Motor-Pump Alignment Time at 7.2% dial-indicator setup and shimming allowance: a worked example
Suppose dial-indicator setup and shimming allowance falls to 7.2%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimate motor-pump alignment time for water, wastewater and pump systems manufacturing using production-ready inputs so teams can plan labor hours, schedule the work, or check whether the job fits the available shift time.
The inputs for this scenario
- Pump-motor sets to align: 120 units (held at the documented default)
- Alignment sets completed per minute: 12 units / min (held at the documented default)
- Dial-indicator setup and shimming allowance: 7.2 % (the input this scenario stresses; the baseline uses 10)
Working through the calculation
- The calculation starts from the formula this tool documents: Base motor-pump alignment time = motor-pump alignment time workload รท motor-pump alignment time completion rate.
- Required motor-pump alignment time works out to 10.72 hr at these inputs, and this is the headline figure for the scenario.
- Base motor-pump alignment time works out to 10 hr at these inputs.
- Motor-pump alignment time allowance applied works out to 7.2 % at these inputs.
- Motor-pump alignment time completion rate works out to 12 pieces / min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where dial-indicator setup and shimming allowance sits at 10% and the headline result is 11 hr, this scenario comes in 2.55% below the baseline at 10.72 hr.
- It computes the total labor hours to align a batch of pump-motor sets from the set count, the alignment completion rate, and a setup/handling allowance. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Required motor-pump alignment time: 10.72 hr (headline result)
- Base motor-pump alignment time: 10 hr
- Motor-pump alignment time allowance applied: 7.2 %
- Motor-pump alignment time completion rate: 12 pieces / min