{
  "version": "1.0.0",
  "baseMonth": "1990-01",
  "asOf": "2026-07",
  "inputIndex": 291.13,
  "outputIndex": 230.66,
  "inputYoyPct": 20,
  "outputYoyPct": 2.4,
  "bestLagMonths": 6,
  "passThroughCoeff": 0.207,
  "correlation": 0.712,
  "impliedOutputYoyPct": 4.8,
  "passThroughGapPp": 2.4,
  "lags": [
    {
      "lagMonths": 0,
      "correlation": 0.376,
      "slope": 0.108,
      "obs": 427
    },
    {
      "lagMonths": 1,
      "correlation": 0.459,
      "slope": 0.132,
      "obs": 426
    },
    {
      "lagMonths": 2,
      "correlation": 0.536,
      "slope": 0.155,
      "obs": 425
    },
    {
      "lagMonths": 3,
      "correlation": 0.601,
      "slope": 0.174,
      "obs": 424
    },
    {
      "lagMonths": 4,
      "correlation": 0.652,
      "slope": 0.189,
      "obs": 423
    },
    {
      "lagMonths": 5,
      "correlation": 0.688,
      "slope": 0.2,
      "obs": 422
    },
    {
      "lagMonths": 6,
      "correlation": 0.712,
      "slope": 0.207,
      "obs": 421
    }
  ],
  "inputHistory": [
    [
      "1990-01",
      100
    ],
    [
      "1990-02",
      99.22
    ],
    [
      "1990-03",
      99.86
    ],
    [
      "1990-04",
      100.73
    ],
    [
      "1990-05",
      100.69
    ],
    [
      "1990-06",
      100.13
    ],
    [
      "1990-07",
      100.42
    ],
    [
      "1990-08",
      101.12
    ],
    [
      "1990-09",
      101.81
    ],
    [
      "1990-10",
      102.63
    ],
    [
      "1990-11",
      102.09
    ],
    [
      "1990-12",
      100.99
    ],
    [
      "1991-01",
      100.57
    ],
    [
      "1991-02",
      99.65
    ],
    [
      "1991-03",
      98.65
    ],
    [
      "1991-04",
      98.07
    ],
    [
      "1991-05",
      97.36
    ],
    [
      "1991-06",
      96.87
    ],
    [
      "1991-07",
      96.24
    ],
    [
      "1991-08",
      95.15
    ],
    [
      "1991-09",
      95.23
    ],
    [
      "1991-10",
      95.23
    ],
    [
      "1991-11",
      95.15
    ],
    [
      "1991-12",
      95
    ],
    [
      "1992-01",
      94.4
    ],
    [
      "1992-02",
      95.72
    ],
    [
      "1992-03",
      96.33
    ],
    [
      "1992-04",
      96.49
    ],
    [
      "1992-05",
      96.6
    ],
    [
      "1992-06",
      96.71
    ],
    [
      "1992-07",
      97.03
    ],
    [
      "1992-08",
      97.33
    ],
    [
      "1992-09",
      97.27
    ],
    [
      "1992-10",
      96.47
    ],
    [
      "1992-11",
      96.08
    ],
    [
      "1992-12",
      96.55
    ],
    [
      "1993-01",
      97.47
    ],
    [
      "1993-02",
      98.92
    ],
    [
      "1993-03",
      99.73
    ],
    [
      "1993-04",
      99.65
    ],
    [
      "1993-05",
      98.39
    ],
    [
      "1993-06",
      98.02
    ],
    [
      "1993-07",
      97.99
    ],
    [
      "1993-08",
      98.53
    ],
    [
      "1993-09",
      98.62
    ],
    [
      "1993-10",
      98.42
    ],
    [
      "1993-11",
      98.57
    ],
    [
      "1993-12",
      99.1
    ],
    [
      "1994-01",
      99.55
    ],
    [
      "1994-02",
      99.96
    ],
    [
      "1994-03",
      100.72
    ],
    [
      "1994-04",
      100.53
    ],
    [
      "1994-05",
      101.04
    ],
    [
      "1994-06",
      102.58
    ],
    [
      "1994-07",
      103.41
    ],
    [
      "1994-08",
      104.75
    ],
    [
      "1994-09",
      106.67
    ],
    [
      "1994-10",
      108.38
    ],
    [
      "1994-11",
      110.65
    ],
    [
      "1994-12",
      112.55
    ],
    [
      "1995-01",
      116.17
    ],
    [
      "1995-02",
      117.84
    ],
    [
      "1995-03",
      118.69
    ],
    [
      "1995-04",
      119.39
    ],
    [
      "1995-05",
      118.98
    ],
    [
      "1995-06",
      118.63
    ],
    [
      "1995-07",
      119.2
    ],
    [
      "1995-08",
      118.93
    ],
    [
      "1995-09",
      118.59
    ],
    [
      "1995-10",
      116.95
    ],
    [
      "1995-11",
      115.36
    ],
    [
      "1995-12",
      114.54
    ],
    [
      "1996-01",
      113.43
    ],
    [
      "1996-02",
      112.11
    ],
    [
      "1996-03",
      112.03
    ],
    [
      "1996-04",
      111.86
    ],
    [
      "1996-05",
      113.12
    ],
    [
      "1996-06",
      113.6
    ],
    [
      "1996-07",
      111.27
    ],
    [
      "1996-08",
      110.88
    ],
    [
      "1996-09",
      111.43
    ],
    [
      "1996-10",
      110.23
    ],
    [
      "1996-11",
      110.76
    ],
    [
      "1996-12",
      111.5
    ],
    [
      "1997-01",
      112.24
    ],
    [
      "1997-02",
      113.1
    ],
    [
      "1997-03",
      113.74
    ],
    [
      "1997-04",
      113.84
    ],
    [
      "1997-05",
      114.15
    ],
    [
      "1997-06",
      114.23
    ],
    [
      "1997-07",
      113.9
    ],
    [
      "1997-08",
      113.85
    ],
    [
      "1997-09",
      113.35
    ],
    [
      "1997-10",
      112.42
    ],
    [
      "1997-11",
      112.13
    ],
    [
      "1997-12",
      111.6
    ],
    [
      "1998-01",
      110.73
    ],
    [
      "1998-02",
      110.39
    ],
    [
      "1998-03",
      109.58
    ],
    [
      "1998-04",
      109.52
    ],
    [
      "1998-05",
      108.33
    ],
    [
      "1998-06",
      106.84
    ],
    [
      "1998-07",
      106.27
    ],
    [
      "1998-08",
      105.78
    ],
    [
      "1998-09",
      104.45
    ],
    [
      "1998-10",
      103.28
    ],
    [
      "1998-11",
      102.26
    ],
    [
      "1998-12",
      101.4
    ],
    [
      "1999-01",
      101.01
    ],
    [
      "1999-02",
      100.62
    ],
    [
      "1999-03",
      100.61
    ],
    [
      "1999-04",
      100.8
    ],
    [
      "1999-05",
      102.39
    ],
    [
      "1999-06",
      102.84
    ],
    [
      "1999-07",
      104.71
    ],
    [
      "1999-08",
      104.92
    ],
    [
      "1999-09",
      105.61
    ],
    [
      "1999-10",
      106.29
    ],
    [
      "1999-11",
      106.88
    ],
    [
      "1999-12",
      107.57
    ],
    [
      "2000-01",
      108.63
    ],
    [
      "2000-02",
      109.59
    ],
    [
      "2000-03",
      110.09
    ],
    [
      "2000-04",
      110.52
    ],
    [
      "2000-05",
      110.33
    ],
    [
      "2000-06",
      110.22
    ],
    [
      "2000-07",
      110.43
    ],
    [
      "2000-08",
      109.95
    ],
    [
      "2000-09",
      109.9
    ],
    [
      "2000-10",
      109.41
    ],
    [
      "2000-11",
      107.84
    ],
    [
      "2000-12",
      107.99
    ],
    [
      "2001-01",
      107.65
    ],
    [
      "2001-02",
      107.9
    ],
    [
      "2001-03",
      108.03
    ],
    [
      "2001-04",
      107.21
    ],
    [
      "2001-05",
      107.97
    ],
    [
      "2001-06",
      107.4
    ],
    [
      "2001-07",
      105.72
    ],
    [
      "2001-08",
      104.28
    ],
    [
      "2001-09",
      103.69
    ],
    [
      "2001-10",
      102.34
    ],
    [
      "2001-11",
      101.42
    ],
    [
      "2001-12",
      100.8
    ],
    [
      "2002-01",
      100.99
    ],
    [
      "2002-02",
      101.17
    ],
    [
      "2002-03",
      102.62
    ],
    [
      "2002-04",
      103.16
    ],
    [
      "2002-05",
      103.67
    ],
    [
      "2002-06",
      104.35
    ],
    [
      "2002-07",
      105.32
    ],
    [
      "2002-08",
      105.26
    ],
    [
      "2002-09",
      105.71
    ],
    [
      "2002-10",
      106.1
    ],
    [
      "2002-11",
      106.54
    ],
    [
      "2002-12",
      106.32
    ],
    [
      "2003-01",
      107.01
    ],
    [
      "2003-02",
      109.1
    ],
    [
      "2003-03",
      109.94
    ],
    [
      "2003-04",
      109
    ],
    [
      "2003-05",
      109.09
    ],
    [
      "2003-06",
      108.86
    ],
    [
      "2003-07",
      108.62
    ],
    [
      "2003-08",
      109.04
    ],
    [
      "2003-09",
      109.86
    ],
    [
      "2003-10",
      110.66
    ],
    [
      "2003-11",
      111.43
    ],
    [
      "2003-12",
      112.75
    ],
    [
      "2004-01",
      115.6
    ],
    [
      "2004-02",
      119.89
    ],
    [
      "2004-03",
      122.73
    ],
    [
      "2004-04",
      126.01
    ],
    [
      "2004-05",
      127.77
    ],
    [
      "2004-06",
      127.99
    ],
    [
      "2004-07",
      130.6
    ],
    [
      "2004-08",
      134.04
    ],
    [
      "2004-09",
      135.97
    ],
    [
      "2004-10",
      137.75
    ],
    [
      "2004-11",
      138.23
    ],
    [
      "2004-12",
      139.33
    ],
    [
      "2005-01",
      140.94
    ],
    [
      "2005-02",
      142.4
    ],
    [
      "2005-03",
      143.28
    ],
    [
      "2005-04",
      143.02
    ],
    [
      "2005-05",
      140.38
    ],
    [
      "2005-06",
      139.04
    ],
    [
      "2005-07",
      138.67
    ],
    [
      "2005-08",
      138.47
    ],
    [
      "2005-09",
      142.29
    ],
    [
      "2005-10",
      146.24
    ],
    [
      "2005-11",
      148.01
    ],
    [
      "2005-12",
      149.52
    ],
    [
      "2006-01",
      152.03
    ],
    [
      "2006-02",
      153.43
    ],
    [
      "2006-03",
      153.74
    ],
    [
      "2006-04",
      157.39
    ],
    [
      "2006-05",
      162.83
    ],
    [
      "2006-06",
      163
    ],
    [
      "2006-07",
      164.72
    ],
    [
      "2006-08",
      164.52
    ],
    [
      "2006-09",
      164.22
    ],
    [
      "2006-10",
      163.41
    ],
    [
      "2006-11",
      160.87
    ],
    [
      "2006-12",
      160.47
    ],
    [
      "2007-01",
      160.01
    ],
    [
      "2007-02",
      160.6
    ],
    [
      "2007-03",
      163.48
    ],
    [
      "2007-04",
      168.32
    ],
    [
      "2007-05",
      169.39
    ],
    [
      "2007-06",
      169.55
    ],
    [
      "2007-07",
      170.42
    ],
    [
      "2007-08",
      167.01
    ],
    [
      "2007-09",
      165.93
    ],
    [
      "2007-10",
      166.49
    ],
    [
      "2007-11",
      167.29
    ],
    [
      "2007-12",
      166.75
    ],
    [
      "2008-01",
      169.03
    ],
    [
      "2008-02",
      172.54
    ],
    [
      "2008-03",
      178.13
    ],
    [
      "2008-04",
      184.02
    ],
    [
      "2008-05",
      190
    ],
    [
      "2008-06",
      193.02
    ],
    [
      "2008-07",
      197.79
    ],
    [
      "2008-08",
      196.66
    ],
    [
      "2008-09",
      191.45
    ],
    [
      "2008-10",
      177.24
    ],
    [
      "2008-11",
      163.22
    ],
    [
      "2008-12",
      153.35
    ],
    [
      "2009-01",
      149.38
    ],
    [
      "2009-02",
      145.79
    ],
    [
      "2009-03",
      143.49
    ],
    [
      "2009-04",
      140.6
    ],
    [
      "2009-05",
      141.01
    ],
    [
      "2009-06",
      142.49
    ],
    [
      "2009-07",
      145.51
    ],
    [
      "2009-08",
      150.43
    ],
    [
      "2009-09",
      154.33
    ],
    [
      "2009-10",
      154.79
    ],
    [
      "2009-11",
      155.39
    ],
    [
      "2009-12",
      158.53
    ],
    [
      "2010-01",
      161.34
    ],
    [
      "2010-02",
      163.43
    ],
    [
      "2010-03",
      166.83
    ],
    [
      "2010-04",
      173.36
    ],
    [
      "2010-05",
      171.65
    ],
    [
      "2010-06",
      167.21
    ],
    [
      "2010-07",
      165.21
    ],
    [
      "2010-08",
      166.4
    ],
    [
      "2010-09",
      168.16
    ],
    [
      "2010-10",
      171.23
    ],
    [
      "2010-11",
      173.04
    ],
    [
      "2010-12",
      174.77
    ],
    [
      "2011-01",
      179.78
    ],
    [
      "2011-02",
      184.65
    ],
    [
      "2011-03",
      186.35
    ],
    [
      "2011-04",
      190.05
    ],
    [
      "2011-05",
      190.6
    ],
    [
      "2011-06",
      189.83
    ],
    [
      "2011-07",
      190.64
    ],
    [
      "2011-08",
      189.37
    ],
    [
      "2011-09",
      187.98
    ],
    [
      "2011-10",
      183.11
    ],
    [
      "2011-11",
      181.37
    ],
    [
      "2011-12",
      179.56
    ],
    [
      "2012-01",
      181.34
    ],
    [
      "2012-02",
      183.76
    ],
    [
      "2012-03",
      185.52
    ],
    [
      "2012-04",
      184.6
    ],
    [
      "2012-05",
      183.18
    ],
    [
      "2012-06",
      178.57
    ],
    [
      "2012-07",
      176.01
    ],
    [
      "2012-08",
      176.15
    ],
    [
      "2012-09",
      178.5
    ],
    [
      "2012-10",
      177.87
    ],
    [
      "2012-11",
      177.66
    ],
    [
      "2012-12",
      178.88
    ],
    [
      "2013-01",
      180.75
    ],
    [
      "2013-02",
      182.15
    ],
    [
      "2013-03",
      182.01
    ],
    [
      "2013-04",
      180.08
    ],
    [
      "2013-05",
      177.45
    ],
    [
      "2013-06",
      176.3
    ],
    [
      "2013-07",
      175.43
    ],
    [
      "2013-08",
      176.74
    ],
    [
      "2013-09",
      176.66
    ],
    [
      "2013-10",
      177.11
    ],
    [
      "2013-11",
      177.57
    ],
    [
      "2013-12",
      178.28
    ],
    [
      "2014-01",
      179.63
    ],
    [
      "2014-02",
      180.77
    ],
    [
      "2014-03",
      180.17
    ],
    [
      "2014-04",
      180.79
    ],
    [
      "2014-05",
      180.82
    ],
    [
      "2014-06",
      180.83
    ],
    [
      "2014-07",
      182.27
    ],
    [
      "2014-08",
      183.22
    ],
    [
      "2014-09",
      183.43
    ],
    [
      "2014-10",
      180.95
    ],
    [
      "2014-11",
      179.11
    ],
    [
      "2014-12",
      176.9
    ],
    [
      "2015-01",
      172.73
    ],
    [
      "2015-02",
      169.62
    ],
    [
      "2015-03",
      167.31
    ],
    [
      "2015-04",
      165.85
    ],
    [
      "2015-05",
      165.57
    ],
    [
      "2015-06",
      164.79
    ],
    [
      "2015-07",
      163.17
    ],
    [
      "2015-08",
      160.17
    ],
    [
      "2015-09",
      157.76
    ],
    [
      "2015-10",
      156.21
    ],
    [
      "2015-11",
      153.65
    ],
    [
      "2015-12",
      151.7
    ],
    [
      "2016-01",
      150.66
    ],
    [
      "2016-02",
      150.89
    ],
    [
      "2016-03",
      152.36
    ],
    [
      "2016-04",
      154.33
    ],
    [
      "2016-05",
      156.76
    ],
    [
      "2016-06",
      157.65
    ],
    [
      "2016-07",
      158.67
    ],
    [
      "2016-08",
      159.58
    ],
    [
      "2016-09",
      158.95
    ],
    [
      "2016-10",
      159.23
    ],
    [
      "2016-11",
      160.87
    ],
    [
      "2016-12",
      161.95
    ],
    [
      "2017-01",
      163.44
    ],
    [
      "2017-02",
      167.2
    ],
    [
      "2017-03",
      169.28
    ],
    [
      "2017-04",
      170.68
    ],
    [
      "2017-05",
      170.66
    ],
    [
      "2017-06",
      170.19
    ],
    [
      "2017-07",
      170.29
    ],
    [
      "2017-08",
      171.93
    ],
    [
      "2017-09",
      173.76
    ],
    [
      "2017-10",
      174.58
    ],
    [
      "2017-11",
      175.07
    ],
    [
      "2017-12",
      174.98
    ],
    [
      "2018-01",
      177.06
    ],
    [
      "2018-02",
      179.9
    ],
    [
      "2018-03",
      181.99
    ],
    [
      "2018-04",
      183.25
    ],
    [
      "2018-05",
      187.04
    ],
    [
      "2018-06",
      189.43
    ],
    [
      "2018-07",
      188.09
    ],
    [
      "2018-08",
      187.06
    ],
    [
      "2018-09",
      186.96
    ],
    [
      "2018-10",
      185.69
    ],
    [
      "2018-11",
      183.92
    ],
    [
      "2018-12",
      182.03
    ],
    [
      "2019-01",
      180.11
    ],
    [
      "2019-02",
      179.81
    ],
    [
      "2019-03",
      179.81
    ],
    [
      "2019-04",
      178.9
    ],
    [
      "2019-05",
      177.17
    ],
    [
      "2019-06",
      174.6
    ],
    [
      "2019-07",
      173.7
    ],
    [
      "2019-08",
      172.78
    ],
    [
      "2019-09",
      172.11
    ],
    [
      "2019-10",
      171.52
    ],
    [
      "2019-11",
      170.48
    ],
    [
      "2019-12",
      169.9
    ],
    [
      "2020-01",
      170.54
    ],
    [
      "2020-02",
      169.63
    ],
    [
      "2020-03",
      169.56
    ],
    [
      "2020-04",
      161.93
    ],
    [
      "2020-05",
      160
    ],
    [
      "2020-06",
      163.22
    ],
    [
      "2020-07",
      166.74
    ],
    [
      "2020-08",
      171.07
    ],
    [
      "2020-09",
      176.7
    ],
    [
      "2020-10",
      177.2
    ],
    [
      "2020-11",
      175.9
    ],
    [
      "2020-12",
      184.82
    ],
    [
      "2021-01",
      193.94
    ],
    [
      "2021-02",
      202.06
    ],
    [
      "2021-03",
      216.19
    ],
    [
      "2021-04",
      230.21
    ],
    [
      "2021-05",
      244.28
    ],
    [
      "2021-06",
      249.85
    ],
    [
      "2021-07",
      248.83
    ],
    [
      "2021-08",
      249.59
    ],
    [
      "2021-09",
      252.18
    ],
    [
      "2021-10",
      258.85
    ],
    [
      "2021-11",
      262.35
    ],
    [
      "2021-12",
      264.74
    ],
    [
      "2022-01",
      270.68
    ],
    [
      "2022-02",
      270.18
    ],
    [
      "2022-03",
      273.06
    ],
    [
      "2022-04",
      273.1
    ],
    [
      "2022-05",
      276.5
    ],
    [
      "2022-06",
      266.99
    ],
    [
      "2022-07",
      258.97
    ],
    [
      "2022-08",
      251.9
    ],
    [
      "2022-09",
      243.69
    ],
    [
      "2022-10",
      236.6
    ],
    [
      "2022-11",
      234.16
    ],
    [
      "2022-12",
      231.42
    ],
    [
      "2023-01",
      231.91
    ],
    [
      "2023-02",
      235.63
    ],
    [
      "2023-03",
      234.15
    ],
    [
      "2023-04",
      236.21
    ],
    [
      "2023-05",
      238.2
    ],
    [
      "2023-06",
      235.61
    ],
    [
      "2023-07",
      232.91
    ],
    [
      "2023-08",
      228.22
    ],
    [
      "2023-09",
      227.39
    ],
    [
      "2023-10",
      224.51
    ],
    [
      "2023-11",
      222.41
    ],
    [
      "2023-12",
      223.44
    ],
    [
      "2024-01",
      225.18
    ],
    [
      "2024-02",
      228.83
    ],
    [
      "2024-03",
      225.03
    ],
    [
      "2024-04",
      226.52
    ],
    [
      "2024-05",
      228.52
    ],
    [
      "2024-06",
      228.24
    ],
    [
      "2024-07",
      227.16
    ],
    [
      "2024-08",
      224.92
    ],
    [
      "2024-09",
      224.44
    ],
    [
      "2024-10",
      226.57
    ],
    [
      "2024-11",
      227.26
    ],
    [
      "2024-12",
      225.39
    ],
    [
      "2025-01",
      225.47
    ],
    [
      "2025-02",
      230.37
    ],
    [
      "2025-03",
      237.42
    ],
    [
      "2025-04",
      238.45
    ],
    [
      "2025-05",
      241.28
    ],
    [
      "2025-06",
      239.74
    ],
    [
      "2025-07",
      242.55
    ],
    [
      "2025-08",
      244.78
    ],
    [
      "2025-09",
      244.7
    ],
    [
      "2025-10",
      246.28
    ],
    [
      "2025-11",
      246.37
    ],
    [
      "2025-12",
      255.05
    ],
    [
      "2026-01",
      258.44
    ],
    [
      "2026-02",
      264.81
    ],
    [
      "2026-03",
      269.32
    ],
    [
      "2026-04",
      279.9
    ],
    [
      "2026-05",
      291.79
    ],
    [
      "2026-06",
      293.8
    ],
    [
      "2026-07",
      291.13
    ]
  ],
  "outputHistory": [
    [
      "1990-01",
      100
    ],
    [
      "1990-02",
      100.29
    ],
    [
      "1990-03",
      100.63
    ],
    [
      "1990-04",
      100.8
    ],
    [
      "1990-05",
      100.97
    ],
    [
      "1990-06",
      100.91
    ],
    [
      "1990-07",
      101.06
    ],
    [
      "1990-08",
      101.46
    ],
    [
      "1990-09",
      101.6
    ],
    [
      "1990-10",
      101.48
    ],
    [
      "1990-11",
      101.65
    ],
    [
      "1990-12",
      101.85
    ],
    [
      "1991-01",
      102.22
    ],
    [
      "1991-02",
      102.39
    ],
    [
      "1991-03",
      102.56
    ],
    [
      "1991-04",
      102.65
    ],
    [
      "1991-05",
      102.56
    ],
    [
      "1991-06",
      103.14
    ],
    [
      "1991-07",
      103.23
    ],
    [
      "1991-08",
      103.08
    ],
    [
      "1991-09",
      103.14
    ],
    [
      "1991-10",
      103.14
    ],
    [
      "1991-11",
      103.03
    ],
    [
      "1991-12",
      103.08
    ],
    [
      "1992-01",
      103.25
    ],
    [
      "1992-02",
      103.28
    ],
    [
      "1992-03",
      103.43
    ],
    [
      "1992-04",
      103.37
    ],
    [
      "1992-05",
      103.43
    ],
    [
      "1992-06",
      103.34
    ],
    [
      "1992-07",
      103.43
    ],
    [
      "1992-08",
      103.25
    ],
    [
      "1992-09",
      103.23
    ],
    [
      "1992-10",
      103.37
    ],
    [
      "1992-11",
      103.45
    ],
    [
      "1992-12",
      103.57
    ],
    [
      "1993-01",
      103.8
    ],
    [
      "1993-02",
      103.91
    ],
    [
      "1993-03",
      103.97
    ],
    [
      "1993-04",
      104.06
    ],
    [
      "1993-05",
      104.09
    ],
    [
      "1993-06",
      104.26
    ],
    [
      "1993-07",
      104.32
    ],
    [
      "1993-08",
      104.29
    ],
    [
      "1993-09",
      104.46
    ],
    [
      "1993-10",
      104.4
    ],
    [
      "1993-11",
      104.43
    ],
    [
      "1993-12",
      104.49
    ],
    [
      "1994-01",
      104.8
    ],
    [
      "1994-02",
      104.94
    ],
    [
      "1994-03",
      105.11
    ],
    [
      "1994-04",
      105.34
    ],
    [
      "1994-05",
      105.42
    ],
    [
      "1994-06",
      105.45
    ],
    [
      "1994-07",
      105.6
    ],
    [
      "1994-08",
      105.71
    ],
    [
      "1994-09",
      105.83
    ],
    [
      "1994-10",
      106.03
    ],
    [
      "1994-11",
      106.23
    ],
    [
      "1994-12",
      106.31
    ],
    [
      "1995-01",
      106.94
    ],
    [
      "1995-02",
      107.42
    ],
    [
      "1995-03",
      107.64
    ],
    [
      "1995-04",
      107.87
    ],
    [
      "1995-05",
      107.96
    ],
    [
      "1995-06",
      108.02
    ],
    [
      "1995-07",
      108.18
    ],
    [
      "1995-08",
      108.35
    ],
    [
      "1995-09",
      108.49
    ],
    [
      "1995-10",
      108.69
    ],
    [
      "1995-11",
      108.86
    ],
    [
      "1995-12",
      108.89
    ],
    [
      "1996-01",
      109.17
    ],
    [
      "1996-02",
      109.25
    ],
    [
      "1996-03",
      109.68
    ],
    [
      "1996-04",
      109.6
    ],
    [
      "1996-05",
      109.71
    ],
    [
      "1996-06",
      109.74
    ],
    [
      "1996-07",
      109.77
    ],
    [
      "1996-08",
      109.86
    ],
    [
      "1996-09",
      109.8
    ],
    [
      "1996-10",
      109.97
    ],
    [
      "1996-11",
      109.85
    ],
    [
      "1996-12",
      109.94
    ],
    [
      "1997-01",
      110.22
    ],
    [
      "1997-02",
      110.27
    ],
    [
      "1997-03",
      110.39
    ],
    [
      "1997-04",
      110.42
    ],
    [
      "1997-05",
      110.47
    ],
    [
      "1997-06",
      110.44
    ],
    [
      "1997-07",
      110.53
    ],
    [
      "1997-08",
      110.45
    ],
    [
      "1997-09",
      110.44
    ],
    [
      "1997-10",
      110.42
    ],
    [
      "1997-11",
      110.59
    ],
    [
      "1997-12",
      110.53
    ],
    [
      "1998-01",
      110.64
    ],
    [
      "1998-02",
      110.63
    ],
    [
      "1998-03",
      110.92
    ],
    [
      "1998-04",
      110.83
    ],
    [
      "1998-05",
      110.89
    ],
    [
      "1998-06",
      110.92
    ],
    [
      "1998-07",
      110.8
    ],
    [
      "1998-08",
      110.8
    ],
    [
      "1998-09",
      110.8
    ],
    [
      "1998-10",
      110.8
    ],
    [
      "1998-11",
      110.8
    ],
    [
      "1998-12",
      110.6
    ],
    [
      "1999-01",
      110.69
    ],
    [
      "1999-02",
      110.74
    ],
    [
      "1999-03",
      110.65
    ],
    [
      "1999-04",
      110.6
    ],
    [
      "1999-05",
      110.48
    ],
    [
      "1999-06",
      110.51
    ],
    [
      "1999-07",
      110.45
    ],
    [
      "1999-08",
      110.42
    ],
    [
      "1999-09",
      110.39
    ],
    [
      "1999-10",
      110.39
    ],
    [
      "1999-11",
      110.36
    ],
    [
      "1999-12",
      110.42
    ],
    [
      "2000-01",
      110.55
    ],
    [
      "2000-02",
      110.74
    ],
    [
      "2000-03",
      110.77
    ],
    [
      "2000-04",
      110.63
    ],
    [
      "2000-05",
      110.71
    ],
    [
      "2000-06",
      110.85
    ],
    [
      "2000-07",
      110.86
    ],
    [
      "2000-08",
      110.75
    ],
    [
      "2000-09",
      110.75
    ],
    [
      "2000-10",
      110.97
    ],
    [
      "2000-11",
      110.88
    ],
    [
      "2000-12",
      110.79
    ],
    [
      "2001-01",
      110.85
    ],
    [
      "2001-02",
      110.85
    ],
    [
      "2001-03",
      110.88
    ],
    [
      "2001-04",
      110.96
    ],
    [
      "2001-05",
      110.99
    ],
    [
      "2001-06",
      110.96
    ],
    [
      "2001-07",
      110.9
    ],
    [
      "2001-08",
      110.79
    ],
    [
      "2001-09",
      110.78
    ],
    [
      "2001-10",
      110.67
    ],
    [
      "2001-11",
      110.76
    ],
    [
      "2001-12",
      110.76
    ],
    [
      "2002-01",
      110.76
    ],
    [
      "2002-02",
      110.79
    ],
    [
      "2002-03",
      110.82
    ],
    [
      "2002-04",
      110.7
    ],
    [
      "2002-05",
      110.64
    ],
    [
      "2002-06",
      110.75
    ],
    [
      "2002-07",
      110.61
    ],
    [
      "2002-08",
      110.64
    ],
    [
      "2002-09",
      110.63
    ],
    [
      "2002-10",
      110.57
    ],
    [
      "2002-11",
      110.54
    ],
    [
      "2002-12",
      110.48
    ],
    [
      "2003-01",
      110.46
    ],
    [
      "2003-02",
      110.45
    ],
    [
      "2003-03",
      110.48
    ],
    [
      "2003-04",
      110.68
    ],
    [
      "2003-05",
      110.77
    ],
    [
      "2003-06",
      110.82
    ],
    [
      "2003-07",
      110.81
    ],
    [
      "2003-08",
      110.81
    ],
    [
      "2003-09",
      110.78
    ],
    [
      "2003-10",
      110.66
    ],
    [
      "2003-11",
      110.82
    ],
    [
      "2003-12",
      110.79
    ],
    [
      "2004-01",
      111.32
    ],
    [
      "2004-02",
      111.71
    ],
    [
      "2004-03",
      111.83
    ],
    [
      "2004-04",
      113.52
    ],
    [
      "2004-05",
      113.77
    ],
    [
      "2004-06",
      114.49
    ],
    [
      "2004-07",
      114.6
    ],
    [
      "2004-08",
      115.05
    ],
    [
      "2004-09",
      115.65
    ],
    [
      "2004-10",
      116.21
    ],
    [
      "2004-11",
      116.69
    ],
    [
      "2004-12",
      117.09
    ],
    [
      "2005-01",
      118.05
    ],
    [
      "2005-02",
      121.85
    ],
    [
      "2005-03",
      122.17
    ],
    [
      "2005-04",
      122.21
    ],
    [
      "2005-05",
      122.16
    ],
    [
      "2005-06",
      123.05
    ],
    [
      "2005-07",
      123.19
    ],
    [
      "2005-08",
      123.17
    ],
    [
      "2005-09",
      123.06
    ],
    [
      "2005-10",
      122.94
    ],
    [
      "2005-11",
      122.93
    ],
    [
      "2005-12",
      123.69
    ],
    [
      "2006-01",
      124.58
    ],
    [
      "2006-02",
      124.8
    ],
    [
      "2006-03",
      125.67
    ],
    [
      "2006-04",
      126.02
    ],
    [
      "2006-05",
      126.37
    ],
    [
      "2006-06",
      126.62
    ],
    [
      "2006-07",
      127.44
    ],
    [
      "2006-08",
      128.24
    ],
    [
      "2006-09",
      128.56
    ],
    [
      "2006-10",
      128.45
    ],
    [
      "2006-11",
      128.63
    ],
    [
      "2006-12",
      129.16
    ],
    [
      "2007-01",
      129.48
    ],
    [
      "2007-02",
      130.39
    ],
    [
      "2007-03",
      130.59
    ],
    [
      "2007-04",
      130.96
    ],
    [
      "2007-05",
      132.18
    ],
    [
      "2007-06",
      131.84
    ],
    [
      "2007-07",
      133.23
    ],
    [
      "2007-08",
      134.7
    ],
    [
      "2007-09",
      132.79
    ],
    [
      "2007-10",
      133.08
    ],
    [
      "2007-11",
      133.16
    ],
    [
      "2007-12",
      133.31
    ],
    [
      "2008-01",
      134.2
    ],
    [
      "2008-02",
      135.33
    ],
    [
      "2008-03",
      135.81
    ],
    [
      "2008-04",
      137.54
    ],
    [
      "2008-05",
      139.07
    ],
    [
      "2008-06",
      141.12
    ],
    [
      "2008-07",
      143.22
    ],
    [
      "2008-08",
      144.77
    ],
    [
      "2008-09",
      145.96
    ],
    [
      "2008-10",
      144.6
    ],
    [
      "2008-11",
      143.38
    ],
    [
      "2008-12",
      141.92
    ],
    [
      "2009-01",
      142.08
    ],
    [
      "2009-02",
      141.88
    ],
    [
      "2009-03",
      140.51
    ],
    [
      "2009-04",
      138.48
    ],
    [
      "2009-05",
      137.81
    ],
    [
      "2009-06",
      138.27
    ],
    [
      "2009-07",
      138.21
    ],
    [
      "2009-08",
      138.47
    ],
    [
      "2009-09",
      138.36
    ],
    [
      "2009-10",
      138.78
    ],
    [
      "2009-11",
      138.76
    ],
    [
      "2009-12",
      138.55
    ],
    [
      "2010-01",
      138.12
    ],
    [
      "2010-02",
      138.5
    ],
    [
      "2010-03",
      139.9
    ],
    [
      "2010-04",
      140.46
    ],
    [
      "2010-05",
      141.74
    ],
    [
      "2010-06",
      141.7
    ],
    [
      "2010-07",
      141.86
    ],
    [
      "2010-08",
      141.38
    ],
    [
      "2010-09",
      141.65
    ],
    [
      "2010-10",
      142.05
    ],
    [
      "2010-11",
      141.67
    ],
    [
      "2010-12",
      141.94
    ],
    [
      "2011-01",
      142.57
    ],
    [
      "2011-02",
      143.69
    ],
    [
      "2011-03",
      144.02
    ],
    [
      "2011-04",
      144.69
    ],
    [
      "2011-05",
      144.92
    ],
    [
      "2011-06",
      145.28
    ],
    [
      "2011-07",
      145.57
    ],
    [
      "2011-08",
      145.78
    ],
    [
      "2011-09",
      146.37
    ],
    [
      "2011-10",
      146.77
    ],
    [
      "2011-11",
      146.74
    ],
    [
      "2011-12",
      146.68
    ],
    [
      "2012-01",
      147.34
    ],
    [
      "2012-02",
      147.72
    ],
    [
      "2012-03",
      147.88
    ],
    [
      "2012-04",
      147.89
    ],
    [
      "2012-05",
      148.11
    ],
    [
      "2012-06",
      148.13
    ],
    [
      "2012-07",
      148.22
    ],
    [
      "2012-08",
      148.18
    ],
    [
      "2012-09",
      147.96
    ],
    [
      "2012-10",
      147.79
    ],
    [
      "2012-11",
      147.96
    ],
    [
      "2012-12",
      148.26
    ],
    [
      "2013-01",
      148.64
    ],
    [
      "2013-02",
      149.12
    ],
    [
      "2013-03",
      149.04
    ],
    [
      "2013-04",
      149.05
    ],
    [
      "2013-05",
      149.06
    ],
    [
      "2013-06",
      148.96
    ],
    [
      "2013-07",
      148.99
    ],
    [
      "2013-08",
      148.99
    ],
    [
      "2013-09",
      149.05
    ],
    [
      "2013-10",
      149.16
    ],
    [
      "2013-11",
      149.15
    ],
    [
      "2013-12",
      149.13
    ],
    [
      "2014-01",
      149.82
    ],
    [
      "2014-02",
      150.13
    ],
    [
      "2014-03",
      150.23
    ],
    [
      "2014-04",
      150.2
    ],
    [
      "2014-05",
      149.97
    ],
    [
      "2014-06",
      150.24
    ],
    [
      "2014-07",
      150.35
    ],
    [
      "2014-08",
      150.35
    ],
    [
      "2014-09",
      150.1
    ],
    [
      "2014-10",
      150.16
    ],
    [
      "2014-11",
      150.4
    ],
    [
      "2014-12",
      150.66
    ],
    [
      "2015-01",
      150.95
    ],
    [
      "2015-02",
      150.95
    ],
    [
      "2015-03",
      150.95
    ],
    [
      "2015-04",
      150.36
    ],
    [
      "2015-05",
      150.31
    ],
    [
      "2015-06",
      150.59
    ],
    [
      "2015-07",
      150.55
    ],
    [
      "2015-08",
      150.53
    ],
    [
      "2015-09",
      150.82
    ],
    [
      "2015-10",
      150.89
    ],
    [
      "2015-11",
      150.61
    ],
    [
      "2015-12",
      150.32
    ],
    [
      "2016-01",
      150.68
    ],
    [
      "2016-02",
      150.96
    ],
    [
      "2016-03",
      150.95
    ],
    [
      "2016-04",
      150.91
    ],
    [
      "2016-05",
      150.3
    ],
    [
      "2016-06",
      150.15
    ],
    [
      "2016-07",
      150.22
    ],
    [
      "2016-08",
      150.37
    ],
    [
      "2016-09",
      150.06
    ],
    [
      "2016-10",
      150.08
    ],
    [
      "2016-11",
      150.14
    ],
    [
      "2016-12",
      150.09
    ],
    [
      "2017-01",
      150.35
    ],
    [
      "2017-02",
      150.56
    ],
    [
      "2017-03",
      150.6
    ],
    [
      "2017-04",
      150.7
    ],
    [
      "2017-05",
      150.86
    ],
    [
      "2017-06",
      150.87
    ],
    [
      "2017-07",
      150.97
    ],
    [
      "2017-08",
      150.77
    ],
    [
      "2017-09",
      150.82
    ],
    [
      "2017-10",
      151.01
    ],
    [
      "2017-11",
      150.76
    ],
    [
      "2017-12",
      150.83
    ],
    [
      "2018-01",
      151.18
    ],
    [
      "2018-02",
      151.59
    ],
    [
      "2018-03",
      152.14
    ],
    [
      "2018-04",
      152.44
    ],
    [
      "2018-05",
      152.56
    ],
    [
      "2018-06",
      152.99
    ],
    [
      "2018-07",
      154.22
    ],
    [
      "2018-08",
      154.38
    ],
    [
      "2018-09",
      155.23
    ],
    [
      "2018-10",
      155.98
    ],
    [
      "2018-11",
      155.72
    ],
    [
      "2018-12",
      156.66
    ],
    [
      "2019-01",
      158.17
    ],
    [
      "2019-02",
      158.36
    ],
    [
      "2019-03",
      158.53
    ],
    [
      "2019-04",
      158.43
    ],
    [
      "2019-05",
      158.61
    ],
    [
      "2019-06",
      158.79
    ],
    [
      "2019-07",
      158.76
    ],
    [
      "2019-08",
      158.76
    ],
    [
      "2019-09",
      158.74
    ],
    [
      "2019-10",
      158.82
    ],
    [
      "2019-11",
      158.81
    ],
    [
      "2019-12",
      158.92
    ],
    [
      "2020-01",
      159.8
    ],
    [
      "2020-02",
      159.93
    ],
    [
      "2020-03",
      159.98
    ],
    [
      "2020-04",
      160.32
    ],
    [
      "2020-05",
      162.22
    ],
    [
      "2020-06",
      162.32
    ],
    [
      "2020-07",
      162.37
    ],
    [
      "2020-08",
      162.39
    ],
    [
      "2020-09",
      162.52
    ],
    [
      "2020-10",
      162.57
    ],
    [
      "2020-11",
      162.58
    ],
    [
      "2020-12",
      162.74
    ],
    [
      "2021-01",
      163.83
    ],
    [
      "2021-02",
      164.84
    ],
    [
      "2021-03",
      165.79
    ],
    [
      "2021-04",
      168.95
    ],
    [
      "2021-05",
      168.93
    ],
    [
      "2021-06",
      172.28
    ],
    [
      "2021-07",
      173.75
    ],
    [
      "2021-08",
      176.72
    ],
    [
      "2021-09",
      177.64
    ],
    [
      "2021-10",
      179.42
    ],
    [
      "2021-11",
      180.34
    ],
    [
      "2021-12",
      182
    ],
    [
      "2022-01",
      186.22
    ],
    [
      "2022-02",
      188.31
    ],
    [
      "2022-03",
      192.05
    ],
    [
      "2022-04",
      196.01
    ],
    [
      "2022-05",
      200.55
    ],
    [
      "2022-06",
      201.33
    ],
    [
      "2022-07",
      203.06
    ],
    [
      "2022-08",
      204.24
    ],
    [
      "2022-09",
      204.63
    ],
    [
      "2022-10",
      204.32
    ],
    [
      "2022-11",
      204.08
    ],
    [
      "2022-12",
      204.49
    ],
    [
      "2023-01",
      207.1
    ],
    [
      "2023-02",
      208.87
    ],
    [
      "2023-03",
      209.5
    ],
    [
      "2023-04",
      210.61
    ],
    [
      "2023-05",
      211.07
    ],
    [
      "2023-06",
      211.48
    ],
    [
      "2023-07",
      211.3
    ],
    [
      "2023-08",
      211.91
    ],
    [
      "2023-09",
      213.98
    ],
    [
      "2023-10",
      213.24
    ],
    [
      "2023-11",
      213.43
    ],
    [
      "2023-12",
      214.14
    ],
    [
      "2024-01",
      216.48
    ],
    [
      "2024-02",
      218.4
    ],
    [
      "2024-03",
      219.08
    ],
    [
      "2024-04",
      219.86
    ],
    [
      "2024-05",
      218.83
    ],
    [
      "2024-06",
      219.43
    ],
    [
      "2024-07",
      218.7
    ],
    [
      "2024-08",
      218.76
    ],
    [
      "2024-09",
      219.7
    ],
    [
      "2024-10",
      219.59
    ],
    [
      "2024-11",
      220.2
    ],
    [
      "2024-12",
      220.17
    ],
    [
      "2025-01",
      221.31
    ],
    [
      "2025-02",
      222.22
    ],
    [
      "2025-03",
      222.75
    ],
    [
      "2025-04",
      223.83
    ],
    [
      "2025-05",
      224.44
    ],
    [
      "2025-06",
      224.53
    ],
    [
      "2025-07",
      225.32
    ],
    [
      "2025-08",
      226.03
    ],
    [
      "2025-09",
      226.29
    ],
    [
      "2025-10",
      227.13
    ],
    [
      "2025-11",
      228.18
    ],
    [
      "2025-12",
      229.01
    ],
    [
      "2026-01",
      231.53
    ],
    [
      "2026-02",
      230.43
    ],
    [
      "2026-03",
      231.49
    ],
    [
      "2026-04",
      230.49
    ],
    [
      "2026-05",
      230.73
    ],
    [
      "2026-06",
      230.32
    ],
    [
      "2026-07",
      230.66
    ]
  ],
  "methodology": {
    "name": "MFG Calcs Cost Pass-Through Index",
    "slug": "us-manufacturing-cost-pass-through",
    "version": "1.0.0",
    "url": "https://www.mfgcalcs.com/signals/cost-pass-through",
    "formula": "Two equal-weight geometric (Jevons) blends of live producer prices, each reindexed to 100 at the base month: an INPUT index of raw materials (steel, aluminum, copper, resins, chemicals, ironSteel, lumber, paper) and an OUTPUT index of fabricated goods (machinery, castings, fasteners). For each lag from 0 to 6 months, the output index's year-over-year change is fit against the input index's year-over-year change shifted by that lag (OLS slope and Pearson correlation). The best-fitting lag gives the pass-through coefficient (output-YoY points per input-YoY point) and the typical delay. The current pass-through GAP is the model-implied output YoY at the best lag minus the actual output YoY: positive means input-cost inflation the relationship expects has not fully shown up in fabricated-goods prices yet.",
    "unit": "index, base month = 100; changes in percent; coefficient as output-YoY points per input-YoY point; gap in percentage points.",
    "scope": "A STATISTICAL relationship over public producer-price series, not a causal claim and not firm-level margins. Read the correlation and the lag, not just the headline coefficient.",
    "source": "U.S. Bureau of Labor Statistics producer price indexes (public domain).",
    "provenance": "Derived from public-domain BLS series. Redistributable.",
    "license": "https://creativecommons.org/licenses/by/4.0/",
    "attribution": "MFG Calcs (mfgcalcs.com)",
    "baseMonth": "1990-01",
    "asOf": "2026-07"
  }
}
