service parts consumption of 3,000 units / day: a worked example in vending, kiosk & self-service equipment
Push daily service parts consumption up to 3,000 units / day and the picture changes. This example computes every intermediate figure at that operating point. Use it when service parts buffer in vending, kiosk and self-service equipment is being sized for a buffer or safety stock review.
The inputs for this scenario
- Daily Service Parts Consumption: 3,000 units / day (raised for this scenario; the documented default is 1,200)
- Parts Replenishment Lead Time: 85 days (unchanged)
- Service Parts Safety Stock: 1.1 units (unchanged)
Working through the calculation
- Applying the documented formula (Service parts buffer cycle stock = service parts buffer daily usage × service parts buffer lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 32.09 days for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 35.29 days for unprotected days.
- At this operating point the engine returns 3,000 pieces for inventory.
- At this operating point the engine returns 85 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where daily service parts consumption sits at 1,200 units / day and the headline result is 12.83 days, this scenario comes in 150% above the baseline at 32.09 days.
- It computes the cycle stock needed to cover replenishment lead time plus safety stock, and translates on-hand inventory into protected days of supply. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Protected days of supply: 32.09 days (headline result)
- Unprotected days: 35.29 days
- Inventory: 3,000 pieces
- Daily usage: 85 pieces / day
Run it with your numbers
- Every input above is editable in the live Service Parts Buffer calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.