WMS, Warehouse Labor & Fulfillment worked example
Pallet Storage Cost at 99% average slot occupancy: a worked example
What does the result look like when average slot occupancy reaches 99%? The full calculation is worked below with real intermediate numbers. A warehouse manager uses it to compare in-house racking cost against a public-warehouse storage quote.
The inputs for this scenario
- Pallet positions billed (pallet-months): 800 pallet-months (unchanged)
- Storage rate per pallet position: 18 $/pallet-month (unchanged)
- Average slot occupancy: 99 % (raised for this scenario; the documented default is 90)
- Inbound and handling charge: 1,200 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total storage = pallet-months x rate per position x occupancy % + handling charge) to the inputs above produces each figure below.
- At this operating point the engine returns 15,456 $ for total pallet storage cost, the number this scenario is built around.
- At this operating point the engine returns 19.32 $ / piece for pallet storage cost per unit.
- At this operating point the engine returns 14,256 $ for variable pallet storage cost.
- At this operating point the engine returns 1,200 $ for fixed pallet storage cost adder.
How this compares with the baseline
- Against the tool's baseline example, where average slot occupancy sits at 90% and the headline result is 14,160 $, this scenario comes in 9.15% above the baseline at 15,456 $.
- A figure at this level is achievable when average slot occupancy is genuinely sustained, not just peaked for a shift. It assumes a flat rate per position; tiered or seasonal pricing, minimum-charge floors, and accessorial fees aren't captured and must be added separately.
Results at a glance
- Total pallet storage cost: 15,456 $ (headline result)
- Pallet storage cost per unit: 19.32 $ / piece
- Variable pallet storage cost: 14,256 $
- Fixed pallet storage cost adder: 1,200 $
Run it with your numbers
- Every input above is editable in the live Pallet Storage Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.