Wearable Medical Sensors worked example
Final Functional Test Load with functional test rig connected load of 6 kW: a worked example in wearable medical sensors
This worked example runs the final functional test load numbers for a tougher week than the baseline: functional test rig connected load of 6 kW instead of the typical 12 kW. Estimate final functional test load for wearable medical sensors using production-ready inputs so teams can budget energy cost, compare equipment settings, or include electricity in the quote.
The inputs for this scenario
- Functional test rig connected load: 6 kW (the input this scenario stresses; the baseline uses 12)
- Test rig runtime: 8 hr (held at the documented default)
- Blended electricity rate: 0.12 $ / kWh (held at the documented default)
- Sensors tested during runtime: 1,000 units (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Total final functional test load energy cost = final functional test load connected load × final functional test load runtime × blended electricity rate.
- Final functional test load energy used works out to 48 kWh at these inputs, and this is the headline figure for the scenario.
- Total final functional test load energy cost works out to 5.76 $ at these inputs.
- Energy cost per kWh works out to 0.01 $ / piece at these inputs.
- Hourly final functional test load energy cost works out to 0.72 $ / hr at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where functional test rig connected load sits at 12 kW and the headline result is 96 kWh, this scenario comes in 50% below the baseline at 48 kWh.
- Use it when allocating test-station energy into unit cost, or comparing the operating cost of a longer test sequence against a shorter one. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Final functional test load energy used: 48 kWh (headline result)
- Total final functional test load energy cost: 5.76 $
- Energy cost per kWh: 0.01 $ / piece
- Hourly final functional test load energy cost: 0.72 $ / hr
Run it with your numbers
- To rerun this with your own numbers, open the live Final Functional Test Load calculator, set functional test rig connected load to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.