Wearable Medical Sensors worked example
Biocompatibility Cost at 86% variants requiring the full panel: a worked example
This scenario runs the biocompatibility cost calculation on the strong side: 86% variants requiring the full panel, with every other input held at its documented default. A program lead sizing ISO 10993 biological evaluation cost before locking adhesive and housing materials for a skin-worn sensor.
The inputs for this scenario
- Material-contact variants tested: 6 variants (unchanged)
- ISO 10993 test panel price: 4,200 $ / variant (unchanged)
- Variants requiring the full panel: 86 % (raised for this scenario; the documented default is 75)
- Biological evaluation plan fee: 5,500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total biocompatibility cost = variants x panel price x (% needing full panel) + BEP fee) to the inputs above produces each figure below.
- At this operating point the engine returns 27,172 $ for total biocompatibility cost, the number this scenario is built around.
- At this operating point the engine returns 4,529 $ / piece for biocompatibility cost per unit.
- At this operating point the engine returns 21,672 $ for variable biocompatibility cost.
- At this operating point the engine returns 5,500 $ for fixed biocompatibility cost adder.
How this compares with the baseline
- Against the tool's baseline example, where variants requiring the full panel sits at 75% and the headline result is 24,400 $, this scenario comes in 11.36% above the baseline at 27,172 $.
- Use it during design transfer or supplier changes to budget ISO 10993 testing before committing to a material set. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total biocompatibility cost: 27,172 $ (headline result)
- Biocompatibility cost per unit: 4,529 $ / piece
- Variable biocompatibility cost: 21,672 $
- Fixed biocompatibility cost adder: 5,500 $
Run it with your numbers
- Every input above is editable in the live Biocompatibility Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.