Weighing, Dosing & Loss-in-Weight Feeding worked example
Microingredient Usage with micro-ingredient feeder system investment of 62,500 $: a worked example
This scenario runs the microingredient usage calculation on the strong side: micro-ingredient feeder system investment of 62,500 $, with every other input held at its documented default. Use it when microingredient usage in weighing, dosing and loss-in-weight feeding is being put in front of a capital committee and the savings story needs to hold up.
The inputs for this scenario
- Micro-ingredient feeder system investment: 62,500 $ (raised for this scenario; the documented default is 25,000)
- Annual give-away savings from precise dosing: 18,000 $ / yr (unchanged)
- Annual calibration and support cost: 2,500 $ / yr (unchanged)
Working through the calculation
- Applying the documented formula (Net annual savings = annual savings - annual support) to the inputs above produces each figure below.
- At this operating point the engine returns 4.03 yr for payback period, the number this scenario is built around.
- At this operating point the engine returns 15,500 $ / yr for net annual savings.
- At this operating point the engine returns 62,500 $ for investment.
- At this operating point the engine returns 15,000 $ for five year net.
How this compares with the baseline
- Against the tool's baseline example, where micro-ingredient feeder system investment sits at 25,000 $ and the headline result is 1.61 yr, this scenario comes in 150% above the baseline at 4.03 yr.
- Use it when justifying capital for a gravimetric feeder, a refill upgrade, or a dosing-control retrofit on costly micro-ingredients. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Payback period: 4.03 yr (headline result)
- Net annual savings: 15,500 $ / yr
- Investment: 62,500 $
- Five year net: 15,000 $
Run it with your numbers
- Every input above is editable in the live Microingredient Usage calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.