Wire Drawing & Rod Processing worked example

Rod-To-Wire Yield at 68% target scrap-loss allowance: a worked example

Suppose target scrap-loss allowance falls to 68%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Rod-To-Wire Yield tracks how much of the rod you charge into a drawing line survives as finished wire versus what is lost to cobbles, welds, tag ends, scale and out-of-tolerance footage.

The inputs for this scenario

  • Scrap and cobble weight lost: 8 units (held at the documented default)
  • Rod charged into the line: 250 units (held at the documented default)
  • Target scrap-loss allowance: 68 % (the input this scenario stresses; the baseline uses 95)

Working through the calculation

  • The calculation starts from the formula this tool documents: Rod-To-Wire Yield rate = affected amount รท total amount.
  • Rate works out to 3.2 % at these inputs, and this is the headline figure for the scenario.
  • Gap to target works out to 64.8 points at these inputs.
  • Affected count works out to 8 count at these inputs.
  • Total count works out to 250 count at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where target scrap-loss allowance sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
  • Computes scrap loss as a percent of rod charged and the gap between that loss and your target allowance in percentage points. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.

Results at a glance

  • Rate: 3.2 % (headline result)
  • Gap to target: 64.8 points
  • Affected count: 8 count
  • Total count: 250 count

Run it with your numbers

  • To rerun this with your own numbers, open the live Rod-To-Wire Yield calculator, set target scrap-loss allowance to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.