{
 "meta": {
  "units": "millions of current dollars unless noted; national quarterly at seasonally adjusted annual rates; shareOfGdp in percent; averageAge in years; real series in chained 2017 dollars",
  "sources": {
   "gdpByIndustry": "BEA GDP by Industry (tables 1, 5, 10, 15)",
   "regional": "BEA Regional (SAGDP2, SAGDP9, SQGDP2)",
   "profits": "BEA NIPA table 6.16D (profits with IVA, industry detail without CCAdj)",
   "fixedAssets": "BEA Fixed Assets (FAAt301ESI, FAAt307ESI, FAAt309ESI)"
  },
  "through": {
   "nationalAnnual": 2025,
   "nationalQuarterly": "2026Q2",
   "statesAnnual": 2025,
   "statesQuarterly": "2026Q2",
   "profits": "2026Q2",
   "fixedAssets": 2025
  }
 },
 "headline": {
  "shareAnnual": {
   "y": 2025,
   "v": 9.5
  },
  "shareQuarterly": {
   "p": "2026Q2",
   "v": 9.7
  },
  "shareYoYPts": 0.2,
  "valueAddedQuarterly": {
   "p": "2026Q2",
   "v": 3168100
  },
  "valueAddedAnnual": {
   "y": 2025,
   "v": 2930100
  },
  "valueAddedYoYPct": 8.9,
  "realYoYPct": 1.8,
  "grossOutputAnnual": {
   "y": 2025,
   "v": 7230000
  },
  "gdpAnnual": {
   "y": 2025,
   "v": 30861300
  }
 },
 "split": {
  "durable": {
   "y": 2025,
   "valueM": 1581300,
   "sharePctOfMfg": 54
  },
  "nondurable": {
   "y": 2025,
   "valueM": 1348800,
   "sharePctOfMfg": 46
  }
 },
 "subsectors": [
  {
   "code": "325",
   "slug": "chemicals",
   "name": "Chemical Products",
   "durable": false,
   "valueM": 579400,
   "year": 2025,
   "yoyPct": 5.6,
   "sharePctOfMfg": 19.8,
   "sharePctOfGdp": 1.9,
   "spark": [
    {
     "p": "2023Q3",
     "v": 490400
    },
    {
     "p": "2023Q4",
     "v": 510100
    },
    {
     "p": "2024Q1",
     "v": 522300
    },
    {
     "p": "2024Q2",
     "v": 545400
    },
    {
     "p": "2024Q3",
     "v": 560200
    },
    {
     "p": "2024Q4",
     "v": 567900
    },
    {
     "p": "2025Q1",
     "v": 543600
    },
    {
     "p": "2025Q2",
     "v": 588200
    },
    {
     "p": "2025Q3",
     "v": 603600
    },
    {
     "p": "2025Q4",
     "v": 582000
    },
    {
     "p": "2026Q1",
     "v": 587000
    },
    {
     "p": "2026Q2",
     "v": 623700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 1036000
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 88646.8,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 77229.1,
     "year": 2025
    },
    {
     "name": "Indiana",
     "slug": "indiana",
     "valueM": 38652.4,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "plastics-resins",
    "coatings-paints",
    "adhesives-sealants",
    "tanks-vessels",
    "filtering-separation"
   ],
   "relatedCalculators": [
    "process-manufacturing-chemicals-fluids",
    "coatings-inks-specialty-chemical-production",
    "paint-resin-polymer-compounding"
   ]
  },
  {
   "code": "311FT",
   "slug": "food-beverage-tobacco",
   "name": "Food, Beverage, and Tobacco Products",
   "durable": false,
   "valueM": 384000,
   "year": 2025,
   "yoyPct": -1.6,
   "sharePctOfMfg": 13.1,
   "sharePctOfGdp": 1.2,
   "spark": [
    {
     "p": "2023Q3",
     "v": 366100
    },
    {
     "p": "2023Q4",
     "v": 383000
    },
    {
     "p": "2024Q1",
     "v": 388100
    },
    {
     "p": "2024Q2",
     "v": 386600
    },
    {
     "p": "2024Q3",
     "v": 391400
    },
    {
     "p": "2024Q4",
     "v": 394500
    },
    {
     "p": "2025Q1",
     "v": 378500
    },
    {
     "p": "2025Q2",
     "v": 382900
    },
    {
     "p": "2025Q3",
     "v": 382600
    },
    {
     "p": "2025Q4",
     "v": 392100
    },
    {
     "p": "2026Q1",
     "v": 392000
    },
    {
     "p": "2026Q2",
     "v": 391500
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 1251800
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 35029,
     "year": 2025
    },
    {
     "name": "North Carolina",
     "slug": "north-carolina",
     "valueM": 28402.5,
     "year": 2025
    },
    {
     "name": "Virginia",
     "slug": "virginia",
     "valueM": 23840.3,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "packaging-machinery",
    "filtering-separation",
    "heat-exchange",
    "tanks-vessels"
   ],
   "relatedCalculators": [
    "food-beverage-cpg-manufacturing",
    "bottling-canning-filling-lines",
    "meat-poultry-seafood-processing",
    "dairy-frozen-food-manufacturing"
   ]
  },
  {
   "code": "334",
   "slug": "computers-electronics",
   "name": "Computer and Electronic Products",
   "durable": true,
   "valueM": 315400,
   "year": 2025,
   "yoyPct": 7.8,
   "sharePctOfMfg": 10.8,
   "sharePctOfGdp": 1,
   "spark": [
    {
     "p": "2023Q3",
     "v": 288300
    },
    {
     "p": "2023Q4",
     "v": 290200
    },
    {
     "p": "2024Q1",
     "v": 289700
    },
    {
     "p": "2024Q2",
     "v": 291300
    },
    {
     "p": "2024Q3",
     "v": 294300
    },
    {
     "p": "2024Q4",
     "v": 294500
    },
    {
     "p": "2025Q1",
     "v": 299800
    },
    {
     "p": "2025Q2",
     "v": 315200
    },
    {
     "p": "2025Q3",
     "v": 321500
    },
    {
     "p": "2025Q4",
     "v": 325200
    },
    {
     "p": "2026Q1",
     "v": 339500
    },
    {
     "p": "2026Q2",
     "v": 348500
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 447100
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 132234.7,
     "year": 2025
    },
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 31536.9,
     "year": 2025
    },
    {
     "name": "Oregon",
     "slug": "oregon",
     "valueM": 13484.6,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "semiconductors",
    "passive-components",
    "measuring-instruments",
    "optical-components",
    "semiconductor-equipment"
   ],
   "relatedCalculators": [
    "electronics-pcb-semiconductor-manufacturing",
    "semiconductor-advanced-packaging-test",
    "semiconductor-fab-equipment-manufacturing",
    "measurement-test-control-equipment"
   ]
  },
  {
   "code": "333",
   "slug": "machinery",
   "name": "Machinery",
   "durable": true,
   "valueM": 220200,
   "year": 2025,
   "yoyPct": 0.5,
   "sharePctOfMfg": 7.5,
   "sharePctOfGdp": 0.7,
   "spark": [
    {
     "p": "2023Q3",
     "v": 219700
    },
    {
     "p": "2023Q4",
     "v": 223200
    },
    {
     "p": "2024Q1",
     "v": 219600
    },
    {
     "p": "2024Q2",
     "v": 222500
    },
    {
     "p": "2024Q3",
     "v": 221800
    },
    {
     "p": "2024Q4",
     "v": 212000
    },
    {
     "p": "2025Q1",
     "v": 217700
    },
    {
     "p": "2025Q2",
     "v": 217900
    },
    {
     "p": "2025Q3",
     "v": 220700
    },
    {
     "p": "2025Q4",
     "v": 224500
    },
    {
     "p": "2026Q1",
     "v": 228600
    },
    {
     "p": "2026Q2",
     "v": 241600
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 457100
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 21109.6,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 18713.6,
     "year": 2025
    },
    {
     "name": "Illinois",
     "slug": "illinois",
     "valueM": 17573.4,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "machine-tools-cutting",
    "machine-tools-forming",
    "molds-dies",
    "pumps",
    "compressors-fans",
    "lifting-handling",
    "power-transmission",
    "welding-equipment",
    "engines",
    "turbines",
    "industrial-furnaces",
    "industrial-robots",
    "packaging-machinery"
   ],
   "relatedCalculators": [
    "industrial-equipment-machinery-capital-goods",
    "cnc-machining-cutting-tools",
    "pump-compressor-rotating-equipment-assembly",
    "tooling-fixtures-dies-mold-economics"
   ]
  },
  {
   "code": "3364OT",
   "slug": "other-transportation",
   "name": "Other Transportation Equipment",
   "durable": true,
   "valueM": 201500,
   "year": 2025,
   "yoyPct": 11.9,
   "sharePctOfMfg": 6.9,
   "sharePctOfGdp": 0.7,
   "spark": [
    {
     "p": "2023Q3",
     "v": 174300
    },
    {
     "p": "2023Q4",
     "v": 179000
    },
    {
     "p": "2024Q1",
     "v": 170900
    },
    {
     "p": "2024Q2",
     "v": 178800
    },
    {
     "p": "2024Q3",
     "v": 188800
    },
    {
     "p": "2024Q4",
     "v": 181700
    },
    {
     "p": "2025Q1",
     "v": 192200
    },
    {
     "p": "2025Q2",
     "v": 198800
    },
    {
     "p": "2025Q3",
     "v": 205200
    },
    {
     "p": "2025Q4",
     "v": 209900
    },
    {
     "p": "2026Q1",
     "v": 219200
    },
    {
     "p": "2026Q2",
     "v": 229000
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 446000
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 31260.4,
     "year": 2025
    },
    {
     "name": "Washington",
     "slug": "washington",
     "valueM": 24796.9,
     "year": 2025
    },
    {
     "name": "Connecticut",
     "slug": "connecticut",
     "valueM": 16583.7,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "turbines",
    "optical-components"
   ],
   "relatedCalculators": [
    "aerospace-defense-space-manufacturing",
    "marine-shipbuilding-boat-manufacturing",
    "rail-transit-rolling-stock-manufacturing"
   ]
  },
  {
   "code": "332",
   "slug": "fabricated-metals",
   "name": "Fabricated Metal Products",
   "durable": true,
   "valueM": 199200,
   "year": 2025,
   "yoyPct": 1.3,
   "sharePctOfMfg": 6.8,
   "sharePctOfGdp": 0.6,
   "spark": [
    {
     "p": "2023Q3",
     "v": 196400
    },
    {
     "p": "2023Q4",
     "v": 203000
    },
    {
     "p": "2024Q1",
     "v": 195600
    },
    {
     "p": "2024Q2",
     "v": 194100
    },
    {
     "p": "2024Q3",
     "v": 196600
    },
    {
     "p": "2024Q4",
     "v": 199900
    },
    {
     "p": "2025Q1",
     "v": 195400
    },
    {
     "p": "2025Q2",
     "v": 193100
    },
    {
     "p": "2025Q3",
     "v": 200700
    },
    {
     "p": "2025Q4",
     "v": 207500
    },
    {
     "p": "2026Q1",
     "v": 204700
    },
    {
     "p": "2026Q2",
     "v": 209700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 460600
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 19967.4,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 15891.5,
     "year": 2025
    },
    {
     "name": "Ohio",
     "slug": "ohio",
     "valueM": 13865.2,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "steel-structures",
    "steel-fasteners",
    "iron-steel-articles",
    "aluminum-articles",
    "hand-tools",
    "cutting-tools",
    "steel-springs-chain",
    "valves",
    "bearings"
   ],
   "relatedCalculators": [
    "sheet-metal-stamping-press-lines",
    "welding-metal-fabrication",
    "fastener-manufacturing-thread-rolling",
    "cnc-machining-cutting-tools"
   ]
  },
  {
   "code": "3361MV",
   "slug": "motor-vehicles",
   "name": "Motor Vehicles and Parts",
   "durable": true,
   "valueM": 185100,
   "year": 2025,
   "yoyPct": -3,
   "sharePctOfMfg": 6.3,
   "sharePctOfGdp": 0.6,
   "spark": [
    {
     "p": "2023Q3",
     "v": 189900
    },
    {
     "p": "2023Q4",
     "v": 187500
    },
    {
     "p": "2024Q1",
     "v": 188500
    },
    {
     "p": "2024Q2",
     "v": 192500
    },
    {
     "p": "2024Q3",
     "v": 189400
    },
    {
     "p": "2024Q4",
     "v": 193200
    },
    {
     "p": "2025Q1",
     "v": 192200
    },
    {
     "p": "2025Q2",
     "v": 185100
    },
    {
     "p": "2025Q3",
     "v": 187900
    },
    {
     "p": "2025Q4",
     "v": 175100
    },
    {
     "p": "2026Q1",
     "v": 177100
    },
    {
     "p": "2026Q2",
     "v": 181600
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 790900
   },
   "topStates": [
    {
     "name": "Michigan",
     "slug": "michigan",
     "valueM": 40787.9,
     "year": 2025
    },
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 28436.2,
     "year": 2025
    },
    {
     "name": "Indiana",
     "slug": "indiana",
     "valueM": 19912.6,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "engines",
    "bearings",
    "gaskets-seals",
    "batteries"
   ],
   "relatedCalculators": [
    "automotive-ev-battery-manufacturing",
    "trailers-truck-bodies-specialty-vehicles",
    "commercial-vehicle-bus-coach-manufacturing"
   ]
  },
  {
   "code": "324",
   "slug": "petroleum-coal",
   "name": "Petroleum and Coal Products",
   "durable": false,
   "valueM": 148000,
   "year": 2025,
   "yoyPct": -15.3,
   "sharePctOfMfg": 5.1,
   "sharePctOfGdp": 0.5,
   "spark": [
    {
     "p": "2023Q3",
     "v": 213400
    },
    {
     "p": "2023Q4",
     "v": 193300
    },
    {
     "p": "2024Q1",
     "v": 187000
    },
    {
     "p": "2024Q2",
     "v": 182200
    },
    {
     "p": "2024Q3",
     "v": 163200
    },
    {
     "p": "2024Q4",
     "v": 166600
    },
    {
     "p": "2025Q1",
     "v": 148800
    },
    {
     "p": "2025Q2",
     "v": 138700
    },
    {
     "p": "2025Q3",
     "v": 149900
    },
    {
     "p": "2025Q4",
     "v": 154500
    },
    {
     "p": "2026Q1",
     "v": 151700
    },
    {
     "p": "2026Q2",
     "v": 222100
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 588100
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 53170.9,
     "year": 2025
    },
    {
     "name": "Louisiana",
     "slug": "louisiana",
     "valueM": 15097.5,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 11937.3,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "heat-exchange",
    "tanks-vessels",
    "valves",
    "pumps"
   ],
   "relatedCalculators": [
    "oil-gas-energy-equipment-manufacturing",
    "process-manufacturing-chemicals-fluids"
   ]
  },
  {
   "code": "339",
   "slug": "miscellaneous",
   "name": "Miscellaneous Manufacturing",
   "durable": true,
   "valueM": 118900,
   "year": 2025,
   "yoyPct": 1.7,
   "sharePctOfMfg": 4.1,
   "sharePctOfGdp": 0.4,
   "spark": [
    {
     "p": "2023Q3",
     "v": 114700
    },
    {
     "p": "2023Q4",
     "v": 116300
    },
    {
     "p": "2024Q1",
     "v": 116400
    },
    {
     "p": "2024Q2",
     "v": 115000
    },
    {
     "p": "2024Q3",
     "v": 117300
    },
    {
     "p": "2024Q4",
     "v": 118900
    },
    {
     "p": "2025Q1",
     "v": 116700
    },
    {
     "p": "2025Q2",
     "v": 118100
    },
    {
     "p": "2025Q3",
     "v": 119400
    },
    {
     "p": "2025Q4",
     "v": 121600
    },
    {
     "p": "2026Q1",
     "v": 122000
    },
    {
     "p": "2026Q2",
     "v": 126500
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 182600
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 17678.3,
     "year": 2025
    },
    {
     "name": "Illinois",
     "slug": "illinois",
     "valueM": 7518.4,
     "year": 2025
    },
    {
     "name": "Florida",
     "slug": "florida",
     "valueM": 6796.7,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "measuring-instruments"
   ],
   "relatedCalculators": [
    "medtech-medical-device-manufacturing",
    "jewelry-watches-precision-luxury-goods",
    "toys-sporting-goods-recreational-products"
   ]
  },
  {
   "code": "326",
   "slug": "plastics-rubber",
   "name": "Plastics and Rubber Products",
   "durable": false,
   "valueM": 94100,
   "year": 2025,
   "yoyPct": -1.5,
   "sharePctOfMfg": 3.2,
   "sharePctOfGdp": 0.3,
   "spark": [
    {
     "p": "2023Q3",
     "v": 101700
    },
    {
     "p": "2023Q4",
     "v": 100000
    },
    {
     "p": "2024Q1",
     "v": 99500
    },
    {
     "p": "2024Q2",
     "v": 97400
    },
    {
     "p": "2024Q3",
     "v": 93100
    },
    {
     "p": "2024Q4",
     "v": 92000
    },
    {
     "p": "2025Q1",
     "v": 90500
    },
    {
     "p": "2025Q2",
     "v": 93400
    },
    {
     "p": "2025Q3",
     "v": 95900
    },
    {
     "p": "2025Q4",
     "v": 96500
    },
    {
     "p": "2026Q1",
     "v": 95500
    },
    {
     "p": "2026Q2",
     "v": 94400
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 289500
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 6883,
     "year": 2025
    },
    {
     "name": "Ohio",
     "slug": "ohio",
     "valueM": 6359.3,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 5983.5,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "plastic-semis",
    "rubber-products",
    "gaskets-seals",
    "plastics-rubber-machinery",
    "molds-dies"
   ],
   "relatedCalculators": [
    "injection-molding-plastics",
    "plastics-extrusion-pipe-film-profile",
    "rubber-tires-foam-elastomer-manufacturing",
    "blow-molding-hollow-plastic-products"
   ]
  },
  {
   "code": "335",
   "slug": "electrical-equipment",
   "name": "Electrical Equipment and Appliances",
   "durable": true,
   "valueM": 87100,
   "year": 2025,
   "yoyPct": 5.8,
   "sharePctOfMfg": 3,
   "sharePctOfGdp": 0.3,
   "spark": [
    {
     "p": "2023Q3",
     "v": 79100
    },
    {
     "p": "2023Q4",
     "v": 80900
    },
    {
     "p": "2024Q1",
     "v": 81300
    },
    {
     "p": "2024Q2",
     "v": 81600
    },
    {
     "p": "2024Q3",
     "v": 82700
    },
    {
     "p": "2024Q4",
     "v": 83700
    },
    {
     "p": "2025Q1",
     "v": 84700
    },
    {
     "p": "2025Q2",
     "v": 86800
    },
    {
     "p": "2025Q3",
     "v": 87700
    },
    {
     "p": "2025Q4",
     "v": 89100
    },
    {
     "p": "2026Q1",
     "v": 85500
    },
    {
     "p": "2026Q2",
     "v": 87100
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 202600
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 7515.1,
     "year": 2025
    },
    {
     "name": "Ohio",
     "slug": "ohio",
     "valueM": 7148.5,
     "year": 2025
    },
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 5969.6,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "electric-motors",
    "transformers-power",
    "wire-cable",
    "switchgear-connectors",
    "batteries",
    "industrial-lighting"
   ],
   "relatedCalculators": [
    "motors-generators-electrification-equipment",
    "transformers-coils-magnetics-manufacturing",
    "wire-cable-conductor-manufacturing",
    "lighting-leds-electrical-fixtures"
   ]
  },
  {
   "code": "327",
   "slug": "nonmetallic-minerals",
   "name": "Nonmetallic Mineral Products",
   "durable": true,
   "valueM": 85100,
   "year": 2025,
   "yoyPct": 0.4,
   "sharePctOfMfg": 2.9,
   "sharePctOfGdp": 0.3,
   "spark": [
    {
     "p": "2023Q3",
     "v": 85400
    },
    {
     "p": "2023Q4",
     "v": 86300
    },
    {
     "p": "2024Q1",
     "v": 84100
    },
    {
     "p": "2024Q2",
     "v": 84200
    },
    {
     "p": "2024Q3",
     "v": 85000
    },
    {
     "p": "2024Q4",
     "v": 86100
    },
    {
     "p": "2025Q1",
     "v": 84500
    },
    {
     "p": "2025Q2",
     "v": 84900
    },
    {
     "p": "2025Q3",
     "v": 86000
    },
    {
     "p": "2025Q4",
     "v": 85000
    },
    {
     "p": "2026Q1",
     "v": 86100
    },
    {
     "p": "2026Q2",
     "v": 86700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 175500
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 8569.1,
     "year": 2025
    },
    {
     "name": "California",
     "slug": "california",
     "valueM": 5930.8,
     "year": 2025
    },
    {
     "name": "Ohio",
     "slug": "ohio",
     "valueM": 5000,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "technical-ceramics",
    "glass-fiber",
    "abrasives",
    "carbon-insulators"
   ],
   "relatedCalculators": [
    "building-materials-cement-glass-ceramics",
    "ceramic-tile-sanitaryware-manufacturing",
    "glass-container-bottle-manufacturing"
   ]
  },
  {
   "code": "331",
   "slug": "primary-metals",
   "name": "Primary Metals",
   "durable": true,
   "valueM": 77800,
   "year": 2025,
   "yoyPct": -1,
   "sharePctOfMfg": 2.7,
   "sharePctOfGdp": 0.3,
   "spark": [
    {
     "p": "2023Q3",
     "v": 85700
    },
    {
     "p": "2023Q4",
     "v": 85700
    },
    {
     "p": "2024Q1",
     "v": 82000
    },
    {
     "p": "2024Q2",
     "v": 79200
    },
    {
     "p": "2024Q3",
     "v": 76500
    },
    {
     "p": "2024Q4",
     "v": 76700
    },
    {
     "p": "2025Q1",
     "v": 75800
    },
    {
     "p": "2025Q2",
     "v": 74400
    },
    {
     "p": "2025Q3",
     "v": 80200
    },
    {
     "p": "2025Q4",
     "v": 81000
    },
    {
     "p": "2026Q1",
     "v": 83800
    },
    {
     "p": "2026Q2",
     "v": 93700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 283800
   },
   "topStates": [
    {
     "name": "Indiana",
     "slug": "indiana",
     "valueM": 9258.2,
     "year": 2025
    },
    {
     "name": "Alabama",
     "slug": "alabama",
     "valueM": 7121.6,
     "year": 2025
    },
    {
     "name": "Ohio",
     "slug": "ohio",
     "valueM": 6556.7,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "steel-flat-rolled",
    "steel-long-products",
    "stainless-steel",
    "copper-semis",
    "aluminum-semis",
    "nickel-alloys",
    "specialty-metals",
    "foundry-metallurgy"
   ],
   "relatedCalculators": [
    "foundry-casting-forging",
    "metals-steel-aluminum-coil-processing",
    "metal-recycling-scrap-processing-salvage"
   ]
  },
  {
   "code": "322",
   "slug": "paper",
   "name": "Paper Products",
   "durable": false,
   "valueM": 70900,
   "year": 2025,
   "yoyPct": 2.8,
   "sharePctOfMfg": 2.4,
   "sharePctOfGdp": 0.2,
   "spark": [
    {
     "p": "2023Q3",
     "v": 70000
    },
    {
     "p": "2023Q4",
     "v": 69700
    },
    {
     "p": "2024Q1",
     "v": 67300
    },
    {
     "p": "2024Q2",
     "v": 69600
    },
    {
     "p": "2024Q3",
     "v": 68800
    },
    {
     "p": "2024Q4",
     "v": 70100
    },
    {
     "p": "2025Q1",
     "v": 68800
    },
    {
     "p": "2025Q2",
     "v": 69800
    },
    {
     "p": "2025Q3",
     "v": 73900
    },
    {
     "p": "2025Q4",
     "v": 71300
    },
    {
     "p": "2026Q1",
     "v": 69100
    },
    {
     "p": "2026Q2",
     "v": 68600
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 211800
   },
   "topStates": [
    {
     "name": "Wisconsin",
     "slug": "wisconsin",
     "valueM": 5858.9,
     "year": 2025
    },
    {
     "name": "Georgia",
     "slug": "georgia",
     "valueM": 5309.1,
     "year": 2025
    },
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 4662,
     "year": 2025
    }
   ],
   "relatedFamilies": [],
   "relatedCalculators": [
    "wood-paper-pulp-corrugated-manufacturing",
    "printing-labels-industrial-converting"
   ]
  },
  {
   "code": "321",
   "slug": "wood-products",
   "name": "Wood Products",
   "durable": true,
   "valueM": 55500,
   "year": 2025,
   "yoyPct": 0.2,
   "sharePctOfMfg": 1.9,
   "sharePctOfGdp": 0.2,
   "spark": [
    {
     "p": "2023Q3",
     "v": 57200
    },
    {
     "p": "2023Q4",
     "v": 58100
    },
    {
     "p": "2024Q1",
     "v": 55000
    },
    {
     "p": "2024Q2",
     "v": 53900
    },
    {
     "p": "2024Q3",
     "v": 55000
    },
    {
     "p": "2024Q4",
     "v": 58000
    },
    {
     "p": "2025Q1",
     "v": 55600
    },
    {
     "p": "2025Q2",
     "v": 54900
    },
    {
     "p": "2025Q3",
     "v": 56200
    },
    {
     "p": "2025Q4",
     "v": 55400
    },
    {
     "p": "2026Q1",
     "v": 53700
    },
    {
     "p": "2026Q2",
     "v": 54700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 161300
   },
   "topStates": [
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 5090.3,
     "year": 2025
    },
    {
     "name": "Georgia",
     "slug": "georgia",
     "valueM": 3528.6,
     "year": 2025
    },
    {
     "name": "Oregon",
     "slug": "oregon",
     "valueM": 3188.1,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "cutting-tools",
    "powered-hand-tools"
   ],
   "relatedCalculators": [
    "wood-paper-pulp-corrugated-manufacturing",
    "furniture-fixtures-interior-products"
   ]
  },
  {
   "code": "323",
   "slug": "printing",
   "name": "Printing and Related Support",
   "durable": false,
   "valueM": 42500,
   "year": 2025,
   "yoyPct": 0.7,
   "sharePctOfMfg": 1.5,
   "sharePctOfGdp": 0.1,
   "spark": [
    {
     "p": "2023Q3",
     "v": 42100
    },
    {
     "p": "2023Q4",
     "v": 41600
    },
    {
     "p": "2024Q1",
     "v": 41900
    },
    {
     "p": "2024Q2",
     "v": 42100
    },
    {
     "p": "2024Q3",
     "v": 42400
    },
    {
     "p": "2024Q4",
     "v": 42400
    },
    {
     "p": "2025Q1",
     "v": 42700
    },
    {
     "p": "2025Q2",
     "v": 42600
    },
    {
     "p": "2025Q3",
     "v": 42400
    },
    {
     "p": "2025Q4",
     "v": 42300
    },
    {
     "p": "2026Q1",
     "v": 42600
    },
    {
     "p": "2026Q2",
     "v": 42500
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 87200
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 3438.9,
     "year": 2025
    },
    {
     "name": "Wisconsin",
     "slug": "wisconsin",
     "valueM": 2879.1,
     "year": 2025
    },
    {
     "name": "Illinois",
     "slug": "illinois",
     "valueM": 2772.8,
     "year": 2025
    }
   ],
   "relatedFamilies": [],
   "relatedCalculators": [
    "printing-labels-industrial-converting",
    "signage-displays-architectural-graphics"
   ]
  },
  {
   "code": "337",
   "slug": "furniture",
   "name": "Furniture and Related Products",
   "durable": true,
   "valueM": 35400,
   "year": 2025,
   "yoyPct": 1.4,
   "sharePctOfMfg": 1.2,
   "sharePctOfGdp": 0.1,
   "spark": [
    {
     "p": "2023Q3",
     "v": 34100
    },
    {
     "p": "2023Q4",
     "v": 34300
    },
    {
     "p": "2024Q1",
     "v": 34700
    },
    {
     "p": "2024Q2",
     "v": 35000
    },
    {
     "p": "2024Q3",
     "v": 35000
    },
    {
     "p": "2024Q4",
     "v": 35000
    },
    {
     "p": "2025Q1",
     "v": 35200
    },
    {
     "p": "2025Q2",
     "v": 35300
    },
    {
     "p": "2025Q3",
     "v": 35600
    },
    {
     "p": "2025Q4",
     "v": 35500
    },
    {
     "p": "2026Q1",
     "v": 35800
    },
    {
     "p": "2026Q2",
     "v": 35700
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 84900
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 3044.4,
     "year": 2025
    },
    {
     "name": "Indiana",
     "slug": "indiana",
     "valueM": 2893.3,
     "year": 2025
    },
    {
     "name": "North Carolina",
     "slug": "north-carolina",
     "valueM": 2443.4,
     "year": 2025
    }
   ],
   "relatedFamilies": [
    "steel-fasteners"
   ],
   "relatedCalculators": [
    "furniture-fixtures-interior-products",
    "mattress-bedding-foam-product-assembly"
   ]
  },
  {
   "code": "313TT",
   "slug": "textiles",
   "name": "Textile Mills and Textile Products",
   "durable": false,
   "valueM": 17700,
   "year": 2025,
   "yoyPct": 0.6,
   "sharePctOfMfg": 0.6,
   "sharePctOfGdp": 0.1,
   "spark": [
    {
     "p": "2023Q3",
     "v": 17800
    },
    {
     "p": "2023Q4",
     "v": 17800
    },
    {
     "p": "2024Q1",
     "v": 17600
    },
    {
     "p": "2024Q2",
     "v": 17600
    },
    {
     "p": "2024Q3",
     "v": 17500
    },
    {
     "p": "2024Q4",
     "v": 17800
    },
    {
     "p": "2025Q1",
     "v": 17700
    },
    {
     "p": "2025Q2",
     "v": 17600
    },
    {
     "p": "2025Q3",
     "v": 17700
    },
    {
     "p": "2025Q4",
     "v": 17900
    },
    {
     "p": "2026Q1",
     "v": 17900
    },
    {
     "p": "2026Q2",
     "v": 18000
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 48500
   },
   "topStates": [
    {
     "name": "Georgia",
     "slug": "georgia",
     "valueM": 4476.1,
     "year": 2025
    },
    {
     "name": "North Carolina",
     "slug": "north-carolina",
     "valueM": 2388.7,
     "year": 2025
    },
    {
     "name": "South Carolina",
     "slug": "south-carolina",
     "valueM": 1518.7,
     "year": 2025
    }
   ],
   "relatedFamilies": [],
   "relatedCalculators": [
    "textiles-apparel-soft-goods-manufacturing",
    "nonwoven-materials-and-technical-textiles",
    "industrial-laundry-uniform-textile-rental-operations"
   ]
  },
  {
   "code": "315AL",
   "slug": "apparel-leather",
   "name": "Apparel and Leather Products",
   "durable": false,
   "valueM": 12200,
   "year": 2025,
   "yoyPct": -0.8,
   "sharePctOfMfg": 0.4,
   "sharePctOfGdp": 0,
   "spark": [
    {
     "p": "2023Q3",
     "v": 11800
    },
    {
     "p": "2023Q4",
     "v": 12000
    },
    {
     "p": "2024Q1",
     "v": 12100
    },
    {
     "p": "2024Q2",
     "v": 12300
    },
    {
     "p": "2024Q3",
     "v": 12500
    },
    {
     "p": "2024Q4",
     "v": 12400
    },
    {
     "p": "2025Q1",
     "v": 12500
    },
    {
     "p": "2025Q2",
     "v": 12300
    },
    {
     "p": "2025Q3",
     "v": 12100
    },
    {
     "p": "2025Q4",
     "v": 11900
    },
    {
     "p": "2026Q1",
     "v": 12400
    },
    {
     "p": "2026Q2",
     "v": 12500
    }
   ],
   "grossOutput": {
    "y": 2025,
    "v": 24800
   },
   "topStates": [
    {
     "name": "California",
     "slug": "california",
     "valueM": 3765.6,
     "year": 2025
    },
    {
     "name": "New York",
     "slug": "new-york",
     "valueM": 1202.6,
     "year": 2025
    },
    {
     "name": "Texas",
     "slug": "texas",
     "valueM": 862.5,
     "year": 2025
    }
   ],
   "relatedFamilies": [],
   "relatedCalculators": [
    "leather-footwear-accessories-manufacturing",
    "textiles-apparel-soft-goods-manufacturing"
   ]
  }
 ],
 "states": [
  {
   "fips": "06000",
   "name": "California",
   "slug": "california",
   "year": 2025,
   "mfgM": 390527.9,
   "sharePctOfState": 9.1,
   "yoyPct": 3.7,
   "realYoYPct": 2.6,
   "durableM": 249219.1,
   "nondurableM": 141308.8,
   "topSubsectors": [
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 132234.7,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 77229.1,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 35029,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 272154.2
    },
    {
     "y": 2017,
     "v": 294636.7
    },
    {
     "y": 2018,
     "v": 325580.2
    },
    {
     "y": 2019,
     "v": 335966.3
    },
    {
     "y": 2020,
     "v": 323770.6
    },
    {
     "y": 2021,
     "v": 360353.4
    },
    {
     "y": 2022,
     "v": 361595.6
    },
    {
     "y": 2023,
     "v": 369073.9
    },
    {
     "y": 2024,
     "v": 376748.2
    },
    {
     "y": 2025,
     "v": 390527.9
    }
   ],
   "rank": 1
  },
  {
   "fips": "48000",
   "name": "Texas",
   "slug": "texas",
   "year": 2025,
   "mfgM": 332089.2,
   "sharePctOfState": 11.3,
   "yoyPct": 0.4,
   "realYoYPct": 0.8,
   "durableM": 151236.6,
   "nondurableM": 180852.6,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 88646.8,
     "year": 2025
    },
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 53170.9,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 31536.9,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 187456.2
    },
    {
     "y": 2017,
     "v": 198838.4
    },
    {
     "y": 2018,
     "v": 233772.6
    },
    {
     "y": 2019,
     "v": 211551.5
    },
    {
     "y": 2020,
     "v": 187447
    },
    {
     "y": 2021,
     "v": 243038.3
    },
    {
     "y": 2022,
     "v": 310523.8
    },
    {
     "y": 2023,
     "v": 318273.4
    },
    {
     "y": 2024,
     "v": 330921.6
    },
    {
     "y": 2025,
     "v": 332089.2
    }
   ],
   "rank": 2
  },
  {
   "fips": "17000",
   "name": "Illinois",
   "slug": "illinois",
   "year": 2025,
   "mfgM": 140264.2,
   "sharePctOfState": 11.3,
   "yoyPct": 0.6,
   "realYoYPct": 0.1,
   "durableM": 64351.5,
   "nondurableM": 75912.7,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 37511.4,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 18502.3,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 17573.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 96088.2
    },
    {
     "y": 2017,
     "v": 98647.4
    },
    {
     "y": 2018,
     "v": 108502.3
    },
    {
     "y": 2019,
     "v": 106954.6
    },
    {
     "y": 2020,
     "v": 100078.4
    },
    {
     "y": 2021,
     "v": 115274.6
    },
    {
     "y": 2022,
     "v": 127706.9
    },
    {
     "y": 2023,
     "v": 135502.5
    },
    {
     "y": 2024,
     "v": 139399.2
    },
    {
     "y": 2025,
     "v": 140264.2
    }
   ],
   "rank": 3
  },
  {
   "fips": "39000",
   "name": "Ohio",
   "slug": "ohio",
   "year": 2025,
   "mfgM": 132782.8,
   "sharePctOfState": 13.6,
   "yoyPct": 0.3,
   "realYoYPct": 0.3,
   "durableM": 73959.9,
   "nondurableM": 58822.9,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 24322.7,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 15671.2,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 13865.2,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 100412.1
    },
    {
     "y": 2017,
     "v": 102938.7
    },
    {
     "y": 2018,
     "v": 106587.9
    },
    {
     "y": 2019,
     "v": 106153.2
    },
    {
     "y": 2020,
     "v": 97936.5
    },
    {
     "y": 2021,
     "v": 112497.1
    },
    {
     "y": 2022,
     "v": 123837.7
    },
    {
     "y": 2023,
     "v": 128310.3
    },
    {
     "y": 2024,
     "v": 132416.2
    },
    {
     "y": 2025,
     "v": 132782.8
    }
   ],
   "rank": 4
  },
  {
   "fips": "18000",
   "name": "Indiana",
   "slug": "indiana",
   "year": 2025,
   "mfgM": 129367.3,
   "sharePctOfState": 23.8,
   "yoyPct": 2.5,
   "realYoYPct": 3.2,
   "durableM": 66671.4,
   "nondurableM": 62695.9,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 38652.4,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 19912.6,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 11242.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 88764.2
    },
    {
     "y": 2017,
     "v": 92862
    },
    {
     "y": 2018,
     "v": 99022
    },
    {
     "y": 2019,
     "v": 97240.2
    },
    {
     "y": 2020,
     "v": 90769.7
    },
    {
     "y": 2021,
     "v": 108284.1
    },
    {
     "y": 2022,
     "v": 117201.4
    },
    {
     "y": 2023,
     "v": 119965.3
    },
    {
     "y": 2024,
     "v": 126256.2
    },
    {
     "y": 2025,
     "v": 129367.3
    }
   ],
   "rank": 5
  },
  {
   "fips": "26000",
   "name": "Michigan",
   "slug": "michigan",
   "year": 2025,
   "mfgM": 113223,
   "sharePctOfState": 15.4,
   "yoyPct": -2.1,
   "realYoYPct": 0,
   "durableM": 84221.2,
   "nondurableM": 29001.8,
   "topSubsectors": [
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 40787.9,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 11584.4,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 10703.8,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 92515.9
    },
    {
     "y": 2017,
     "v": 93889.7
    },
    {
     "y": 2018,
     "v": 96659.6
    },
    {
     "y": 2019,
     "v": 94947.6
    },
    {
     "y": 2020,
     "v": 89928.3
    },
    {
     "y": 2021,
     "v": 92939.2
    },
    {
     "y": 2022,
     "v": 103894.1
    },
    {
     "y": 2023,
     "v": 114156
    },
    {
     "y": 2024,
     "v": 115600
    },
    {
     "y": 2025,
     "v": 113223
    }
   ],
   "rank": 6
  },
  {
   "fips": "37000",
   "name": "North Carolina",
   "slug": "north-carolina",
   "year": 2025,
   "mfgM": 111526.2,
   "sharePctOfState": 12.4,
   "yoyPct": 3.7,
   "realYoYPct": 3.1,
   "durableM": 42724.1,
   "nondurableM": 68802.1,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 28402.5,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 28308.5,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 9522,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 93696.6
    },
    {
     "y": 2017,
     "v": 91652.6
    },
    {
     "y": 2018,
     "v": 92679.2
    },
    {
     "y": 2019,
     "v": 89156.1
    },
    {
     "y": 2020,
     "v": 89071.3
    },
    {
     "y": 2021,
     "v": 88909.9
    },
    {
     "y": 2022,
     "v": 96078.6
    },
    {
     "y": 2023,
     "v": 103364.4
    },
    {
     "y": 2024,
     "v": 107530.9
    },
    {
     "y": 2025,
     "v": 111526.2
    }
   ],
   "rank": 7
  },
  {
   "fips": "42000",
   "name": "Pennsylvania",
   "slug": "pennsylvania",
   "year": 2025,
   "mfgM": 107217.7,
   "sharePctOfState": 10.1,
   "yoyPct": 1.8,
   "realYoYPct": 1.3,
   "durableM": 53142,
   "nondurableM": 54075.7,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 23751.4,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 14409,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 9671.7,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 83091.2
    },
    {
     "y": 2017,
     "v": 86996
    },
    {
     "y": 2018,
     "v": 87745.5
    },
    {
     "y": 2019,
     "v": 90598.5
    },
    {
     "y": 2020,
     "v": 86839.4
    },
    {
     "y": 2021,
     "v": 93379.7
    },
    {
     "y": 2022,
     "v": 97905.7
    },
    {
     "y": 2023,
     "v": 103172
    },
    {
     "y": 2024,
     "v": 105282.6
    },
    {
     "y": 2025,
     "v": 107217.7
    }
   ],
   "rank": 8
  },
  {
   "fips": "13000",
   "name": "Georgia",
   "slug": "georgia",
   "year": 2025,
   "mfgM": 87862.5,
   "sharePctOfState": 9.4,
   "yoyPct": 1.4,
   "realYoYPct": 1.1,
   "durableM": 46649.4,
   "nondurableM": 41213.2,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 18010.6,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 9110.7,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 7349.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 57901.7
    },
    {
     "y": 2017,
     "v": 59317.1
    },
    {
     "y": 2018,
     "v": 59291.5
    },
    {
     "y": 2019,
     "v": 61476.2
    },
    {
     "y": 2020,
     "v": 62477.5
    },
    {
     "y": 2021,
     "v": 70658
    },
    {
     "y": 2022,
     "v": 76252.8
    },
    {
     "y": 2023,
     "v": 84028.2
    },
    {
     "y": 2024,
     "v": 86686.4
    },
    {
     "y": 2025,
     "v": 87862.5
    }
   ],
   "rank": 9
  },
  {
   "fips": "12000",
   "name": "Florida",
   "slug": "florida",
   "year": 2025,
   "mfgM": 87429.9,
   "sharePctOfState": 4.8,
   "yoyPct": 4.6,
   "realYoYPct": 3.8,
   "durableM": 56344.5,
   "nondurableM": 31085.4,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 14477.4,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 13813.7,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 9137.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 48973.6
    },
    {
     "y": 2017,
     "v": 49925.9
    },
    {
     "y": 2018,
     "v": 52847.7
    },
    {
     "y": 2019,
     "v": 54402.5
    },
    {
     "y": 2020,
     "v": 56536
    },
    {
     "y": 2021,
     "v": 62117.3
    },
    {
     "y": 2022,
     "v": 72217.2
    },
    {
     "y": 2023,
     "v": 79096.5
    },
    {
     "y": 2024,
     "v": 83562
    },
    {
     "y": 2025,
     "v": 87429.9
    }
   ],
   "rank": 10
  },
  {
   "fips": "36000",
   "name": "New York",
   "slug": "new-york",
   "year": 2025,
   "mfgM": 84760.4,
   "sharePctOfState": 3.4,
   "yoyPct": 1.6,
   "realYoYPct": 0.7,
   "durableM": 39001.1,
   "nondurableM": 45759.3,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 24534.9,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 12411.5,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 10156.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 68208.2
    },
    {
     "y": 2017,
     "v": 69419.6
    },
    {
     "y": 2018,
     "v": 68628.3
    },
    {
     "y": 2019,
     "v": 72382.3
    },
    {
     "y": 2020,
     "v": 70158.2
    },
    {
     "y": 2021,
     "v": 76629.8
    },
    {
     "y": 2022,
     "v": 79397.2
    },
    {
     "y": 2023,
     "v": 81046.2
    },
    {
     "y": 2024,
     "v": 83397.2
    },
    {
     "y": 2025,
     "v": 84760.4
    }
   ],
   "rank": 11
  },
  {
   "fips": "55000",
   "name": "Wisconsin",
   "slug": "wisconsin",
   "year": 2025,
   "mfgM": 77166.7,
   "sharePctOfState": 16.1,
   "yoyPct": 0.7,
   "realYoYPct": -0.1,
   "durableM": 42062.7,
   "nondurableM": 35104,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 14899.2,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 13120.4,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 8577.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 57641.8
    },
    {
     "y": 2017,
     "v": 56187.8
    },
    {
     "y": 2018,
     "v": 57579.8
    },
    {
     "y": 2019,
     "v": 60258.5
    },
    {
     "y": 2020,
     "v": 59003.5
    },
    {
     "y": 2021,
     "v": 61829.7
    },
    {
     "y": 2022,
     "v": 68162.9
    },
    {
     "y": 2023,
     "v": 75282.5
    },
    {
     "y": 2024,
     "v": 76611.4
    },
    {
     "y": 2025,
     "v": 77166.7
    }
   ],
   "rank": 12
  },
  {
   "fips": "34000",
   "name": "New Jersey",
   "slug": "new-jersey",
   "year": 2025,
   "mfgM": 75398.6,
   "sharePctOfState": 8.5,
   "yoyPct": 3.2,
   "realYoYPct": 2.5,
   "durableM": 21949.1,
   "nondurableM": 53449.5,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 36465.6,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 7055.6,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 5851.9,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 48078.4
    },
    {
     "y": 2017,
     "v": 46725.3
    },
    {
     "y": 2018,
     "v": 55907.4
    },
    {
     "y": 2019,
     "v": 55061
    },
    {
     "y": 2020,
     "v": 52585.3
    },
    {
     "y": 2021,
     "v": 57834.2
    },
    {
     "y": 2022,
     "v": 67911
    },
    {
     "y": 2023,
     "v": 69203.1
    },
    {
     "y": 2024,
     "v": 73080.2
    },
    {
     "y": 2025,
     "v": 75398.6
    }
   ],
   "rank": 13
  },
  {
   "fips": "47000",
   "name": "Tennessee",
   "slug": "tennessee",
   "year": 2025,
   "mfgM": 68030.5,
   "sharePctOfState": 11.6,
   "yoyPct": -0.2,
   "realYoYPct": 0,
   "durableM": 36265.4,
   "nondurableM": 31765.1,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 12512.5,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 9897.3,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 8153.8,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 51758.4
    },
    {
     "y": 2017,
     "v": 55231.1
    },
    {
     "y": 2018,
     "v": 54628
    },
    {
     "y": 2019,
     "v": 55280.9
    },
    {
     "y": 2020,
     "v": 56513.8
    },
    {
     "y": 2021,
     "v": 58373.7
    },
    {
     "y": 2022,
     "v": 59977.8
    },
    {
     "y": 2023,
     "v": 66404
    },
    {
     "y": 2024,
     "v": 68158.6
    },
    {
     "y": 2025,
     "v": 68030.5
    }
   ],
   "rank": 14
  },
  {
   "fips": "25000",
   "name": "Massachusetts",
   "slug": "massachusetts",
   "year": 2025,
   "mfgM": 67984.9,
   "sharePctOfState": 8.4,
   "yoyPct": 3.6,
   "realYoYPct": 2.4,
   "durableM": 33420.9,
   "nondurableM": 34564,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 24571.7,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 12751.7,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 5077,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 48256.1
    },
    {
     "y": 2017,
     "v": 46542.2
    },
    {
     "y": 2018,
     "v": 49650.4
    },
    {
     "y": 2019,
     "v": 49391.9
    },
    {
     "y": 2020,
     "v": 49311.7
    },
    {
     "y": 2021,
     "v": 53834.9
    },
    {
     "y": 2022,
     "v": 59561.1
    },
    {
     "y": 2023,
     "v": 62336.7
    },
    {
     "y": 2024,
     "v": 65634.2
    },
    {
     "y": 2025,
     "v": 67984.9
    }
   ],
   "rank": 15
  },
  {
   "fips": "53000",
   "name": "Washington",
   "slug": "washington",
   "year": 2025,
   "mfgM": 62431.3,
   "sharePctOfState": 7,
   "yoyPct": 4.8,
   "realYoYPct": 4.6,
   "durableM": 44903.9,
   "nondurableM": 17527.4,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 24796.9,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 6759.5,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 5815.8,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 58781.3
    },
    {
     "y": 2017,
     "v": 62382.4
    },
    {
     "y": 2018,
     "v": 65742.3
    },
    {
     "y": 2019,
     "v": 67820
    },
    {
     "y": 2020,
     "v": 51470.9
    },
    {
     "y": 2021,
     "v": 50607.2
    },
    {
     "y": 2022,
     "v": 55643.8
    },
    {
     "y": 2023,
     "v": 58266.6
    },
    {
     "y": 2024,
     "v": 59564.8
    },
    {
     "y": 2025,
     "v": 62431.3
    }
   ],
   "rank": 16
  },
  {
   "fips": "22000",
   "name": "Louisiana",
   "slug": "louisiana",
   "year": 2025,
   "mfgM": 62325.2,
   "sharePctOfState": 18.2,
   "yoyPct": 0.7,
   "realYoYPct": 1.2,
   "durableM": 11131.2,
   "nondurableM": 51194.1,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 28674,
     "year": 2025
    },
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 15097.5,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 3099.6,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 36031.7
    },
    {
     "y": 2017,
     "v": 41517.9
    },
    {
     "y": 2018,
     "v": 49941.9
    },
    {
     "y": 2019,
     "v": 47175.3
    },
    {
     "y": 2020,
     "v": 32549.2
    },
    {
     "y": 2021,
     "v": 50707.4
    },
    {
     "y": 2022,
     "v": 63228.3
    },
    {
     "y": 2023,
     "v": 61503.2
    },
    {
     "y": 2024,
     "v": 61866.5
    },
    {
     "y": 2025,
     "v": 62325.2
    }
   ],
   "rank": 17
  },
  {
   "fips": "51000",
   "name": "Virginia",
   "slug": "virginia",
   "year": 2025,
   "mfgM": 58864.8,
   "sharePctOfState": 7.3,
   "yoyPct": 3.7,
   "realYoYPct": 3.2,
   "durableM": 25596.4,
   "nondurableM": 33268.4,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 23840.3,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 7127,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 3923.8,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 42085
    },
    {
     "y": 2017,
     "v": 42028.8
    },
    {
     "y": 2018,
     "v": 44242.8
    },
    {
     "y": 2019,
     "v": 44187.7
    },
    {
     "y": 2020,
     "v": 44532
    },
    {
     "y": 2021,
     "v": 46078.7
    },
    {
     "y": 2022,
     "v": 47845.2
    },
    {
     "y": 2023,
     "v": 55910.2
    },
    {
     "y": 2024,
     "v": 56789.6
    },
    {
     "y": 2025,
     "v": 58864.8
    }
   ],
   "rank": 18
  },
  {
   "fips": "27000",
   "name": "Minnesota",
   "slug": "minnesota",
   "year": 2025,
   "mfgM": 58003.1,
   "sharePctOfState": 11.3,
   "yoyPct": 0.4,
   "realYoYPct": -0.5,
   "durableM": 36570.6,
   "nondurableM": 21432.5,
   "topSubsectors": [
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 8841.4,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 8612.4,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 6600.1,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 45908.2
    },
    {
     "y": 2017,
     "v": 46000.9
    },
    {
     "y": 2018,
     "v": 48716.6
    },
    {
     "y": 2019,
     "v": 48167.9
    },
    {
     "y": 2020,
     "v": 45544.4
    },
    {
     "y": 2021,
     "v": 48316.1
    },
    {
     "y": 2022,
     "v": 54042.7
    },
    {
     "y": 2023,
     "v": 56559.3
    },
    {
     "y": 2024,
     "v": 57778.3
    },
    {
     "y": 2025,
     "v": 58003.1
    }
   ],
   "rank": 19
  },
  {
   "fips": "29000",
   "name": "Missouri",
   "slug": "missouri",
   "year": 2025,
   "mfgM": 50887.2,
   "sharePctOfState": 10.7,
   "yoyPct": 1.5,
   "realYoYPct": 1.4,
   "durableM": 24838.2,
   "nondurableM": 26049,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 11239.2,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 9437.6,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 4185.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 36219.1
    },
    {
     "y": 2017,
     "v": 35939.9
    },
    {
     "y": 2018,
     "v": 35933.5
    },
    {
     "y": 2019,
     "v": 38125.5
    },
    {
     "y": 2020,
     "v": 38792.8
    },
    {
     "y": 2021,
     "v": 40931.5
    },
    {
     "y": 2022,
     "v": 43975.8
    },
    {
     "y": 2023,
     "v": 48710.3
    },
    {
     "y": 2024,
     "v": 50126.1
    },
    {
     "y": 2025,
     "v": 50887.2
    }
   ],
   "rank": 20
  },
  {
   "fips": "01000",
   "name": "Alabama",
   "slug": "alabama",
   "year": 2025,
   "mfgM": 49534.1,
   "sharePctOfState": 14.6,
   "yoyPct": 1.8,
   "realYoYPct": 2.7,
   "durableM": 34270.3,
   "nondurableM": 15263.8,
   "topSubsectors": [
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 8344.3,
     "year": 2025
    },
    {
     "code": "331",
     "slug": "primary-metals",
     "name": "Primary Metals",
     "valueM": 7121.6,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 4396.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 33740
    },
    {
     "y": 2017,
     "v": 35501.4
    },
    {
     "y": 2018,
     "v": 37798.9
    },
    {
     "y": 2019,
     "v": 37956.4
    },
    {
     "y": 2020,
     "v": 35521.7
    },
    {
     "y": 2021,
     "v": 40407.2
    },
    {
     "y": 2022,
     "v": 45164.5
    },
    {
     "y": 2023,
     "v": 47756.8
    },
    {
     "y": 2024,
     "v": 48662.2
    },
    {
     "y": 2025,
     "v": 49534.1
    }
   ],
   "rank": 21
  },
  {
   "fips": "21000",
   "name": "Kentucky",
   "slug": "kentucky",
   "year": 2025,
   "mfgM": 49307.9,
   "sharePctOfState": 15.7,
   "yoyPct": -1,
   "realYoYPct": 0,
   "durableM": 26488.6,
   "nondurableM": 22819.3,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 11838.1,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 10088.3,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 5002.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 34347.1
    },
    {
     "y": 2017,
     "v": 35880.9
    },
    {
     "y": 2018,
     "v": 36653.1
    },
    {
     "y": 2019,
     "v": 39157.2
    },
    {
     "y": 2020,
     "v": 36307.7
    },
    {
     "y": 2021,
     "v": 38423
    },
    {
     "y": 2022,
     "v": 43035.1
    },
    {
     "y": 2023,
     "v": 47761.5
    },
    {
     "y": 2024,
     "v": 49792
    },
    {
     "y": 2025,
     "v": 49307.9
    }
   ],
   "rank": 22
  },
  {
   "fips": "45000",
   "name": "South Carolina",
   "slug": "south-carolina",
   "year": 2025,
   "mfgM": 48670.3,
   "sharePctOfState": 12.9,
   "yoyPct": 1.4,
   "realYoYPct": 1.7,
   "durableM": 29242.3,
   "nondurableM": 19428,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 6697.5,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 6161.5,
     "year": 2025
    },
    {
     "code": "326",
     "slug": "plastics-rubber",
     "name": "Plastics and Rubber Products",
     "valueM": 4516.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 34739.4
    },
    {
     "y": 2017,
     "v": 33153.5
    },
    {
     "y": 2018,
     "v": 34949.5
    },
    {
     "y": 2019,
     "v": 37236.1
    },
    {
     "y": 2020,
     "v": 33905.4
    },
    {
     "y": 2021,
     "v": 35737.3
    },
    {
     "y": 2022,
     "v": 41927.8
    },
    {
     "y": 2023,
     "v": 45906.8
    },
    {
     "y": 2024,
     "v": 47981.9
    },
    {
     "y": 2025,
     "v": 48670.3
    }
   ],
   "rank": 23
  },
  {
   "fips": "19000",
   "name": "Iowa",
   "slug": "iowa",
   "year": 2025,
   "mfgM": 45661.9,
   "sharePctOfState": 16.8,
   "yoyPct": -0.8,
   "realYoYPct": -1.7,
   "durableM": 23189,
   "nondurableM": 22472.9,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 11527.5,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 9939.8,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 8289,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 29991.6
    },
    {
     "y": 2017,
     "v": 31977.4
    },
    {
     "y": 2018,
     "v": 34001.9
    },
    {
     "y": 2019,
     "v": 33569
    },
    {
     "y": 2020,
     "v": 34599.1
    },
    {
     "y": 2021,
     "v": 37068.4
    },
    {
     "y": 2022,
     "v": 41402
    },
    {
     "y": 2023,
     "v": 43965.7
    },
    {
     "y": 2024,
     "v": 46043.1
    },
    {
     "y": 2025,
     "v": 45661.9
    }
   ],
   "rank": 24
  },
  {
   "fips": "04000",
   "name": "Arizona",
   "slug": "arizona",
   "year": 2025,
   "mfgM": 44048.4,
   "sharePctOfState": 7.4,
   "yoyPct": 1.9,
   "realYoYPct": 1,
   "durableM": 36095.1,
   "nondurableM": 7953.3,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 10639.6,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 9653.8,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 4368.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 25424
    },
    {
     "y": 2017,
     "v": 25753.7
    },
    {
     "y": 2018,
     "v": 28507.1
    },
    {
     "y": 2019,
     "v": 33207.6
    },
    {
     "y": 2020,
     "v": 34645.8
    },
    {
     "y": 2021,
     "v": 40195.4
    },
    {
     "y": 2022,
     "v": 42258.1
    },
    {
     "y": 2023,
     "v": 41746.6
    },
    {
     "y": 2024,
     "v": 43227.5
    },
    {
     "y": 2025,
     "v": 44048.4
    }
   ],
   "rank": 25
  },
  {
   "fips": "09000",
   "name": "Connecticut",
   "slug": "connecticut",
   "year": 2025,
   "mfgM": 40154,
   "sharePctOfState": 10.5,
   "yoyPct": 4.6,
   "realYoYPct": 3.9,
   "durableM": 30534.5,
   "nondurableM": 9619.5,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 16583.7,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 5084.3,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 3872.9,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 27095
    },
    {
     "y": 2017,
     "v": 28374.3
    },
    {
     "y": 2018,
     "v": 31694
    },
    {
     "y": 2019,
     "v": 33958.4
    },
    {
     "y": 2020,
     "v": 32643.4
    },
    {
     "y": 2021,
     "v": 35642.5
    },
    {
     "y": 2022,
     "v": 38771.2
    },
    {
     "y": 2023,
     "v": 38082
    },
    {
     "y": 2024,
     "v": 38402.6
    },
    {
     "y": 2025,
     "v": 40154
    }
   ],
   "rank": 26
  },
  {
   "fips": "20000",
   "name": "Kansas",
   "slug": "kansas",
   "year": 2025,
   "mfgM": 35138.6,
   "sharePctOfState": 15.1,
   "yoyPct": 1.9,
   "realYoYPct": 1.7,
   "durableM": 17615,
   "nondurableM": 17523.5,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 8213.7,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 6844.5,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 4089.2,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 23685.2
    },
    {
     "y": 2017,
     "v": 24284.8
    },
    {
     "y": 2018,
     "v": 26879
    },
    {
     "y": 2019,
     "v": 25657.1
    },
    {
     "y": 2020,
     "v": 23489.5
    },
    {
     "y": 2021,
     "v": 26491.2
    },
    {
     "y": 2022,
     "v": 33628.8
    },
    {
     "y": 2023,
     "v": 34646.9
    },
    {
     "y": 2024,
     "v": 34499.4
    },
    {
     "y": 2025,
     "v": 35138.6
    }
   ],
   "rank": 27
  },
  {
   "fips": "41000",
   "name": "Oregon",
   "slug": "oregon",
   "year": 2025,
   "mfgM": 34792.6,
   "sharePctOfState": 10.1,
   "yoyPct": -0.9,
   "realYoYPct": -1.8,
   "durableM": 26962.5,
   "nondurableM": 7830,
   "topSubsectors": [
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 13484.6,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 4324.9,
     "year": 2025
    },
    {
     "code": "321",
     "slug": "wood-products",
     "name": "Wood Products",
     "valueM": 3188.1,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 29039
    },
    {
     "y": 2017,
     "v": 31143.7
    },
    {
     "y": 2018,
     "v": 31993.1
    },
    {
     "y": 2019,
     "v": 31424.1
    },
    {
     "y": 2020,
     "v": 31206
    },
    {
     "y": 2021,
     "v": 34229.9
    },
    {
     "y": 2022,
     "v": 35903.6
    },
    {
     "y": 2023,
     "v": 33797.6
    },
    {
     "y": 2024,
     "v": 35097.8
    },
    {
     "y": 2025,
     "v": 34792.6
    }
   ],
   "rank": 28
  },
  {
   "fips": "24000",
   "name": "Maryland",
   "slug": "maryland",
   "year": 2025,
   "mfgM": 30158.7,
   "sharePctOfState": 5.3,
   "yoyPct": 4.3,
   "realYoYPct": 3.4,
   "durableM": 13078.3,
   "nondurableM": 17080.3,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 9793.2,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 5919.1,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 4431.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 20574.1
    },
    {
     "y": 2017,
     "v": 21032.4
    },
    {
     "y": 2018,
     "v": 21682.5
    },
    {
     "y": 2019,
     "v": 21913.4
    },
    {
     "y": 2020,
     "v": 23437.7
    },
    {
     "y": 2021,
     "v": 24591.3
    },
    {
     "y": 2022,
     "v": 25913.6
    },
    {
     "y": 2023,
     "v": 27980.4
    },
    {
     "y": 2024,
     "v": 28909.4
    },
    {
     "y": 2025,
     "v": 30158.7
    }
   ],
   "rank": 29
  },
  {
   "fips": "49000",
   "name": "Utah",
   "slug": "utah",
   "year": 2025,
   "mfgM": 29650.4,
   "sharePctOfState": 9.3,
   "yoyPct": 1.7,
   "realYoYPct": 1.1,
   "durableM": 17472.3,
   "nondurableM": 12178.1,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 4566.2,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 3346.4,
     "year": 2025
    },
    {
     "code": "339",
     "slug": "miscellaneous",
     "name": "Miscellaneous Manufacturing",
     "valueM": 3146.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 16108.6
    },
    {
     "y": 2017,
     "v": 18035.9
    },
    {
     "y": 2018,
     "v": 20319.5
    },
    {
     "y": 2019,
     "v": 21134.9
    },
    {
     "y": 2020,
     "v": 19778
    },
    {
     "y": 2021,
     "v": 24211.2
    },
    {
     "y": 2022,
     "v": 27206
    },
    {
     "y": 2023,
     "v": 28076.8
    },
    {
     "y": 2024,
     "v": 29165
    },
    {
     "y": 2025,
     "v": 29650.4
    }
   ],
   "rank": 30
  },
  {
   "fips": "08000",
   "name": "Colorado",
   "slug": "colorado",
   "year": 2025,
   "mfgM": 29074.4,
   "sharePctOfState": 5.1,
   "yoyPct": 1.5,
   "realYoYPct": 0.4,
   "durableM": 19058.5,
   "nondurableM": 10015.9,
   "topSubsectors": [
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 5908.5,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 5458.6,
     "year": 2025
    },
    {
     "code": "339",
     "slug": "miscellaneous",
     "name": "Miscellaneous Manufacturing",
     "valueM": 3197.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 21878.4
    },
    {
     "y": 2017,
     "v": 21524
    },
    {
     "y": 2018,
     "v": 23032.5
    },
    {
     "y": 2019,
     "v": 24253
    },
    {
     "y": 2020,
     "v": 25631.2
    },
    {
     "y": 2021,
     "v": 25942.7
    },
    {
     "y": 2022,
     "v": 28541.2
    },
    {
     "y": 2023,
     "v": 27865.6
    },
    {
     "y": 2024,
     "v": 28645.8
    },
    {
     "y": 2025,
     "v": 29074.4
    }
   ],
   "rank": 31
  },
  {
   "fips": "05000",
   "name": "Arkansas",
   "slug": "arkansas",
   "year": 2025,
   "mfgM": 25140.5,
   "sharePctOfState": 12.8,
   "yoyPct": -0.2,
   "realYoYPct": -0.3,
   "durableM": 12543.8,
   "nondurableM": 12596.7,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 6597.9,
     "year": 2025
    },
    {
     "code": "331",
     "slug": "primary-metals",
     "name": "Primary Metals",
     "valueM": 2862.9,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 2385.6,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 17322.7
    },
    {
     "y": 2017,
     "v": 17427.1
    },
    {
     "y": 2018,
     "v": 18869.6
    },
    {
     "y": 2019,
     "v": 18881.9
    },
    {
     "y": 2020,
     "v": 18780
    },
    {
     "y": 2021,
     "v": 23183.8
    },
    {
     "y": 2022,
     "v": 23531.6
    },
    {
     "y": 2023,
     "v": 24668.4
    },
    {
     "y": 2024,
     "v": 25180.6
    },
    {
     "y": 2025,
     "v": 25140.5
    }
   ],
   "rank": 32
  },
  {
   "fips": "40000",
   "name": "Oklahoma",
   "slug": "oklahoma",
   "year": 2025,
   "mfgM": 24841.7,
   "sharePctOfState": 9.1,
   "yoyPct": 0.8,
   "realYoYPct": 0.5,
   "durableM": 14208.9,
   "nondurableM": 10632.8,
   "topSubsectors": [
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 4047.2,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 3579.5,
     "year": 2025
    },
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 2767.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 15416.6
    },
    {
     "y": 2017,
     "v": 16541.9
    },
    {
     "y": 2018,
     "v": 18332.2
    },
    {
     "y": 2019,
     "v": 19130
    },
    {
     "y": 2020,
     "v": 16766.7
    },
    {
     "y": 2021,
     "v": 18985.2
    },
    {
     "y": 2022,
     "v": 20720.2
    },
    {
     "y": 2023,
     "v": 23915.9
    },
    {
     "y": 2024,
     "v": 24649.4
    },
    {
     "y": 2025,
     "v": 24841.7
    }
   ],
   "rank": 33
  },
  {
   "fips": "28000",
   "name": "Mississippi",
   "slug": "mississippi",
   "year": 2025,
   "mfgM": 24198.4,
   "sharePctOfState": 14.9,
   "yoyPct": -0.3,
   "realYoYPct": 0.4,
   "durableM": 12069.8,
   "nondurableM": 12128.6,
   "topSubsectors": [
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 5118,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 2332.6,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 2234.6,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 15899
    },
    {
     "y": 2017,
     "v": 16396.9
    },
    {
     "y": 2018,
     "v": 16730.9
    },
    {
     "y": 2019,
     "v": 16728.5
    },
    {
     "y": 2020,
     "v": 16633.8
    },
    {
     "y": 2021,
     "v": 20631.4
    },
    {
     "y": 2022,
     "v": 22032.4
    },
    {
     "y": 2023,
     "v": 24784.1
    },
    {
     "y": 2024,
     "v": 24275.5
    },
    {
     "y": 2025,
     "v": 24198.4
    }
   ],
   "rank": 34
  },
  {
   "fips": "31000",
   "name": "Nebraska",
   "slug": "nebraska",
   "year": 2025,
   "mfgM": 19079,
   "sharePctOfState": 9.2,
   "yoyPct": -1.2,
   "realYoYPct": -1.7,
   "durableM": 7500.4,
   "nondurableM": 11578.7,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 6077.1,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 4383.6,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 1500.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 12111.3
    },
    {
     "y": 2017,
     "v": 11914.8
    },
    {
     "y": 2018,
     "v": 13624.5
    },
    {
     "y": 2019,
     "v": 14041.9
    },
    {
     "y": 2020,
     "v": 14995.7
    },
    {
     "y": 2021,
     "v": 17768.5
    },
    {
     "y": 2022,
     "v": 18644.1
    },
    {
     "y": 2023,
     "v": 18733.6
    },
    {
     "y": 2024,
     "v": 19310.9
    },
    {
     "y": 2025,
     "v": 19079
    }
   ],
   "rank": 35
  },
  {
   "fips": "16000",
   "name": "Idaho",
   "slug": "idaho",
   "year": 2025,
   "mfgM": 13311.3,
   "sharePctOfState": 9.7,
   "yoyPct": 4.1,
   "realYoYPct": 3.4,
   "durableM": 7451.7,
   "nondurableM": 5859.6,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 4170.1,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 2842,
     "year": 2025
    },
    {
     "code": "321",
     "slug": "wood-products",
     "name": "Wood Products",
     "valueM": 1040.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 7121.4
    },
    {
     "y": 2017,
     "v": 7936.1
    },
    {
     "y": 2018,
     "v": 8842.3
    },
    {
     "y": 2019,
     "v": 9013.3
    },
    {
     "y": 2020,
     "v": 8942.5
    },
    {
     "y": 2021,
     "v": 9570.4
    },
    {
     "y": 2022,
     "v": 10565.4
    },
    {
     "y": 2023,
     "v": 11847.2
    },
    {
     "y": 2024,
     "v": 12789.9
    },
    {
     "y": 2025,
     "v": 13311.3
    }
   ],
   "rank": 36
  },
  {
   "fips": "32000",
   "name": "Nevada",
   "slug": "nevada",
   "year": 2025,
   "mfgM": 12290.4,
   "sharePctOfState": 4.4,
   "yoyPct": 3.5,
   "realYoYPct": 2.5,
   "durableM": 8833.1,
   "nondurableM": 3457.2,
   "topSubsectors": [
    {
     "code": "339",
     "slug": "miscellaneous",
     "name": "Miscellaneous Manufacturing",
     "valueM": 3249.9,
     "year": 2025
    },
    {
     "code": "335",
     "slug": "electrical-equipment",
     "name": "Electrical Equipment and Appliances",
     "valueM": 1669,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 1351.9,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 5978.1
    },
    {
     "y": 2017,
     "v": 7081
    },
    {
     "y": 2018,
     "v": 7478.9
    },
    {
     "y": 2019,
     "v": 7910.5
    },
    {
     "y": 2020,
     "v": 7923.6
    },
    {
     "y": 2021,
     "v": 8730.4
    },
    {
     "y": 2022,
     "v": 10222.3
    },
    {
     "y": 2023,
     "v": 11105.8
    },
    {
     "y": 2024,
     "v": 11870.7
    },
    {
     "y": 2025,
     "v": 12290.4
    }
   ],
   "rank": 37
  },
  {
   "fips": "33000",
   "name": "New Hampshire",
   "slug": "new-hampshire",
   "year": 2025,
   "mfgM": 12048,
   "sharePctOfState": 9.4,
   "yoyPct": 3.3,
   "realYoYPct": 2.1,
   "durableM": 9136.1,
   "nondurableM": 2911.9,
   "topSubsectors": [
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 3349.7,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 1694.1,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 1251.1,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 8489.7
    },
    {
     "y": 2017,
     "v": 8187.4
    },
    {
     "y": 2018,
     "v": 8334.7
    },
    {
     "y": 2019,
     "v": 8820.7
    },
    {
     "y": 2020,
     "v": 8940.9
    },
    {
     "y": 2021,
     "v": 9411.4
    },
    {
     "y": 2022,
     "v": 10565.9
    },
    {
     "y": 2023,
     "v": 11396.8
    },
    {
     "y": 2024,
     "v": 11664.3
    },
    {
     "y": 2025,
     "v": 12048
    }
   ],
   "rank": 38
  },
  {
   "fips": "54000",
   "name": "West Virginia",
   "slug": "west-virginia",
   "year": 2025,
   "mfgM": 9268.7,
   "sharePctOfState": 8.3,
   "yoyPct": 2,
   "realYoYPct": 2.8,
   "durableM": 4502.4,
   "nondurableM": 4766.3,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 3079.1,
     "year": 2025
    },
    {
     "code": "3361MV",
     "slug": "motor-vehicles",
     "name": "Motor Vehicles and Parts",
     "valueM": 1209.3,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 666.4,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 6787.1
    },
    {
     "y": 2017,
     "v": 7533.2
    },
    {
     "y": 2018,
     "v": 8052
    },
    {
     "y": 2019,
     "v": 7289.1
    },
    {
     "y": 2020,
     "v": 7112.4
    },
    {
     "y": 2021,
     "v": 8103.3
    },
    {
     "y": 2022,
     "v": 8894
    },
    {
     "y": 2023,
     "v": 8610.3
    },
    {
     "y": 2024,
     "v": 9085.3
    },
    {
     "y": 2025,
     "v": 9268.7
    }
   ],
   "rank": 39
  },
  {
   "fips": "10000",
   "name": "Delaware",
   "slug": "delaware",
   "year": 2025,
   "mfgM": 8457.4,
   "sharePctOfState": 6.9,
   "yoyPct": 0.3,
   "realYoYPct": -0.3,
   "durableM": 1611.5,
   "nondurableM": 6845.9,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 3782.2,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 2259.9,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 463,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 3728.6
    },
    {
     "y": 2017,
     "v": 4352.1
    },
    {
     "y": 2018,
     "v": 4769.3
    },
    {
     "y": 2019,
     "v": 5370.9
    },
    {
     "y": 2020,
     "v": 5270.1
    },
    {
     "y": 2021,
     "v": 5645.5
    },
    {
     "y": 2022,
     "v": 6841.2
    },
    {
     "y": 2023,
     "v": 7527
    },
    {
     "y": 2024,
     "v": 8433.7
    },
    {
     "y": 2025,
     "v": 8457.4
    }
   ],
   "rank": 40
  },
  {
   "fips": "23000",
   "name": "Maine",
   "slug": "maine",
   "year": 2025,
   "mfgM": 8252.2,
   "sharePctOfState": 8.1,
   "yoyPct": 3.4,
   "realYoYPct": 2.9,
   "durableM": 4631.3,
   "nondurableM": 3620.8,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 1803.4,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 1330.6,
     "year": 2025
    },
    {
     "code": "322",
     "slug": "paper",
     "name": "Paper Products",
     "valueM": 760.6,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 5571.8
    },
    {
     "y": 2017,
     "v": 5933.7
    },
    {
     "y": 2018,
     "v": 6176.6
    },
    {
     "y": 2019,
     "v": 6539.6
    },
    {
     "y": 2020,
     "v": 7199.7
    },
    {
     "y": 2021,
     "v": 7801.9
    },
    {
     "y": 2022,
     "v": 8091.4
    },
    {
     "y": 2023,
     "v": 7928.7
    },
    {
     "y": 2024,
     "v": 7983.3
    },
    {
     "y": 2025,
     "v": 8252.2
    }
   ],
   "rank": 41
  },
  {
   "fips": "38000",
   "name": "North Dakota",
   "slug": "north-dakota",
   "year": 2025,
   "mfgM": 6850.6,
   "sharePctOfState": 8.3,
   "yoyPct": -3.4,
   "realYoYPct": -4.2,
   "durableM": 4440.5,
   "nondurableM": 2410.1,
   "topSubsectors": [
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 2899.6,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 1331.6,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 445.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 3320.2
    },
    {
     "y": 2017,
     "v": 3588.3
    },
    {
     "y": 2018,
     "v": 3433.4
    },
    {
     "y": 2019,
     "v": 3901.4
    },
    {
     "y": 2020,
     "v": 4254.7
    },
    {
     "y": 2021,
     "v": 4870.1
    },
    {
     "y": 2022,
     "v": 6069.7
    },
    {
     "y": 2023,
     "v": 7285
    },
    {
     "y": 2024,
     "v": 7092.7
    },
    {
     "y": 2025,
     "v": 6850.6
    }
   ],
   "rank": 42
  },
  {
   "fips": "44000",
   "name": "Rhode Island",
   "slug": "rhode-island",
   "year": 2025,
   "mfgM": 6165.3,
   "sharePctOfState": 7,
   "yoyPct": 3.6,
   "realYoYPct": 2.9,
   "durableM": 4238.5,
   "nondurableM": 1926.8,
   "topSubsectors": [
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 1793.9,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 892.1,
     "year": 2025
    },
    {
     "code": "339",
     "slug": "miscellaneous",
     "name": "Miscellaneous Manufacturing",
     "valueM": 594.5,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 4765.2
    },
    {
     "y": 2017,
     "v": 4696.4
    },
    {
     "y": 2018,
     "v": 4950.4
    },
    {
     "y": 2019,
     "v": 4734.1
    },
    {
     "y": 2020,
     "v": 4839.3
    },
    {
     "y": 2021,
     "v": 5389.1
    },
    {
     "y": 2022,
     "v": 5521.7
    },
    {
     "y": 2023,
     "v": 5745.9
    },
    {
     "y": 2024,
     "v": 5953.6
    },
    {
     "y": 2025,
     "v": 6165.3
    }
   ],
   "rank": 43
  },
  {
   "fips": "46000",
   "name": "South Dakota",
   "slug": "south-dakota",
   "year": 2025,
   "mfgM": 5361.8,
   "sharePctOfState": 6.5,
   "yoyPct": -0.7,
   "realYoYPct": -1.5,
   "durableM": 3616.9,
   "nondurableM": 1744.9,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 891.5,
     "year": 2025
    },
    {
     "code": "339",
     "slug": "miscellaneous",
     "name": "Miscellaneous Manufacturing",
     "valueM": 847.5,
     "year": 2025
    },
    {
     "code": "333",
     "slug": "machinery",
     "name": "Machinery",
     "valueM": 742.6,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 4535.4
    },
    {
     "y": 2017,
     "v": 4503.8
    },
    {
     "y": 2018,
     "v": 4441.6
    },
    {
     "y": 2019,
     "v": 4112.1
    },
    {
     "y": 2020,
     "v": 4491.8
    },
    {
     "y": 2021,
     "v": 5136.9
    },
    {
     "y": 2022,
     "v": 4947.5
    },
    {
     "y": 2023,
     "v": 5247.1
    },
    {
     "y": 2024,
     "v": 5402.1
    },
    {
     "y": 2025,
     "v": 5361.8
    }
   ],
   "rank": 44
  },
  {
   "fips": "35000",
   "name": "New Mexico",
   "slug": "new-mexico",
   "year": 2025,
   "mfgM": 4474.7,
   "sharePctOfState": 2.9,
   "yoyPct": 0.2,
   "realYoYPct": -0.6,
   "durableM": 2271.2,
   "nondurableM": 2203.5,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 991.2,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 942.8,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 492.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 3636.2
    },
    {
     "y": 2017,
     "v": 3555.4
    },
    {
     "y": 2018,
     "v": 3859.5
    },
    {
     "y": 2019,
     "v": 4360.9
    },
    {
     "y": 2020,
     "v": 3851.5
    },
    {
     "y": 2021,
     "v": 4384.6
    },
    {
     "y": 2022,
     "v": 4729.3
    },
    {
     "y": 2023,
     "v": 4452.2
    },
    {
     "y": 2024,
     "v": 4464.2
    },
    {
     "y": 2025,
     "v": 4474.7
    }
   ],
   "rank": 45
  },
  {
   "fips": "30000",
   "name": "Montana",
   "slug": "montana",
   "year": 2025,
   "mfgM": 4070.2,
   "sharePctOfState": 5,
   "yoyPct": -8.9,
   "realYoYPct": -7.9,
   "durableM": 1640,
   "nondurableM": 2430.2,
   "topSubsectors": [
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 1763.4,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 342,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 337.3,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 2254.8
    },
    {
     "y": 2017,
     "v": 3252
    },
    {
     "y": 2018,
     "v": 3762.7
    },
    {
     "y": 2019,
     "v": 3054.1
    },
    {
     "y": 2020,
     "v": 2374.7
    },
    {
     "y": 2021,
     "v": 3148.4
    },
    {
     "y": 2022,
     "v": 4367.6
    },
    {
     "y": 2023,
     "v": 4584.5
    },
    {
     "y": 2024,
     "v": 4467.8
    },
    {
     "y": 2025,
     "v": 4070.2
    }
   ],
   "rank": 46
  },
  {
   "fips": "56000",
   "name": "Wyoming",
   "slug": "wyoming",
   "year": 2025,
   "mfgM": 4044.4,
   "sharePctOfState": 7.7,
   "yoyPct": -5.3,
   "realYoYPct": -4.1,
   "durableM": 778.6,
   "nondurableM": 3265.8,
   "topSubsectors": [
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 1856.4,
     "year": 2025
    },
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 1183.7,
     "year": 2025
    },
    {
     "code": "332",
     "slug": "fabricated-metals",
     "name": "Fabricated Metal Products",
     "valueM": 239,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 1620.3
    },
    {
     "y": 2017,
     "v": 1987
    },
    {
     "y": 2018,
     "v": 2565.1
    },
    {
     "y": 2019,
     "v": 2856.8
    },
    {
     "y": 2020,
     "v": 1917.9
    },
    {
     "y": 2021,
     "v": 3095.5
    },
    {
     "y": 2022,
     "v": 4637.6
    },
    {
     "y": 2023,
     "v": 4312.6
    },
    {
     "y": 2024,
     "v": 4271.8
    },
    {
     "y": 2025,
     "v": 4044.4
    }
   ],
   "rank": 47
  },
  {
   "fips": "50000",
   "name": "Vermont",
   "slug": "vermont",
   "year": 2025,
   "mfgM": 3857.7,
   "sharePctOfState": 7.8,
   "yoyPct": 3.5,
   "realYoYPct": 2.6,
   "durableM": 2370.2,
   "nondurableM": 1487.4,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 950.9,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 547.2,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 486.2,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 2696.4
    },
    {
     "y": 2017,
     "v": 2939.9
    },
    {
     "y": 2018,
     "v": 3098
    },
    {
     "y": 2019,
     "v": 3160.4
    },
    {
     "y": 2020,
     "v": 3102.2
    },
    {
     "y": 2021,
     "v": 2950.9
    },
    {
     "y": 2022,
     "v": 3400.9
    },
    {
     "y": 2023,
     "v": 3662.1
    },
    {
     "y": 2024,
     "v": 3726.1
    },
    {
     "y": 2025,
     "v": 3857.7
    }
   ],
   "rank": 48
  },
  {
   "fips": "15000",
   "name": "Hawaii",
   "slug": "hawaii",
   "year": 2025,
   "mfgM": 2237.4,
   "sharePctOfState": 1.8,
   "yoyPct": -2.8,
   "realYoYPct": -2.3,
   "durableM": 640.6,
   "nondurableM": 1596.8,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 652.9,
     "year": 2025
    },
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 644.2,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 238.2,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 1537.4
    },
    {
     "y": 2017,
     "v": 1565.9
    },
    {
     "y": 2018,
     "v": 1700.7
    },
    {
     "y": 2019,
     "v": 1459.5
    },
    {
     "y": 2020,
     "v": 1342.9
    },
    {
     "y": 2021,
     "v": 1522.7
    },
    {
     "y": 2022,
     "v": 1798.4
    },
    {
     "y": 2023,
     "v": 2120.9
    },
    {
     "y": 2024,
     "v": 2302.3
    },
    {
     "y": 2025,
     "v": 2237.4
    }
   ],
   "rank": 49
  },
  {
   "fips": "02000",
   "name": "Alaska",
   "slug": "alaska",
   "year": 2025,
   "mfgM": 1462.5,
   "sharePctOfState": 2,
   "yoyPct": 2.7,
   "realYoYPct": 2.6,
   "durableM": 368.2,
   "nondurableM": 1094.2,
   "topSubsectors": [
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 902.9,
     "year": 2025
    },
    {
     "code": "324",
     "slug": "petroleum-coal",
     "name": "Petroleum and Coal Products",
     "valueM": 146.2,
     "year": 2025
    },
    {
     "code": "3364OT",
     "slug": "other-transportation",
     "name": "Other Transportation Equipment",
     "valueM": 124.2,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 1525.6
    },
    {
     "y": 2017,
     "v": 1726.5
    },
    {
     "y": 2018,
     "v": 1366.6
    },
    {
     "y": 2019,
     "v": 1413.7
    },
    {
     "y": 2020,
     "v": 1275.7
    },
    {
     "y": 2021,
     "v": 1448.5
    },
    {
     "y": 2022,
     "v": 1546.1
    },
    {
     "y": 2023,
     "v": 1517.7
    },
    {
     "y": 2024,
     "v": 1423.5
    },
    {
     "y": 2025,
     "v": 1462.5
    }
   ],
   "rank": 50
  },
  {
   "fips": "11000",
   "name": "District of Columbia",
   "slug": "district-of-columbia",
   "year": 2025,
   "mfgM": 349.2,
   "sharePctOfState": 0.2,
   "yoyPct": -1.6,
   "realYoYPct": -2.9,
   "durableM": 168.6,
   "nondurableM": 180.6,
   "topSubsectors": [
    {
     "code": "325",
     "slug": "chemicals",
     "name": "Chemical Products",
     "valueM": 116.2,
     "year": 2025
    },
    {
     "code": "334",
     "slug": "computers-electronics",
     "name": "Computer and Electronic Products",
     "valueM": 66.6,
     "year": 2025
    },
    {
     "code": "311FT",
     "slug": "food-beverage-tobacco",
     "name": "Food, Beverage, and Tobacco Products",
     "valueM": 43.8,
     "year": 2025
    }
   ],
   "spark": [
    {
     "y": 2016,
     "v": 267.1
    },
    {
     "y": 2017,
     "v": 260.1
    },
    {
     "y": 2018,
     "v": 259.2
    },
    {
     "y": 2019,
     "v": 246.7
    },
    {
     "y": 2020,
     "v": 256.2
    },
    {
     "y": 2021,
     "v": 357.8
    },
    {
     "y": 2022,
     "v": 383.9
    },
    {
     "y": 2023,
     "v": 360.5
    },
    {
     "y": 2024,
     "v": 355
    },
    {
     "y": 2025,
     "v": 349.2
    }
   ],
   "rank": 51
  }
 ],
 "stateIndustries": {
  "10000": [
   {
    "c": "325",
    "v": 3782.2,
    "y": 2025,
    "g": 2.9
   },
   {
    "c": "311FT",
    "v": 2259.9,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "334",
    "v": 463,
    "y": 2025,
    "g": 9
   },
   {
    "c": "324",
    "v": 329.8,
    "y": 2025,
    "g": -24.1
   },
   {
    "c": "322",
    "v": 215.8,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "339",
    "v": 187.3,
    "y": 2025,
    "g": -21
   },
   {
    "c": "333",
    "v": 147,
    "y": 2025,
    "g": -4.7
   },
   {
    "c": "335",
    "v": 145.5,
    "y": 2025,
    "g": 11.5
   },
   {
    "c": "327",
    "v": 144.8,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "326",
    "v": 143.4,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "331",
    "v": 135.7,
    "y": 2025,
    "g": -15.2
   },
   {
    "c": "332",
    "v": 129.4,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "3364OT",
    "v": 103.3,
    "y": 2025,
    "g": 9.7
   },
   {
    "c": "313TT",
    "v": 84.4,
    "y": 2025,
    "g": 14.8
   },
   {
    "c": "337",
    "v": 59.8,
    "y": 2025,
    "g": -19.9
   },
   {
    "c": "321",
    "v": 54.2,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "3361MV",
    "v": 41.3,
    "y": 2025,
    "g": 5.6
   },
   {
    "c": "323",
    "v": 29.4,
    "y": 2025,
    "g": -9
   },
   {
    "c": "315AL",
    "v": 1,
    "y": 2025,
    "g": 0
   }
  ],
  "11000": [
   {
    "c": "325",
    "v": 116.2,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "334",
    "v": 66.6,
    "y": 2025,
    "g": 1.1
   },
   {
    "c": "311FT",
    "v": 43.8,
    "y": 2025,
    "g": -11.3
   },
   {
    "c": "327",
    "v": 27.4,
    "y": 2025,
    "g": -14.6
   },
   {
    "c": "339",
    "v": 25.1,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "337",
    "v": 15.8,
    "y": 2025,
    "g": 6.8
   },
   {
    "c": "323",
    "v": 11,
    "y": 2025,
    "g": 1.9
   },
   {
    "c": "331",
    "v": 9.5,
    "y": 2025,
    "g": 17.3
   },
   {
    "c": "333",
    "v": 9.3,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "332",
    "v": 8,
    "y": 2025,
    "g": -39.8
   },
   {
    "c": "313TT",
    "v": 4.8,
    "y": 2025,
    "g": -7.7
   },
   {
    "c": "315AL",
    "v": 4.4,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "335",
    "v": 3.6,
    "y": 2025,
    "g": 5.9
   },
   {
    "c": "3364OT",
    "v": 2.5,
    "y": 2025,
    "g": 31.6
   },
   {
    "c": "321",
    "v": 0.7,
    "y": 2025,
    "g": 0
   },
   {
    "c": "3361MV",
    "v": 0.6,
    "y": 2021,
    "g": null
   },
   {
    "c": "324",
    "v": 0.3,
    "y": 2025,
    "g": 0
   },
   {
    "c": "322",
    "v": 0.1,
    "y": 2025,
    "g": -66.7
   },
   {
    "c": "326",
    "v": 0.1,
    "y": 2025,
    "g": 0
   }
  ],
  "12000": [
   {
    "c": "3364OT",
    "v": 14477.4,
    "y": 2025,
    "g": 16.5
   },
   {
    "c": "325",
    "v": 13813.7,
    "y": 2025,
    "g": 7.4
   },
   {
    "c": "334",
    "v": 9137.5,
    "y": 2025,
    "g": 6.7
   },
   {
    "c": "311FT",
    "v": 8887.6,
    "y": 2025,
    "g": -3.5
   },
   {
    "c": "333",
    "v": 7097.7,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "339",
    "v": 6796.7,
    "y": 2025,
    "g": 6
   },
   {
    "c": "332",
    "v": 5989.1,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "327",
    "v": 4955.3,
    "y": 2025,
    "g": -0.2
   },
   {
    "c": "321",
    "v": 2320.6,
    "y": 2025,
    "g": -4.3
   },
   {
    "c": "326",
    "v": 2296.5,
    "y": 2025,
    "g": 0
   },
   {
    "c": "323",
    "v": 2028.1,
    "y": 2025,
    "g": 6.2
   },
   {
    "c": "335",
    "v": 1951.4,
    "y": 2025,
    "g": 6.3
   },
   {
    "c": "322",
    "v": 1693.1,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "324",
    "v": 1516.7,
    "y": 2025,
    "g": -16.1
   },
   {
    "c": "337",
    "v": 1244,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "3361MV",
    "v": 1202.9,
    "y": 2025,
    "g": 11.9
   },
   {
    "c": "331",
    "v": 1172,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "313TT",
    "v": 518.8,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "315AL",
    "v": 330.9,
    "y": 2025,
    "g": -12.2
   }
  ],
  "13000": [
   {
    "c": "311FT",
    "v": 18010.6,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "3364OT",
    "v": 9110.7,
    "y": 2025,
    "g": 9.8
   },
   {
    "c": "325",
    "v": 7349.4,
    "y": 2025,
    "g": 4.7
   },
   {
    "c": "333",
    "v": 6319.9,
    "y": 2025,
    "g": -3.3
   },
   {
    "c": "322",
    "v": 5309.1,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "3361MV",
    "v": 5040.1,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "332",
    "v": 4814.1,
    "y": 2025,
    "g": 2.6
   },
   {
    "c": "331",
    "v": 4786.4,
    "y": 2025,
    "g": -5.5
   },
   {
    "c": "313TT",
    "v": 4476.1,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "335",
    "v": 4437.9,
    "y": 2025,
    "g": 13.1
   },
   {
    "c": "326",
    "v": 3837.7,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "321",
    "v": 3528.6,
    "y": 2025,
    "g": 0.8
   },
   {
    "c": "327",
    "v": 3284,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "334",
    "v": 2097.8,
    "y": 2025,
    "g": 9.2
   },
   {
    "c": "339",
    "v": 2077.8,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "323",
    "v": 1359.5,
    "y": 2025,
    "g": -6.3
   },
   {
    "c": "337",
    "v": 1152.1,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "324",
    "v": 721.6,
    "y": 2025,
    "g": -8.9
   },
   {
    "c": "315AL",
    "v": 149.2,
    "y": 2025,
    "g": -10.9
   }
  ],
  "15000": [
   {
    "c": "311FT",
    "v": 652.9,
    "y": 2025,
    "g": -1.7
   },
   {
    "c": "324",
    "v": 644.2,
    "y": 2025,
    "g": -19.6
   },
   {
    "c": "3364OT",
    "v": 238.2,
    "y": 2025,
    "g": 62.5
   },
   {
    "c": "327",
    "v": 195.8,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "325",
    "v": 172.6,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "339",
    "v": 52.2,
    "y": 2025,
    "g": -3.9
   },
   {
    "c": "323",
    "v": 47.7,
    "y": 2025,
    "g": 2.8
   },
   {
    "c": "334",
    "v": 46.1,
    "y": 2025,
    "g": 9.5
   },
   {
    "c": "332",
    "v": 44.6,
    "y": 2025,
    "g": 0
   },
   {
    "c": "315AL",
    "v": 31,
    "y": 2025,
    "g": 9.5
   },
   {
    "c": "337",
    "v": 28.1,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "326",
    "v": 26.4,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "321",
    "v": 18.9,
    "y": 2025,
    "g": -25.3
   },
   {
    "c": "313TT",
    "v": 13.7,
    "y": 2025,
    "g": -1.4
   },
   {
    "c": "322",
    "v": 8.3,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "333",
    "v": 7.8,
    "y": 2025,
    "g": -10.3
   },
   {
    "c": "331",
    "v": 4.5,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "335",
    "v": 3.7,
    "y": 2025,
    "g": 23.3
   },
   {
    "c": "3361MV",
    "v": 0.7,
    "y": 2025,
    "g": 0
   }
  ],
  "16000": [
   {
    "c": "311FT",
    "v": 4170.1,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "334",
    "v": 2842,
    "y": 2025,
    "g": 11.2
   },
   {
    "c": "321",
    "v": 1040.5,
    "y": 2025,
    "g": 5.1
   },
   {
    "c": "325",
    "v": 840.4,
    "y": 2025,
    "g": 2.9
   },
   {
    "c": "332",
    "v": 780.8,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "335",
    "v": 640.6,
    "y": 2025,
    "g": 21.8
   },
   {
    "c": "333",
    "v": 605.5,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "327",
    "v": 422.8,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "339",
    "v": 397.4,
    "y": 2025,
    "g": 7.5
   },
   {
    "c": "322",
    "v": 341.9,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "326",
    "v": 301.2,
    "y": 2025,
    "g": 9.6
   },
   {
    "c": "3361MV",
    "v": 252.2,
    "y": 2025,
    "g": -4.7
   },
   {
    "c": "337",
    "v": 162.1,
    "y": 2025,
    "g": 4.2
   },
   {
    "c": "331",
    "v": 161.9,
    "y": 2025,
    "g": -11
   },
   {
    "c": "3364OT",
    "v": 145.7,
    "y": 2025,
    "g": 9
   },
   {
    "c": "323",
    "v": 104.5,
    "y": 2025,
    "g": 4.8
   },
   {
    "c": "315AL",
    "v": 34.2,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "324",
    "v": 33.7,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "313TT",
    "v": 33.6,
    "y": 2025,
    "g": -2.6
   }
  ],
  "17000": [
   {
    "c": "325",
    "v": 37511.4,
    "y": 2025,
    "g": 6
   },
   {
    "c": "311FT",
    "v": 18502.3,
    "y": 2025,
    "g": -2.8
   },
   {
    "c": "333",
    "v": 17573.4,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "332",
    "v": 12150.5,
    "y": 2025,
    "g": -0.8
   },
   {
    "c": "324",
    "v": 7910.4,
    "y": 2025,
    "g": -16
   },
   {
    "c": "339",
    "v": 7518.4,
    "y": 2025,
    "g": 26
   },
   {
    "c": "334",
    "v": 7387.3,
    "y": 2025,
    "g": 6
   },
   {
    "c": "326",
    "v": 5450.5,
    "y": 2025,
    "g": -16.8
   },
   {
    "c": "335",
    "v": 5037.7,
    "y": 2025,
    "g": 4.1
   },
   {
    "c": "3361MV",
    "v": 4628.2,
    "y": 2025,
    "g": -6.7
   },
   {
    "c": "322",
    "v": 2920.2,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "323",
    "v": 2772.8,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "331",
    "v": 2665.5,
    "y": 2025,
    "g": -6.5
   },
   {
    "c": "327",
    "v": 2663.2,
    "y": 2025,
    "g": 12.9
   },
   {
    "c": "3364OT",
    "v": 2349.5,
    "y": 2025,
    "g": 20.3
   },
   {
    "c": "337",
    "v": 1551.5,
    "y": 2025,
    "g": 2
   },
   {
    "c": "321",
    "v": 826.4,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "315AL",
    "v": 489.8,
    "y": 2025,
    "g": 3.9
   },
   {
    "c": "313TT",
    "v": 355.4,
    "y": 2025,
    "g": 0.1
   }
  ],
  "18000": [
   {
    "c": "325",
    "v": 38652.4,
    "y": 2025,
    "g": 13.5
   },
   {
    "c": "3361MV",
    "v": 19912.6,
    "y": 2025,
    "g": -2.9
   },
   {
    "c": "311FT",
    "v": 11242.5,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "333",
    "v": 10203.1,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "332",
    "v": 9459,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "331",
    "v": 9258.2,
    "y": 2025,
    "g": -4.3
   },
   {
    "c": "324",
    "v": 5575.5,
    "y": 2025,
    "g": -17
   },
   {
    "c": "339",
    "v": 4266.4,
    "y": 2025,
    "g": -5.7
   },
   {
    "c": "326",
    "v": 4111.1,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "327",
    "v": 3085.5,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "3364OT",
    "v": 2999.9,
    "y": 2025,
    "g": 17.7
   },
   {
    "c": "337",
    "v": 2893.3,
    "y": 2025,
    "g": 4.3
   },
   {
    "c": "321",
    "v": 1610.9,
    "y": 2025,
    "g": 3.2
   },
   {
    "c": "334",
    "v": 1571.9,
    "y": 2025,
    "g": 6.8
   },
   {
    "c": "322",
    "v": 1552.2,
    "y": 2025,
    "g": 4.5
   },
   {
    "c": "335",
    "v": 1410.6,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "323",
    "v": 1210.9,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "313TT",
    "v": 267.5,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "315AL",
    "v": 83.7,
    "y": 2025,
    "g": -0.7
   }
  ],
  "19000": [
   {
    "c": "311FT",
    "v": 11527.5,
    "y": 2025,
    "g": -3.9
   },
   {
    "c": "333",
    "v": 9939.8,
    "y": 2025,
    "g": -5.8
   },
   {
    "c": "325",
    "v": 8289,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "334",
    "v": 2852.5,
    "y": 2025,
    "g": 9
   },
   {
    "c": "332",
    "v": 2657.1,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "331",
    "v": 1643.3,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "327",
    "v": 1227.5,
    "y": 2025,
    "g": 11.9
   },
   {
    "c": "326",
    "v": 1114.2,
    "y": 2025,
    "g": 1.9
   },
   {
    "c": "3361MV",
    "v": 1103.1,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "321",
    "v": 998.1,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "335",
    "v": 897.1,
    "y": 2025,
    "g": -1.8
   },
   {
    "c": "337",
    "v": 892.4,
    "y": 2025,
    "g": -2.8
   },
   {
    "c": "322",
    "v": 650.6,
    "y": 2025,
    "g": 4.4
   },
   {
    "c": "339",
    "v": 601.6,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "323",
    "v": 551.3,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "3364OT",
    "v": 376.5,
    "y": 2025,
    "g": 8.5
   },
   {
    "c": "324",
    "v": 198.4,
    "y": 2025,
    "g": -14
   },
   {
    "c": "315AL",
    "v": 100.5,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "313TT",
    "v": 41.5,
    "y": 2025,
    "g": -10
   }
  ],
  "20000": [
   {
    "c": "311FT",
    "v": 8213.7,
    "y": 2025,
    "g": -4.9
   },
   {
    "c": "3364OT",
    "v": 6844.5,
    "y": 2025,
    "g": 13.2
   },
   {
    "c": "325",
    "v": 4089.2,
    "y": 2025,
    "g": 7.3
   },
   {
    "c": "333",
    "v": 2780.8,
    "y": 2025,
    "g": -2.2
   },
   {
    "c": "324",
    "v": 2726.2,
    "y": 2025,
    "g": -11.4
   },
   {
    "c": "332",
    "v": 2053.9,
    "y": 2025,
    "g": 3.8
   },
   {
    "c": "334",
    "v": 1639.2,
    "y": 2025,
    "g": 15.5
   },
   {
    "c": "335",
    "v": 1321.9,
    "y": 2025,
    "g": 28.6
   },
   {
    "c": "326",
    "v": 1260.2,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "327",
    "v": 1050.6,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "323",
    "v": 859.1,
    "y": 2025,
    "g": -2
   },
   {
    "c": "3361MV",
    "v": 827.5,
    "y": 2025,
    "g": -22.6
   },
   {
    "c": "339",
    "v": 360.1,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "321",
    "v": 337,
    "y": 2025,
    "g": 17.9
   },
   {
    "c": "322",
    "v": 284.5,
    "y": 2025,
    "g": 4.4
   },
   {
    "c": "337",
    "v": 203.1,
    "y": 2025,
    "g": 2
   },
   {
    "c": "331",
    "v": 196.4,
    "y": 2025,
    "g": -0.8
   },
   {
    "c": "313TT",
    "v": 52.2,
    "y": 2025,
    "g": 6.5
   },
   {
    "c": "315AL",
    "v": 38.4,
    "y": 2025,
    "g": 1.6
   }
  ],
  "21000": [
   {
    "c": "311FT",
    "v": 11838.1,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "3361MV",
    "v": 10088.3,
    "y": 2025,
    "g": -9.9
   },
   {
    "c": "325",
    "v": 5002.3,
    "y": 2025,
    "g": 5
   },
   {
    "c": "333",
    "v": 3356.1,
    "y": 2025,
    "g": -3.4
   },
   {
    "c": "332",
    "v": 3168.9,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "335",
    "v": 2968.8,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "331",
    "v": 2527.8,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "322",
    "v": 2245.9,
    "y": 2025,
    "g": 4.5
   },
   {
    "c": "326",
    "v": 1874.6,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "327",
    "v": 1273.2,
    "y": 2025,
    "g": -1.3
   },
   {
    "c": "324",
    "v": 986.4,
    "y": 2025,
    "g": -14
   },
   {
    "c": "339",
    "v": 808.5,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "321",
    "v": 747.5,
    "y": 2025,
    "g": -8.4
   },
   {
    "c": "3364OT",
    "v": 712.7,
    "y": 2025,
    "g": 17.5
   },
   {
    "c": "334",
    "v": 581.9,
    "y": 2025,
    "g": 12.7
   },
   {
    "c": "323",
    "v": 556.9,
    "y": 2025,
    "g": -5.3
   },
   {
    "c": "337",
    "v": 254.9,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "315AL",
    "v": 176.1,
    "y": 2025,
    "g": 15.9
   },
   {
    "c": "313TT",
    "v": 139.2,
    "y": 2025,
    "g": -2.3
   }
  ],
  "22000": [
   {
    "c": "325",
    "v": 28674,
    "y": 2025,
    "g": 13.1
   },
   {
    "c": "324",
    "v": 15097.5,
    "y": 2025,
    "g": -19
   },
   {
    "c": "311FT",
    "v": 3099.6,
    "y": 2025,
    "g": -3.2
   },
   {
    "c": "322",
    "v": 2797.2,
    "y": 2025,
    "g": 2.5
   },
   {
    "c": "332",
    "v": 2697.8,
    "y": 2025,
    "g": 11.7
   },
   {
    "c": "321",
    "v": 1909.3,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "333",
    "v": 1775.8,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "3364OT",
    "v": 1546.2,
    "y": 2025,
    "g": 5.9
   },
   {
    "c": "326",
    "v": 1229.4,
    "y": 2025,
    "g": 11.3
   },
   {
    "c": "327",
    "v": 1012.4,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "339",
    "v": 616.1,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "331",
    "v": 570.4,
    "y": 2025,
    "g": 12.5
   },
   {
    "c": "334",
    "v": 465,
    "y": 2025,
    "g": 8.8
   },
   {
    "c": "335",
    "v": 337.9,
    "y": 2025,
    "g": 7.5
   },
   {
    "c": "323",
    "v": 183.2,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "337",
    "v": 100.9,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "3361MV",
    "v": 99.4,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "313TT",
    "v": 92.4,
    "y": 2025,
    "g": -2.8
   },
   {
    "c": "315AL",
    "v": 20.8,
    "y": 2025,
    "g": 0.5
   }
  ],
  "23000": [
   {
    "c": "3364OT",
    "v": 1803.4,
    "y": 2025,
    "g": 13.8
   },
   {
    "c": "311FT",
    "v": 1330.6,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "322",
    "v": 760.6,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "325",
    "v": 741.1,
    "y": 2025,
    "g": 3.9
   },
   {
    "c": "332",
    "v": 636.5,
    "y": 2025,
    "g": 3.2
   },
   {
    "c": "334",
    "v": 620.4,
    "y": 2025,
    "g": 5.3
   },
   {
    "c": "321",
    "v": 544.1,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "326",
    "v": 290.9,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "333",
    "v": 272.3,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "339",
    "v": 248.2,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "327",
    "v": 199.5,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "3361MV",
    "v": 132.6,
    "y": 2025,
    "g": -8.4
   },
   {
    "c": "324",
    "v": 129.4,
    "y": 2025,
    "g": -14.1
   },
   {
    "c": "315AL",
    "v": 128.8,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "313TT",
    "v": 123,
    "y": 2025,
    "g": -6.6
   },
   {
    "c": "323",
    "v": 116.4,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "337",
    "v": 95.4,
    "y": 2025,
    "g": 0.8
   },
   {
    "c": "335",
    "v": 47.9,
    "y": 2025,
    "g": -3.2
   },
   {
    "c": "331",
    "v": 30.9,
    "y": 2025,
    "g": 0
   }
  ],
  "24000": [
   {
    "c": "325",
    "v": 9793.2,
    "y": 2025,
    "g": 9.5
   },
   {
    "c": "334",
    "v": 5919.1,
    "y": 2025,
    "g": 6.6
   },
   {
    "c": "311FT",
    "v": 4431.3,
    "y": 2025,
    "g": 1.7
   },
   {
    "c": "339",
    "v": 1519.4,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "333",
    "v": 1455.5,
    "y": 2025,
    "g": -0.1
   },
   {
    "c": "326",
    "v": 1341.7,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "3364OT",
    "v": 1234.5,
    "y": 2025,
    "g": 5
   },
   {
    "c": "332",
    "v": 1135.7,
    "y": 2025,
    "g": 6.1
   },
   {
    "c": "327",
    "v": 780.9,
    "y": 2025,
    "g": -10.2
   },
   {
    "c": "324",
    "v": 582.9,
    "y": 2025,
    "g": -13.2
   },
   {
    "c": "323",
    "v": 499.4,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "335",
    "v": 297,
    "y": 2025,
    "g": 14.5
   },
   {
    "c": "321",
    "v": 278.5,
    "y": 2025,
    "g": -1
   },
   {
    "c": "337",
    "v": 214.8,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "322",
    "v": 152,
    "y": 2025,
    "g": -1
   },
   {
    "c": "315AL",
    "v": 149.3,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "313TT",
    "v": 130.6,
    "y": 2025,
    "g": -12.8
   },
   {
    "c": "3361MV",
    "v": 125.6,
    "y": 2025,
    "g": -4.3
   },
   {
    "c": "331",
    "v": 117.4,
    "y": 2025,
    "g": -24.3
   }
  ],
  "25000": [
   {
    "c": "325",
    "v": 24571.7,
    "y": 2025,
    "g": 6.5
   },
   {
    "c": "334",
    "v": 12751.7,
    "y": 2025,
    "g": 6.8
   },
   {
    "c": "332",
    "v": 5077,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "339",
    "v": 4998.3,
    "y": 2025,
    "g": 2.9
   },
   {
    "c": "311FT",
    "v": 4482.3,
    "y": 2025,
    "g": -2.8
   },
   {
    "c": "333",
    "v": 3402.5,
    "y": 2025,
    "g": -8.3
   },
   {
    "c": "3364OT",
    "v": 3006.6,
    "y": 2025,
    "g": 11
   },
   {
    "c": "326",
    "v": 2174.3,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "335",
    "v": 1611,
    "y": 2025,
    "g": 7.4
   },
   {
    "c": "322",
    "v": 1058,
    "y": 2025,
    "g": 9.3
   },
   {
    "c": "327",
    "v": 1045.4,
    "y": 2025,
    "g": -2.5
   },
   {
    "c": "323",
    "v": 1025.8,
    "y": 2025,
    "g": -1.8
   },
   {
    "c": "331",
    "v": 650.4,
    "y": 2025,
    "g": 1.4
   },
   {
    "c": "315AL",
    "v": 541.3,
    "y": 2025,
    "g": 2.5
   },
   {
    "c": "337",
    "v": 443.1,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "324",
    "v": 383.8,
    "y": 2025,
    "g": -13.6
   },
   {
    "c": "313TT",
    "v": 326.7,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "321",
    "v": 263.1,
    "y": 2025,
    "g": -18.8
   },
   {
    "c": "3361MV",
    "v": 171.8,
    "y": 2025,
    "g": 6
   }
  ],
  "26000": [
   {
    "c": "3361MV",
    "v": 40787.9,
    "y": 2025,
    "g": -6.3
   },
   {
    "c": "325",
    "v": 11584.4,
    "y": 2025,
    "g": 3.2
   },
   {
    "c": "333",
    "v": 10703.8,
    "y": 2025,
    "g": 1.4
   },
   {
    "c": "332",
    "v": 8602.7,
    "y": 2025,
    "g": -3.3
   },
   {
    "c": "311FT",
    "v": 7786.2,
    "y": 2025,
    "g": -1.1
   },
   {
    "c": "339",
    "v": 6727.9,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "326",
    "v": 4044,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "334",
    "v": 3344.7,
    "y": 2025,
    "g": 6.9
   },
   {
    "c": "327",
    "v": 3130.3,
    "y": 2025,
    "g": 1.7
   },
   {
    "c": "335",
    "v": 2549.5,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "331",
    "v": 2486.7,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "337",
    "v": 2370.6,
    "y": 2025,
    "g": 8.6
   },
   {
    "c": "3364OT",
    "v": 2231,
    "y": 2025,
    "g": 20.5
   },
   {
    "c": "322",
    "v": 2116.8,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "324",
    "v": 1831.4,
    "y": 2025,
    "g": -15.6
   },
   {
    "c": "321",
    "v": 1286.1,
    "y": 2025,
    "g": -6.3
   },
   {
    "c": "323",
    "v": 1242.2,
    "y": 2025,
    "g": 2.8
   },
   {
    "c": "315AL",
    "v": 199.9,
    "y": 2025,
    "g": -14.7
   },
   {
    "c": "313TT",
    "v": 196.9,
    "y": 2025,
    "g": -0.3
   }
  ],
  "27000": [
   {
    "c": "334",
    "v": 8841.4,
    "y": 2025,
    "g": 8.9
   },
   {
    "c": "311FT",
    "v": 8612.4,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "333",
    "v": 6600.1,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "332",
    "v": 6159.8,
    "y": 2025,
    "g": 0
   },
   {
    "c": "339",
    "v": 5193,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "325",
    "v": 3964.6,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "324",
    "v": 3122.7,
    "y": 2025,
    "g": -8.5
   },
   {
    "c": "321",
    "v": 2083.6,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "323",
    "v": 2069.4,
    "y": 2025,
    "g": 0.8
   },
   {
    "c": "326",
    "v": 2016.9,
    "y": 2025,
    "g": -2.1
   },
   {
    "c": "327",
    "v": 1811.5,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "3364OT",
    "v": 1696.4,
    "y": 2025,
    "g": -5
   },
   {
    "c": "335",
    "v": 1689.4,
    "y": 2025,
    "g": 6.6
   },
   {
    "c": "322",
    "v": 1275.1,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "337",
    "v": 901.1,
    "y": 2025,
    "g": 3.8
   },
   {
    "c": "3361MV",
    "v": 867.5,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "331",
    "v": 726.8,
    "y": 2025,
    "g": -15.1
   },
   {
    "c": "315AL",
    "v": 194.1,
    "y": 2025,
    "g": 10.1
   },
   {
    "c": "313TT",
    "v": 177.3,
    "y": 2025,
    "g": -6.3
   }
  ],
  "28000": [
   {
    "c": "324",
    "v": 5118,
    "y": 2025,
    "g": -11.1
   },
   {
    "c": "311FT",
    "v": 2332.6,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "325",
    "v": 2234.6,
    "y": 2025,
    "g": 12.9
   },
   {
    "c": "3364OT",
    "v": 2060.2,
    "y": 2025,
    "g": 9.8
   },
   {
    "c": "333",
    "v": 1961.1,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "3361MV",
    "v": 1501.8,
    "y": 2025,
    "g": -6.7
   },
   {
    "c": "321",
    "v": 1170.9,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "331",
    "v": 1144.9,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "322",
    "v": 1122.6,
    "y": 2025,
    "g": 6.3
   },
   {
    "c": "335",
    "v": 1061.8,
    "y": 2025,
    "g": 26.8
   },
   {
    "c": "332",
    "v": 1046.3,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "337",
    "v": 1005.2,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "326",
    "v": 869,
    "y": 2025,
    "g": -6.8
   },
   {
    "c": "327",
    "v": 592.5,
    "y": 2025,
    "g": 10.5
   },
   {
    "c": "334",
    "v": 282,
    "y": 2025,
    "g": 4.8
   },
   {
    "c": "339",
    "v": 243.2,
    "y": 2025,
    "g": -1.4
   },
   {
    "c": "313TT",
    "v": 226,
    "y": 2025,
    "g": -22.2
   },
   {
    "c": "315AL",
    "v": 137.3,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "323",
    "v": 88.5,
    "y": 2025,
    "g": 33.9
   }
  ],
  "29000": [
   {
    "c": "311FT",
    "v": 11239.2,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "325",
    "v": 9437.6,
    "y": 2025,
    "g": 6.3
   },
   {
    "c": "3361MV",
    "v": 4185.4,
    "y": 2025,
    "g": -8.6
   },
   {
    "c": "332",
    "v": 4095.8,
    "y": 2025,
    "g": 5.7
   },
   {
    "c": "333",
    "v": 3542.6,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "3364OT",
    "v": 3405.9,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "335",
    "v": 2290.1,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "334",
    "v": 2184,
    "y": 2025,
    "g": 9.6
   },
   {
    "c": "326",
    "v": 1981.2,
    "y": 2025,
    "g": 2.6
   },
   {
    "c": "327",
    "v": 1945.1,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "323",
    "v": 1257.7,
    "y": 2025,
    "g": 3
   },
   {
    "c": "339",
    "v": 1175.5,
    "y": 2025,
    "g": 7
   },
   {
    "c": "322",
    "v": 1009.5,
    "y": 2025,
    "g": 1.7
   },
   {
    "c": "331",
    "v": 829.1,
    "y": 2025,
    "g": -9.1
   },
   {
    "c": "324",
    "v": 656.4,
    "y": 2025,
    "g": -10
   },
   {
    "c": "337",
    "v": 645.4,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "321",
    "v": 539.2,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "315AL",
    "v": 319,
    "y": 2025,
    "g": 7.3
   },
   {
    "c": "313TT",
    "v": 148.4,
    "y": 2025,
    "g": 0.5
   }
  ],
  "30000": [
   {
    "c": "324",
    "v": 1763.4,
    "y": 2025,
    "g": -17.5
   },
   {
    "c": "311FT",
    "v": 342,
    "y": 2025,
    "g": -4.4
   },
   {
    "c": "332",
    "v": 337.3,
    "y": 2025,
    "g": 14.4
   },
   {
    "c": "327",
    "v": 278.8,
    "y": 2025,
    "g": -6
   },
   {
    "c": "339",
    "v": 262.2,
    "y": 2025,
    "g": -9.2
   },
   {
    "c": "321",
    "v": 219.7,
    "y": 2025,
    "g": -8.6
   },
   {
    "c": "333",
    "v": 193.8,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "325",
    "v": 187.1,
    "y": 2025,
    "g": 9.3
   },
   {
    "c": "334",
    "v": 160.4,
    "y": 2025,
    "g": -13.5
   },
   {
    "c": "323",
    "v": 73.4,
    "y": 2025,
    "g": -3
   },
   {
    "c": "337",
    "v": 62.1,
    "y": 2025,
    "g": 3
   },
   {
    "c": "3364OT",
    "v": 49.9,
    "y": 2025,
    "g": 12.4
   },
   {
    "c": "326",
    "v": 49.6,
    "y": 2025,
    "g": 6.2
   },
   {
    "c": "3361MV",
    "v": 34.9,
    "y": 2025,
    "g": 28.8
   },
   {
    "c": "331",
    "v": 28.7,
    "y": 2025,
    "g": 2.5
   },
   {
    "c": "335",
    "v": 12.2,
    "y": 2025,
    "g": 7
   },
   {
    "c": "315AL",
    "v": 7.3,
    "y": 2025,
    "g": 9
   },
   {
    "c": "313TT",
    "v": 7,
    "y": 2025,
    "g": 42.9
   },
   {
    "c": "322",
    "v": 0.4,
    "y": 2025,
    "g": 0
   }
  ],
  "31000": [
   {
    "c": "311FT",
    "v": 6077.1,
    "y": 2025,
    "g": -4.6
   },
   {
    "c": "325",
    "v": 4383.6,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "333",
    "v": 1500.3,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "339",
    "v": 1444.4,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "332",
    "v": 1405.4,
    "y": 2025,
    "g": -2.5
   },
   {
    "c": "3361MV",
    "v": 772.6,
    "y": 2025,
    "g": -6.7
   },
   {
    "c": "327",
    "v": 591,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "326",
    "v": 559.9,
    "y": 2025,
    "g": -0.4
   },
   {
    "c": "334",
    "v": 544.3,
    "y": 2025,
    "g": 3.9
   },
   {
    "c": "335",
    "v": 332.1,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "321",
    "v": 312.6,
    "y": 2025,
    "g": -1
   },
   {
    "c": "3364OT",
    "v": 268.6,
    "y": 2025,
    "g": 39
   },
   {
    "c": "331",
    "v": 247.7,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "323",
    "v": 207,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "322",
    "v": 160.3,
    "y": 2025,
    "g": 4.5
   },
   {
    "c": "315AL",
    "v": 89,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "337",
    "v": 81.4,
    "y": 2025,
    "g": 10.7
   },
   {
    "c": "313TT",
    "v": 58,
    "y": 2025,
    "g": -3.3
   },
   {
    "c": "324",
    "v": 43.9,
    "y": 2025,
    "g": -15.6
   }
  ],
  "32000": [
   {
    "c": "339",
    "v": 3249.9,
    "y": 2025,
    "g": 7.2
   },
   {
    "c": "335",
    "v": 1669,
    "y": 2025,
    "g": 15.1
   },
   {
    "c": "311FT",
    "v": 1351.9,
    "y": 2025,
    "g": -3.5
   },
   {
    "c": "332",
    "v": 1189.9,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "327",
    "v": 724.8,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "325",
    "v": 629.8,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "334",
    "v": 584.4,
    "y": 2025,
    "g": 6.6
   },
   {
    "c": "326",
    "v": 506.3,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "323",
    "v": 496.7,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "3361MV",
    "v": 433,
    "y": 2025,
    "g": 2
   },
   {
    "c": "333",
    "v": 276.8,
    "y": 2025,
    "g": -2.3
   },
   {
    "c": "321",
    "v": 245.8,
    "y": 2025,
    "g": -6.2
   },
   {
    "c": "322",
    "v": 234.6,
    "y": 2025,
    "g": 4.2
   },
   {
    "c": "324",
    "v": 183.3,
    "y": 2025,
    "g": -11.7
   },
   {
    "c": "3364OT",
    "v": 177.9,
    "y": 2025,
    "g": -5.6
   },
   {
    "c": "337",
    "v": 170.9,
    "y": 2025,
    "g": 8
   },
   {
    "c": "331",
    "v": 110.8,
    "y": 2025,
    "g": -3.4
   },
   {
    "c": "313TT",
    "v": 49.7,
    "y": 2025,
    "g": 4
   },
   {
    "c": "315AL",
    "v": 4.8,
    "y": 2025,
    "g": 4.3
   }
  ],
  "33000": [
   {
    "c": "334",
    "v": 3349.7,
    "y": 2025,
    "g": 12.7
   },
   {
    "c": "332",
    "v": 1694.1,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "333",
    "v": 1251.1,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "335",
    "v": 995.6,
    "y": 2025,
    "g": 4
   },
   {
    "c": "325",
    "v": 922.1,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "311FT",
    "v": 845.5,
    "y": 2025,
    "g": -9.9
   },
   {
    "c": "326",
    "v": 559.8,
    "y": 2025,
    "g": -4.4
   },
   {
    "c": "339",
    "v": 557.2,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "327",
    "v": 334.4,
    "y": 2025,
    "g": 7.4
   },
   {
    "c": "331",
    "v": 255.2,
    "y": 2025,
    "g": -6.9
   },
   {
    "c": "321",
    "v": 234.4,
    "y": 2025,
    "g": -4.2
   },
   {
    "c": "3364OT",
    "v": 201.4,
    "y": 2025,
    "g": 13.8
   },
   {
    "c": "3361MV",
    "v": 185.4,
    "y": 2025,
    "g": 3.9
   },
   {
    "c": "323",
    "v": 177.8,
    "y": 2025,
    "g": 7.4
   },
   {
    "c": "313TT",
    "v": 148.7,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "324",
    "v": 117,
    "y": 2025,
    "g": -13.4
   },
   {
    "c": "322",
    "v": 95.4,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "337",
    "v": 77.7,
    "y": 2025,
    "g": 3.6
   },
   {
    "c": "315AL",
    "v": 45.6,
    "y": 2025,
    "g": -1.7
   }
  ],
  "34000": [
   {
    "c": "325",
    "v": 36465.6,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "311FT",
    "v": 7055.6,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "334",
    "v": 5851.9,
    "y": 2025,
    "g": 13.4
   },
   {
    "c": "339",
    "v": 5007.3,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "324",
    "v": 4604.6,
    "y": 2025,
    "g": -7.6
   },
   {
    "c": "333",
    "v": 2893.5,
    "y": 2025,
    "g": 9
   },
   {
    "c": "332",
    "v": 2664.4,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "326",
    "v": 1885.2,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "323",
    "v": 1770.4,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "327",
    "v": 1694.9,
    "y": 2025,
    "g": -4
   },
   {
    "c": "335",
    "v": 1074.7,
    "y": 2025,
    "g": 0
   },
   {
    "c": "322",
    "v": 980.5,
    "y": 2025,
    "g": 3.4
   },
   {
    "c": "337",
    "v": 821.1,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "3364OT",
    "v": 663.4,
    "y": 2025,
    "g": 16.2
   },
   {
    "c": "331",
    "v": 644.3,
    "y": 2025,
    "g": -4.2
   },
   {
    "c": "313TT",
    "v": 367.2,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "321",
    "v": 336.5,
    "y": 2025,
    "g": -9
   },
   {
    "c": "315AL",
    "v": 320.4,
    "y": 2025,
    "g": -3.7
   },
   {
    "c": "3361MV",
    "v": 297,
    "y": 2025,
    "g": -0.1
   }
  ],
  "35000": [
   {
    "c": "311FT",
    "v": 991.2,
    "y": 2025,
    "g": -3.5
   },
   {
    "c": "334",
    "v": 942.8,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "325",
    "v": 492.3,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "324",
    "v": 351.5,
    "y": 2025,
    "g": -14.5
   },
   {
    "c": "327",
    "v": 280.4,
    "y": 2025,
    "g": -7.3
   },
   {
    "c": "332",
    "v": 248.1,
    "y": 2025,
    "g": 8.4
   },
   {
    "c": "333",
    "v": 212.2,
    "y": 2025,
    "g": 4.2
   },
   {
    "c": "339",
    "v": 198,
    "y": 2025,
    "g": 13.5
   },
   {
    "c": "322",
    "v": 135.8,
    "y": 2025,
    "g": 5.6
   },
   {
    "c": "326",
    "v": 132.3,
    "y": 2025,
    "g": 6.4
   },
   {
    "c": "3364OT",
    "v": 131.4,
    "y": 2025,
    "g": 12.6
   },
   {
    "c": "331",
    "v": 95.2,
    "y": 2025,
    "g": 6.7
   },
   {
    "c": "323",
    "v": 69,
    "y": 2025,
    "g": 4.2
   },
   {
    "c": "335",
    "v": 55.7,
    "y": 2025,
    "g": -3.3
   },
   {
    "c": "321",
    "v": 41.7,
    "y": 2025,
    "g": -7.9
   },
   {
    "c": "337",
    "v": 36.8,
    "y": 2025,
    "g": -12
   },
   {
    "c": "3361MV",
    "v": 28.9,
    "y": 2025,
    "g": -6.5
   },
   {
    "c": "313TT",
    "v": 26.9,
    "y": 2025,
    "g": 5.1
   },
   {
    "c": "315AL",
    "v": 4.4,
    "y": 2025,
    "g": -4.3
   }
  ],
  "36000": [
   {
    "c": "325",
    "v": 24534.9,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "311FT",
    "v": 12411.5,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "334",
    "v": 10156.5,
    "y": 2025,
    "g": 5.7
   },
   {
    "c": "333",
    "v": 6230.4,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "332",
    "v": 5734.3,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "339",
    "v": 4499.4,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "327",
    "v": 3965.9,
    "y": 2025,
    "g": 8.3
   },
   {
    "c": "335",
    "v": 2594.7,
    "y": 2025,
    "g": 10
   },
   {
    "c": "326",
    "v": 2415.6,
    "y": 2025,
    "g": -5.2
   },
   {
    "c": "323",
    "v": 2250.2,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "322",
    "v": 1912.8,
    "y": 2025,
    "g": 3.4
   },
   {
    "c": "3361MV",
    "v": 1549,
    "y": 2025,
    "g": -3
   },
   {
    "c": "3364OT",
    "v": 1522.8,
    "y": 2025,
    "g": 10.6
   },
   {
    "c": "315AL",
    "v": 1202.6,
    "y": 2025,
    "g": -0.4
   },
   {
    "c": "331",
    "v": 1045.9,
    "y": 2025,
    "g": -1.4
   },
   {
    "c": "337",
    "v": 975.1,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "321",
    "v": 727.2,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "324",
    "v": 551.5,
    "y": 2025,
    "g": -13.2
   },
   {
    "c": "313TT",
    "v": 480.1,
    "y": 2025,
    "g": 0.9
   }
  ],
  "37000": [
   {
    "c": "311FT",
    "v": 28402.5,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "325",
    "v": 28308.5,
    "y": 2025,
    "g": 7.3
   },
   {
    "c": "333",
    "v": 9522,
    "y": 2025,
    "g": 1.9
   },
   {
    "c": "334",
    "v": 6438,
    "y": 2025,
    "g": 6.4
   },
   {
    "c": "332",
    "v": 6046.3,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "326",
    "v": 4571.9,
    "y": 2025,
    "g": 1.5
   },
   {
    "c": "335",
    "v": 4146.9,
    "y": 2025,
    "g": 14.4
   },
   {
    "c": "3361MV",
    "v": 3375.6,
    "y": 2025,
    "g": -7.4
   },
   {
    "c": "327",
    "v": 2767.8,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "322",
    "v": 2590.4,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "337",
    "v": 2443.4,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "313TT",
    "v": 2388.7,
    "y": 2025,
    "g": 1.4
   },
   {
    "c": "321",
    "v": 2287.5,
    "y": 2025,
    "g": -2.1
   },
   {
    "c": "3364OT",
    "v": 2013.9,
    "y": 2025,
    "g": 13
   },
   {
    "c": "339",
    "v": 1907,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "323",
    "v": 1805.5,
    "y": 2025,
    "g": 2
   },
   {
    "c": "331",
    "v": 1775.4,
    "y": 2025,
    "g": -2.9
   },
   {
    "c": "324",
    "v": 459.4,
    "y": 2025,
    "g": -5.1
   },
   {
    "c": "315AL",
    "v": 275.2,
    "y": 2025,
    "g": -4.4
   }
  ],
  "38000": [
   {
    "c": "333",
    "v": 2899.6,
    "y": 2025,
    "g": -8.4
   },
   {
    "c": "311FT",
    "v": 1331.6,
    "y": 2025,
    "g": -3
   },
   {
    "c": "325",
    "v": 445.5,
    "y": 2025,
    "g": 13.4
   },
   {
    "c": "321",
    "v": 346.1,
    "y": 2025,
    "g": 10.5
   },
   {
    "c": "327",
    "v": 341.7,
    "y": 2025,
    "g": 1
   },
   {
    "c": "324",
    "v": 286.3,
    "y": 2025,
    "g": -14.5
   },
   {
    "c": "332",
    "v": 262.9,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "326",
    "v": 234.6,
    "y": 2025,
    "g": -2.3
   },
   {
    "c": "3361MV",
    "v": 134.7,
    "y": 2025,
    "g": -0.8
   },
   {
    "c": "3364OT",
    "v": 115.5,
    "y": 2025,
    "g": 38.5
   },
   {
    "c": "334",
    "v": 106.7,
    "y": 2025,
    "g": 4.1
   },
   {
    "c": "331",
    "v": 104.1,
    "y": 2025,
    "g": -3.6
   },
   {
    "c": "339",
    "v": 59.5,
    "y": 2025,
    "g": -5.6
   },
   {
    "c": "323",
    "v": 56.6,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "337",
    "v": 56.3,
    "y": 2025,
    "g": 8.5
   },
   {
    "c": "313TT",
    "v": 32.8,
    "y": 2025,
    "g": 0
   },
   {
    "c": "322",
    "v": 20,
    "y": 2025,
    "g": -4.3
   },
   {
    "c": "335",
    "v": 13.4,
    "y": 2025,
    "g": -13
   },
   {
    "c": "315AL",
    "v": 2.7,
    "y": 2025,
    "g": 50
   }
  ],
  "39000": [
   {
    "c": "325",
    "v": 24322.7,
    "y": 2025,
    "g": 1
   },
   {
    "c": "311FT",
    "v": 15671.2,
    "y": 2025,
    "g": -1.8
   },
   {
    "c": "332",
    "v": 13865.2,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "333",
    "v": 12071.4,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "3361MV",
    "v": 10346.4,
    "y": 2025,
    "g": -3.3
   },
   {
    "c": "3364OT",
    "v": 8627.4,
    "y": 2025,
    "g": 20.2
   },
   {
    "c": "335",
    "v": 7148.5,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "324",
    "v": 6693,
    "y": 2025,
    "g": -17.3
   },
   {
    "c": "331",
    "v": 6556.7,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "326",
    "v": 6359.3,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "327",
    "v": 5000,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "334",
    "v": 3976.4,
    "y": 2025,
    "g": 8.2
   },
   {
    "c": "339",
    "v": 3176.1,
    "y": 2025,
    "g": 4.3
   },
   {
    "c": "322",
    "v": 3081.7,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "323",
    "v": 1858.9,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "337",
    "v": 1611.5,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "321",
    "v": 1580.3,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "315AL",
    "v": 431.8,
    "y": 2025,
    "g": -1.8
   },
   {
    "c": "313TT",
    "v": 404.3,
    "y": 2025,
    "g": 3.5
   }
  ],
  "40000": [
   {
    "c": "333",
    "v": 4047.2,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "332",
    "v": 3579.5,
    "y": 2025,
    "g": 5.7
   },
   {
    "c": "324",
    "v": 2767.5,
    "y": 2025,
    "g": -7.3
   },
   {
    "c": "311FT",
    "v": 2683.3,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "325",
    "v": 2630,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "327",
    "v": 1466.8,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "3364OT",
    "v": 1374.7,
    "y": 2025,
    "g": 4.7
   },
   {
    "c": "326",
    "v": 1269.9,
    "y": 2025,
    "g": -4.7
   },
   {
    "c": "322",
    "v": 935,
    "y": 2025,
    "g": 5.1
   },
   {
    "c": "334",
    "v": 927.7,
    "y": 2025,
    "g": 6.7
   },
   {
    "c": "3361MV",
    "v": 903.3,
    "y": 2025,
    "g": 3
   },
   {
    "c": "331",
    "v": 545.2,
    "y": 2025,
    "g": -7.3
   },
   {
    "c": "339",
    "v": 425.1,
    "y": 2025,
    "g": -2.7
   },
   {
    "c": "321",
    "v": 419.7,
    "y": 2025,
    "g": -5.7
   },
   {
    "c": "335",
    "v": 376.6,
    "y": 2025,
    "g": 0
   },
   {
    "c": "323",
    "v": 236.4,
    "y": 2025,
    "g": 8.2
   },
   {
    "c": "337",
    "v": 143.1,
    "y": 2025,
    "g": 6.5
   },
   {
    "c": "315AL",
    "v": 75.2,
    "y": 2025,
    "g": 11.4
   },
   {
    "c": "313TT",
    "v": 35.6,
    "y": 2025,
    "g": -10.1
   }
  ],
  "41000": [
   {
    "c": "334",
    "v": 13484.6,
    "y": 2025,
    "g": -3.2
   },
   {
    "c": "311FT",
    "v": 4324.9,
    "y": 2025,
    "g": -2
   },
   {
    "c": "321",
    "v": 3188.1,
    "y": 2025,
    "g": -0.1
   },
   {
    "c": "333",
    "v": 2679.1,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "332",
    "v": 1990.2,
    "y": 2025,
    "g": 1
   },
   {
    "c": "325",
    "v": 1174.8,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "331",
    "v": 1113,
    "y": 2025,
    "g": 1.5
   },
   {
    "c": "339",
    "v": 1089.8,
    "y": 2025,
    "g": 1
   },
   {
    "c": "3364OT",
    "v": 958.5,
    "y": 2025,
    "g": 27.7
   },
   {
    "c": "327",
    "v": 934.8,
    "y": 2025,
    "g": -5
   },
   {
    "c": "322",
    "v": 911,
    "y": 2025,
    "g": 1
   },
   {
    "c": "3361MV",
    "v": 724,
    "y": 2025,
    "g": -4.8
   },
   {
    "c": "326",
    "v": 652.4,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "337",
    "v": 462.3,
    "y": 2025,
    "g": -1
   },
   {
    "c": "323",
    "v": 359.6,
    "y": 2025,
    "g": 4.5
   },
   {
    "c": "335",
    "v": 338,
    "y": 2025,
    "g": -3.7
   },
   {
    "c": "324",
    "v": 211,
    "y": 2025,
    "g": -12.6
   },
   {
    "c": "315AL",
    "v": 139.8,
    "y": 2025,
    "g": -9.5
   },
   {
    "c": "313TT",
    "v": 56.6,
    "y": 2025,
    "g": -2.4
   }
  ],
  "42000": [
   {
    "c": "325",
    "v": 23751.4,
    "y": 2025,
    "g": 5.8
   },
   {
    "c": "311FT",
    "v": 14409,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "332",
    "v": 9671.7,
    "y": 2025,
    "g": -0.2
   },
   {
    "c": "333",
    "v": 7956.2,
    "y": 2025,
    "g": 1.1
   },
   {
    "c": "331",
    "v": 6464.1,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "326",
    "v": 5590.4,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "334",
    "v": 5386.5,
    "y": 2025,
    "g": 8.7
   },
   {
    "c": "3364OT",
    "v": 4574.9,
    "y": 2025,
    "g": 9.3
   },
   {
    "c": "335",
    "v": 4442.1,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "339",
    "v": 4269.8,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "327",
    "v": 4157.1,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "322",
    "v": 4155.4,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "324",
    "v": 3373.6,
    "y": 2025,
    "g": -9.2
   },
   {
    "c": "321",
    "v": 2635.4,
    "y": 2025,
    "g": 1.9
   },
   {
    "c": "3361MV",
    "v": 2093.9,
    "y": 2025,
    "g": -5.4
   },
   {
    "c": "323",
    "v": 2013.8,
    "y": 2025,
    "g": 0.7
   },
   {
    "c": "337",
    "v": 1490.3,
    "y": 2025,
    "g": 2
   },
   {
    "c": "313TT",
    "v": 466.1,
    "y": 2025,
    "g": 3.8
   },
   {
    "c": "315AL",
    "v": 316,
    "y": 2025,
    "g": -2.2
   }
  ],
  "44000": [
   {
    "c": "3364OT",
    "v": 1793.9,
    "y": 2025,
    "g": 14.7
   },
   {
    "c": "325",
    "v": 892.1,
    "y": 2025,
    "g": 6.9
   },
   {
    "c": "339",
    "v": 594.5,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "334",
    "v": 479.8,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "331",
    "v": 331.5,
    "y": 2025,
    "g": -7.4
   },
   {
    "c": "311FT",
    "v": 320.1,
    "y": 2025,
    "g": -3.1
   },
   {
    "c": "332",
    "v": 286.9,
    "y": 2025,
    "g": 3.8
   },
   {
    "c": "333",
    "v": 253,
    "y": 2025,
    "g": -7.9
   },
   {
    "c": "326",
    "v": 240,
    "y": 2025,
    "g": -5.3
   },
   {
    "c": "335",
    "v": 153.8,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "313TT",
    "v": 139.5,
    "y": 2025,
    "g": 5.4
   },
   {
    "c": "3361MV",
    "v": 129.4,
    "y": 2025,
    "g": -11.7
   },
   {
    "c": "323",
    "v": 128.7,
    "y": 2025,
    "g": -4.5
   },
   {
    "c": "322",
    "v": 123.9,
    "y": 2025,
    "g": -1
   },
   {
    "c": "337",
    "v": 102.8,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "327",
    "v": 78.7,
    "y": 2025,
    "g": -19.6
   },
   {
    "c": "324",
    "v": 71.6,
    "y": 2025,
    "g": -7.7
   },
   {
    "c": "321",
    "v": 34.1,
    "y": 2025,
    "g": -11.2
   },
   {
    "c": "315AL",
    "v": 10.9,
    "y": 2025,
    "g": 2.8
   }
  ],
  "45000": [
   {
    "c": "325",
    "v": 6697.5,
    "y": 2025,
    "g": 4.7
   },
   {
    "c": "3361MV",
    "v": 6161.5,
    "y": 2025,
    "g": -2.6
   },
   {
    "c": "326",
    "v": 4516.3,
    "y": 2025,
    "g": -7.6
   },
   {
    "c": "333",
    "v": 4448.5,
    "y": 2025,
    "g": 3.2
   },
   {
    "c": "335",
    "v": 3816.4,
    "y": 2025,
    "g": 5
   },
   {
    "c": "332",
    "v": 3451.4,
    "y": 2025,
    "g": 3.7
   },
   {
    "c": "311FT",
    "v": 3069.3,
    "y": 2025,
    "g": -2.1
   },
   {
    "c": "3364OT",
    "v": 2753.8,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "322",
    "v": 2563.7,
    "y": 2025,
    "g": -3.9
   },
   {
    "c": "339",
    "v": 1775.2,
    "y": 2025,
    "g": 8.1
   },
   {
    "c": "334",
    "v": 1772.8,
    "y": 2025,
    "g": 16.8
   },
   {
    "c": "327",
    "v": 1712.3,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "313TT",
    "v": 1518.7,
    "y": 2025,
    "g": 2.6
   },
   {
    "c": "331",
    "v": 1512.9,
    "y": 2025,
    "g": 10.5
   },
   {
    "c": "321",
    "v": 1271,
    "y": 2025,
    "g": -2.3
   },
   {
    "c": "323",
    "v": 595,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "337",
    "v": 566.5,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "315AL",
    "v": 314.9,
    "y": 2025,
    "g": 3.4
   },
   {
    "c": "324",
    "v": 152.7,
    "y": 2025,
    "g": 1.9
   }
  ],
  "46000": [
   {
    "c": "311FT",
    "v": 891.5,
    "y": 2025,
    "g": -3.8
   },
   {
    "c": "339",
    "v": 847.5,
    "y": 2025,
    "g": -9.6
   },
   {
    "c": "333",
    "v": 742.6,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "332",
    "v": 488.4,
    "y": 2025,
    "g": 8
   },
   {
    "c": "325",
    "v": 403.2,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "321",
    "v": 332.7,
    "y": 2025,
    "g": 11.2
   },
   {
    "c": "327",
    "v": 324.2,
    "y": 2025,
    "g": 1.1
   },
   {
    "c": "3361MV",
    "v": 243.1,
    "y": 2025,
    "g": -13.2
   },
   {
    "c": "337",
    "v": 186.3,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "334",
    "v": 169.6,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "323",
    "v": 159.8,
    "y": 2025,
    "g": 3.4
   },
   {
    "c": "326",
    "v": 149.6,
    "y": 2025,
    "g": 4.5
   },
   {
    "c": "335",
    "v": 124,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "322",
    "v": 84.9,
    "y": 2025,
    "g": 9.8
   },
   {
    "c": "3364OT",
    "v": 80.2,
    "y": 2025,
    "g": 16.7
   },
   {
    "c": "331",
    "v": 78.1,
    "y": 2025,
    "g": -2.3
   },
   {
    "c": "313TT",
    "v": 49.2,
    "y": 2025,
    "g": -1.4
   },
   {
    "c": "315AL",
    "v": 3.8,
    "y": 2025,
    "g": -15.6
   },
   {
    "c": "324",
    "v": 2.9,
    "y": 2025,
    "g": 7.4
   }
  ],
  "47000": [
   {
    "c": "311FT",
    "v": 12512.5,
    "y": 2025,
    "g": -5.6
   },
   {
    "c": "325",
    "v": 9897.3,
    "y": 2025,
    "g": 7.4
   },
   {
    "c": "3361MV",
    "v": 8153.8,
    "y": 2025,
    "g": -7.5
   },
   {
    "c": "332",
    "v": 5748.2,
    "y": 2025,
    "g": 2.8
   },
   {
    "c": "335",
    "v": 5079.2,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "333",
    "v": 4844.9,
    "y": 2025,
    "g": 4.4
   },
   {
    "c": "322",
    "v": 3581.9,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "326",
    "v": 3004.1,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "339",
    "v": 2810.2,
    "y": 2025,
    "g": -3.6
   },
   {
    "c": "327",
    "v": 2779.3,
    "y": 2025,
    "g": -5.4
   },
   {
    "c": "331",
    "v": 1951.4,
    "y": 2025,
    "g": -0.4
   },
   {
    "c": "321",
    "v": 1720.2,
    "y": 2025,
    "g": -2.2
   },
   {
    "c": "3364OT",
    "v": 1343.1,
    "y": 2025,
    "g": 9.2
   },
   {
    "c": "334",
    "v": 1141.4,
    "y": 2025,
    "g": 11.6
   },
   {
    "c": "323",
    "v": 1105.5,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "324",
    "v": 962.9,
    "y": 2025,
    "g": -12.8
   },
   {
    "c": "337",
    "v": 693.7,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "313TT",
    "v": 400.6,
    "y": 2025,
    "g": 0
   },
   {
    "c": "315AL",
    "v": 300.3,
    "y": 2025,
    "g": 1.4
   }
  ],
  "48000": [
   {
    "c": "325",
    "v": 88646.8,
    "y": 2025,
    "g": 5.3
   },
   {
    "c": "324",
    "v": 53170.9,
    "y": 2025,
    "g": -15.6
   },
   {
    "c": "334",
    "v": 31536.9,
    "y": 2025,
    "g": 5.7
   },
   {
    "c": "3361MV",
    "v": 28436.2,
    "y": 2025,
    "g": 9.8
   },
   {
    "c": "311FT",
    "v": 23452.2,
    "y": 2025,
    "g": -3.2
   },
   {
    "c": "333",
    "v": 21109.6,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "332",
    "v": 19967.4,
    "y": 2025,
    "g": 2
   },
   {
    "c": "3364OT",
    "v": 16403.6,
    "y": 2025,
    "g": 10.8
   },
   {
    "c": "327",
    "v": 8569.1,
    "y": 2025,
    "g": -2.4
   },
   {
    "c": "326",
    "v": 6883,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "339",
    "v": 6137.6,
    "y": 2025,
    "g": 5.7
   },
   {
    "c": "335",
    "v": 5969.6,
    "y": 2025,
    "g": 8.9
   },
   {
    "c": "331",
    "v": 5961.8,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "321",
    "v": 5090.3,
    "y": 2025,
    "g": 7.1
   },
   {
    "c": "322",
    "v": 4662,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "323",
    "v": 2549.7,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "337",
    "v": 2054.3,
    "y": 2025,
    "g": -2.1
   },
   {
    "c": "315AL",
    "v": 862.5,
    "y": 2025,
    "g": 5.9
   },
   {
    "c": "313TT",
    "v": 625.6,
    "y": 2025,
    "g": 3.4
   }
  ],
  "49000": [
   {
    "c": "311FT",
    "v": 4566.2,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "3364OT",
    "v": 3346.4,
    "y": 2025,
    "g": 14.5
   },
   {
    "c": "339",
    "v": 3146.4,
    "y": 2025,
    "g": 0
   },
   {
    "c": "324",
    "v": 2536.3,
    "y": 2025,
    "g": -15.9
   },
   {
    "c": "334",
    "v": 2422.1,
    "y": 2025,
    "g": 8.8
   },
   {
    "c": "325",
    "v": 2253.8,
    "y": 2025,
    "g": 4.3
   },
   {
    "c": "332",
    "v": 2032.2,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "331",
    "v": 1355.3,
    "y": 2025,
    "g": -2.5
   },
   {
    "c": "327",
    "v": 1324.5,
    "y": 2025,
    "g": 5.6
   },
   {
    "c": "333",
    "v": 1129.6,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "322",
    "v": 1090.9,
    "y": 2025,
    "g": 2.5
   },
   {
    "c": "326",
    "v": 929.8,
    "y": 2025,
    "g": -9
   },
   {
    "c": "335",
    "v": 839.5,
    "y": 2025,
    "g": 11.6
   },
   {
    "c": "337",
    "v": 722.7,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "3361MV",
    "v": 713,
    "y": 2025,
    "g": -8.9
   },
   {
    "c": "323",
    "v": 639.7,
    "y": 2025,
    "g": 7.7
   },
   {
    "c": "321",
    "v": 440.6,
    "y": 2025,
    "g": 9
   },
   {
    "c": "313TT",
    "v": 102.9,
    "y": 2025,
    "g": -6
   },
   {
    "c": "315AL",
    "v": 58.5,
    "y": 2025,
    "g": -4.7
   }
  ],
  "50000": [
   {
    "c": "311FT",
    "v": 950.9,
    "y": 2025,
    "g": -2
   },
   {
    "c": "334",
    "v": 547.2,
    "y": 2025,
    "g": 6
   },
   {
    "c": "3364OT",
    "v": 486.2,
    "y": 2025,
    "g": 39
   },
   {
    "c": "333",
    "v": 331.1,
    "y": 2025,
    "g": -1.1
   },
   {
    "c": "332",
    "v": 228.3,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "339",
    "v": 211.6,
    "y": 2025,
    "g": -3.2
   },
   {
    "c": "327",
    "v": 206,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "325",
    "v": 194.4,
    "y": 2025,
    "g": 5
   },
   {
    "c": "321",
    "v": 140.7,
    "y": 2025,
    "g": -2
   },
   {
    "c": "322",
    "v": 96,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "335",
    "v": 93.3,
    "y": 2025,
    "g": -3.8
   },
   {
    "c": "315AL",
    "v": 79.8,
    "y": 2025,
    "g": 8.3
   },
   {
    "c": "326",
    "v": 76.9,
    "y": 2025,
    "g": -7.2
   },
   {
    "c": "337",
    "v": 73.5,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "323",
    "v": 52.1,
    "y": 2025,
    "g": -7.5
   },
   {
    "c": "3361MV",
    "v": 32.6,
    "y": 2025,
    "g": -5
   },
   {
    "c": "324",
    "v": 26.9,
    "y": 2025,
    "g": -21.1
   },
   {
    "c": "331",
    "v": 19.8,
    "y": 2025,
    "g": 1
   },
   {
    "c": "313TT",
    "v": 10.5,
    "y": 2025,
    "g": 2.9
   }
  ],
  "51000": [
   {
    "c": "311FT",
    "v": 23840.3,
    "y": 2025,
    "g": 0.1
   },
   {
    "c": "3364OT",
    "v": 7127,
    "y": 2025,
    "g": 14.3
   },
   {
    "c": "325",
    "v": 3923.8,
    "y": 2025,
    "g": 4.7
   },
   {
    "c": "332",
    "v": 3385.5,
    "y": 2025,
    "g": 18.3
   },
   {
    "c": "333",
    "v": 3082.9,
    "y": 2025,
    "g": 13.8
   },
   {
    "c": "334",
    "v": 2632.7,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "326",
    "v": 2401.4,
    "y": 2025,
    "g": -3.1
   },
   {
    "c": "327",
    "v": 2079.1,
    "y": 2025,
    "g": 15.7
   },
   {
    "c": "321",
    "v": 1725.7,
    "y": 2025,
    "g": -1.1
   },
   {
    "c": "3361MV",
    "v": 1575.8,
    "y": 2025,
    "g": -16.2
   },
   {
    "c": "322",
    "v": 1573.3,
    "y": 2025,
    "g": 5.8
   },
   {
    "c": "335",
    "v": 1384.4,
    "y": 2025,
    "g": 14.1
   },
   {
    "c": "339",
    "v": 1255.4,
    "y": 2025,
    "g": 1.1
   },
   {
    "c": "323",
    "v": 762.9,
    "y": 2025,
    "g": 3
   },
   {
    "c": "337",
    "v": 713.9,
    "y": 2025,
    "g": -3.6
   },
   {
    "c": "331",
    "v": 634.1,
    "y": 2025,
    "g": 0
   },
   {
    "c": "313TT",
    "v": 475.4,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "324",
    "v": 184.9,
    "y": 2025,
    "g": -26.7
   },
   {
    "c": "315AL",
    "v": 106.3,
    "y": 2025,
    "g": -10.5
   }
  ],
  "53000": [
   {
    "c": "3364OT",
    "v": 24796.9,
    "y": 2025,
    "g": 14.8
   },
   {
    "c": "311FT",
    "v": 6759.5,
    "y": 2025,
    "g": -4.4
   },
   {
    "c": "334",
    "v": 5815.8,
    "y": 2025,
    "g": 7.8
   },
   {
    "c": "325",
    "v": 3906.9,
    "y": 2025,
    "g": 4.7
   },
   {
    "c": "324",
    "v": 3900.4,
    "y": 2025,
    "g": -13
   },
   {
    "c": "333",
    "v": 3025.8,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "332",
    "v": 2373.8,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "339",
    "v": 2017.5,
    "y": 2025,
    "g": 4.3
   },
   {
    "c": "321",
    "v": 1946,
    "y": 2025,
    "g": -0.1
   },
   {
    "c": "327",
    "v": 1645.5,
    "y": 2025,
    "g": -2.1
   },
   {
    "c": "322",
    "v": 1419.9,
    "y": 2025,
    "g": 1.5
   },
   {
    "c": "335",
    "v": 1037.5,
    "y": 2025,
    "g": -5.8
   },
   {
    "c": "3361MV",
    "v": 947.6,
    "y": 2025,
    "g": -5.7
   },
   {
    "c": "331",
    "v": 830.4,
    "y": 2025,
    "g": -5
   },
   {
    "c": "326",
    "v": 750.9,
    "y": 2025,
    "g": -5.4
   },
   {
    "c": "323",
    "v": 520.3,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "337",
    "v": 467,
    "y": 2025,
    "g": -1.7
   },
   {
    "c": "313TT",
    "v": 143,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "315AL",
    "v": 126.5,
    "y": 2025,
    "g": 0.5
   }
  ],
  "54000": [
   {
    "c": "325",
    "v": 3079.1,
    "y": 2025,
    "g": 3.2
   },
   {
    "c": "3361MV",
    "v": 1209.3,
    "y": 2025,
    "g": 18
   },
   {
    "c": "311FT",
    "v": 666.4,
    "y": 2025,
    "g": -3.7
   },
   {
    "c": "331",
    "v": 629.2,
    "y": 2025,
    "g": -10.2
   },
   {
    "c": "332",
    "v": 565.6,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "326",
    "v": 497.6,
    "y": 2025,
    "g": 3.4
   },
   {
    "c": "327",
    "v": 474.6,
    "y": 2025,
    "g": -3.1
   },
   {
    "c": "3364OT",
    "v": 432.3,
    "y": 2025,
    "g": 9.1
   },
   {
    "c": "321",
    "v": 432,
    "y": 2025,
    "g": -6.1
   },
   {
    "c": "324",
    "v": 357.1,
    "y": 2025,
    "g": -6.9
   },
   {
    "c": "333",
    "v": 228.6,
    "y": 2025,
    "g": 5.4
   },
   {
    "c": "339",
    "v": 197.3,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "335",
    "v": 190.5,
    "y": 2025,
    "g": 0.6
   },
   {
    "c": "323",
    "v": 108.5,
    "y": 2025,
    "g": -3.4
   },
   {
    "c": "337",
    "v": 78.9,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "334",
    "v": 64.1,
    "y": 2025,
    "g": 10.1
   },
   {
    "c": "322",
    "v": 46.4,
    "y": 2025,
    "g": 10.5
   },
   {
    "c": "315AL",
    "v": 6.6,
    "y": 2025,
    "g": -7
   },
   {
    "c": "313TT",
    "v": 4.6,
    "y": 2025,
    "g": -35.2
   }
  ],
  "55000": [
   {
    "c": "311FT",
    "v": 14899.2,
    "y": 2025,
    "g": -1.3
   },
   {
    "c": "333",
    "v": 13120.4,
    "y": 2025,
    "g": 1.8
   },
   {
    "c": "332",
    "v": 8577.5,
    "y": 2025,
    "g": -1.7
   },
   {
    "c": "325",
    "v": 6676,
    "y": 2025,
    "g": 8.2
   },
   {
    "c": "322",
    "v": 5858.9,
    "y": 2025,
    "g": 3.8
   },
   {
    "c": "326",
    "v": 4014.7,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "335",
    "v": 3792.4,
    "y": 2025,
    "g": 1.4
   },
   {
    "c": "3361MV",
    "v": 3399.5,
    "y": 2025,
    "g": -10.7
   },
   {
    "c": "323",
    "v": 2879.1,
    "y": 2025,
    "g": 1.6
   },
   {
    "c": "334",
    "v": 2664.7,
    "y": 2025,
    "g": 5.4
   },
   {
    "c": "339",
    "v": 2307.8,
    "y": 2025,
    "g": -0.1
   },
   {
    "c": "327",
    "v": 2120.1,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "331",
    "v": 1963.4,
    "y": 2025,
    "g": -3
   },
   {
    "c": "321",
    "v": 1649.6,
    "y": 2025,
    "g": -1
   },
   {
    "c": "337",
    "v": 1238.1,
    "y": 2025,
    "g": 1.5
   },
   {
    "c": "3364OT",
    "v": 1229.2,
    "y": 2025,
    "g": 7.6
   },
   {
    "c": "324",
    "v": 381,
    "y": 2025,
    "g": -6.1
   },
   {
    "c": "313TT",
    "v": 232.3,
    "y": 2025,
    "g": 7
   },
   {
    "c": "315AL",
    "v": 162.8,
    "y": 2025,
    "g": 0.7
   }
  ],
  "56000": [
   {
    "c": "324",
    "v": 1856.4,
    "y": 2025,
    "g": -14.6
   },
   {
    "c": "325",
    "v": 1183.7,
    "y": 2025,
    "g": 7.1
   },
   {
    "c": "332",
    "v": 239,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "327",
    "v": 203.6,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "311FT",
    "v": 107.6,
    "y": 2025,
    "g": -0.3
   },
   {
    "c": "326",
    "v": 92.3,
    "y": 2025,
    "g": 7.2
   },
   {
    "c": "333",
    "v": 87.6,
    "y": 2025,
    "g": -5.1
   },
   {
    "c": "335",
    "v": 63.5,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "321",
    "v": 60.2,
    "y": 2025,
    "g": -1.5
   },
   {
    "c": "334",
    "v": 39.1,
    "y": 2025,
    "g": 13.3
   },
   {
    "c": "339",
    "v": 25.2,
    "y": 2025,
    "g": 26
   },
   {
    "c": "331",
    "v": 23.6,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "3361MV",
    "v": 17,
    "y": 2025,
    "g": 22.3
   },
   {
    "c": "323",
    "v": 12.5,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "313TT",
    "v": 10.4,
    "y": 2025,
    "g": -1.9
   },
   {
    "c": "337",
    "v": 10.1,
    "y": 2025,
    "g": 0
   },
   {
    "c": "3364OT",
    "v": 9.7,
    "y": 2025,
    "g": -22.4
   },
   {
    "c": "315AL",
    "v": 2.2,
    "y": 2025,
    "g": 29.4
   },
   {
    "c": "322",
    "v": 0.6,
    "y": 2025,
    "g": 0
   }
  ],
  "01000": [
   {
    "c": "3361MV",
    "v": 8344.3,
    "y": 2025,
    "g": -6.8
   },
   {
    "c": "331",
    "v": 7121.6,
    "y": 2025,
    "g": 20.7
   },
   {
    "c": "3364OT",
    "v": 4396.4,
    "y": 2025,
    "g": -4.2
   },
   {
    "c": "332",
    "v": 4334.1,
    "y": 2025,
    "g": 3.5
   },
   {
    "c": "311FT",
    "v": 4156.8,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "325",
    "v": 4105.1,
    "y": 2025,
    "g": 3.1
   },
   {
    "c": "322",
    "v": 2975.8,
    "y": 2025,
    "g": 5.6
   },
   {
    "c": "321",
    "v": 2378,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "327",
    "v": 2014.8,
    "y": 2025,
    "g": -0.8
   },
   {
    "c": "326",
    "v": 1718,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "333",
    "v": 1489.4,
    "y": 2025,
    "g": 6.1
   },
   {
    "c": "324",
    "v": 1375.4,
    "y": 2025,
    "g": -16.1
   },
   {
    "c": "335",
    "v": 1186.3,
    "y": 2025,
    "g": 7.7
   },
   {
    "c": "339",
    "v": 1139.8,
    "y": 2025,
    "g": 2.4
   },
   {
    "c": "334",
    "v": 966.4,
    "y": 2025,
    "g": 6.9
   },
   {
    "c": "337",
    "v": 899.2,
    "y": 2025,
    "g": -0.1
   },
   {
    "c": "313TT",
    "v": 535.6,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "323",
    "v": 278.9,
    "y": 2025,
    "g": 1.3
   },
   {
    "c": "315AL",
    "v": 118.1,
    "y": 2025,
    "g": -0.3
   }
  ],
  "02000": [
   {
    "c": "311FT",
    "v": 902.9,
    "y": 2025,
    "g": 3.6
   },
   {
    "c": "324",
    "v": 146.2,
    "y": 2025,
    "g": -14.6
   },
   {
    "c": "3364OT",
    "v": 124.2,
    "y": 2025,
    "g": 11.6
   },
   {
    "c": "327",
    "v": 72.4,
    "y": 2025,
    "g": 6.2
   },
   {
    "c": "332",
    "v": 53.1,
    "y": 2025,
    "g": 13.2
   },
   {
    "c": "321",
    "v": 39.2,
    "y": 2025,
    "g": 17.7
   },
   {
    "c": "333",
    "v": 27,
    "y": 2025,
    "g": 11.6
   },
   {
    "c": "323",
    "v": 21.7,
    "y": 2025,
    "g": -2.3
   },
   {
    "c": "334",
    "v": 21.2,
    "y": 2025,
    "g": 5
   },
   {
    "c": "337",
    "v": 16.1,
    "y": 2025,
    "g": 15
   },
   {
    "c": "326",
    "v": 10.5,
    "y": 2025,
    "g": -8.7
   },
   {
    "c": "339",
    "v": 8.6,
    "y": 2025,
    "g": -3.4
   },
   {
    "c": "325",
    "v": 6.4,
    "y": 2025,
    "g": -5.9
   },
   {
    "c": "313TT",
    "v": 3.3,
    "y": 2025,
    "g": -2.9
   },
   {
    "c": "331",
    "v": 2.9,
    "y": 2025,
    "g": -17.1
   },
   {
    "c": "3361MV",
    "v": 2.3,
    "y": 2025,
    "g": 0
   },
   {
    "c": "315AL",
    "v": 2.1,
    "y": 2025,
    "g": 0
   },
   {
    "c": "335",
    "v": 1.2,
    "y": 2025,
    "g": 9.1
   },
   {
    "c": "322",
    "v": 1.1,
    "y": 2025,
    "g": 10
   }
  ],
  "04000": [
   {
    "c": "3364OT",
    "v": 10639.6,
    "y": 2025,
    "g": 7.8
   },
   {
    "c": "334",
    "v": 9653.8,
    "y": 2025,
    "g": 0.4
   },
   {
    "c": "332",
    "v": 4368.3,
    "y": 2025,
    "g": 6.4
   },
   {
    "c": "311FT",
    "v": 3074.6,
    "y": 2025,
    "g": -3.4
   },
   {
    "c": "339",
    "v": 2923.5,
    "y": 2025,
    "g": -7.2
   },
   {
    "c": "325",
    "v": 2216.2,
    "y": 2025,
    "g": -0.2
   },
   {
    "c": "333",
    "v": 2164.8,
    "y": 2025,
    "g": 4.9
   },
   {
    "c": "327",
    "v": 1657.8,
    "y": 2025,
    "g": -0.7
   },
   {
    "c": "335",
    "v": 1276.8,
    "y": 2025,
    "g": 11.2
   },
   {
    "c": "3361MV",
    "v": 1253.8,
    "y": 2025,
    "g": -8.1
   },
   {
    "c": "326",
    "v": 1065.1,
    "y": 2025,
    "g": 6.6
   },
   {
    "c": "331",
    "v": 1033.8,
    "y": 2025,
    "g": -8.9
   },
   {
    "c": "323",
    "v": 733.5,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "337",
    "v": 608.6,
    "y": 2025,
    "g": -0.9
   },
   {
    "c": "321",
    "v": 514.3,
    "y": 2025,
    "g": 4
   },
   {
    "c": "322",
    "v": 459.6,
    "y": 2025,
    "g": -0.5
   },
   {
    "c": "324",
    "v": 176,
    "y": 2025,
    "g": -6
   },
   {
    "c": "313TT",
    "v": 145.1,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "315AL",
    "v": 83.2,
    "y": 2025,
    "g": 2.5
   }
  ],
  "05000": [
   {
    "c": "311FT",
    "v": 6597.9,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "331",
    "v": 2862.9,
    "y": 2025,
    "g": 3.3
   },
   {
    "c": "332",
    "v": 2385.6,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "321",
    "v": 1943.9,
    "y": 2025,
    "g": 0.2
   },
   {
    "c": "325",
    "v": 1791,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "322",
    "v": 1768,
    "y": 2025,
    "g": 3
   },
   {
    "c": "333",
    "v": 1672.3,
    "y": 2025,
    "g": -1
   },
   {
    "c": "326",
    "v": 1308.8,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "3364OT",
    "v": 1076.9,
    "y": 2025,
    "g": 11.1
   },
   {
    "c": "324",
    "v": 728.9,
    "y": 2025,
    "g": -21
   },
   {
    "c": "327",
    "v": 650.9,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "335",
    "v": 645.4,
    "y": 2025,
    "g": 3
   },
   {
    "c": "3361MV",
    "v": 495.9,
    "y": 2025,
    "g": -11.3
   },
   {
    "c": "339",
    "v": 298.5,
    "y": 2025,
    "g": -5.7
   },
   {
    "c": "337",
    "v": 283.3,
    "y": 2025,
    "g": -4.6
   },
   {
    "c": "323",
    "v": 278.6,
    "y": 2025,
    "g": 3
   },
   {
    "c": "334",
    "v": 228.1,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "313TT",
    "v": 62,
    "y": 2025,
    "g": -6.2
   },
   {
    "c": "315AL",
    "v": 61.4,
    "y": 2025,
    "g": 0
   }
  ],
  "06000": [
   {
    "c": "334",
    "v": 132234.7,
    "y": 2025,
    "g": 10.5
   },
   {
    "c": "325",
    "v": 77229.1,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "311FT",
    "v": 35029,
    "y": 2025,
    "g": -3
   },
   {
    "c": "3364OT",
    "v": 31260.4,
    "y": 2025,
    "g": 12.9
   },
   {
    "c": "333",
    "v": 18713.6,
    "y": 2025,
    "g": 2.7
   },
   {
    "c": "339",
    "v": 17678.3,
    "y": 2025,
    "g": -1.2
   },
   {
    "c": "332",
    "v": 15891.5,
    "y": 2025,
    "g": 0.9
   },
   {
    "c": "324",
    "v": 11937.3,
    "y": 2025,
    "g": -18.9
   },
   {
    "c": "3361MV",
    "v": 11346.3,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "335",
    "v": 7515.1,
    "y": 2025,
    "g": 5
   },
   {
    "c": "326",
    "v": 5983.5,
    "y": 2025,
    "g": -3.5
   },
   {
    "c": "327",
    "v": 5930.8,
    "y": 2025,
    "g": -5.4
   },
   {
    "c": "315AL",
    "v": 3765.6,
    "y": 2025,
    "g": -2.7
   },
   {
    "c": "323",
    "v": 3438.9,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "321",
    "v": 3082.4,
    "y": 2025,
    "g": -1.6
   },
   {
    "c": "337",
    "v": 3044.4,
    "y": 2025,
    "g": -1
   },
   {
    "c": "322",
    "v": 2809.3,
    "y": 2025,
    "g": -1.4
   },
   {
    "c": "331",
    "v": 2521.7,
    "y": 2025,
    "g": -7.9
   },
   {
    "c": "313TT",
    "v": 1116.1,
    "y": 2025,
    "g": -6.5
   }
  ],
  "08000": [
   {
    "c": "334",
    "v": 5908.5,
    "y": 2025,
    "g": 5.2
   },
   {
    "c": "311FT",
    "v": 5458.6,
    "y": 2025,
    "g": -6.1
   },
   {
    "c": "339",
    "v": 3197.5,
    "y": 2025,
    "g": 0.5
   },
   {
    "c": "3364OT",
    "v": 2624.7,
    "y": 2025,
    "g": 9
   },
   {
    "c": "325",
    "v": 2301.9,
    "y": 2025,
    "g": 4.1
   },
   {
    "c": "333",
    "v": 1961.2,
    "y": 2025,
    "g": 15.8
   },
   {
    "c": "327",
    "v": 1553.2,
    "y": 2025,
    "g": -2.8
   },
   {
    "c": "332",
    "v": 1520.2,
    "y": 2025,
    "g": 1.7
   },
   {
    "c": "324",
    "v": 827.9,
    "y": 2025,
    "g": -16.2
   },
   {
    "c": "326",
    "v": 727.3,
    "y": 2025,
    "g": 4.6
   },
   {
    "c": "337",
    "v": 651.9,
    "y": 2025,
    "g": -1
   },
   {
    "c": "335",
    "v": 447,
    "y": 2025,
    "g": 9.2
   },
   {
    "c": "331",
    "v": 446.9,
    "y": 2025,
    "g": 17.1
   },
   {
    "c": "321",
    "v": 445.7,
    "y": 2025,
    "g": -2
   },
   {
    "c": "323",
    "v": 396.3,
    "y": 2025,
    "g": -4.1
   },
   {
    "c": "3361MV",
    "v": 301.6,
    "y": 2025,
    "g": -5.1
   },
   {
    "c": "322",
    "v": 166.7,
    "y": 2025,
    "g": 1.2
   },
   {
    "c": "313TT",
    "v": 81.4,
    "y": 2025,
    "g": -8.2
   },
   {
    "c": "315AL",
    "v": 55.7,
    "y": 2025,
    "g": -6.5
   }
  ],
  "09000": [
   {
    "c": "3364OT",
    "v": 16583.7,
    "y": 2025,
    "g": 10.3
   },
   {
    "c": "325",
    "v": 5084.3,
    "y": 2025,
    "g": 2.3
   },
   {
    "c": "332",
    "v": 3872.9,
    "y": 2025,
    "g": -3
   },
   {
    "c": "339",
    "v": 2410,
    "y": 2025,
    "g": 2.2
   },
   {
    "c": "333",
    "v": 2283.4,
    "y": 2025,
    "g": -0.4
   },
   {
    "c": "311FT",
    "v": 2195.3,
    "y": 2025,
    "g": -2.2
   },
   {
    "c": "334",
    "v": 2140.1,
    "y": 2025,
    "g": 10.3
   },
   {
    "c": "335",
    "v": 1573.3,
    "y": 2025,
    "g": -1.1
   },
   {
    "c": "322",
    "v": 906.1,
    "y": 2025,
    "g": 5.1
   },
   {
    "c": "326",
    "v": 553.5,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "323",
    "v": 479.4,
    "y": 2025,
    "g": 0.3
   },
   {
    "c": "3361MV",
    "v": 464.8,
    "y": 2025,
    "g": -2.5
   },
   {
    "c": "331",
    "v": 451.6,
    "y": 2025,
    "g": 7.3
   },
   {
    "c": "337",
    "v": 313.9,
    "y": 2025,
    "g": 4
   },
   {
    "c": "327",
    "v": 310.6,
    "y": 2025,
    "g": -0.6
   },
   {
    "c": "324",
    "v": 205,
    "y": 2025,
    "g": -15.2
   },
   {
    "c": "313TT",
    "v": 160.3,
    "y": 2025,
    "g": 2.1
   },
   {
    "c": "321",
    "v": 130.2,
    "y": 2025,
    "g": -3.6
   },
   {
    "c": "315AL",
    "v": 35.6,
    "y": 2025,
    "g": -7.5
   }
  ]
 },
 "profits": {
  "latest": {
   "p": "2026Q2",
   "v": 1053304
  },
  "yoyPct": 54.6,
  "durableLatest": {
   "p": "2026Q2",
   "v": 573729
  },
  "nondurableLatest": {
   "p": "2026Q2",
   "v": 479575
  },
  "allCorporateLatest": {
   "p": "2026Q2",
   "v": 4709453
  },
  "shareOfCorporatePct": 22.4,
  "series": [
   {
    "p": "2021Q3",
    "v": 489618
   },
   {
    "p": "2021Q4",
    "v": 560236
   },
   {
    "p": "2022Q1",
    "v": 593194
   },
   {
    "p": "2022Q2",
    "v": 642340
   },
   {
    "p": "2022Q3",
    "v": 659902
   },
   {
    "p": "2022Q4",
    "v": 683386
   },
   {
    "p": "2023Q1",
    "v": 726141
   },
   {
    "p": "2023Q2",
    "v": 695533
   },
   {
    "p": "2023Q3",
    "v": 727414
   },
   {
    "p": "2023Q4",
    "v": 754906
   },
   {
    "p": "2024Q1",
    "v": 660739
   },
   {
    "p": "2024Q2",
    "v": 713854
   },
   {
    "p": "2024Q3",
    "v": 703829
   },
   {
    "p": "2024Q4",
    "v": 736662
   },
   {
    "p": "2025Q1",
    "v": 616572
   },
   {
    "p": "2025Q2",
    "v": 681285
   },
   {
    "p": "2025Q3",
    "v": 741175
   },
   {
    "p": "2025Q4",
    "v": 801724
   },
   {
    "p": "2026Q1",
    "v": 812346
   },
   {
    "p": "2026Q2",
    "v": 1053304
   }
  ]
 },
 "fixedAssets": {
  "investment": {
   "y": 2025,
   "v": 812567
  },
  "investmentYoYPct": 2.7,
  "netStock": {
   "y": 2025,
   "v": 6256301
  },
  "averageAge": {
   "y": 2025,
   "v": 12.8
  }
 },
 "gdpSeries": {
  "shareAnnual": [
   {
    "y": 1997,
    "v": 16.1
   },
   {
    "y": 1998,
    "v": 15.8
   },
   {
    "y": 1999,
    "v": 15.5
   },
   {
    "y": 2000,
    "v": 15.1
   },
   {
    "y": 2001,
    "v": 13.9
   },
   {
    "y": 2002,
    "v": 13.4
   },
   {
    "y": 2003,
    "v": 13.3
   },
   {
    "y": 2004,
    "v": 13.2
   },
   {
    "y": 2005,
    "v": 13
   },
   {
    "y": 2006,
    "v": 13
   },
   {
    "y": 2007,
    "v": 12.8
   },
   {
    "y": 2008,
    "v": 12.2
   },
   {
    "y": 2009,
    "v": 11.7
   },
   {
    "y": 2010,
    "v": 11.9
   },
   {
    "y": 2011,
    "v": 11.9
   },
   {
    "y": 2012,
    "v": 11.8
   },
   {
    "y": 2013,
    "v": 11.7
   },
   {
    "y": 2014,
    "v": 11.4
   },
   {
    "y": 2015,
    "v": 11.3
   },
   {
    "y": 2016,
    "v": 10.8
   },
   {
    "y": 2017,
    "v": 10.8
   },
   {
    "y": 2018,
    "v": 10.9
   },
   {
    "y": 2019,
    "v": 10.5
   },
   {
    "y": 2020,
    "v": 10.1
   },
   {
    "y": 2021,
    "v": 10.2
   },
   {
    "y": 2022,
    "v": 10.2
   },
   {
    "y": 2023,
    "v": 10.1
   },
   {
    "y": 2024,
    "v": 9.8
   },
   {
    "y": 2025,
    "v": 9.5
   }
  ],
  "shareQuarterly": [
   {
    "p": "2005Q1",
    "v": 13.1
   },
   {
    "p": "2005Q2",
    "v": 12.9
   },
   {
    "p": "2005Q3",
    "v": 13
   },
   {
    "p": "2005Q4",
    "v": 13
   },
   {
    "p": "2006Q1",
    "v": 13.1
   },
   {
    "p": "2006Q2",
    "v": 13.1
   },
   {
    "p": "2006Q3",
    "v": 12.9
   },
   {
    "p": "2006Q4",
    "v": 12.9
   },
   {
    "p": "2007Q1",
    "v": 12.7
   },
   {
    "p": "2007Q2",
    "v": 12.9
   },
   {
    "p": "2007Q3",
    "v": 12.8
   },
   {
    "p": "2007Q4",
    "v": 12.7
   },
   {
    "p": "2008Q1",
    "v": 12.2
   },
   {
    "p": "2008Q2",
    "v": 12.2
   },
   {
    "p": "2008Q3",
    "v": 12.3
   },
   {
    "p": "2008Q4",
    "v": 12
   },
   {
    "p": "2009Q1",
    "v": 11.7
   },
   {
    "p": "2009Q2",
    "v": 11.6
   },
   {
    "p": "2009Q3",
    "v": 11.7
   },
   {
    "p": "2009Q4",
    "v": 11.8
   },
   {
    "p": "2010Q1",
    "v": 11.8
   },
   {
    "p": "2010Q2",
    "v": 11.8
   },
   {
    "p": "2010Q3",
    "v": 11.9
   },
   {
    "p": "2010Q4",
    "v": 12
   },
   {
    "p": "2011Q1",
    "v": 11.9
   },
   {
    "p": "2011Q2",
    "v": 12
   },
   {
    "p": "2011Q3",
    "v": 11.9
   },
   {
    "p": "2011Q4",
    "v": 12
   },
   {
    "p": "2012Q1",
    "v": 11.9
   },
   {
    "p": "2012Q2",
    "v": 11.9
   },
   {
    "p": "2012Q3",
    "v": 11.8
   },
   {
    "p": "2012Q4",
    "v": 11.7
   },
   {
    "p": "2013Q1",
    "v": 11.8
   },
   {
    "p": "2013Q2",
    "v": 11.6
   },
   {
    "p": "2013Q3",
    "v": 11.6
   },
   {
    "p": "2013Q4",
    "v": 11.7
   },
   {
    "p": "2014Q1",
    "v": 11.4
   },
   {
    "p": "2014Q2",
    "v": 11.4
   },
   {
    "p": "2014Q3",
    "v": 11.5
   },
   {
    "p": "2014Q4",
    "v": 11.4
   },
   {
    "p": "2015Q1",
    "v": 11.4
   },
   {
    "p": "2015Q2",
    "v": 11.4
   },
   {
    "p": "2015Q3",
    "v": 11.4
   },
   {
    "p": "2015Q4",
    "v": 11.1
   },
   {
    "p": "2016Q1",
    "v": 11
   },
   {
    "p": "2016Q2",
    "v": 10.9
   },
   {
    "p": "2016Q3",
    "v": 10.8
   },
   {
    "p": "2016Q4",
    "v": 10.6
   },
   {
    "p": "2017Q1",
    "v": 10.7
   },
   {
    "p": "2017Q2",
    "v": 10.7
   },
   {
    "p": "2017Q3",
    "v": 10.8
   },
   {
    "p": "2017Q4",
    "v": 10.9
   },
   {
    "p": "2018Q1",
    "v": 11
   },
   {
    "p": "2018Q2",
    "v": 10.9
   },
   {
    "p": "2018Q3",
    "v": 10.9
   },
   {
    "p": "2018Q4",
    "v": 10.9
   },
   {
    "p": "2019Q1",
    "v": 10.7
   },
   {
    "p": "2019Q2",
    "v": 10.6
   },
   {
    "p": "2019Q3",
    "v": 10.5
   },
   {
    "p": "2019Q4",
    "v": 10.4
   },
   {
    "p": "2020Q1",
    "v": 10.2
   },
   {
    "p": "2020Q2",
    "v": 9.9
   },
   {
    "p": "2020Q3",
    "v": 10.1
   },
   {
    "p": "2020Q4",
    "v": 10.1
   },
   {
    "p": "2021Q1",
    "v": 10.2
   },
   {
    "p": "2021Q2",
    "v": 10.1
   },
   {
    "p": "2021Q3",
    "v": 10.1
   },
   {
    "p": "2021Q4",
    "v": 10.3
   },
   {
    "p": "2022Q1",
    "v": 10.3
   },
   {
    "p": "2022Q2",
    "v": 10.3
   },
   {
    "p": "2022Q3",
    "v": 10.1
   },
   {
    "p": "2022Q4",
    "v": 10.2
   },
   {
    "p": "2023Q1",
    "v": 10
   },
   {
    "p": "2023Q2",
    "v": 10
   },
   {
    "p": "2023Q3",
    "v": 10.1
   },
   {
    "p": "2023Q4",
    "v": 10.1
   },
   {
    "p": "2024Q1",
    "v": 9.9
   },
   {
    "p": "2024Q2",
    "v": 9.9
   },
   {
    "p": "2024Q3",
    "v": 9.8
   },
   {
    "p": "2024Q4",
    "v": 9.7
   },
   {
    "p": "2025Q1",
    "v": 9.5
   },
   {
    "p": "2025Q2",
    "v": 9.5
   },
   {
    "p": "2025Q3",
    "v": 9.6
   },
   {
    "p": "2025Q4",
    "v": 9.5
   },
   {
    "p": "2026Q1",
    "v": 9.4
   },
   {
    "p": "2026Q2",
    "v": 9.7
   }
  ],
  "valueAddedAnnual": [
   {
    "y": 1997,
    "v": 1382900
   },
   {
    "y": 1998,
    "v": 1430600
   },
   {
    "y": 1999,
    "v": 1489600
   },
   {
    "y": 2000,
    "v": 1549800
   },
   {
    "y": 2001,
    "v": 1473500
   },
   {
    "y": 2002,
    "v": 1468300
   },
   {
    "y": 2003,
    "v": 1524000
   },
   {
    "y": 2004,
    "v": 1607800
   },
   {
    "y": 2005,
    "v": 1692500
   },
   {
    "y": 2006,
    "v": 1793500
   },
   {
    "y": 2007,
    "v": 1845800
   },
   {
    "y": 2008,
    "v": 1799600
   },
   {
    "y": 2009,
    "v": 1695800
   },
   {
    "y": 2010,
    "v": 1788300
   },
   {
    "y": 2011,
    "v": 1863100
   },
   {
    "y": 2012,
    "v": 1921300
   },
   {
    "y": 2013,
    "v": 1970500
   },
   {
    "y": 2014,
    "v": 2009700
   },
   {
    "y": 2015,
    "v": 2071100
   },
   {
    "y": 2016,
    "v": 2035200
   },
   {
    "y": 2017,
    "v": 2109700
   },
   {
    "y": 2018,
    "v": 2261800
   },
   {
    "y": 2019,
    "v": 2268800
   },
   {
    "y": 2020,
    "v": 2156800
   },
   {
    "y": 2021,
    "v": 2417700
   },
   {
    "y": 2022,
    "v": 2668200
   },
   {
    "y": 2023,
    "v": 2797600
   },
   {
    "y": 2024,
    "v": 2882500
   },
   {
    "y": 2025,
    "v": 2930100
   }
  ],
  "valueAddedQuarterly": [
   {
    "p": "2005Q1",
    "v": 1670000
   },
   {
    "p": "2005Q2",
    "v": 1667300
   },
   {
    "p": "2005Q3",
    "v": 1703000
   },
   {
    "p": "2005Q4",
    "v": 1729700
   },
   {
    "p": "2006Q1",
    "v": 1779100
   },
   {
    "p": "2006Q2",
    "v": 1797300
   },
   {
    "p": "2006Q3",
    "v": 1793300
   },
   {
    "p": "2006Q4",
    "v": 1804400
   },
   {
    "p": "2007Q1",
    "v": 1800600
   },
   {
    "p": "2007Q2",
    "v": 1856800
   },
   {
    "p": "2007Q3",
    "v": 1862700
   },
   {
    "p": "2007Q4",
    "v": 1862800
   },
   {
    "p": "2008Q1",
    "v": 1801400
   },
   {
    "p": "2008Q2",
    "v": 1816400
   },
   {
    "p": "2008Q3",
    "v": 1828400
   },
   {
    "p": "2008Q4",
    "v": 1752100
   },
   {
    "p": "2009Q1",
    "v": 1686000
   },
   {
    "p": "2009Q2",
    "v": 1669300
   },
   {
    "p": "2009Q3",
    "v": 1692400
   },
   {
    "p": "2009Q4",
    "v": 1735500
   },
   {
    "p": "2010Q1",
    "v": 1743400
   },
   {
    "p": "2010Q2",
    "v": 1773100
   },
   {
    "p": "2010Q3",
    "v": 1805700
   },
   {
    "p": "2010Q4",
    "v": 1831100
   },
   {
    "p": "2011Q1",
    "v": 1831400
   },
   {
    "p": "2011Q2",
    "v": 1860100
   },
   {
    "p": "2011Q3",
    "v": 1865400
   },
   {
    "p": "2011Q4",
    "v": 1895400
   },
   {
    "p": "2012Q1",
    "v": 1912600
   },
   {
    "p": "2012Q2",
    "v": 1926800
   },
   {
    "p": "2012Q3",
    "v": 1932100
   },
   {
    "p": "2012Q4",
    "v": 1913700
   },
   {
    "p": "2013Q1",
    "v": 1961200
   },
   {
    "p": "2013Q2",
    "v": 1944300
   },
   {
    "p": "2013Q3",
    "v": 1967100
   },
   {
    "p": "2013Q4",
    "v": 2009500
   },
   {
    "p": "2014Q1",
    "v": 1963400
   },
   {
    "p": "2014Q2",
    "v": 1998300
   },
   {
    "p": "2014Q3",
    "v": 2041900
   },
   {
    "p": "2014Q4",
    "v": 2035100
   },
   {
    "p": "2015Q1",
    "v": 2063600
   },
   {
    "p": "2015Q2",
    "v": 2074800
   },
   {
    "p": "2015Q3",
    "v": 2091100
   },
   {
    "p": "2015Q4",
    "v": 2055000
   },
   {
    "p": "2016Q1",
    "v": 2036200
   },
   {
    "p": "2016Q2",
    "v": 2038600
   },
   {
    "p": "2016Q3",
    "v": 2035300
   },
   {
    "p": "2016Q4",
    "v": 2030800
   },
   {
    "p": "2017Q1",
    "v": 2056400
   },
   {
    "p": "2017Q2",
    "v": 2077700
   },
   {
    "p": "2017Q3",
    "v": 2118400
   },
   {
    "p": "2017Q4",
    "v": 2186400
   },
   {
    "p": "2018Q1",
    "v": 2230000
   },
   {
    "p": "2018Q2",
    "v": 2252600
   },
   {
    "p": "2018Q3",
    "v": 2274500
   },
   {
    "p": "2018Q4",
    "v": 2290200
   },
   {
    "p": "2019Q1",
    "v": 2253400
   },
   {
    "p": "2019Q2",
    "v": 2268100
   },
   {
    "p": "2019Q3",
    "v": 2274900
   },
   {
    "p": "2019Q4",
    "v": 2278700
   },
   {
    "p": "2020Q1",
    "v": 2215400
   },
   {
    "p": "2020Q2",
    "v": 1977000
   },
   {
    "p": "2020Q3",
    "v": 2199700
   },
   {
    "p": "2020Q4",
    "v": 2234900
   },
   {
    "p": "2021Q1",
    "v": 2305900
   },
   {
    "p": "2021Q2",
    "v": 2379600
   },
   {
    "p": "2021Q3",
    "v": 2422100
   },
   {
    "p": "2021Q4",
    "v": 2563100
   },
   {
    "p": "2022Q1",
    "v": 2594900
   },
   {
    "p": "2022Q2",
    "v": 2672600
   },
   {
    "p": "2022Q3",
    "v": 2670400
   },
   {
    "p": "2022Q4",
    "v": 2735000
   },
   {
    "p": "2023Q1",
    "v": 2733500
   },
   {
    "p": "2023Q2",
    "v": 2746700
   },
   {
    "p": "2023Q3",
    "v": 2838000
   },
   {
    "p": "2023Q4",
    "v": 2872100
   },
   {
    "p": "2024Q1",
    "v": 2853700
   },
   {
    "p": "2024Q2",
    "v": 2881500
   },
   {
    "p": "2024Q3",
    "v": 2891500
   },
   {
    "p": "2024Q4",
    "v": 2903400
   },
   {
    "p": "2025Q1",
    "v": 2852900
   },
   {
    "p": "2025Q2",
    "v": 2910000
   },
   {
    "p": "2025Q3",
    "v": 2979100
   },
   {
    "p": "2025Q4",
    "v": 2978400
   },
   {
    "p": "2026Q1",
    "v": 3004200
   },
   {
    "p": "2026Q2",
    "v": 3168100
   }
  ],
  "realValueAddedQuarterly": [
   {
    "p": "2005Q1",
    "v": 1858100
   },
   {
    "p": "2005Q2",
    "v": 1858400
   },
   {
    "p": "2005Q3",
    "v": 1878300
   },
   {
    "p": "2005Q4",
    "v": 1915900
   },
   {
    "p": "2006Q1",
    "v": 1974600
   },
   {
    "p": "2006Q2",
    "v": 1970100
   },
   {
    "p": "2006Q3",
    "v": 1970600
   },
   {
    "p": "2006Q4",
    "v": 2016300
   },
   {
    "p": "2007Q1",
    "v": 2010200
   },
   {
    "p": "2007Q2",
    "v": 2049000
   },
   {
    "p": "2007Q3",
    "v": 2082400
   },
   {
    "p": "2007Q4",
    "v": 2120300
   },
   {
    "p": "2008Q1",
    "v": 2045300
   },
   {
    "p": "2008Q2",
    "v": 2089300
   },
   {
    "p": "2008Q3",
    "v": 2037500
   },
   {
    "p": "2008Q4",
    "v": 1912500
   },
   {
    "p": "2009Q1",
    "v": 1808200
   },
   {
    "p": "2009Q2",
    "v": 1811700
   },
   {
    "p": "2009Q3",
    "v": 1838300
   },
   {
    "p": "2009Q4",
    "v": 1909300
   },
   {
    "p": "2010Q1",
    "v": 1931200
   },
   {
    "p": "2010Q2",
    "v": 1939000
   },
   {
    "p": "2010Q3",
    "v": 1963300
   },
   {
    "p": "2010Q4",
    "v": 1969400
   },
   {
    "p": "2011Q1",
    "v": 1958000
   },
   {
    "p": "2011Q2",
    "v": 1973300
   },
   {
    "p": "2011Q3",
    "v": 1955400
   },
   {
    "p": "2011Q4",
    "v": 1971000
   },
   {
    "p": "2012Q1",
    "v": 1989900
   },
   {
    "p": "2012Q2",
    "v": 1981500
   },
   {
    "p": "2012Q3",
    "v": 1949200
   },
   {
    "p": "2012Q4",
    "v": 1937800
   },
   {
    "p": "2013Q1",
    "v": 2010900
   },
   {
    "p": "2013Q2",
    "v": 2019700
   },
   {
    "p": "2013Q3",
    "v": 2043300
   },
   {
    "p": "2013Q4",
    "v": 2046800
   },
   {
    "p": "2014Q1",
    "v": 2011800
   },
   {
    "p": "2014Q2",
    "v": 2052100
   },
   {
    "p": "2014Q3",
    "v": 2069300
   },
   {
    "p": "2014Q4",
    "v": 2063700
   },
   {
    "p": "2015Q1",
    "v": 2078300
   },
   {
    "p": "2015Q2",
    "v": 2067300
   },
   {
    "p": "2015Q3",
    "v": 2068600
   },
   {
    "p": "2015Q4",
    "v": 2045000
   },
   {
    "p": "2016Q1",
    "v": 2049900
   },
   {
    "p": "2016Q2",
    "v": 2045800
   },
   {
    "p": "2016Q3",
    "v": 2058800
   },
   {
    "p": "2016Q4",
    "v": 2042700
   },
   {
    "p": "2017Q1",
    "v": 2062300
   },
   {
    "p": "2017Q2",
    "v": 2099500
   },
   {
    "p": "2017Q3",
    "v": 2111600
   },
   {
    "p": "2017Q4",
    "v": 2165500
   },
   {
    "p": "2018Q1",
    "v": 2189100
   },
   {
    "p": "2018Q2",
    "v": 2201800
   },
   {
    "p": "2018Q3",
    "v": 2216300
   },
   {
    "p": "2018Q4",
    "v": 2244900
   },
   {
    "p": "2019Q1",
    "v": 2207100
   },
   {
    "p": "2019Q2",
    "v": 2221200
   },
   {
    "p": "2019Q3",
    "v": 2240000
   },
   {
    "p": "2019Q4",
    "v": 2231000
   },
   {
    "p": "2020Q1",
    "v": 2174400
   },
   {
    "p": "2020Q2",
    "v": 1961800
   },
   {
    "p": "2020Q3",
    "v": 2190800
   },
   {
    "p": "2020Q4",
    "v": 2234800
   },
   {
    "p": "2021Q1",
    "v": 2273900
   },
   {
    "p": "2021Q2",
    "v": 2308400
   },
   {
    "p": "2021Q3",
    "v": 2302900
   },
   {
    "p": "2021Q4",
    "v": 2374000
   },
   {
    "p": "2022Q1",
    "v": 2320700
   },
   {
    "p": "2022Q2",
    "v": 2290700
   },
   {
    "p": "2022Q3",
    "v": 2283000
   },
   {
    "p": "2022Q4",
    "v": 2283100
   },
   {
    "p": "2023Q1",
    "v": 2230300
   },
   {
    "p": "2023Q2",
    "v": 2260400
   },
   {
    "p": "2023Q3",
    "v": 2319700
   },
   {
    "p": "2023Q4",
    "v": 2366000
   },
   {
    "p": "2024Q1",
    "v": 2337700
   },
   {
    "p": "2024Q2",
    "v": 2387200
   },
   {
    "p": "2024Q3",
    "v": 2406200
   },
   {
    "p": "2024Q4",
    "v": 2395300
   },
   {
    "p": "2025Q1",
    "v": 2367100
   },
   {
    "p": "2025Q2",
    "v": 2427600
   },
   {
    "p": "2025Q3",
    "v": 2445800
   },
   {
    "p": "2025Q4",
    "v": 2420500
   },
   {
    "p": "2026Q1",
    "v": 2450300
   },
   {
    "p": "2026Q2",
    "v": 2470600
   }
  ],
  "realValueAddedAnnual": [
   {
    "y": 1997,
    "v": 1379000
   },
   {
    "y": 1998,
    "v": 1444300
   },
   {
    "y": 1999,
    "v": 1531700
   },
   {
    "y": 2000,
    "v": 1641100
   },
   {
    "y": 2001,
    "v": 1586100
   },
   {
    "y": 2002,
    "v": 1602600
   },
   {
    "y": 2003,
    "v": 1702800
   },
   {
    "y": 2004,
    "v": 1824300
   },
   {
    "y": 2005,
    "v": 1877700
   },
   {
    "y": 2006,
    "v": 1982900
   },
   {
    "y": 2007,
    "v": 2065500
   },
   {
    "y": 2008,
    "v": 2021200
   },
   {
    "y": 2009,
    "v": 1841900
   },
   {
    "y": 2010,
    "v": 1950800
   },
   {
    "y": 2011,
    "v": 1964400
   },
   {
    "y": 2012,
    "v": 1964600
   },
   {
    "y": 2013,
    "v": 2030200
   },
   {
    "y": 2014,
    "v": 2049200
   },
   {
    "y": 2015,
    "v": 2064800
   },
   {
    "y": 2016,
    "v": 2049300
   },
   {
    "y": 2017,
    "v": 2109700
   },
   {
    "y": 2018,
    "v": 2213000
   },
   {
    "y": 2019,
    "v": 2224800
   },
   {
    "y": 2020,
    "v": 2140400
   },
   {
    "y": 2021,
    "v": 2314800
   },
   {
    "y": 2022,
    "v": 2294400
   },
   {
    "y": 2023,
    "v": 2294100
   },
   {
    "y": 2024,
    "v": 2381600
   },
   {
    "y": 2025,
    "v": 2415300
   }
  ],
  "durableQuarterly": [
   {
    "p": "2005Q1",
    "v": 944100
   },
   {
    "p": "2005Q2",
    "v": 946400
   },
   {
    "p": "2005Q3",
    "v": 960400
   },
   {
    "p": "2005Q4",
    "v": 974500
   },
   {
    "p": "2006Q1",
    "v": 1004200
   },
   {
    "p": "2006Q2",
    "v": 1003900
   },
   {
    "p": "2006Q3",
    "v": 994000
   },
   {
    "p": "2006Q4",
    "v": 1014900
   },
   {
    "p": "2007Q1",
    "v": 1011900
   },
   {
    "p": "2007Q2",
    "v": 1031000
   },
   {
    "p": "2007Q3",
    "v": 1047700
   },
   {
    "p": "2007Q4",
    "v": 1033700
   },
   {
    "p": "2008Q1",
    "v": 1010600
   },
   {
    "p": "2008Q2",
    "v": 1008700
   },
   {
    "p": "2008Q3",
    "v": 1002400
   },
   {
    "p": "2008Q4",
    "v": 969300
   },
   {
    "p": "2009Q1",
    "v": 893600
   },
   {
    "p": "2009Q2",
    "v": 862600
   },
   {
    "p": "2009Q3",
    "v": 860000
   },
   {
    "p": "2009Q4",
    "v": 885100
   },
   {
    "p": "2010Q1",
    "v": 900800
   },
   {
    "p": "2010Q2",
    "v": 944700
   },
   {
    "p": "2010Q3",
    "v": 977500
   },
   {
    "p": "2010Q4",
    "v": 993200
   },
   {
    "p": "2011Q1",
    "v": 995100
   },
   {
    "p": "2011Q2",
    "v": 996300
   },
   {
    "p": "2011Q3",
    "v": 1003700
   },
   {
    "p": "2011Q4",
    "v": 1034400
   },
   {
    "p": "2012Q1",
    "v": 1043100
   },
   {
    "p": "2012Q2",
    "v": 1057100
   },
   {
    "p": "2012Q3",
    "v": 1053600
   },
   {
    "p": "2012Q4",
    "v": 1053700
   },
   {
    "p": "2013Q1",
    "v": 1074100
   },
   {
    "p": "2013Q2",
    "v": 1073400
   },
   {
    "p": "2013Q3",
    "v": 1088200
   },
   {
    "p": "2013Q4",
    "v": 1099000
   },
   {
    "p": "2014Q1",
    "v": 1078700
   },
   {
    "p": "2014Q2",
    "v": 1095000
   },
   {
    "p": "2014Q3",
    "v": 1124900
   },
   {
    "p": "2014Q4",
    "v": 1126000
   },
   {
    "p": "2015Q1",
    "v": 1141100
   },
   {
    "p": "2015Q2",
    "v": 1143500
   },
   {
    "p": "2015Q3",
    "v": 1150400
   },
   {
    "p": "2015Q4",
    "v": 1142800
   },
   {
    "p": "2016Q1",
    "v": 1140000
   },
   {
    "p": "2016Q2",
    "v": 1136600
   },
   {
    "p": "2016Q3",
    "v": 1139500
   },
   {
    "p": "2016Q4",
    "v": 1143300
   },
   {
    "p": "2017Q1",
    "v": 1154800
   },
   {
    "p": "2017Q2",
    "v": 1166200
   },
   {
    "p": "2017Q3",
    "v": 1183200
   },
   {
    "p": "2017Q4",
    "v": 1209000
   },
   {
    "p": "2018Q1",
    "v": 1220800
   },
   {
    "p": "2018Q2",
    "v": 1224400
   },
   {
    "p": "2018Q3",
    "v": 1238400
   },
   {
    "p": "2018Q4",
    "v": 1246700
   },
   {
    "p": "2019Q1",
    "v": 1259800
   },
   {
    "p": "2019Q2",
    "v": 1264000
   },
   {
    "p": "2019Q3",
    "v": 1262900
   },
   {
    "p": "2019Q4",
    "v": 1263500
   },
   {
    "p": "2020Q1",
    "v": 1236500
   },
   {
    "p": "2020Q2",
    "v": 1081600
   },
   {
    "p": "2020Q3",
    "v": 1236300
   },
   {
    "p": "2020Q4",
    "v": 1249600
   },
   {
    "p": "2021Q1",
    "v": 1261400
   },
   {
    "p": "2021Q2",
    "v": 1278500
   },
   {
    "p": "2021Q3",
    "v": 1266700
   },
   {
    "p": "2021Q4",
    "v": 1326500
   },
   {
    "p": "2022Q1",
    "v": 1351500
   },
   {
    "p": "2022Q2",
    "v": 1376700
   },
   {
    "p": "2022Q3",
    "v": 1404500
   },
   {
    "p": "2022Q4",
    "v": 1440600
   },
   {
    "p": "2023Q1",
    "v": 1454000
   },
   {
    "p": "2023Q2",
    "v": 1495600
   },
   {
    "p": "2023Q3",
    "v": 1524800
   },
   {
    "p": "2023Q4",
    "v": 1544600
   },
   {
    "p": "2024Q1",
    "v": 1517900
   },
   {
    "p": "2024Q2",
    "v": 1528200
   },
   {
    "p": "2024Q3",
    "v": 1542500
   },
   {
    "p": "2024Q4",
    "v": 1539600
   },
   {
    "p": "2025Q1",
    "v": 1549800
   },
   {
    "p": "2025Q2",
    "v": 1564500
   },
   {
    "p": "2025Q3",
    "v": 1601100
   },
   {
    "p": "2025Q4",
    "v": 1609800
   },
   {
    "p": "2026Q1",
    "v": 1635900
   },
   {
    "p": "2026Q2",
    "v": 1694700
   }
  ],
  "nondurableQuarterly": [
   {
    "p": "2005Q1",
    "v": 725900
   },
   {
    "p": "2005Q2",
    "v": 720900
   },
   {
    "p": "2005Q3",
    "v": 742600
   },
   {
    "p": "2005Q4",
    "v": 755200
   },
   {
    "p": "2006Q1",
    "v": 774900
   },
   {
    "p": "2006Q2",
    "v": 793400
   },
   {
    "p": "2006Q3",
    "v": 799300
   },
   {
    "p": "2006Q4",
    "v": 789500
   },
   {
    "p": "2007Q1",
    "v": 788800
   },
   {
    "p": "2007Q2",
    "v": 825800
   },
   {
    "p": "2007Q3",
    "v": 815100
   },
   {
    "p": "2007Q4",
    "v": 829200
   },
   {
    "p": "2008Q1",
    "v": 790800
   },
   {
    "p": "2008Q2",
    "v": 807700
   },
   {
    "p": "2008Q3",
    "v": 826100
   },
   {
    "p": "2008Q4",
    "v": 782800
   },
   {
    "p": "2009Q1",
    "v": 792400
   },
   {
    "p": "2009Q2",
    "v": 806700
   },
   {
    "p": "2009Q3",
    "v": 832400
   },
   {
    "p": "2009Q4",
    "v": 850400
   },
   {
    "p": "2010Q1",
    "v": 842600
   },
   {
    "p": "2010Q2",
    "v": 828500
   },
   {
    "p": "2010Q3",
    "v": 828200
   },
   {
    "p": "2010Q4",
    "v": 837800
   },
   {
    "p": "2011Q1",
    "v": 836300
   },
   {
    "p": "2011Q2",
    "v": 863900
   },
   {
    "p": "2011Q3",
    "v": 861600
   },
   {
    "p": "2011Q4",
    "v": 861000
   },
   {
    "p": "2012Q1",
    "v": 869500
   },
   {
    "p": "2012Q2",
    "v": 869700
   },
   {
    "p": "2012Q3",
    "v": 878600
   },
   {
    "p": "2012Q4",
    "v": 860000
   },
   {
    "p": "2013Q1",
    "v": 887100
   },
   {
    "p": "2013Q2",
    "v": 870900
   },
   {
    "p": "2013Q3",
    "v": 878900
   },
   {
    "p": "2013Q4",
    "v": 910500
   },
   {
    "p": "2014Q1",
    "v": 884700
   },
   {
    "p": "2014Q2",
    "v": 903300
   },
   {
    "p": "2014Q3",
    "v": 917100
   },
   {
    "p": "2014Q4",
    "v": 909100
   },
   {
    "p": "2015Q1",
    "v": 922500
   },
   {
    "p": "2015Q2",
    "v": 931300
   },
   {
    "p": "2015Q3",
    "v": 940700
   },
   {
    "p": "2015Q4",
    "v": 912200
   },
   {
    "p": "2016Q1",
    "v": 896100
   },
   {
    "p": "2016Q2",
    "v": 902000
   },
   {
    "p": "2016Q3",
    "v": 895900
   },
   {
    "p": "2016Q4",
    "v": 887500
   },
   {
    "p": "2017Q1",
    "v": 901600
   },
   {
    "p": "2017Q2",
    "v": 911600
   },
   {
    "p": "2017Q3",
    "v": 935300
   },
   {
    "p": "2017Q4",
    "v": 977300
   },
   {
    "p": "2018Q1",
    "v": 1009200
   },
   {
    "p": "2018Q2",
    "v": 1028200
   },
   {
    "p": "2018Q3",
    "v": 1036200
   },
   {
    "p": "2018Q4",
    "v": 1043500
   },
   {
    "p": "2019Q1",
    "v": 993700
   },
   {
    "p": "2019Q2",
    "v": 1004100
   },
   {
    "p": "2019Q3",
    "v": 1012000
   },
   {
    "p": "2019Q4",
    "v": 1015200
   },
   {
    "p": "2020Q1",
    "v": 978900
   },
   {
    "p": "2020Q2",
    "v": 895400
   },
   {
    "p": "2020Q3",
    "v": 963400
   },
   {
    "p": "2020Q4",
    "v": 985300
   },
   {
    "p": "2021Q1",
    "v": 1044600
   },
   {
    "p": "2021Q2",
    "v": 1101000
   },
   {
    "p": "2021Q3",
    "v": 1155400
   },
   {
    "p": "2021Q4",
    "v": 1236600
   },
   {
    "p": "2022Q1",
    "v": 1243400
   },
   {
    "p": "2022Q2",
    "v": 1295900
   },
   {
    "p": "2022Q3",
    "v": 1265900
   },
   {
    "p": "2022Q4",
    "v": 1294400
   },
   {
    "p": "2023Q1",
    "v": 1279500
   },
   {
    "p": "2023Q2",
    "v": 1251100
   },
   {
    "p": "2023Q3",
    "v": 1313200
   },
   {
    "p": "2023Q4",
    "v": 1327500
   },
   {
    "p": "2024Q1",
    "v": 1335800
   },
   {
    "p": "2024Q2",
    "v": 1353300
   },
   {
    "p": "2024Q3",
    "v": 1349100
   },
   {
    "p": "2024Q4",
    "v": 1363800
   },
   {
    "p": "2025Q1",
    "v": 1303100
   },
   {
    "p": "2025Q2",
    "v": 1345500
   },
   {
    "p": "2025Q3",
    "v": 1378000
   },
   {
    "p": "2025Q4",
    "v": 1368600
   },
   {
    "p": "2026Q1",
    "v": 1368300
   },
   {
    "p": "2026Q2",
    "v": 1473300
   }
  ]
 }
}
