Wood & Paper Manufacturing worked example
Trim Optimization Savings at 86% achievable trim capture rate: a worked example
What does the result look like when achievable trim capture rate reaches 86%? The full calculation is worked below with real intermediate numbers. A planning manager uses it to value a trim optimizer against the license and integration cost.
The inputs for this scenario
- Rolls Trimmed per Week: 480 rolls (unchanged)
- Savings per Roll from Trim Optimization: 3.1 $/roll (unchanged)
- Achievable Trim Capture Rate: 86 % (raised for this scenario; the documented default is 75)
- Weekly Software License Charge: 600 $ (unchanged)
Working through the calculation
- Applying the documented formula (Trim savings = rolls x savings per roll x capture rate% + software license charge) to the inputs above produces each figure below.
- At this operating point the engine returns 1,880 $ for total trim optimization savings cost, the number this scenario is built around.
- At this operating point the engine returns 3.92 $ / piece for trim optimization savings cost per unit.
- At this operating point the engine returns 1,280 $ for variable trim optimization savings cost.
- At this operating point the engine returns 600 $ for fixed trim optimization savings adder.
How this compares with the baseline
- Against the tool's baseline example, where achievable trim capture rate sits at 75% and the headline result is 1,716 $, this scenario comes in 9.54% above the baseline at 1,880 $.
- A figure at this level is achievable when achievable trim capture rate is genuinely sustained, not just peaked for a shift. Savings per roll and capture rate are estimates; actual recovery depends on order mix, roll width variability, and how tightly schedulers pack cut plans, so validate against real scale-house tonnage.
Results at a glance
- Total trim optimization savings cost: 1,880 $ (headline result)
- Trim optimization savings cost per unit: 3.92 $ / piece
- Variable trim optimization savings cost: 1,280 $
- Fixed trim optimization savings adder: 600 $
Run it with your numbers
- Every input above is editable in the live Trim Optimization Savings calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.