Veterinary Device & Animal Health Products worked example
Shelf-Life Buffer with average daily consumption of the vet product of 3,000 units / day: a worked example
Push average daily consumption of the vet product up to 3,000 units / day and the picture changes. This example computes every intermediate figure at that operating point. Use it when shelf-life buffer in veterinary device and animal health products is being sized for a buffer or safety stock review.
The inputs for this scenario
- Average daily consumption of the vet product: 3,000 units / day (raised for this scenario; the documented default is 1,200)
- Supplier replenishment lead time: 85 days (unchanged)
- Safety stock / expiry-risk buffer factor: 1.1 units (unchanged)
Working through the calculation
- Applying the documented formula (Shelf-life buffer cycle stock = shelf-life buffer daily usage × shelf-life buffer lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 32.09 days for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 35.29 days for unprotected days.
- At this operating point the engine returns 3,000 pieces for inventory.
- At this operating point the engine returns 85 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where average daily consumption of the vet product sits at 1,200 units / day and the headline result is 12.83 days, this scenario comes in 150% above the baseline at 32.09 days.
- It computes protected days of supply from cycle stock (daily usage times lead time) plus a safety-stock buffer, expressed against current usage. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Protected days of supply: 32.09 days (headline result)
- Unprotected days: 35.29 days
- Inventory: 3,000 pieces
- Daily usage: 85 pieces / day
Run it with your numbers
- Every input above is editable in the live Shelf-Life Buffer calculator, which recalculates instantly and can be shared with the inputs intact.