Wire, Cable & Conductor Manufacturing worked example

Cooling Trough Dwell at 7.2% dwell allowance for splices and speed ramps: a worked example

This worked example runs the cooling trough dwell numbers for a tougher week than the baseline: 7.2% dwell allowance for splices and speed ramps instead of the typical 10%. Cooling trough dwell is the time a freshly extruded conductor or insulated core spends submerged in the water trough before it is dry enough to spark-test, print and take up.

The inputs for this scenario

  • Conductor length to cool through the trough: 120 units (held at the documented default)
  • Line speed through cooling trough: 12 units / hr (held at the documented default)
  • Dwell allowance for splices and speed ramps: 7.2 % (the input this scenario stresses; the baseline uses 10)

Working through the calculation

  • The calculation starts from the formula this tool documents: Base cooling trough dwell time = required work รท processing rate.
  • Adjusted run time works out to 10.72 hr at these inputs, and this is the headline figure for the scenario.
  • Base run time works out to 10 hr at these inputs.
  • Allowance applied works out to 7.2 % at these inputs.
  • Process rate works out to 12 pieces / min at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where dwell allowance for splices and speed ramps sits at 10% and the headline result is 11 hr, this scenario comes in 2.55% below the baseline at 10.72 hr.
  • Use it when planning a run on a specific extrusion line, sizing or re-sequencing cooling troughs, or estimating how many hours a job will tie up the line. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Adjusted run time: 10.72 hr (headline result)
  • Base run time: 10 hr
  • Allowance applied: 7.2 %
  • Process rate: 12 pieces / min