Workforce, Labor Standards & Skills Planning worked example

Skills Gap Score with severity if the skill gap causes a failure of 15 score: a worked example

This scenario runs the skills gap score calculation on the strong side: severity if the skill gap causes a failure of 15 score, with every other input held at its documented default. Use it when skills gap in workforce, labor standards and skills planning needs a defensible ranking against other workforce, labor standards and skills planning risks for the next review.

The inputs for this scenario

  • Severity if the skill gap causes a failure: 15 score (raised for this scenario; the documented default is 6)
  • Likelihood the skill gap occurs: 4 score (unchanged)
  • Detectability of the skill gap before impact: 3 score (unchanged)

Working through the calculation

  • Applying the documented formula (Skills gap risk score = skills gap severity score × skills gap occurrence score × skills gap detection score) to the inputs above produces each figure below.
  • At this operating point the engine returns 8.15 score for skills gap risk score, the number this scenario is built around.
  • At this operating point the engine returns 15 score for skills gap severity score.
  • At this operating point the engine returns 4 score for skills gap occurrence score.
  • At this operating point the engine returns 3 score for skills gap detection score.

How this compares with the baseline

  • Against the tool's baseline example, where severity if the skill gap causes a failure sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
  • Use it to triage and rank competency gaps across a crew when you can't train everyone at once. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Skills gap risk score: 8.15 score (headline result)
  • Skills gap severity score: 15 score
  • Skills gap occurrence score: 4 score
  • Skills gap detection score: 3 score

Run it with your numbers

  • Every input above is editable in the live Skills Gap Score calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.