Wire, Cable & Conductor Manufacturing worked example
Finished Cable Cost at 92% yield-adjusted cost capture: a worked example
This scenario runs the finished cable cost calculation on the strong side: 92% yield-adjusted cost capture, with every other input held at its documented default. Use it when finished cable cost in wire, cable and conductor manufacturing is being put through a wire, cable and conductor manufacturing weighted-cost review.
The inputs for this scenario
- Cable produced in run (length or reels): 100 units (unchanged)
- Variable cost per unit of cable: 45 $ / unit (unchanged)
- Yield-adjusted cost capture (usable output): 92 % (raised for this scenario; the documented default is 80)
- Fixed setup and tooling charge: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Finished Cable Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where yield-adjusted cost capture sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it when quoting a cable order or reconciling actual run cost, once you know run length, blended per-unit cost, expected usable yield, and setup charges. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Finished Cable Cost calculator, which recalculates instantly and can be shared with the inputs intact.