Veterinary Device & Animal Health Products worked example

Rework Cost at 61% reworkable yield: a worked example in veterinary device & animal health products

Suppose reworkable yield falls to 61%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimates the cost to rework defective veterinary devices and animal health products back into saleable condition.

The inputs for this scenario

  • Devices Reworked: 500 units (held at the documented default)
  • Rework Labor & Materials Rate: 6.4 $/unit (held at the documented default)
  • Reworkable Yield: 61 % (the input this scenario stresses; the baseline uses 85)
  • Line Changeover & Re-Inspection: 850 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Total rework = devices reworked x rework rate x reworkable yield% + changeover/re-inspection.
  • Total rework cost works out to 2,802 $ at these inputs, and this is the headline figure for the scenario.
  • Rework cost per unit works out to 5.6 $ / piece at these inputs.
  • Variable rework cost works out to 1,952 $ at these inputs.
  • Fixed rework cost adder works out to 850 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where reworkable yield sits at 85% and the headline result is 3,570 $, this scenario comes in 21.51% below the baseline at 2,802 $.
  • It computes total rework cost as devices reworked times the rework rate times the reworkable yield percentage, plus fixed changeover and re-inspection cost, then divides by units for a per-device figure. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.

Results at a glance

  • Total rework cost: 2,802 $ (headline result)
  • Rework cost per unit: 5.6 $ / piece
  • Variable rework cost: 1,952 $
  • Fixed rework cost adder: 850 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Rework Cost calculator, set reworkable yield to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.