Vending, Kiosk & Self-Service Equipment worked example

Wiring Harness Labor at 12% setup, dressing, and continuity-test allowance: a worked example in vending, kiosk & self-service equipment

This scenario runs the wiring harness labor calculation on the strong side: 12% setup, dressing, and continuity-test allowance, with every other input held at its documented default. Use it when wiring harness labor in vending, kiosk and self-service equipment is changing rate or allowance and you want to see the impact.

The inputs for this scenario

  • Wiring harnesses to build: 120 units (unchanged)
  • Harness assembly rate per station: 12 units / min (unchanged)
  • Setup, dressing, and continuity-test allowance: 12 % (raised for this scenario; the documented default is 10)

Working through the calculation

  • Applying the documented formula (Base wiring harness labor time = wiring harness labor workload รท wiring harness labor completion rate) to the inputs above produces each figure below.
  • At this operating point the engine returns 11.2 hr for required wiring harness labor time, the number this scenario is built around.
  • At this operating point the engine returns 10 hr for base wiring harness labor time.
  • At this operating point the engine returns 12 % for wiring harness labor allowance applied.
  • At this operating point the engine returns 12 pieces / min for wiring harness labor completion rate.

How this compares with the baseline

  • Against the tool's baseline example, where setup, dressing, and continuity-test allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
  • Use it when quoting harness labor content, staffing the harness cell, or checking that harness build keeps pace with cabinet assembly. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Required wiring harness labor time: 11.2 hr (headline result)
  • Base wiring harness labor time: 10 hr
  • Wiring harness labor allowance applied: 12 %
  • Wiring harness labor completion rate: 12 pieces / min