Weighing, Dosing & Loss-in-Weight Feeding worked example
Feeder Rate at 99% target feed-rate compliance: a worked example in weighing, dosing & loss-in-weight feeding
Push target feed-rate compliance up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when feeder rate in weighing, dosing and loss-in-weight feeding needs a clean rate and gap-to-target you can put on a tier board.
The inputs for this scenario
- Off-target dose events: 8 count (unchanged)
- Total dose cycles sampled: 250 count (unchanged)
- Target feed-rate compliance: 99 % (raised for this scenario; the documented default is 95)
Working through the calculation
- Applying the documented formula (Feeder Rate rate = affected amount รท total amount) to the inputs above produces each figure below.
- At this operating point the engine returns 3.2 % for rate, the number this scenario is built around.
- At this operating point the engine returns 95.8 points for gap to target.
- At this operating point the engine returns 8 count for affected count.
- At this operating point the engine returns 250 count for total count.
How this compares with the baseline
- Against the tool's baseline example, where target feed-rate compliance sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
- It computes the fraction of feeder dose cycles flagged as off-target and the point gap between that fraction and your target compliance rate. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Rate: 3.2 % (headline result)
- Gap to target: 95.8 points
- Affected count: 8 count
- Total count: 250 count
Run it with your numbers
- Every input above is editable in the live Feeder Rate calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.