Waste-to-Energy Equipment worked example
Maintenance Downtime Cost at 57% generating capacity affected: a worked example
This scenario runs the maintenance downtime cost calculation on the strong side: 57% generating capacity affected, with every other input held at its documented default. Use it when scheduling a furnace or grate outage to balance lost generation and tipping revenue against the fixed cost of the maintenance turnaround.
The inputs for this scenario
- Forced Outage Hours: 120 hours (unchanged)
- Lost Generation Value Rate: 1,900 $/hr (unchanged)
- Generating Capacity Affected: 57 % (raised for this scenario; the documented default is 50)
- Turnaround Labor & Parts: 140,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total = outage hours x lost generation rate x (capacity affected รท 100) + turnaround cost) to the inputs above produces each figure below.
- At this operating point the engine returns 269,960 $ for total maintenance downtime cost, the number this scenario is built around.
- At this operating point the engine returns 2,250 $ / piece for maintenance downtime cost per unit.
- At this operating point the engine returns 129,960 $ for variable maintenance downtime cost.
- At this operating point the engine returns 140,000 $ for fixed maintenance downtime cost adder.
How this compares with the baseline
- Against the tool's baseline example, where generating capacity affected sits at 50% and the headline result is 254,000 $, this scenario comes in 6.28% above the baseline at 269,960 $.
- Use it when evaluating a planned versus forced outage, building a maintenance business case, or quantifying the cost of a specific historical trip. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total maintenance downtime cost: 269,960 $ (headline result)
- Maintenance downtime cost per unit: 2,250 $ / piece
- Variable maintenance downtime cost: 129,960 $
- Fixed maintenance downtime cost adder: 140,000 $
Run it with your numbers
- Every input above is editable in the live Maintenance Downtime Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.