Workforce, Labor Standards & Skills Planning worked example

Crew Size Calculator at 99% expected uptime: a worked example

Push expected uptime up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when crew size in workforce, labor standards and skills planning is being asked to take on more work and you need to know if there is room.

The inputs for this scenario

  • Parts produced per cycle by the crew: 4 units / cycle (unchanged)
  • Available production cycles in the window: 480 cycles (unchanged)
  • Expected uptime (availability): 99 % (raised for this scenario; the documented default is 90)
  • Expected first-pass yield: 97 % (unchanged)

Working through the calculation

  • Applying the documented formula (Gross crew size capacity = crew size output per cycle × available crew size cycles) to the inputs above produces each figure below.
  • At this operating point the engine returns 1,844 units for good crew size capacity, the number this scenario is built around.
  • At this operating point the engine returns 1,920 units for gross crew size capacity.
  • At this operating point the engine returns 19.2 units for crew size downtime loss.
  • At this operating point the engine returns 57.02 units for crew size yield loss.

How this compares with the baseline

  • Against the tool's baseline example, where expected uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
  • It computes gross crew capacity from output per cycle and available cycles, then multiplies by uptime and first-pass yield to give good (sellable) capacity. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Good crew size capacity: 1,844 units (headline result)
  • Gross crew size capacity: 1,920 units
  • Crew size downtime loss: 19.2 units
  • Crew size yield loss: 57.02 units

Run it with your numbers

  • Every input above is editable in the live Crew Size Calculator calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.