{
 "name": "U.S. Manufacturing Source-Country Import-Burden Comparison",
 "status": "burden-only",
 "availability": {
  "status": "burden-only",
  "familyCount": 57,
  "burdenComparableFamilyCount": 57,
  "rankableFamilyCount": 0,
  "reason": "Observed duty-and-freight burdens are comparable, but no family has two complete country-specific customs unit values. Supplier-level landed-cost rankings remain pending."
 },
 "description": "For every tracked manufacturing family, compares each named source country's additive effective-duty and international-freight burden. Supplier-level landed-cost ranking is pending because no family currently has two complete country-specific customs unit values. Reference data from USITC DataWeb and Federal Reserve H.10, not a customs or supplier quote.",
 "reportingYear": "2025",
 "familyCount": 57,
 "familiesWithUnitCost": 0,
 "familiesWithRankableLanes": 0,
 "laneCount": 570,
 "method": {
  "uplift": "1 + effective_duty + freight_pct; international freight is added over customs value and duty is not compounded onto freight.",
  "landedUnitCost": "country_unit_value x additive uplift, shown only when that country reports a usable quantity in the same unit.",
  "fxOverlay": "A forward cost-DIRECTION signal from the currency's recent FRED H.10 drift, not a USD recompute (customs value is already USD).",
  "ranking": "At least two complete country-unit-value lanes are required before ranks are assigned. Lanes without a country unit value remain unranked burden comparisons.",
  "sourcing": "Each source-country share uses its explicit denominator: lane share_pct is within retained displayed lanes, while sourcing.topSharePct is against true annual family import value. In incomplete boards, sourcing.hhi is a named-source lower bound and carries hhiIsLowerBound plus namedSharePct coverage."
 },
 "license": "CC BY 4.0 with attribution to MFG Calcs; underlying USITC and Federal Reserve data is public domain.",
 "scorecards": [
  {
   "family": "steel-flat-rolled",
   "label": "Steel flat-rolled products",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 1.0398,
   "basisUnitPrice": 1.0398,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 398936035,
     "sharePct": 6.9,
     "effectiveDutyPct": 11.12,
     "freightPct": 4.4,
     "upliftPct": 15.52,
     "upliftIndex": 1.1552,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 293942241,
     "sharePct": 5.1,
     "effectiveDutyPct": 9.86,
     "freightPct": 8.23,
     "upliftPct": 18.09,
     "upliftIndex": 1.1809,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Brazil",
     "rank": null,
     "customsValueUsd": 134436617,
     "sharePct": 2.3,
     "effectiveDutyPct": 16.75,
     "freightPct": 6.22,
     "upliftPct": 22.97,
     "upliftIndex": 1.2297,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 769414947,
     "sharePct": 13.3,
     "effectiveDutyPct": 17.84,
     "freightPct": 5.99,
     "upliftPct": 23.83,
     "upliftIndex": 1.2383,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 473040555,
     "sharePct": 8.1,
     "effectiveDutyPct": 19.9,
     "freightPct": 5.57,
     "upliftPct": 25.47,
     "upliftIndex": 1.2547,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1968786949,
     "sharePct": 33.9,
     "effectiveDutyPct": 24.97,
     "freightPct": 0.83,
     "upliftPct": 25.8,
     "upliftIndex": 1.258,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 912185183,
     "sharePct": 15.7,
     "effectiveDutyPct": 27.33,
     "freightPct": 8.96,
     "upliftPct": 36.29,
     "upliftIndex": 1.3629,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Turkey",
     "rank": null,
     "customsValueUsd": 153000352,
     "sharePct": 2.6,
     "effectiveDutyPct": 34.15,
     "freightPct": 5.23,
     "upliftPct": 39.38,
     "upliftIndex": 1.3938,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 570784245,
     "sharePct": 9.8,
     "effectiveDutyPct": 34.16,
     "freightPct": 9.87,
     "upliftPct": 44.03,
     "upliftIndex": 1.4403,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 129888828,
     "sharePct": 2.2,
     "effectiveDutyPct": 61.32,
     "freightPct": 11.7,
     "upliftPct": 73.02,
     "upliftIndex": 1.7302,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 57.5,
   "sourcing": {
    "hhi": 1410,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 29.8,
    "namedSharePct": 88,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "steel-long-products",
   "label": "Steel bar, rod, and wire",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 0.8559,
   "basisUnitPrice": 0.8559,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 417381531,
     "sharePct": 18.5,
     "effectiveDutyPct": 14.57,
     "freightPct": 2.57,
     "upliftPct": 17.14,
     "upliftIndex": 1.1714,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 187670536,
     "sharePct": 8.3,
     "effectiveDutyPct": 7.77,
     "freightPct": 10.64,
     "upliftPct": 18.41,
     "upliftIndex": 1.1841,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 579349698,
     "sharePct": 25.6,
     "effectiveDutyPct": 19.8,
     "freightPct": 2.4,
     "upliftPct": 22.2,
     "upliftIndex": 1.222,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 197596934,
     "sharePct": 8.7,
     "effectiveDutyPct": 17.47,
     "freightPct": 13.15,
     "upliftPct": 30.62,
     "upliftIndex": 1.3062,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Egypt",
     "rank": null,
     "customsValueUsd": 151425468,
     "sharePct": 6.7,
     "effectiveDutyPct": 32.58,
     "freightPct": 3.2,
     "upliftPct": 35.78,
     "upliftIndex": 1.3578,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 197920285,
     "sharePct": 8.8,
     "effectiveDutyPct": 25.4,
     "freightPct": 11.4,
     "upliftPct": 36.8,
     "upliftIndex": 1.368,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 183779133,
     "sharePct": 8.1,
     "effectiveDutyPct": 28.66,
     "freightPct": 10.53,
     "upliftPct": 39.19,
     "upliftIndex": 1.3919,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 142842671,
     "sharePct": 6.3,
     "effectiveDutyPct": 28.35,
     "freightPct": 14.21,
     "upliftPct": 42.56,
     "upliftIndex": 1.4256,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Turkey",
     "rank": null,
     "customsValueUsd": 117132948,
     "sharePct": 5.2,
     "effectiveDutyPct": 37.77,
     "freightPct": 10.06,
     "upliftPct": 47.83,
     "upliftIndex": 1.4783,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 84595683,
     "sharePct": 3.7,
     "effectiveDutyPct": 60.62,
     "freightPct": 17.01,
     "upliftPct": 77.63,
     "upliftIndex": 1.7763,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 60.49,
   "sourcing": {
    "hhi": 840,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 19.8,
    "namedSharePct": 77.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "stainless-steel",
   "label": "Stainless steel mill products",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 3.462,
   "basisUnitPrice": 3.462,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Indonesia",
     "rank": null,
     "customsValueUsd": 97076599,
     "sharePct": 6.3,
     "effectiveDutyPct": 14.03,
     "freightPct": 7.96,
     "upliftPct": 21.99,
     "upliftIndex": 1.2199,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 236149641,
     "sharePct": 15.3,
     "effectiveDutyPct": 20.29,
     "freightPct": 4.2,
     "upliftPct": 24.49,
     "upliftIndex": 1.2449,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 119097724,
     "sharePct": 7.7,
     "effectiveDutyPct": 22.35,
     "freightPct": 5.59,
     "upliftPct": 27.94,
     "upliftIndex": 1.2794,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 86669129,
     "sharePct": 5.6,
     "effectiveDutyPct": 24.19,
     "freightPct": 5.15,
     "upliftPct": 29.34,
     "upliftIndex": 1.2934,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 98759304,
     "sharePct": 6.4,
     "effectiveDutyPct": 24.54,
     "freightPct": 6.1,
     "upliftPct": 30.64,
     "upliftIndex": 1.3064,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 120170318,
     "sharePct": 7.8,
     "effectiveDutyPct": 28.97,
     "freightPct": 5.05,
     "upliftPct": 34.02,
     "upliftIndex": 1.3402,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Belgium",
     "rank": null,
     "customsValueUsd": 108721266,
     "sharePct": 7,
     "effectiveDutyPct": 29.45,
     "freightPct": 5.38,
     "upliftPct": 34.83,
     "upliftIndex": 1.3483,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 222419805,
     "sharePct": 14.4,
     "effectiveDutyPct": 28.64,
     "freightPct": 7.17,
     "upliftPct": 35.81,
     "upliftIndex": 1.3581,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 353944389,
     "sharePct": 22.9,
     "effectiveDutyPct": 30.81,
     "freightPct": 5.94,
     "upliftPct": 36.75,
     "upliftIndex": 1.3675,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 104332949,
     "sharePct": 6.7,
     "effectiveDutyPct": 32.38,
     "freightPct": 5.73,
     "upliftPct": 38.11,
     "upliftIndex": 1.3811,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 16.12,
   "sourcing": {
    "hhi": 720,
    "band": "diversified",
    "topCountry": "Taiwan",
    "topSharePct": 17.1,
    "namedSharePct": 74.8,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "steel-pipe-tube",
   "label": "Steel pipe and tube",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 1.5067,
   "basisUnitPrice": 1.5067,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 901553644,
     "sharePct": 17.5,
     "effectiveDutyPct": 20.65,
     "freightPct": 1.53,
     "upliftPct": 22.18,
     "upliftIndex": 1.2218,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 301219632,
     "sharePct": 5.9,
     "effectiveDutyPct": 17.06,
     "freightPct": 5.6,
     "upliftPct": 22.66,
     "upliftIndex": 1.2266,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 399943567,
     "sharePct": 7.8,
     "effectiveDutyPct": 20.12,
     "freightPct": 5.88,
     "upliftPct": 26,
     "upliftIndex": 1.26,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 652350034,
     "sharePct": 12.7,
     "effectiveDutyPct": 23.22,
     "freightPct": 2.88,
     "upliftPct": 26.1,
     "upliftIndex": 1.261,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 460101151,
     "sharePct": 8.9,
     "effectiveDutyPct": 23.04,
     "freightPct": 8.32,
     "upliftPct": 31.36,
     "upliftIndex": 1.3136,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Turkey",
     "rank": null,
     "customsValueUsd": 274226659,
     "sharePct": 5.3,
     "effectiveDutyPct": 30.66,
     "freightPct": 2.96,
     "upliftPct": 33.62,
     "upliftIndex": 1.3362,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1120648842,
     "sharePct": 21.8,
     "effectiveDutyPct": 25.49,
     "freightPct": 8.31,
     "upliftPct": 33.8,
     "upliftIndex": 1.338,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 295336838,
     "sharePct": 5.7,
     "effectiveDutyPct": 30.28,
     "freightPct": 5.29,
     "upliftPct": 35.57,
     "upliftIndex": 1.3557,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 395337369,
     "sharePct": 7.7,
     "effectiveDutyPct": 27.8,
     "freightPct": 11.29,
     "upliftPct": 39.09,
     "upliftIndex": 1.3909,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 347092588,
     "sharePct": 6.7,
     "effectiveDutyPct": 34.92,
     "freightPct": 10.43,
     "upliftPct": 45.35,
     "upliftIndex": 1.4535,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 23.17,
   "sourcing": {
    "hhi": 710,
    "band": "diversified",
    "topCountry": "South Korea",
    "topSharePct": 16.2,
    "namedSharePct": 74.3,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "steel-structures",
   "label": "Fabricated structural steel",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 2.8004,
   "basisUnitPrice": 2.8004,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 283723140,
     "sharePct": 4.9,
     "effectiveDutyPct": 4.05,
     "freightPct": 1.09,
     "upliftPct": 5.14,
     "upliftIndex": 1.0514,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Belgium",
     "rank": null,
     "customsValueUsd": 295688873,
     "sharePct": 5.1,
     "effectiveDutyPct": 6.26,
     "freightPct": 2,
     "upliftPct": 8.26,
     "upliftIndex": 1.0826,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1573800008,
     "sharePct": 26.9,
     "effectiveDutyPct": 7.7,
     "freightPct": 0.64,
     "upliftPct": 8.34,
     "upliftIndex": 1.0834,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 966126316,
     "sharePct": 16.5,
     "effectiveDutyPct": 12.42,
     "freightPct": 1.03,
     "upliftPct": 13.45,
     "upliftIndex": 1.1345,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Arab Emirates",
     "rank": null,
     "customsValueUsd": 194500656,
     "sharePct": 3.3,
     "effectiveDutyPct": 20.66,
     "freightPct": 1.95,
     "upliftPct": 22.61,
     "upliftIndex": 1.2261,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 266595943,
     "sharePct": 4.6,
     "effectiveDutyPct": 17.55,
     "freightPct": 6.89,
     "upliftPct": 24.44,
     "upliftIndex": 1.2444,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Denmark",
     "rank": null,
     "customsValueUsd": 674188305,
     "sharePct": 11.5,
     "effectiveDutyPct": 26.18,
     "freightPct": 1.49,
     "upliftPct": 27.67,
     "upliftIndex": 1.2767,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 497550423,
     "sharePct": 8.5,
     "effectiveDutyPct": 27.27,
     "freightPct": 2.87,
     "upliftPct": 30.14,
     "upliftIndex": 1.3014,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 431146448,
     "sharePct": 7.4,
     "effectiveDutyPct": 25.62,
     "freightPct": 10.14,
     "upliftPct": 35.76,
     "upliftIndex": 1.3576,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 666087401,
     "sharePct": 11.4,
     "effectiveDutyPct": 57.86,
     "freightPct": 14.36,
     "upliftPct": 72.22,
     "upliftIndex": 1.7222,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 67.08,
   "sourcing": {
    "hhi": 990,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 22.1,
    "namedSharePct": 82.3,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "steel-fasteners",
   "label": "Steel fasteners",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 3.5449,
   "basisUnitPrice": 3.5449,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 320574401,
     "sharePct": 6.1,
     "effectiveDutyPct": 16.41,
     "freightPct": 2.4,
     "upliftPct": 18.81,
     "upliftIndex": 1.1881,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 171069971,
     "sharePct": 3.2,
     "effectiveDutyPct": 17.2,
     "freightPct": 1.63,
     "upliftPct": 18.83,
     "upliftIndex": 1.1883,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 278654262,
     "sharePct": 5.3,
     "effectiveDutyPct": 24.42,
     "freightPct": 3.08,
     "upliftPct": 27.5,
     "upliftIndex": 1.275,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 113067276,
     "sharePct": 2.1,
     "effectiveDutyPct": 27.94,
     "freightPct": 3.16,
     "upliftPct": 31.1,
     "upliftIndex": 1.311,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 285858992,
     "sharePct": 5.4,
     "effectiveDutyPct": 27.85,
     "freightPct": 5.51,
     "upliftPct": 33.36,
     "upliftIndex": 1.3336,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 571686416,
     "sharePct": 10.8,
     "effectiveDutyPct": 32.32,
     "freightPct": 4.75,
     "upliftPct": 37.07,
     "upliftIndex": 1.3707,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 315139378,
     "sharePct": 6,
     "effectiveDutyPct": 34.35,
     "freightPct": 3.55,
     "upliftPct": 37.9,
     "upliftIndex": 1.379,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 1916484333,
     "sharePct": 36.4,
     "effectiveDutyPct": 31.72,
     "freightPct": 7.26,
     "upliftPct": 38.98,
     "upliftIndex": 1.3898,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 268073109,
     "sharePct": 5.1,
     "effectiveDutyPct": 32.91,
     "freightPct": 8.79,
     "upliftPct": 41.7,
     "upliftIndex": 1.417,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1030382452,
     "sharePct": 19.5,
     "effectiveDutyPct": 65.46,
     "freightPct": 10.74,
     "upliftPct": 76.2,
     "upliftIndex": 1.762,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 57.39,
   "sourcing": {
    "hhi": 1540,
    "band": "moderately concentrated",
    "topCountry": "Taiwan",
    "topSharePct": 32,
    "namedSharePct": 88,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "iron-steel-articles",
   "label": "Iron and steel castings and articles",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1100351506,
     "sharePct": 22.6,
     "effectiveDutyPct": 11.62,
     "freightPct": 0.76,
     "upliftPct": 12.38,
     "upliftIndex": 1.1238,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 608784124,
     "sharePct": 12.5,
     "effectiveDutyPct": 16.03,
     "freightPct": 1.37,
     "upliftPct": 17.4,
     "upliftIndex": 1.174,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 145556196,
     "sharePct": 3,
     "effectiveDutyPct": 25.53,
     "freightPct": 6.43,
     "upliftPct": 31.96,
     "upliftIndex": 1.3196,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 191381966,
     "sharePct": 3.9,
     "effectiveDutyPct": 28.3,
     "freightPct": 4.99,
     "upliftPct": 33.29,
     "upliftIndex": 1.3329,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 152050219,
     "sharePct": 3.1,
     "effectiveDutyPct": 30.3,
     "freightPct": 4.03,
     "upliftPct": 34.33,
     "upliftIndex": 1.3433,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 253510738,
     "sharePct": 5.2,
     "effectiveDutyPct": 31.2,
     "freightPct": 4.46,
     "upliftPct": 35.66,
     "upliftIndex": 1.3566,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 484266782,
     "sharePct": 9.9,
     "effectiveDutyPct": 27.54,
     "freightPct": 8.87,
     "upliftPct": 36.41,
     "upliftIndex": 1.3641,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 142016562,
     "sharePct": 2.9,
     "effectiveDutyPct": 31.01,
     "freightPct": 5.68,
     "upliftPct": 36.69,
     "upliftIndex": 1.3669,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 163201295,
     "sharePct": 3.3,
     "effectiveDutyPct": 30.29,
     "freightPct": 7.18,
     "upliftPct": 37.47,
     "upliftIndex": 1.3747,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1637042209,
     "sharePct": 33.6,
     "effectiveDutyPct": 66.21,
     "freightPct": 9.3,
     "upliftPct": 75.51,
     "upliftIndex": 1.7551,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 63.13,
   "sourcing": {
    "hhi": 1310,
    "band": "diversified",
    "topCountry": "China",
    "topSharePct": 27.4,
    "namedSharePct": 81.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "copper-semis",
   "label": "Copper semi-finished products",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 23.3725,
   "basisUnitPrice": 23.3725,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1383094457,
     "sharePct": 33.2,
     "effectiveDutyPct": 2.59,
     "freightPct": 0.22,
     "upliftPct": 2.81,
     "upliftIndex": 1.0281,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 327369406,
     "sharePct": 7.9,
     "effectiveDutyPct": 9.88,
     "freightPct": 0.3,
     "upliftPct": 10.18,
     "upliftIndex": 1.1018,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Brazil",
     "rank": null,
     "customsValueUsd": 220554342,
     "sharePct": 5.3,
     "effectiveDutyPct": 7.7,
     "freightPct": 2.5,
     "upliftPct": 10.2,
     "upliftIndex": 1.102,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 256705272,
     "sharePct": 6.2,
     "effectiveDutyPct": 5.86,
     "freightPct": 4.42,
     "upliftPct": 10.28,
     "upliftIndex": 1.1028,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Peru",
     "rank": null,
     "customsValueUsd": 417777966,
     "sharePct": 10,
     "effectiveDutyPct": 12.74,
     "freightPct": 1.73,
     "upliftPct": 14.47,
     "upliftIndex": 1.1447,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 454193415,
     "sharePct": 10.9,
     "effectiveDutyPct": 14.11,
     "freightPct": 2.15,
     "upliftPct": 16.26,
     "upliftIndex": 1.1626,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 137963694,
     "sharePct": 3.3,
     "effectiveDutyPct": 14.61,
     "freightPct": 1.88,
     "upliftPct": 16.49,
     "upliftIndex": 1.1649,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 631736496,
     "sharePct": 15.2,
     "effectiveDutyPct": 13.95,
     "freightPct": 2.63,
     "upliftPct": 16.58,
     "upliftIndex": 1.1658,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 178941809,
     "sharePct": 4.3,
     "effectiveDutyPct": 17.45,
     "freightPct": 1.4,
     "upliftPct": 18.85,
     "upliftIndex": 1.1885,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 152045125,
     "sharePct": 3.7,
     "effectiveDutyPct": 17.01,
     "freightPct": 2.81,
     "upliftPct": 19.82,
     "upliftIndex": 1.1982,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 17.01,
   "sourcing": {
    "hhi": 1040,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 25.8,
    "namedSharePct": 77.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "aluminum-semis",
   "label": "Aluminum semi-finished products",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 4.255,
   "basisUnitPrice": 4.255,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 394284047,
     "sharePct": 8,
     "effectiveDutyPct": 24.22,
     "freightPct": 4.65,
     "upliftPct": 28.87,
     "upliftIndex": 1.2887,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Saudi Arabia",
     "rank": null,
     "customsValueUsd": 229883557,
     "sharePct": 4.7,
     "effectiveDutyPct": 20.99,
     "freightPct": 8.4,
     "upliftPct": 29.39,
     "upliftIndex": 1.2939,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Bahrain",
     "rank": null,
     "customsValueUsd": 249167680,
     "sharePct": 5,
     "effectiveDutyPct": 26.82,
     "freightPct": 3.48,
     "upliftPct": 30.3,
     "upliftIndex": 1.303,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1520800549,
     "sharePct": 30.8,
     "effectiveDutyPct": 28.91,
     "freightPct": 2.22,
     "upliftPct": 31.13,
     "upliftIndex": 1.3113,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Greece",
     "rank": null,
     "customsValueUsd": 210846508,
     "sharePct": 4.3,
     "effectiveDutyPct": 27.73,
     "freightPct": 3.71,
     "upliftPct": 31.44,
     "upliftIndex": 1.3144,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1041398176,
     "sharePct": 21.1,
     "effectiveDutyPct": 32.89,
     "freightPct": 4.36,
     "upliftPct": 37.25,
     "upliftIndex": 1.3725,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Oman",
     "rank": null,
     "customsValueUsd": 250292194,
     "sharePct": 5.1,
     "effectiveDutyPct": 31.55,
     "freightPct": 6.21,
     "upliftPct": 37.76,
     "upliftIndex": 1.3776,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 235693043,
     "sharePct": 4.8,
     "effectiveDutyPct": 33.32,
     "freightPct": 4.44,
     "upliftPct": 37.76,
     "upliftIndex": 1.3776,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 322474603,
     "sharePct": 6.5,
     "effectiveDutyPct": 34.84,
     "freightPct": 6.06,
     "upliftPct": 40.9,
     "upliftIndex": 1.409,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 483636664,
     "sharePct": 9.8,
     "effectiveDutyPct": 66.87,
     "freightPct": 4.86,
     "upliftPct": 71.73,
     "upliftIndex": 1.7173,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 42.86,
   "sourcing": {
    "hhi": 720,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 20.1,
    "namedSharePct": 65.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "aluminum-articles",
   "label": "Aluminum articles",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 27.7066,
   "basisUnitPrice": 27.7066,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 66290170,
     "sharePct": 4.1,
     "effectiveDutyPct": 12.72,
     "freightPct": 2.39,
     "upliftPct": 15.11,
     "upliftIndex": 1.1511,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 413226300,
     "sharePct": 25.7,
     "effectiveDutyPct": 17.21,
     "freightPct": 0.65,
     "upliftPct": 17.86,
     "upliftIndex": 1.1786,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 174496132,
     "sharePct": 10.9,
     "effectiveDutyPct": 18.14,
     "freightPct": 1.7,
     "upliftPct": 19.84,
     "upliftIndex": 1.1984,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 107766506,
     "sharePct": 6.7,
     "effectiveDutyPct": 22.91,
     "freightPct": 3.31,
     "upliftPct": 26.22,
     "upliftIndex": 1.2622,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 40631547,
     "sharePct": 2.5,
     "effectiveDutyPct": 27.38,
     "freightPct": 2.98,
     "upliftPct": 30.36,
     "upliftIndex": 1.3036,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 103852954,
     "sharePct": 6.5,
     "effectiveDutyPct": 27.04,
     "freightPct": 4.31,
     "upliftPct": 31.35,
     "upliftIndex": 1.3135,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 51349050,
     "sharePct": 3.2,
     "effectiveDutyPct": 26.21,
     "freightPct": 5.24,
     "upliftPct": 31.45,
     "upliftIndex": 1.3145,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 115953746,
     "sharePct": 7.2,
     "effectiveDutyPct": 27.4,
     "freightPct": 8.51,
     "upliftPct": 35.91,
     "upliftIndex": 1.3591,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 94012662,
     "sharePct": 5.9,
     "effectiveDutyPct": 31.07,
     "freightPct": 5.65,
     "upliftPct": 36.72,
     "upliftIndex": 1.3672,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 437506891,
     "sharePct": 27.3,
     "effectiveDutyPct": 60.89,
     "freightPct": 6.92,
     "upliftPct": 67.81,
     "upliftIndex": 1.6781,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 52.7,
   "sourcing": {
    "hhi": 1210,
    "band": "diversified",
    "topCountry": "China",
    "topSharePct": 22.7,
    "namedSharePct": 83.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "hand-tools",
   "label": "Hand tools",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 108723739,
     "sharePct": 4.5,
     "effectiveDutyPct": 4.67,
     "freightPct": 1.15,
     "upliftPct": 5.82,
     "upliftIndex": 1.0582,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 54241011,
     "sharePct": 2.2,
     "effectiveDutyPct": 6.17,
     "freightPct": 2.7,
     "upliftPct": 8.87,
     "upliftIndex": 1.0887,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 137175482,
     "sharePct": 5.7,
     "effectiveDutyPct": 13.52,
     "freightPct": 1.53,
     "upliftPct": 15.05,
     "upliftIndex": 1.1505,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 33196923,
     "sharePct": 1.4,
     "effectiveDutyPct": 14.04,
     "freightPct": 4.25,
     "upliftPct": 18.29,
     "upliftIndex": 1.1829,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 28566996,
     "sharePct": 1.2,
     "effectiveDutyPct": 15.22,
     "freightPct": 4.61,
     "upliftPct": 19.83,
     "upliftIndex": 1.1983,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 808352352,
     "sharePct": 33.5,
     "effectiveDutyPct": 16.7,
     "freightPct": 3.41,
     "upliftPct": 20.11,
     "upliftIndex": 1.2011,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 297283180,
     "sharePct": 12.3,
     "effectiveDutyPct": 17.37,
     "freightPct": 4.09,
     "upliftPct": 21.46,
     "upliftIndex": 1.2146,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 66695305,
     "sharePct": 2.8,
     "effectiveDutyPct": 18.5,
     "freightPct": 3.12,
     "upliftPct": 21.62,
     "upliftIndex": 1.2162,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 144886063,
     "sharePct": 6,
     "effectiveDutyPct": 22.3,
     "freightPct": 6.03,
     "upliftPct": 28.33,
     "upliftIndex": 1.2833,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 731754834,
     "sharePct": 30.4,
     "effectiveDutyPct": 49.69,
     "freightPct": 6.1,
     "upliftPct": 55.79,
     "upliftIndex": 1.5579,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 49.97,
   "sourcing": {
    "hhi": 1840,
    "band": "moderately concentrated",
    "topCountry": "Taiwan",
    "topSharePct": 30,
    "namedSharePct": 89.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "cutting-tools",
   "label": "Cutting tools and inserts",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 144001072,
     "sharePct": 4.2,
     "effectiveDutyPct": 1.83,
     "freightPct": 0.53,
     "upliftPct": 2.36,
     "upliftIndex": 1.0236,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 272390261,
     "sharePct": 8,
     "effectiveDutyPct": 2.42,
     "freightPct": 1.04,
     "upliftPct": 3.46,
     "upliftIndex": 1.0346,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 190372672,
     "sharePct": 5.6,
     "effectiveDutyPct": 11.26,
     "freightPct": 1.04,
     "upliftPct": 12.3,
     "upliftIndex": 1.123,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 616506107,
     "sharePct": 18.1,
     "effectiveDutyPct": 9.81,
     "freightPct": 2.65,
     "upliftPct": 12.46,
     "upliftIndex": 1.1246,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Israel",
     "rank": null,
     "customsValueUsd": 239373241,
     "sharePct": 7,
     "effectiveDutyPct": 12.24,
     "freightPct": 0.92,
     "upliftPct": 13.16,
     "upliftIndex": 1.1316,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 762306624,
     "sharePct": 22.3,
     "effectiveDutyPct": 11.76,
     "freightPct": 1.56,
     "upliftPct": 13.32,
     "upliftIndex": 1.1332,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 311368489,
     "sharePct": 9.1,
     "effectiveDutyPct": 9.73,
     "freightPct": 5.04,
     "upliftPct": 14.77,
     "upliftIndex": 1.1477,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 184575773,
     "sharePct": 5.4,
     "effectiveDutyPct": 14.29,
     "freightPct": 3.54,
     "upliftPct": 17.83,
     "upliftIndex": 1.1783,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 162942159,
     "sharePct": 4.8,
     "effectiveDutyPct": 21.4,
     "freightPct": 2.24,
     "upliftPct": 23.64,
     "upliftIndex": 1.2364,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 529507391,
     "sharePct": 15.5,
     "effectiveDutyPct": 50.7,
     "freightPct": 4.38,
     "upliftPct": 55.08,
     "upliftIndex": 1.5508,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 52.72,
   "sourcing": {
    "hhi": 790,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 17,
    "namedSharePct": 76.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "machine-tools-cutting",
   "label": "Metal-cutting machine tools",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 4219.3075,
   "basisUnitPrice": 4219.3075,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 119205852,
     "sharePct": 3.1,
     "effectiveDutyPct": 1.07,
     "freightPct": 0.68,
     "upliftPct": 1.75,
     "upliftIndex": 1.0175,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1164305223,
     "sharePct": 30.1,
     "effectiveDutyPct": 4.96,
     "freightPct": 4.19,
     "upliftPct": 9.15,
     "upliftIndex": 1.0915,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 954269097,
     "sharePct": 24.7,
     "effectiveDutyPct": 8.3,
     "freightPct": 1.56,
     "upliftPct": 9.86,
     "upliftIndex": 1.0986,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Spain",
     "rank": null,
     "customsValueUsd": 110746464,
     "sharePct": 2.9,
     "effectiveDutyPct": 8.31,
     "freightPct": 2.03,
     "upliftPct": 10.34,
     "upliftIndex": 1.1034,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 472255021,
     "sharePct": 12.2,
     "effectiveDutyPct": 7.95,
     "freightPct": 2.77,
     "upliftPct": 10.72,
     "upliftIndex": 1.1072,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 326246506,
     "sharePct": 8.4,
     "effectiveDutyPct": 9.56,
     "freightPct": 1.82,
     "upliftPct": 11.38,
     "upliftIndex": 1.1138,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 202508638,
     "sharePct": 5.2,
     "effectiveDutyPct": 12.31,
     "freightPct": 1.2,
     "upliftPct": 13.51,
     "upliftIndex": 1.1351,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 97642686,
     "sharePct": 2.5,
     "effectiveDutyPct": 13.12,
     "freightPct": 1.92,
     "upliftPct": 15.04,
     "upliftIndex": 1.1504,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 259442536,
     "sharePct": 6.7,
     "effectiveDutyPct": 13.07,
     "freightPct": 3.14,
     "upliftPct": 16.21,
     "upliftIndex": 1.1621,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 161111663,
     "sharePct": 4.2,
     "effectiveDutyPct": 47.2,
     "freightPct": 6.4,
     "upliftPct": 53.6,
     "upliftIndex": 1.536,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 51.85,
   "sourcing": {
    "hhi": 1470,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 26.8,
    "namedSharePct": 89.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "machine-tools-forming",
   "label": "Metal-forming machine tools",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 100254688,
     "sharePct": 6.9,
     "effectiveDutyPct": 3.17,
     "freightPct": 0.54,
     "upliftPct": 3.71,
     "upliftIndex": 1.0371,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 138313837,
     "sharePct": 9.6,
     "effectiveDutyPct": 5.03,
     "freightPct": 2.54,
     "upliftPct": 7.57,
     "upliftIndex": 1.0757,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Turkey",
     "rank": null,
     "customsValueUsd": 73457275,
     "sharePct": 5.1,
     "effectiveDutyPct": 6.56,
     "freightPct": 2.86,
     "upliftPct": 9.42,
     "upliftIndex": 1.0942,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 330963565,
     "sharePct": 22.9,
     "effectiveDutyPct": 9.46,
     "freightPct": 1.56,
     "upliftPct": 11.02,
     "upliftIndex": 1.1102,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 178921438,
     "sharePct": 12.4,
     "effectiveDutyPct": 5.88,
     "freightPct": 5.84,
     "upliftPct": 11.72,
     "upliftIndex": 1.1172,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 108873387,
     "sharePct": 7.5,
     "effectiveDutyPct": 10.94,
     "freightPct": 1.87,
     "upliftPct": 12.81,
     "upliftIndex": 1.1281,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 311264337,
     "sharePct": 21.5,
     "effectiveDutyPct": 10.84,
     "freightPct": 2.39,
     "upliftPct": 13.23,
     "upliftIndex": 1.1323,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 66091328,
     "sharePct": 4.6,
     "effectiveDutyPct": 12.83,
     "freightPct": 0.87,
     "upliftPct": 13.7,
     "upliftIndex": 1.137,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 62460545,
     "sharePct": 4.3,
     "effectiveDutyPct": 12.73,
     "freightPct": 3.56,
     "upliftPct": 16.29,
     "upliftIndex": 1.1629,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 76415423,
     "sharePct": 5.3,
     "effectiveDutyPct": 48.3,
     "freightPct": 6.1,
     "upliftPct": 54.4,
     "upliftIndex": 1.544,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 50.69,
   "sourcing": {
    "hhi": 980,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 18.9,
    "namedSharePct": 82.8,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "molds-dies",
   "label": "Molds and die sets",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 69.7364,
   "basisUnitPrice": 69.7364,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 847865312,
     "sharePct": 43.4,
     "effectiveDutyPct": 0.91,
     "freightPct": 0.37,
     "upliftPct": 1.28,
     "upliftIndex": 1.0128,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 64541276,
     "sharePct": 3.3,
     "effectiveDutyPct": 2.48,
     "freightPct": 0.43,
     "upliftPct": 2.91,
     "upliftIndex": 1.0291,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 128854837,
     "sharePct": 6.6,
     "effectiveDutyPct": 9.72,
     "freightPct": 2.18,
     "upliftPct": 11.9,
     "upliftIndex": 1.119,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 74557318,
     "sharePct": 3.8,
     "effectiveDutyPct": 10.86,
     "freightPct": 3.48,
     "upliftPct": 14.34,
     "upliftIndex": 1.1434,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 189582288,
     "sharePct": 9.7,
     "effectiveDutyPct": 11.84,
     "freightPct": 2.51,
     "upliftPct": 14.35,
     "upliftIndex": 1.1435,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 68654578,
     "sharePct": 3.5,
     "effectiveDutyPct": 14.22,
     "freightPct": 1.32,
     "upliftPct": 15.54,
     "upliftIndex": 1.1554,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 133035956,
     "sharePct": 6.8,
     "effectiveDutyPct": 10.04,
     "freightPct": 5.63,
     "upliftPct": 15.67,
     "upliftIndex": 1.1567,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 52767204,
     "sharePct": 2.7,
     "effectiveDutyPct": 13.28,
     "freightPct": 2.89,
     "upliftPct": 16.17,
     "upliftIndex": 1.1617,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 44930058,
     "sharePct": 2.3,
     "effectiveDutyPct": 13.92,
     "freightPct": 9.88,
     "upliftPct": 23.8,
     "upliftIndex": 1.238,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 348057004,
     "sharePct": 17.8,
     "effectiveDutyPct": 54.17,
     "freightPct": 7.29,
     "upliftPct": 61.46,
     "upliftIndex": 1.6146,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 60.18,
   "sourcing": {
    "hhi": 1790,
    "band": "moderately concentrated",
    "topCountry": "Canada",
    "topSharePct": 37.2,
    "namedSharePct": 85.8,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "pumps",
   "label": "Pumps for liquids",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1047368206,
     "sharePct": 10.3,
     "effectiveDutyPct": 4.3,
     "freightPct": 0.74,
     "upliftPct": 5.04,
     "upliftIndex": 1.0504,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 2676766823,
     "sharePct": 26.4,
     "effectiveDutyPct": 7.17,
     "freightPct": 0.6,
     "upliftPct": 7.77,
     "upliftIndex": 1.0777,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 315230614,
     "sharePct": 3.1,
     "effectiveDutyPct": 7.57,
     "freightPct": 2.01,
     "upliftPct": 9.58,
     "upliftIndex": 1.0958,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 393871495,
     "sharePct": 3.9,
     "effectiveDutyPct": 8.38,
     "freightPct": 2.96,
     "upliftPct": 11.34,
     "upliftIndex": 1.1134,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1354168706,
     "sharePct": 13.3,
     "effectiveDutyPct": 9.79,
     "freightPct": 2.6,
     "upliftPct": 12.39,
     "upliftIndex": 1.1239,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 511357238,
     "sharePct": 5,
     "effectiveDutyPct": 10.43,
     "freightPct": 2.3,
     "upliftPct": 12.73,
     "upliftIndex": 1.1273,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1433539077,
     "sharePct": 14.1,
     "effectiveDutyPct": 10.36,
     "freightPct": 2.41,
     "upliftPct": 12.77,
     "upliftIndex": 1.1277,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 313618351,
     "sharePct": 3.1,
     "effectiveDutyPct": 14.39,
     "freightPct": 4.72,
     "upliftPct": 19.11,
     "upliftIndex": 1.1911,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 450168194,
     "sharePct": 4.4,
     "effectiveDutyPct": 17.93,
     "freightPct": 4.55,
     "upliftPct": 22.48,
     "upliftIndex": 1.2248,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1659061619,
     "sharePct": 16.3,
     "effectiveDutyPct": 46.36,
     "freightPct": 5.13,
     "upliftPct": 51.49,
     "upliftIndex": 1.5149,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 46.45,
   "sourcing": {
    "hhi": 1000,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 21.4,
    "namedSharePct": 81.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "compressors-fans",
   "label": "Compressors and fans",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 39.2439,
   "basisUnitPrice": 39.2439,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 623777657,
     "sharePct": 5,
     "effectiveDutyPct": 1.93,
     "freightPct": 0.68,
     "upliftPct": 2.61,
     "upliftIndex": 1.0261,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 3462182411,
     "sharePct": 28,
     "effectiveDutyPct": 7.3,
     "freightPct": 0.43,
     "upliftPct": 7.73,
     "upliftIndex": 1.0773,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 568570804,
     "sharePct": 4.6,
     "effectiveDutyPct": 9.26,
     "freightPct": 2.21,
     "upliftPct": 11.47,
     "upliftIndex": 1.1147,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 673818544,
     "sharePct": 5.4,
     "effectiveDutyPct": 9.2,
     "freightPct": 2.5,
     "upliftPct": 11.7,
     "upliftIndex": 1.117,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1248876038,
     "sharePct": 10.1,
     "effectiveDutyPct": 9.49,
     "freightPct": 2.43,
     "upliftPct": 11.92,
     "upliftIndex": 1.1192,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1154104513,
     "sharePct": 9.3,
     "effectiveDutyPct": 12.7,
     "freightPct": 1.97,
     "upliftPct": 14.67,
     "upliftIndex": 1.1467,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 696364544,
     "sharePct": 5.6,
     "effectiveDutyPct": 11.77,
     "freightPct": 3.35,
     "upliftPct": 15.12,
     "upliftIndex": 1.1512,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 444064273,
     "sharePct": 3.6,
     "effectiveDutyPct": 11.76,
     "freightPct": 4.05,
     "upliftPct": 15.81,
     "upliftIndex": 1.1581,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 475940233,
     "sharePct": 3.8,
     "effectiveDutyPct": 12.82,
     "freightPct": 3.42,
     "upliftPct": 16.24,
     "upliftIndex": 1.1624,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 3016599798,
     "sharePct": 24.4,
     "effectiveDutyPct": 35.66,
     "freightPct": 6.54,
     "upliftPct": 42.2,
     "upliftIndex": 1.422,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 39.59,
   "sourcing": {
    "hhi": 1170,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 23.2,
    "namedSharePct": 82.7,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "lifting-handling",
   "label": "Lifting and handling equipment",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 841.4936,
   "basisUnitPrice": 841.4936,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1470300495,
     "sharePct": 12.4,
     "effectiveDutyPct": 1.8,
     "freightPct": 1.04,
     "upliftPct": 2.84,
     "upliftIndex": 1.0284,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 2296561988,
     "sharePct": 19.3,
     "effectiveDutyPct": 4.22,
     "freightPct": 0.5,
     "upliftPct": 4.72,
     "upliftIndex": 1.0472,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1268591431,
     "sharePct": 10.7,
     "effectiveDutyPct": 6.88,
     "freightPct": 3.05,
     "upliftPct": 9.93,
     "upliftIndex": 1.0993,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 1099822195,
     "sharePct": 9.3,
     "effectiveDutyPct": 7.59,
     "freightPct": 4.34,
     "upliftPct": 11.93,
     "upliftIndex": 1.1193,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 742241637,
     "sharePct": 6.3,
     "effectiveDutyPct": 10.17,
     "freightPct": 2.18,
     "upliftPct": 12.35,
     "upliftIndex": 1.1235,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Ireland",
     "rank": null,
     "customsValueUsd": 247685652,
     "sharePct": 2.1,
     "effectiveDutyPct": 9.43,
     "freightPct": 4.28,
     "upliftPct": 13.71,
     "upliftIndex": 1.1371,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 351763321,
     "sharePct": 3,
     "effectiveDutyPct": 10.23,
     "freightPct": 3.79,
     "upliftPct": 14.02,
     "upliftIndex": 1.1402,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1369885948,
     "sharePct": 11.5,
     "effectiveDutyPct": 12.52,
     "freightPct": 2.64,
     "upliftPct": 15.16,
     "upliftIndex": 1.1516,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1924807127,
     "sharePct": 16.2,
     "effectiveDutyPct": 14.24,
     "freightPct": 2.08,
     "upliftPct": 16.32,
     "upliftIndex": 1.1632,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1098809074,
     "sharePct": 9.3,
     "effectiveDutyPct": 45.65,
     "freightPct": 5.73,
     "upliftPct": 51.38,
     "upliftIndex": 1.5138,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 48.54,
   "sourcing": {
    "hhi": 930,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 16.6,
    "namedSharePct": 86,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "valves",
   "label": "Valves and fluid controls",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 712128109,
     "sharePct": 4.9,
     "effectiveDutyPct": 4.61,
     "freightPct": 0.99,
     "upliftPct": 5.6,
     "upliftIndex": 1.056,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 3637561533,
     "sharePct": 25.2,
     "effectiveDutyPct": 5.65,
     "freightPct": 0.46,
     "upliftPct": 6.11,
     "upliftIndex": 1.0611,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 625605801,
     "sharePct": 4.3,
     "effectiveDutyPct": 8.22,
     "freightPct": 2.64,
     "upliftPct": 10.86,
     "upliftIndex": 1.1086,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1302884076,
     "sharePct": 9,
     "effectiveDutyPct": 10.79,
     "freightPct": 2.42,
     "upliftPct": 13.21,
     "upliftIndex": 1.1321,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1518951936,
     "sharePct": 10.5,
     "effectiveDutyPct": 10.87,
     "freightPct": 2.35,
     "upliftPct": 13.22,
     "upliftIndex": 1.1322,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 1175220521,
     "sharePct": 8.1,
     "effectiveDutyPct": 10.42,
     "freightPct": 3.46,
     "upliftPct": 13.88,
     "upliftIndex": 1.1388,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 777193947,
     "sharePct": 5.4,
     "effectiveDutyPct": 14.05,
     "freightPct": 2.79,
     "upliftPct": 16.84,
     "upliftIndex": 1.1684,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 917454663,
     "sharePct": 6.4,
     "effectiveDutyPct": 13.71,
     "freightPct": 3.36,
     "upliftPct": 17.07,
     "upliftIndex": 1.1707,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 753405338,
     "sharePct": 5.2,
     "effectiveDutyPct": 20.1,
     "freightPct": 4.66,
     "upliftPct": 24.76,
     "upliftIndex": 1.2476,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 3016976086,
     "sharePct": 20.9,
     "effectiveDutyPct": 45.92,
     "freightPct": 4.3,
     "upliftPct": 50.22,
     "upliftIndex": 1.5022,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 44.62,
   "sourcing": {
    "hhi": 940,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 20.1,
    "namedSharePct": 79.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "bearings",
   "label": "Bearings",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 245105917,
     "sharePct": 9.4,
     "effectiveDutyPct": 8.22,
     "freightPct": 1.03,
     "upliftPct": 9.25,
     "upliftIndex": 1.0925,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 246031280,
     "sharePct": 9.4,
     "effectiveDutyPct": 14.04,
     "freightPct": 0.43,
     "upliftPct": 14.47,
     "upliftIndex": 1.1447,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 146795106,
     "sharePct": 5.6,
     "effectiveDutyPct": 15.51,
     "freightPct": 1.4,
     "upliftPct": 16.91,
     "upliftIndex": 1.1691,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 238745735,
     "sharePct": 9.1,
     "effectiveDutyPct": 14.95,
     "freightPct": 3.12,
     "upliftPct": 18.07,
     "upliftIndex": 1.1807,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 305748987,
     "sharePct": 11.7,
     "effectiveDutyPct": 16.62,
     "freightPct": 2,
     "upliftPct": 18.62,
     "upliftIndex": 1.1862,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 92579941,
     "sharePct": 3.5,
     "effectiveDutyPct": 16.71,
     "freightPct": 2.02,
     "upliftPct": 18.73,
     "upliftIndex": 1.1873,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Romania",
     "rank": null,
     "customsValueUsd": 132710744,
     "sharePct": 5.1,
     "effectiveDutyPct": 17.26,
     "freightPct": 1.81,
     "upliftPct": 19.07,
     "upliftIndex": 1.1907,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 669027517,
     "sharePct": 25.6,
     "effectiveDutyPct": 19.45,
     "freightPct": 3.41,
     "upliftPct": 22.86,
     "upliftIndex": 1.2286,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 173413152,
     "sharePct": 6.6,
     "effectiveDutyPct": 22.4,
     "freightPct": 5.18,
     "upliftPct": 27.58,
     "upliftIndex": 1.2758,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 365198250,
     "sharePct": 14,
     "effectiveDutyPct": 58.68,
     "freightPct": 4.7,
     "upliftPct": 63.38,
     "upliftIndex": 1.6338,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 54.13,
   "sourcing": {
    "hhi": 960,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 21.5,
    "namedSharePct": 84.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "power-transmission",
   "label": "Gears and power transmission",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 398370440,
     "sharePct": 4.5,
     "effectiveDutyPct": 4.91,
     "freightPct": 0.89,
     "upliftPct": 5.8,
     "upliftIndex": 1.058,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1107696201,
     "sharePct": 12.4,
     "effectiveDutyPct": 8.1,
     "freightPct": 1.52,
     "upliftPct": 9.62,
     "upliftIndex": 1.0962,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 549002217,
     "sharePct": 6.1,
     "effectiveDutyPct": 8.58,
     "freightPct": 1.09,
     "upliftPct": 9.67,
     "upliftIndex": 1.0967,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 765895087,
     "sharePct": 8.6,
     "effectiveDutyPct": 8.95,
     "freightPct": 1.13,
     "upliftPct": 10.08,
     "upliftIndex": 1.1008,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 793023777,
     "sharePct": 8.9,
     "effectiveDutyPct": 9.68,
     "freightPct": 2.05,
     "upliftPct": 11.73,
     "upliftIndex": 1.1173,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 344902865,
     "sharePct": 3.9,
     "effectiveDutyPct": 13.74,
     "freightPct": 2.79,
     "upliftPct": 16.53,
     "upliftIndex": 1.1653,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1350305162,
     "sharePct": 15.1,
     "effectiveDutyPct": 14.71,
     "freightPct": 3.12,
     "upliftPct": 17.83,
     "upliftIndex": 1.1783,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1135446067,
     "sharePct": 12.7,
     "effectiveDutyPct": 14.22,
     "freightPct": 3.74,
     "upliftPct": 17.96,
     "upliftIndex": 1.1796,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 1236550494,
     "sharePct": 13.8,
     "effectiveDutyPct": 17.31,
     "freightPct": 2.84,
     "upliftPct": 20.15,
     "upliftIndex": 1.2015,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1258276229,
     "sharePct": 14.1,
     "effectiveDutyPct": 50.96,
     "freightPct": 5,
     "upliftPct": 55.96,
     "upliftIndex": 1.5596,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 50.16,
   "sourcing": {
    "hhi": 790,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 12.5,
    "namedSharePct": 82.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "electric-motors",
   "label": "Electric motors and generators",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 5008752599,
     "sharePct": 36.2,
     "effectiveDutyPct": 3.71,
     "freightPct": 0.51,
     "upliftPct": 4.22,
     "upliftIndex": 1.0422,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 635051749,
     "sharePct": 4.6,
     "effectiveDutyPct": 8.41,
     "freightPct": 1.67,
     "upliftPct": 10.08,
     "upliftIndex": 1.1008,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 502444532,
     "sharePct": 3.6,
     "effectiveDutyPct": 8.92,
     "freightPct": 2.49,
     "upliftPct": 11.41,
     "upliftIndex": 1.1141,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 408858389,
     "sharePct": 3,
     "effectiveDutyPct": 11.84,
     "freightPct": 0.99,
     "upliftPct": 12.83,
     "upliftIndex": 1.1283,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1636603196,
     "sharePct": 11.8,
     "effectiveDutyPct": 11.38,
     "freightPct": 1.87,
     "upliftPct": 13.25,
     "upliftIndex": 1.1325,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 422592383,
     "sharePct": 3.1,
     "effectiveDutyPct": 14.09,
     "freightPct": 1.09,
     "upliftPct": 15.18,
     "upliftIndex": 1.1518,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 741061564,
     "sharePct": 5.4,
     "effectiveDutyPct": 12.41,
     "freightPct": 3.95,
     "upliftPct": 16.36,
     "upliftIndex": 1.1636,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 2193451931,
     "sharePct": 15.9,
     "effectiveDutyPct": 16.08,
     "freightPct": 2.68,
     "upliftPct": 18.76,
     "upliftIndex": 1.1876,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 473771001,
     "sharePct": 3.4,
     "effectiveDutyPct": 20.84,
     "freightPct": 3.43,
     "upliftPct": 24.27,
     "upliftIndex": 1.2427,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1795197180,
     "sharePct": 13,
     "effectiveDutyPct": 47.06,
     "freightPct": 4.52,
     "upliftPct": 51.58,
     "upliftIndex": 1.5158,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 47.36,
   "sourcing": {
    "hhi": 1260,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 29,
    "namedSharePct": 80.1,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "transformers-power",
   "label": "Transformers and power supplies",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 6206904359,
     "sharePct": 25.7,
     "effectiveDutyPct": 2.89,
     "freightPct": 0.41,
     "upliftPct": 3.3,
     "upliftIndex": 1.033,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1507978331,
     "sharePct": 6.3,
     "effectiveDutyPct": 3.31,
     "freightPct": 0.6,
     "upliftPct": 3.91,
     "upliftIndex": 1.0391,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Spain",
     "rank": null,
     "customsValueUsd": 1150784016,
     "sharePct": 4.8,
     "effectiveDutyPct": 8.27,
     "freightPct": 0.81,
     "upliftPct": 9.08,
     "upliftIndex": 1.0908,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 2173649481,
     "sharePct": 9,
     "effectiveDutyPct": 6.37,
     "freightPct": 2.9,
     "upliftPct": 9.27,
     "upliftIndex": 1.0927,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1553789008,
     "sharePct": 6.4,
     "effectiveDutyPct": 8.39,
     "freightPct": 2.25,
     "upliftPct": 10.64,
     "upliftIndex": 1.1064,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 2019759798,
     "sharePct": 8.4,
     "effectiveDutyPct": 10.17,
     "freightPct": 2.51,
     "upliftPct": 12.68,
     "upliftIndex": 1.1268,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 3196656382,
     "sharePct": 13.3,
     "effectiveDutyPct": 10.53,
     "freightPct": 2.56,
     "upliftPct": 13.09,
     "upliftIndex": 1.1309,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 2052660761,
     "sharePct": 8.5,
     "effectiveDutyPct": 11.14,
     "freightPct": 3.42,
     "upliftPct": 14.56,
     "upliftIndex": 1.1456,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 1225156777,
     "sharePct": 5.1,
     "effectiveDutyPct": 14.91,
     "freightPct": 3.51,
     "upliftPct": 18.42,
     "upliftIndex": 1.1842,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 3036809434,
     "sharePct": 12.6,
     "effectiveDutyPct": 47.11,
     "freightPct": 4.37,
     "upliftPct": 51.48,
     "upliftIndex": 1.5148,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 48.18,
   "sourcing": {
    "hhi": 780,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 19.5,
    "namedSharePct": 76,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "welding-equipment",
   "label": "Welding equipment",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 26.2563,
   "basisUnitPrice": 26.2563,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 238268062,
     "sharePct": 15.6,
     "effectiveDutyPct": 1.01,
     "freightPct": 0.34,
     "upliftPct": 1.35,
     "upliftIndex": 1.0135,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 132003544,
     "sharePct": 8.7,
     "effectiveDutyPct": 4.49,
     "freightPct": 2.43,
     "upliftPct": 6.92,
     "upliftIndex": 1.0692,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 75571503,
     "sharePct": 5,
     "effectiveDutyPct": 6.47,
     "freightPct": 1.67,
     "upliftPct": 8.14,
     "upliftIndex": 1.0814,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 103800807,
     "sharePct": 6.8,
     "effectiveDutyPct": 7.75,
     "freightPct": 0.57,
     "upliftPct": 8.32,
     "upliftIndex": 1.0832,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 36123809,
     "sharePct": 2.4,
     "effectiveDutyPct": 6.56,
     "freightPct": 2.8,
     "upliftPct": 9.36,
     "upliftIndex": 1.0936,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 79712118,
     "sharePct": 5.2,
     "effectiveDutyPct": 7.63,
     "freightPct": 2,
     "upliftPct": 9.63,
     "upliftIndex": 1.0963,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 315993502,
     "sharePct": 20.7,
     "effectiveDutyPct": 8.09,
     "freightPct": 3.28,
     "upliftPct": 11.37,
     "upliftIndex": 1.1137,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 288696600,
     "sharePct": 19,
     "effectiveDutyPct": 9,
     "freightPct": 2.51,
     "upliftPct": 11.51,
     "upliftIndex": 1.1151,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 98034214,
     "sharePct": 6.4,
     "effectiveDutyPct": 11.8,
     "freightPct": 2.1,
     "upliftPct": 13.9,
     "upliftIndex": 1.139,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 155092879,
     "sharePct": 10.2,
     "effectiveDutyPct": 47.66,
     "freightPct": 5.1,
     "upliftPct": 52.76,
     "upliftIndex": 1.5276,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 51.41,
   "sourcing": {
    "hhi": 1030,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 18.1,
    "namedSharePct": 87.3,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "wire-cable",
   "label": "Insulated wire and cable",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 17736087850,
     "sharePct": 59,
     "effectiveDutyPct": 2.6,
     "freightPct": 0.73,
     "upliftPct": 3.33,
     "upliftIndex": 1.0333,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 791178741,
     "sharePct": 2.6,
     "effectiveDutyPct": 3.05,
     "freightPct": 0.78,
     "upliftPct": 3.83,
     "upliftIndex": 1.0383,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1011019887,
     "sharePct": 3.4,
     "effectiveDutyPct": 10.79,
     "freightPct": 3.79,
     "upliftPct": 14.58,
     "upliftIndex": 1.1458,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 523721224,
     "sharePct": 1.7,
     "effectiveDutyPct": 12.84,
     "freightPct": 2.66,
     "upliftPct": 15.5,
     "upliftIndex": 1.155,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 2606604212,
     "sharePct": 8.7,
     "effectiveDutyPct": 17.08,
     "freightPct": 3.35,
     "upliftPct": 20.43,
     "upliftIndex": 1.2043,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Honduras",
     "rank": null,
     "customsValueUsd": 969942736,
     "sharePct": 3.2,
     "effectiveDutyPct": 16.17,
     "freightPct": 4.63,
     "upliftPct": 20.8,
     "upliftIndex": 1.208,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Nicaragua",
     "rank": null,
     "customsValueUsd": 817304237,
     "sharePct": 2.7,
     "effectiveDutyPct": 16.93,
     "freightPct": 5.12,
     "upliftPct": 22.05,
     "upliftIndex": 1.2205,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Philippines",
     "rank": null,
     "customsValueUsd": 1182842077,
     "sharePct": 3.9,
     "effectiveDutyPct": 18.81,
     "freightPct": 3.51,
     "upliftPct": 22.32,
     "upliftIndex": 1.2232,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 822179551,
     "sharePct": 2.7,
     "effectiveDutyPct": 17.71,
     "freightPct": 5.36,
     "upliftPct": 23.07,
     "upliftIndex": 1.2307,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 3579168171,
     "sharePct": 11.9,
     "effectiveDutyPct": 53.21,
     "freightPct": 4.3,
     "upliftPct": 57.51,
     "upliftIndex": 1.5751,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 54.18,
   "sourcing": {
    "hhi": 2670,
    "band": "highly concentrated",
    "topCountry": "Mexico",
    "topSharePct": 49.7,
    "namedSharePct": 84.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "plastics-resins",
   "label": "Plastics in primary forms",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 1.6009,
   "basisUnitPrice": 1.6009,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 4146980991,
     "sharePct": 40.4,
     "effectiveDutyPct": 0.31,
     "freightPct": 0.85,
     "upliftPct": 1.16,
     "upliftIndex": 1.0116,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1167199335,
     "sharePct": 11.4,
     "effectiveDutyPct": 0.32,
     "freightPct": 1.69,
     "upliftPct": 2.01,
     "upliftIndex": 1.0201,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 920972708,
     "sharePct": 9,
     "effectiveDutyPct": 8.42,
     "freightPct": 4.11,
     "upliftPct": 12.53,
     "upliftIndex": 1.1253,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 306403605,
     "sharePct": 3,
     "effectiveDutyPct": 8.13,
     "freightPct": 4.6,
     "upliftPct": 12.73,
     "upliftIndex": 1.1273,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 253042747,
     "sharePct": 2.5,
     "effectiveDutyPct": 8.85,
     "freightPct": 4.83,
     "upliftPct": 13.68,
     "upliftIndex": 1.1368,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1508024106,
     "sharePct": 14.7,
     "effectiveDutyPct": 5.14,
     "freightPct": 9.98,
     "upliftPct": 15.12,
     "upliftIndex": 1.1512,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 863388213,
     "sharePct": 8.4,
     "effectiveDutyPct": 7.89,
     "freightPct": 7.91,
     "upliftPct": 15.8,
     "upliftIndex": 1.158,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 537836118,
     "sharePct": 5.2,
     "effectiveDutyPct": 9.78,
     "freightPct": 10.22,
     "upliftPct": 20,
     "upliftIndex": 1.2,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 288238564,
     "sharePct": 2.8,
     "effectiveDutyPct": 9.33,
     "freightPct": 11.9,
     "upliftPct": 21.23,
     "upliftIndex": 1.2123,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 278740473,
     "sharePct": 2.7,
     "effectiveDutyPct": 46.46,
     "freightPct": 7.68,
     "upliftPct": 54.14,
     "upliftIndex": 1.5414,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 52.98,
   "sourcing": {
    "hhi": 1480,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 33.2,
    "namedSharePct": 82.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "plastic-semis",
   "label": "Plastic semi-finished products",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 3017390457,
     "sharePct": 31.2,
     "effectiveDutyPct": 0.33,
     "freightPct": 1.06,
     "upliftPct": 1.39,
     "upliftIndex": 1.0139,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1676061649,
     "sharePct": 17.3,
     "effectiveDutyPct": 1.01,
     "freightPct": 1.09,
     "upliftPct": 2.1,
     "upliftIndex": 1.021,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 850489784,
     "sharePct": 8.8,
     "effectiveDutyPct": 8.5,
     "freightPct": 4.62,
     "upliftPct": 13.12,
     "upliftIndex": 1.1312,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 351886036,
     "sharePct": 3.6,
     "effectiveDutyPct": 11.14,
     "freightPct": 4.24,
     "upliftPct": 15.38,
     "upliftIndex": 1.1538,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 927686272,
     "sharePct": 9.6,
     "effectiveDutyPct": 11.45,
     "freightPct": 4.7,
     "upliftPct": 16.15,
     "upliftIndex": 1.1615,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 664506969,
     "sharePct": 6.9,
     "effectiveDutyPct": 11.42,
     "freightPct": 4.77,
     "upliftPct": 16.19,
     "upliftIndex": 1.1619,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 424372560,
     "sharePct": 4.4,
     "effectiveDutyPct": 13.13,
     "freightPct": 6.44,
     "upliftPct": 19.57,
     "upliftIndex": 1.1957,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 381269705,
     "sharePct": 3.9,
     "effectiveDutyPct": 12.78,
     "freightPct": 10.97,
     "upliftPct": 23.75,
     "upliftIndex": 1.2375,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 403597639,
     "sharePct": 4.2,
     "effectiveDutyPct": 17.13,
     "freightPct": 7.36,
     "upliftPct": 24.49,
     "upliftIndex": 1.2449,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 983507337,
     "sharePct": 10.2,
     "effectiveDutyPct": 47.42,
     "freightPct": 9.85,
     "upliftPct": 57.27,
     "upliftIndex": 1.5727,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 55.88,
   "sourcing": {
    "hhi": 900,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 22.9,
    "namedSharePct": 73.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "measuring-instruments",
   "label": "Measuring and inspection instruments",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1930252090,
     "sharePct": 23.1,
     "effectiveDutyPct": 3.04,
     "freightPct": 0.3,
     "upliftPct": 3.34,
     "upliftIndex": 1.0334,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 815611131,
     "sharePct": 9.7,
     "effectiveDutyPct": 5.4,
     "freightPct": 1.01,
     "upliftPct": 6.41,
     "upliftIndex": 1.0641,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 555409181,
     "sharePct": 6.6,
     "effectiveDutyPct": 6.52,
     "freightPct": 1.54,
     "upliftPct": 8.06,
     "upliftIndex": 1.0806,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 296130446,
     "sharePct": 3.5,
     "effectiveDutyPct": 7.54,
     "freightPct": 1.95,
     "upliftPct": 9.49,
     "upliftIndex": 1.0949,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 355686800,
     "sharePct": 4.3,
     "effectiveDutyPct": 8.63,
     "freightPct": 1.54,
     "upliftPct": 10.17,
     "upliftIndex": 1.1017,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1147193192,
     "sharePct": 13.7,
     "effectiveDutyPct": 8.32,
     "freightPct": 1.97,
     "upliftPct": 10.29,
     "upliftIndex": 1.1029,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1730702489,
     "sharePct": 20.7,
     "effectiveDutyPct": 9.28,
     "freightPct": 2.03,
     "upliftPct": 11.31,
     "upliftIndex": 1.1131,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 371266235,
     "sharePct": 4.4,
     "effectiveDutyPct": 10.36,
     "freightPct": 2.22,
     "upliftPct": 12.58,
     "upliftIndex": 1.1258,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 406189433,
     "sharePct": 4.9,
     "effectiveDutyPct": 14.92,
     "freightPct": 1.07,
     "upliftPct": 15.99,
     "upliftIndex": 1.1599,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 760122775,
     "sharePct": 9.1,
     "effectiveDutyPct": 44.02,
     "freightPct": 3.76,
     "upliftPct": 47.78,
     "upliftIndex": 1.4778,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 44.44,
   "sourcing": {
    "hhi": 800,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 17.2,
    "namedSharePct": 74.7,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "rubber-products",
   "label": "Rubber materials and products",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 0.6401,
   "basisUnitPrice": 0.6401,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 2362973648,
     "sharePct": 32,
     "effectiveDutyPct": 1.81,
     "freightPct": 1.06,
     "upliftPct": 2.87,
     "upliftIndex": 1.0287,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 620924989,
     "sharePct": 8.4,
     "effectiveDutyPct": 1.94,
     "freightPct": 2.18,
     "upliftPct": 4.12,
     "upliftIndex": 1.0412,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 264503081,
     "sharePct": 3.6,
     "effectiveDutyPct": 8.6,
     "freightPct": 4.07,
     "upliftPct": 12.67,
     "upliftIndex": 1.1267,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 663151030,
     "sharePct": 9,
     "effectiveDutyPct": 9.67,
     "freightPct": 3.69,
     "upliftPct": 13.36,
     "upliftIndex": 1.1336,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 798330905,
     "sharePct": 10.8,
     "effectiveDutyPct": 9.37,
     "freightPct": 4.57,
     "upliftPct": 13.94,
     "upliftIndex": 1.1394,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 509264107,
     "sharePct": 6.9,
     "effectiveDutyPct": 7.19,
     "freightPct": 8.33,
     "upliftPct": 15.52,
     "upliftIndex": 1.1552,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 313059678,
     "sharePct": 4.2,
     "effectiveDutyPct": 10.6,
     "freightPct": 6.17,
     "upliftPct": 16.77,
     "upliftIndex": 1.1677,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 495446900,
     "sharePct": 6.7,
     "effectiveDutyPct": 11.93,
     "freightPct": 5.96,
     "upliftPct": 17.89,
     "upliftIndex": 1.1789,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 396287025,
     "sharePct": 5.4,
     "effectiveDutyPct": 18.48,
     "freightPct": 6.85,
     "upliftPct": 25.33,
     "upliftIndex": 1.2533,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 950205422,
     "sharePct": 12.9,
     "effectiveDutyPct": 45.37,
     "freightPct": 8.61,
     "upliftPct": 53.98,
     "upliftIndex": 1.5398,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 51.11,
   "sourcing": {
    "hhi": 1030,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 25.6,
    "namedSharePct": 80,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "abrasives",
   "label": "Abrasives and grinding wheels",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 142073360,
     "sharePct": 17.7,
     "effectiveDutyPct": 0.86,
     "freightPct": 1.14,
     "upliftPct": 2,
     "upliftIndex": 1.02,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 85061750,
     "sharePct": 10.6,
     "effectiveDutyPct": 1.45,
     "freightPct": 0.57,
     "upliftPct": 2.02,
     "upliftIndex": 1.0202,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 107218574,
     "sharePct": 13.4,
     "effectiveDutyPct": 8.16,
     "freightPct": 2.61,
     "upliftPct": 10.77,
     "upliftIndex": 1.1077,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 114520646,
     "sharePct": 14.3,
     "effectiveDutyPct": 9.01,
     "freightPct": 2.68,
     "upliftPct": 11.69,
     "upliftIndex": 1.1169,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 65490765,
     "sharePct": 8.2,
     "effectiveDutyPct": 8.68,
     "freightPct": 3.76,
     "upliftPct": 12.44,
     "upliftIndex": 1.1244,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 61888467,
     "sharePct": 7.7,
     "effectiveDutyPct": 8.98,
     "freightPct": 3.6,
     "upliftPct": 12.58,
     "upliftIndex": 1.1258,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 37606416,
     "sharePct": 4.7,
     "effectiveDutyPct": 8.5,
     "freightPct": 5.5,
     "upliftPct": 14,
     "upliftIndex": 1.14,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 50791465,
     "sharePct": 6.3,
     "effectiveDutyPct": 9.41,
     "freightPct": 4.74,
     "upliftPct": 14.15,
     "upliftIndex": 1.1415,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 36024209,
     "sharePct": 4.5,
     "effectiveDutyPct": 11.58,
     "freightPct": 4.15,
     "upliftPct": 15.73,
     "upliftIndex": 1.1573,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 101962625,
     "sharePct": 12.7,
     "effectiveDutyPct": 45.23,
     "freightPct": 6.22,
     "upliftPct": 51.45,
     "upliftIndex": 1.5145,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 49.45,
   "sourcing": {
    "hhi": 690,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 13.6,
    "namedSharePct": 76.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "coatings-paints",
   "label": "Paints, coatings, and finishes",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 359915348,
     "sharePct": 33.2,
     "effectiveDutyPct": 5.3,
     "freightPct": 0.72,
     "upliftPct": 6.02,
     "upliftIndex": 1.0602,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 58603921,
     "sharePct": 5.4,
     "effectiveDutyPct": 8.38,
     "freightPct": 2.27,
     "upliftPct": 10.65,
     "upliftIndex": 1.1065,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 124240712,
     "sharePct": 11.5,
     "effectiveDutyPct": 10.99,
     "freightPct": 1.04,
     "upliftPct": 12.03,
     "upliftIndex": 1.1203,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 62055275,
     "sharePct": 5.7,
     "effectiveDutyPct": 11.61,
     "freightPct": 0.76,
     "upliftPct": 12.37,
     "upliftIndex": 1.1237,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 50424490,
     "sharePct": 4.6,
     "effectiveDutyPct": 10.34,
     "freightPct": 3.37,
     "upliftPct": 13.71,
     "upliftIndex": 1.1371,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Spain",
     "rank": null,
     "customsValueUsd": 32853043,
     "sharePct": 3,
     "effectiveDutyPct": 10.76,
     "freightPct": 3.97,
     "upliftPct": 14.73,
     "upliftIndex": 1.1473,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 180169471,
     "sharePct": 16.6,
     "effectiveDutyPct": 11.26,
     "freightPct": 3.7,
     "upliftPct": 14.96,
     "upliftIndex": 1.1496,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 58004447,
     "sharePct": 5.3,
     "effectiveDutyPct": 10.44,
     "freightPct": 4.55,
     "upliftPct": 14.99,
     "upliftIndex": 1.1499,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 83667069,
     "sharePct": 7.7,
     "effectiveDutyPct": 10.97,
     "freightPct": 6.1,
     "upliftPct": 17.07,
     "upliftIndex": 1.1707,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 75137562,
     "sharePct": 6.9,
     "effectiveDutyPct": 11.58,
     "freightPct": 6.32,
     "upliftPct": 17.9,
     "upliftIndex": 1.179,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 11.88,
   "sourcing": {
    "hhi": 1340,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 29.2,
    "namedSharePct": 88,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "adhesives-sealants",
   "label": "Adhesives and sealants",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 4.039,
   "basisUnitPrice": 4.039,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 153828191,
     "sharePct": 15.2,
     "effectiveDutyPct": 0.83,
     "freightPct": 1.45,
     "upliftPct": 2.28,
     "upliftIndex": 1.0228,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 194342815,
     "sharePct": 19.3,
     "effectiveDutyPct": 1.56,
     "freightPct": 0.98,
     "upliftPct": 2.54,
     "upliftIndex": 1.0254,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 58704186,
     "sharePct": 5.8,
     "effectiveDutyPct": 8.33,
     "freightPct": 4.16,
     "upliftPct": 12.49,
     "upliftIndex": 1.1249,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 57415467,
     "sharePct": 5.7,
     "effectiveDutyPct": 10.32,
     "freightPct": 4.55,
     "upliftPct": 14.87,
     "upliftIndex": 1.1487,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 295957788,
     "sharePct": 29.3,
     "effectiveDutyPct": 11.39,
     "freightPct": 4.2,
     "upliftPct": 15.59,
     "upliftIndex": 1.1559,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Estonia",
     "rank": null,
     "customsValueUsd": 33999336,
     "sharePct": 3.4,
     "effectiveDutyPct": 12.26,
     "freightPct": 4.61,
     "upliftPct": 16.87,
     "upliftIndex": 1.1687,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 33412611,
     "sharePct": 3.3,
     "effectiveDutyPct": 10.64,
     "freightPct": 7.04,
     "upliftPct": 17.68,
     "upliftIndex": 1.1768,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 45378479,
     "sharePct": 4.5,
     "effectiveDutyPct": 10.86,
     "freightPct": 7.28,
     "upliftPct": 18.14,
     "upliftIndex": 1.1814,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 40926352,
     "sharePct": 4.1,
     "effectiveDutyPct": 13.09,
     "freightPct": 5.1,
     "upliftPct": 18.19,
     "upliftIndex": 1.1819,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 94959933,
     "sharePct": 9.4,
     "effectiveDutyPct": 50.38,
     "freightPct": 8.42,
     "upliftPct": 58.8,
     "upliftIndex": 1.588,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 56.52,
   "sourcing": {
    "hhi": 1100,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 23.7,
    "namedSharePct": 80.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "technical-ceramics",
   "label": "Technical and refractory ceramics",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 309149144,
     "sharePct": 26.9,
     "effectiveDutyPct": 0.1,
     "freightPct": 0.39,
     "upliftPct": 0.49,
     "upliftIndex": 1.0049,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 25484216,
     "sharePct": 2.2,
     "effectiveDutyPct": 1.05,
     "freightPct": 0.99,
     "upliftPct": 2.04,
     "upliftIndex": 1.0204,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 36885872,
     "sharePct": 3.2,
     "effectiveDutyPct": 4.66,
     "freightPct": 5.98,
     "upliftPct": 10.64,
     "upliftIndex": 1.1064,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 41915926,
     "sharePct": 3.6,
     "effectiveDutyPct": 8.52,
     "freightPct": 2.88,
     "upliftPct": 11.4,
     "upliftIndex": 1.114,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 52325359,
     "sharePct": 4.5,
     "effectiveDutyPct": 10.45,
     "freightPct": 1.19,
     "upliftPct": 11.64,
     "upliftIndex": 1.1164,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 408398063,
     "sharePct": 35.5,
     "effectiveDutyPct": 8.66,
     "freightPct": 3.09,
     "upliftPct": 11.75,
     "upliftIndex": 1.1175,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 114245591,
     "sharePct": 9.9,
     "effectiveDutyPct": 10.49,
     "freightPct": 3.01,
     "upliftPct": 13.5,
     "upliftIndex": 1.135,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 25131793,
     "sharePct": 2.2,
     "effectiveDutyPct": 10.08,
     "freightPct": 9.08,
     "upliftPct": 19.16,
     "upliftIndex": 1.1916,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Africa",
     "rank": null,
     "customsValueUsd": 38363130,
     "sharePct": 3.3,
     "effectiveDutyPct": 21.26,
     "freightPct": 1.34,
     "upliftPct": 22.6,
     "upliftIndex": 1.226,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 98288848,
     "sharePct": 8.5,
     "effectiveDutyPct": 45.75,
     "freightPct": 6.74,
     "upliftPct": 52.49,
     "upliftIndex": 1.5249,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 52,
   "sourcing": {
    "hhi": 1760,
    "band": "moderately concentrated",
    "topCountry": "Japan",
    "topSharePct": 31.6,
    "namedSharePct": 89,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "glass-fiber",
   "label": "Glass fiber and reinforcements",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 243178628,
     "sharePct": 21.4,
     "effectiveDutyPct": 0.89,
     "freightPct": 1.79,
     "upliftPct": 2.68,
     "upliftIndex": 1.0268,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 403222200,
     "sharePct": 35.5,
     "effectiveDutyPct": 1.4,
     "freightPct": 1.37,
     "upliftPct": 2.77,
     "upliftIndex": 1.0277,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 39900786,
     "sharePct": 3.5,
     "effectiveDutyPct": 11.47,
     "freightPct": 4.22,
     "upliftPct": 15.69,
     "upliftIndex": 1.1569,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Belgium",
     "rank": null,
     "customsValueUsd": 28945649,
     "sharePct": 2.5,
     "effectiveDutyPct": 10.94,
     "freightPct": 7.64,
     "upliftPct": 18.58,
     "upliftIndex": 1.1858,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 63147113,
     "sharePct": 5.6,
     "effectiveDutyPct": 11.43,
     "freightPct": 7.61,
     "upliftPct": 19.04,
     "upliftIndex": 1.1904,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Bahrain",
     "rank": null,
     "customsValueUsd": 28741194,
     "sharePct": 2.5,
     "effectiveDutyPct": 7.36,
     "freightPct": 17.45,
     "upliftPct": 24.81,
     "upliftIndex": 1.2481,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 70904269,
     "sharePct": 6.2,
     "effectiveDutyPct": 14.3,
     "freightPct": 10.92,
     "upliftPct": 25.22,
     "upliftIndex": 1.2522,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 39801861,
     "sharePct": 3.5,
     "effectiveDutyPct": 21.06,
     "freightPct": 5.63,
     "upliftPct": 26.69,
     "upliftIndex": 1.2669,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Egypt",
     "rank": null,
     "customsValueUsd": 32480261,
     "sharePct": 2.9,
     "effectiveDutyPct": 4.99,
     "freightPct": 31.97,
     "upliftPct": 36.96,
     "upliftIndex": 1.3696,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 186574679,
     "sharePct": 16.4,
     "effectiveDutyPct": 49.5,
     "freightPct": 15.99,
     "upliftPct": 65.49,
     "upliftIndex": 1.6549,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 62.81,
   "sourcing": {
    "hhi": 1360,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 28.6,
    "namedSharePct": 80.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "nickel-alloys",
   "label": "Nickel and nickel alloys",
   "year": "2025",
   "unit": "kg",
   "basisCustomsUnitValue": 21.7374,
   "basisUnitPrice": 21.7374,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 832214440,
     "sharePct": 40.2,
     "effectiveDutyPct": 0.07,
     "freightPct": 0.09,
     "upliftPct": 0.16,
     "upliftIndex": 1.0016,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Norway",
     "rank": null,
     "customsValueUsd": 227609124,
     "sharePct": 11,
     "effectiveDutyPct": 1.27,
     "freightPct": 0.99,
     "upliftPct": 2.26,
     "upliftIndex": 1.0226,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Australia",
     "rank": null,
     "customsValueUsd": 108806402,
     "sharePct": 5.3,
     "effectiveDutyPct": 5.02,
     "freightPct": 0.85,
     "upliftPct": 5.87,
     "upliftIndex": 1.0587,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Africa",
     "rank": null,
     "customsValueUsd": 70938859,
     "sharePct": 3.4,
     "effectiveDutyPct": 4.29,
     "freightPct": 1.92,
     "upliftPct": 6.21,
     "upliftIndex": 1.0621,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 178815914,
     "sharePct": 8.6,
     "effectiveDutyPct": 5.54,
     "freightPct": 1.8,
     "upliftPct": 7.34,
     "upliftIndex": 1.0734,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 170005552,
     "sharePct": 8.2,
     "effectiveDutyPct": 6.73,
     "freightPct": 0.93,
     "upliftPct": 7.66,
     "upliftIndex": 1.0766,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 65587712,
     "sharePct": 3.2,
     "effectiveDutyPct": 7.51,
     "freightPct": 1.59,
     "upliftPct": 9.1,
     "upliftIndex": 1.091,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 43661889,
     "sharePct": 2.1,
     "effectiveDutyPct": 7.55,
     "freightPct": 1.57,
     "upliftPct": 9.12,
     "upliftIndex": 1.0912,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 164163837,
     "sharePct": 7.9,
     "effectiveDutyPct": 9.22,
     "freightPct": 1.28,
     "upliftPct": 10.5,
     "upliftIndex": 1.105,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 207976516,
     "sharePct": 10,
     "effectiveDutyPct": 9.33,
     "freightPct": 1.44,
     "upliftPct": 10.77,
     "upliftIndex": 1.1077,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 10.61,
   "sourcing": {
    "hhi": 1660,
    "band": "moderately concentrated",
    "topCountry": "Canada",
    "topSharePct": 35.7,
    "namedSharePct": 88.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "specialty-metals",
   "label": "Titanium and tungsten",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 97370272,
     "sharePct": 8.2,
     "effectiveDutyPct": 1.83,
     "freightPct": 0.76,
     "upliftPct": 2.59,
     "upliftIndex": 1.0259,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 64635192,
     "sharePct": 5.4,
     "effectiveDutyPct": 3.08,
     "freightPct": 0.42,
     "upliftPct": 3.5,
     "upliftIndex": 1.035,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 55670100,
     "sharePct": 4.7,
     "effectiveDutyPct": 1.56,
     "freightPct": 2.32,
     "upliftPct": 3.88,
     "upliftIndex": 1.0388,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 103489323,
     "sharePct": 8.7,
     "effectiveDutyPct": 2.76,
     "freightPct": 1.47,
     "upliftPct": 4.23,
     "upliftIndex": 1.0423,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 105309875,
     "sharePct": 8.8,
     "effectiveDutyPct": 2.95,
     "freightPct": 2.52,
     "upliftPct": 5.47,
     "upliftIndex": 1.0547,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 75923428,
     "sharePct": 6.4,
     "effectiveDutyPct": 3.43,
     "freightPct": 2.71,
     "upliftPct": 6.14,
     "upliftIndex": 1.0614,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 418867863,
     "sharePct": 35.1,
     "effectiveDutyPct": 7.18,
     "freightPct": 3.12,
     "upliftPct": 10.3,
     "upliftIndex": 1.103,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Saudi Arabia",
     "rank": null,
     "customsValueUsd": 52694746,
     "sharePct": 4.4,
     "effectiveDutyPct": 8.75,
     "freightPct": 2.54,
     "upliftPct": 11.29,
     "upliftIndex": 1.1129,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Kazakhstan",
     "rank": null,
     "customsValueUsd": 79549996,
     "sharePct": 6.7,
     "effectiveDutyPct": 9.69,
     "freightPct": 3.55,
     "upliftPct": 13.24,
     "upliftIndex": 1.1324,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 139554020,
     "sharePct": 11.7,
     "effectiveDutyPct": 34.01,
     "freightPct": 2.44,
     "upliftPct": 36.45,
     "upliftIndex": 1.3645,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 33.86,
   "sourcing": {
    "hhi": 1180,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 28.9,
    "namedSharePct": 82.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "steel-springs-chain",
   "label": "Springs, chain, and wire mesh",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 801390102,
     "sharePct": 40.4,
     "effectiveDutyPct": 18.79,
     "freightPct": 1.04,
     "upliftPct": 19.83,
     "upliftIndex": 1.1983,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 178247191,
     "sharePct": 9,
     "effectiveDutyPct": 21.16,
     "freightPct": 1.77,
     "upliftPct": 22.93,
     "upliftIndex": 1.2293,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 37118291,
     "sharePct": 1.9,
     "effectiveDutyPct": 26.66,
     "freightPct": 3.39,
     "upliftPct": 30.05,
     "upliftIndex": 1.3005,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 186394769,
     "sharePct": 9.4,
     "effectiveDutyPct": 28.3,
     "freightPct": 3.3,
     "upliftPct": 31.6,
     "upliftIndex": 1.316,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 65706025,
     "sharePct": 3.3,
     "effectiveDutyPct": 23.12,
     "freightPct": 11.18,
     "upliftPct": 34.3,
     "upliftIndex": 1.343,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 187852911,
     "sharePct": 9.5,
     "effectiveDutyPct": 30.84,
     "freightPct": 3.64,
     "upliftPct": 34.48,
     "upliftIndex": 1.3448,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 51474738,
     "sharePct": 2.6,
     "effectiveDutyPct": 31.85,
     "freightPct": 5.44,
     "upliftPct": 37.29,
     "upliftIndex": 1.3729,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 45441366,
     "sharePct": 2.3,
     "effectiveDutyPct": 30.28,
     "freightPct": 7.03,
     "upliftPct": 37.31,
     "upliftIndex": 1.3731,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 33481977,
     "sharePct": 1.7,
     "effectiveDutyPct": 35.43,
     "freightPct": 2.87,
     "upliftPct": 38.3,
     "upliftIndex": 1.383,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 397617212,
     "sharePct": 20,
     "effectiveDutyPct": 63.82,
     "freightPct": 11.47,
     "upliftPct": 75.29,
     "upliftIndex": 1.7529,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 55.46,
   "sourcing": {
    "hhi": 1770,
    "band": "moderately concentrated",
    "topCountry": "Mexico",
    "topSharePct": 35.3,
    "namedSharePct": 87.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "tanks-vessels",
   "label": "Tanks, vessels, and gas cylinders",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 176929004,
     "sharePct": 15.8,
     "effectiveDutyPct": 9.62,
     "freightPct": 2.1,
     "upliftPct": 11.72,
     "upliftIndex": 1.1172,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 267374060,
     "sharePct": 23.8,
     "effectiveDutyPct": 10.03,
     "freightPct": 2.14,
     "upliftPct": 12.17,
     "upliftIndex": 1.1217,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 92123986,
     "sharePct": 8.2,
     "effectiveDutyPct": 13.14,
     "freightPct": 1.99,
     "upliftPct": 15.13,
     "upliftIndex": 1.1513,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Spain",
     "rank": null,
     "customsValueUsd": 41499045,
     "sharePct": 3.7,
     "effectiveDutyPct": 14.26,
     "freightPct": 3.48,
     "upliftPct": 17.74,
     "upliftIndex": 1.1774,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 75216593,
     "sharePct": 6.7,
     "effectiveDutyPct": 12.81,
     "freightPct": 6.13,
     "upliftPct": 18.94,
     "upliftIndex": 1.1894,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 65937199,
     "sharePct": 5.9,
     "effectiveDutyPct": 20.83,
     "freightPct": 4.1,
     "upliftPct": 24.93,
     "upliftIndex": 1.2493,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 55521285,
     "sharePct": 4.9,
     "effectiveDutyPct": 25.97,
     "freightPct": 4.95,
     "upliftPct": 30.92,
     "upliftIndex": 1.3092,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 61614970,
     "sharePct": 5.5,
     "effectiveDutyPct": 29.71,
     "freightPct": 4.3,
     "upliftPct": 34.01,
     "upliftIndex": 1.3401,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 105800773,
     "sharePct": 9.4,
     "effectiveDutyPct": 23.82,
     "freightPct": 14.85,
     "upliftPct": 38.67,
     "upliftIndex": 1.3867,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 181088581,
     "sharePct": 16.1,
     "effectiveDutyPct": 59.2,
     "freightPct": 12.09,
     "upliftPct": 71.29,
     "upliftIndex": 1.7129,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 59.57,
   "sourcing": {
    "hhi": 970,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 20,
    "namedSharePct": 83.8,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "semiconductors",
   "label": "Semiconductors and integrated circuits",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 1.4796,
   "basisUnitPrice": 1.4796,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Israel",
     "rank": null,
     "customsValueUsd": 4481843448,
     "sharePct": 10.4,
     "effectiveDutyPct": 0.01,
     "freightPct": 0.07,
     "upliftPct": 0.08,
     "upliftIndex": 1.0008,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Ireland",
     "rank": null,
     "customsValueUsd": 2109876362,
     "sharePct": 4.9,
     "effectiveDutyPct": 0.04,
     "freightPct": 0.07,
     "upliftPct": 0.11,
     "upliftIndex": 1.0011,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Costa Rica",
     "rank": null,
     "customsValueUsd": 1904179986,
     "sharePct": 4.4,
     "effectiveDutyPct": 0.02,
     "freightPct": 0.24,
     "upliftPct": 0.26,
     "upliftIndex": 1.0026,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 12578509466,
     "sharePct": 29.1,
     "effectiveDutyPct": 0.2,
     "freightPct": 0.64,
     "upliftPct": 0.84,
     "upliftIndex": 1.0084,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 11126663208,
     "sharePct": 25.7,
     "effectiveDutyPct": 0.98,
     "freightPct": 0.93,
     "upliftPct": 1.91,
     "upliftIndex": 1.0191,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1995364851,
     "sharePct": 4.6,
     "effectiveDutyPct": 0.66,
     "freightPct": 1.25,
     "upliftPct": 1.91,
     "upliftIndex": 1.0191,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 2423374969,
     "sharePct": 5.6,
     "effectiveDutyPct": 2.67,
     "freightPct": 0.94,
     "upliftPct": 3.61,
     "upliftIndex": 1.0361,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 1789736173,
     "sharePct": 4.1,
     "effectiveDutyPct": 3.94,
     "freightPct": 1.47,
     "upliftPct": 5.41,
     "upliftIndex": 1.0541,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 1750719228,
     "sharePct": 4,
     "effectiveDutyPct": 5.68,
     "freightPct": 3.81,
     "upliftPct": 9.49,
     "upliftIndex": 1.0949,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Indonesia",
     "rank": null,
     "customsValueUsd": 3084325241,
     "sharePct": 7.1,
     "effectiveDutyPct": 11.35,
     "freightPct": 3.91,
     "upliftPct": 15.26,
     "upliftIndex": 1.1526,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 15.18,
   "sourcing": {
    "hhi": 1220,
    "band": "diversified",
    "topCountry": "Taiwan",
    "topSharePct": 24,
    "namedSharePct": 82.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "passive-components",
   "label": "Capacitors, resistors, and circuit boards",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 0.0333,
   "basisUnitPrice": 0.0333,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 438857905,
     "sharePct": 9.5,
     "effectiveDutyPct": 1.86,
     "freightPct": 0.29,
     "upliftPct": 2.15,
     "upliftIndex": 1.0215,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 168336380,
     "sharePct": 3.6,
     "effectiveDutyPct": 5.52,
     "freightPct": 1.89,
     "upliftPct": 7.41,
     "upliftIndex": 1.0741,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Israel",
     "rank": null,
     "customsValueUsd": 150428489,
     "sharePct": 3.3,
     "effectiveDutyPct": 8.67,
     "freightPct": 0.94,
     "upliftPct": 9.61,
     "upliftIndex": 1.0961,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 979227772,
     "sharePct": 21.2,
     "effectiveDutyPct": 8.14,
     "freightPct": 1.76,
     "upliftPct": 9.9,
     "upliftIndex": 1.099,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 1072216864,
     "sharePct": 23.2,
     "effectiveDutyPct": 8.4,
     "freightPct": 1.96,
     "upliftPct": 10.36,
     "upliftIndex": 1.1036,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 221662597,
     "sharePct": 4.8,
     "effectiveDutyPct": 8.74,
     "freightPct": 1.76,
     "upliftPct": 10.5,
     "upliftIndex": 1.105,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 153659961,
     "sharePct": 3.3,
     "effectiveDutyPct": 9.36,
     "freightPct": 2.86,
     "upliftPct": 12.22,
     "upliftIndex": 1.1222,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 269111254,
     "sharePct": 5.8,
     "effectiveDutyPct": 9.99,
     "freightPct": 3.43,
     "upliftPct": 13.42,
     "upliftIndex": 1.1342,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 132049994,
     "sharePct": 2.9,
     "effectiveDutyPct": 11.52,
     "freightPct": 2.34,
     "upliftPct": 13.86,
     "upliftIndex": 1.1386,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1027783085,
     "sharePct": 22.3,
     "effectiveDutyPct": 47.32,
     "freightPct": 4.04,
     "upliftPct": 51.36,
     "upliftIndex": 1.5136,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 49.21,
   "sourcing": {
    "hhi": 1150,
    "band": "diversified",
    "topCountry": "Taiwan",
    "topSharePct": 19.3,
    "namedSharePct": 82.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "switchgear-connectors",
   "label": "Switchgear, connectors, and controls",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 2747611821,
     "sharePct": 8.6,
     "effectiveDutyPct": 3.08,
     "freightPct": 0.89,
     "upliftPct": 3.97,
     "upliftIndex": 1.0397,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 15682312111,
     "sharePct": 48.8,
     "effectiveDutyPct": 3.67,
     "freightPct": 0.53,
     "upliftPct": 4.2,
     "upliftIndex": 1.042,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1338083799,
     "sharePct": 4.2,
     "effectiveDutyPct": 8.87,
     "freightPct": 3.87,
     "upliftPct": 12.74,
     "upliftIndex": 1.1274,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 1749510623,
     "sharePct": 5.4,
     "effectiveDutyPct": 10.41,
     "freightPct": 2.36,
     "upliftPct": 12.77,
     "upliftIndex": 1.1277,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 2598106693,
     "sharePct": 8.1,
     "effectiveDutyPct": 10.88,
     "freightPct": 2.32,
     "upliftPct": 13.2,
     "upliftIndex": 1.132,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 1006335006,
     "sharePct": 3.1,
     "effectiveDutyPct": 12.68,
     "freightPct": 2.49,
     "upliftPct": 15.17,
     "upliftIndex": 1.1517,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 949698562,
     "sharePct": 3,
     "effectiveDutyPct": 12.41,
     "freightPct": 2.8,
     "upliftPct": 15.21,
     "upliftIndex": 1.1521,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 1499147721,
     "sharePct": 4.7,
     "effectiveDutyPct": 12.02,
     "freightPct": 3.65,
     "upliftPct": 15.67,
     "upliftIndex": 1.1567,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 1014269592,
     "sharePct": 3.2,
     "effectiveDutyPct": 20.38,
     "freightPct": 3.87,
     "upliftPct": 24.25,
     "upliftIndex": 1.2425,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 3544870998,
     "sharePct": 11,
     "effectiveDutyPct": 50.91,
     "freightPct": 3.7,
     "upliftPct": 54.61,
     "upliftIndex": 1.5461,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 50.64,
   "sourcing": {
    "hhi": 1590,
    "band": "moderately concentrated",
    "topCountry": "Mexico",
    "topSharePct": 37.2,
    "namedSharePct": 76.3,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "batteries",
   "label": "Batteries and storage cells",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1706166727,
     "sharePct": 6.8,
     "effectiveDutyPct": 1.51,
     "freightPct": 0.63,
     "upliftPct": 2.14,
     "upliftIndex": 1.0214,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 410356240,
     "sharePct": 1.6,
     "effectiveDutyPct": 2.94,
     "freightPct": 0.78,
     "upliftPct": 3.72,
     "upliftIndex": 1.0372,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Hungary",
     "rank": null,
     "customsValueUsd": 346839129,
     "sharePct": 1.4,
     "effectiveDutyPct": 7.89,
     "freightPct": 1.62,
     "upliftPct": 9.51,
     "upliftIndex": 1.0951,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 3881901282,
     "sharePct": 15.5,
     "effectiveDutyPct": 7.89,
     "freightPct": 2.1,
     "upliftPct": 9.99,
     "upliftIndex": 1.0999,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 3626908849,
     "sharePct": 14.5,
     "effectiveDutyPct": 12.15,
     "freightPct": 1.52,
     "upliftPct": 13.67,
     "upliftIndex": 1.1367,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 554882048,
     "sharePct": 2.2,
     "effectiveDutyPct": 11.97,
     "freightPct": 2.49,
     "upliftPct": 14.46,
     "upliftIndex": 1.1446,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 804596004,
     "sharePct": 3.2,
     "effectiveDutyPct": 14.09,
     "freightPct": 2.25,
     "upliftPct": 16.34,
     "upliftIndex": 1.1634,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 487880500,
     "sharePct": 1.9,
     "effectiveDutyPct": 13.77,
     "freightPct": 2.59,
     "upliftPct": 16.36,
     "upliftIndex": 1.1636,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 972903252,
     "sharePct": 3.9,
     "effectiveDutyPct": 13.54,
     "freightPct": 3.57,
     "upliftPct": 17.11,
     "upliftIndex": 1.1711,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 12234621099,
     "sharePct": 48.9,
     "effectiveDutyPct": 23.99,
     "freightPct": 1.99,
     "upliftPct": 25.98,
     "upliftIndex": 1.2598,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 23.84,
   "sourcing": {
    "hhi": 2500,
    "band": "moderately concentrated",
    "topCountry": "China",
    "topSharePct": 45.2,
    "namedSharePct": 92.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "industrial-lighting",
   "label": "Lamps and LED lighting",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 1.484,
   "basisUnitPrice": 1.484,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 110456961,
     "sharePct": 5.9,
     "effectiveDutyPct": 3.59,
     "freightPct": 0.31,
     "upliftPct": 3.9,
     "upliftIndex": 1.039,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 164391219,
     "sharePct": 8.7,
     "effectiveDutyPct": 9.1,
     "freightPct": 2.36,
     "upliftPct": 11.46,
     "upliftIndex": 1.1146,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 89747692,
     "sharePct": 4.8,
     "effectiveDutyPct": 10.42,
     "freightPct": 2.64,
     "upliftPct": 13.06,
     "upliftIndex": 1.1306,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 33998992,
     "sharePct": 1.8,
     "effectiveDutyPct": 10.35,
     "freightPct": 3.28,
     "upliftPct": 13.63,
     "upliftIndex": 1.1363,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 32092992,
     "sharePct": 1.7,
     "effectiveDutyPct": 9.23,
     "freightPct": 5.23,
     "upliftPct": 14.46,
     "upliftIndex": 1.1446,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 44346874,
     "sharePct": 2.4,
     "effectiveDutyPct": 10.88,
     "freightPct": 4.24,
     "upliftPct": 15.12,
     "upliftIndex": 1.1512,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Cambodia",
     "rank": null,
     "customsValueUsd": 38349039,
     "sharePct": 2,
     "effectiveDutyPct": 10.88,
     "freightPct": 5.55,
     "upliftPct": 16.43,
     "upliftIndex": 1.1643,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 73165803,
     "sharePct": 3.9,
     "effectiveDutyPct": 13.88,
     "freightPct": 5.91,
     "upliftPct": 19.79,
     "upliftIndex": 1.1979,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 114725460,
     "sharePct": 6.1,
     "effectiveDutyPct": 16.77,
     "freightPct": 4.59,
     "upliftPct": 21.36,
     "upliftIndex": 1.2136,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1185126834,
     "sharePct": 62.8,
     "effectiveDutyPct": 24.6,
     "freightPct": 9.48,
     "upliftPct": 34.08,
     "upliftIndex": 1.3408,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 30.18,
   "sourcing": {
    "hhi": 3190,
    "band": "highly concentrated",
    "topCountry": "China",
    "topSharePct": 55.1,
    "namedSharePct": 87.7,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "carbon-insulators",
   "label": "Carbon products and insulators",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 167723803,
     "sharePct": 16,
     "effectiveDutyPct": 3.2,
     "freightPct": 0.95,
     "upliftPct": 4.15,
     "upliftIndex": 1.0415,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 85152320,
     "sharePct": 8.1,
     "effectiveDutyPct": 3.74,
     "freightPct": 1.34,
     "upliftPct": 5.08,
     "upliftIndex": 1.0508,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 42304595,
     "sharePct": 4,
     "effectiveDutyPct": 7.3,
     "freightPct": 1.59,
     "upliftPct": 8.89,
     "upliftIndex": 1.0889,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 91171985,
     "sharePct": 8.7,
     "effectiveDutyPct": 7.38,
     "freightPct": 2.43,
     "upliftPct": 9.81,
     "upliftIndex": 1.0981,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 118996715,
     "sharePct": 11.4,
     "effectiveDutyPct": 8.65,
     "freightPct": 2.48,
     "upliftPct": 11.13,
     "upliftIndex": 1.1113,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 33987645,
     "sharePct": 3.2,
     "effectiveDutyPct": 8.79,
     "freightPct": 4.14,
     "upliftPct": 12.93,
     "upliftIndex": 1.1293,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 41654400,
     "sharePct": 4,
     "effectiveDutyPct": 9.56,
     "freightPct": 4.88,
     "upliftPct": 14.44,
     "upliftIndex": 1.1444,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 45260822,
     "sharePct": 4.3,
     "effectiveDutyPct": 10.87,
     "freightPct": 6.21,
     "upliftPct": 17.08,
     "upliftIndex": 1.1708,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 144282281,
     "sharePct": 13.8,
     "effectiveDutyPct": 15.35,
     "freightPct": 5.59,
     "upliftPct": 20.94,
     "upliftIndex": 1.2094,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 277131263,
     "sharePct": 26.5,
     "effectiveDutyPct": 49.95,
     "freightPct": 8.22,
     "upliftPct": 58.17,
     "upliftIndex": 1.5817,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 54.02,
   "sourcing": {
    "hhi": 1020,
    "band": "diversified",
    "topCountry": "China",
    "topSharePct": 22,
    "namedSharePct": 83.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "engines",
   "label": "Internal combustion engines",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 3436879293,
     "sharePct": 13.6,
     "effectiveDutyPct": 2.71,
     "freightPct": 0.32,
     "upliftPct": 3.03,
     "upliftIndex": 1.0303,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 9947975050,
     "sharePct": 39.5,
     "effectiveDutyPct": 9.31,
     "freightPct": 0.41,
     "upliftPct": 9.72,
     "upliftIndex": 1.0972,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1702135507,
     "sharePct": 6.8,
     "effectiveDutyPct": 7.59,
     "freightPct": 5.39,
     "upliftPct": 12.98,
     "upliftIndex": 1.1298,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 1367447171,
     "sharePct": 5.4,
     "effectiveDutyPct": 11.61,
     "freightPct": 1.42,
     "upliftPct": 13.03,
     "upliftIndex": 1.1303,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 487389036,
     "sharePct": 1.9,
     "effectiveDutyPct": 12.92,
     "freightPct": 2.64,
     "upliftPct": 15.56,
     "upliftIndex": 1.1556,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 3723058833,
     "sharePct": 14.8,
     "effectiveDutyPct": 13.7,
     "freightPct": 2.78,
     "upliftPct": 16.48,
     "upliftIndex": 1.1648,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 2051150636,
     "sharePct": 8.1,
     "effectiveDutyPct": 14.32,
     "freightPct": 2.49,
     "upliftPct": 16.81,
     "upliftIndex": 1.1681,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 469745779,
     "sharePct": 1.9,
     "effectiveDutyPct": 16.63,
     "freightPct": 1.39,
     "upliftPct": 18.02,
     "upliftIndex": 1.1802,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 499770998,
     "sharePct": 2,
     "effectiveDutyPct": 17.77,
     "freightPct": 3.88,
     "upliftPct": 21.65,
     "upliftIndex": 1.2165,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1501742881,
     "sharePct": 6,
     "effectiveDutyPct": 54,
     "freightPct": 5.78,
     "upliftPct": 59.78,
     "upliftIndex": 1.5978,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 56.75,
   "sourcing": {
    "hhi": 1780,
    "band": "moderately concentrated",
    "topCountry": "Mexico",
    "topSharePct": 35.9,
    "namedSharePct": 90.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "turbines",
   "label": "Turbines and fluid-power drives",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 7521435403,
     "sharePct": 22.4,
     "effectiveDutyPct": 1.66,
     "freightPct": 0.64,
     "upliftPct": 2.3,
     "upliftIndex": 1.023,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 4501188593,
     "sharePct": 13.4,
     "effectiveDutyPct": 1.67,
     "freightPct": 0.76,
     "upliftPct": 2.43,
     "upliftIndex": 1.0243,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 6031461010,
     "sharePct": 18,
     "effectiveDutyPct": 2.65,
     "freightPct": 0.65,
     "upliftPct": 3.3,
     "upliftIndex": 1.033,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 3980620694,
     "sharePct": 11.9,
     "effectiveDutyPct": 2.82,
     "freightPct": 1.13,
     "upliftPct": 3.95,
     "upliftIndex": 1.0395,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Poland",
     "rank": null,
     "customsValueUsd": 1676482049,
     "sharePct": 5,
     "effectiveDutyPct": 3.48,
     "freightPct": 0.54,
     "upliftPct": 4.02,
     "upliftIndex": 1.0402,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 2852113937,
     "sharePct": 8.5,
     "effectiveDutyPct": 4.02,
     "freightPct": 1,
     "upliftPct": 5.02,
     "upliftIndex": 1.0502,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 3465126428,
     "sharePct": 10.3,
     "effectiveDutyPct": 4.45,
     "freightPct": 1.16,
     "upliftPct": 5.61,
     "upliftIndex": 1.0561,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 1267099970,
     "sharePct": 3.8,
     "effectiveDutyPct": 6.45,
     "freightPct": 1.34,
     "upliftPct": 7.79,
     "upliftIndex": 1.0779,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 987498083,
     "sharePct": 2.9,
     "effectiveDutyPct": 18.26,
     "freightPct": 2.5,
     "upliftPct": 20.76,
     "upliftIndex": 1.2076,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1272448424,
     "sharePct": 3.8,
     "effectiveDutyPct": 46.54,
     "freightPct": 3.47,
     "upliftPct": 50.01,
     "upliftIndex": 1.5001,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 47.71,
   "sourcing": {
    "hhi": 940,
    "band": "diversified",
    "topCountry": "Canada",
    "topSharePct": 18.4,
    "namedSharePct": 82.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "heat-exchange",
   "label": "Heat exchange and process heating",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 857041998,
     "sharePct": 11,
     "effectiveDutyPct": 2.16,
     "freightPct": 0.7,
     "upliftPct": 2.86,
     "upliftIndex": 1.0286,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1551265746,
     "sharePct": 19.9,
     "effectiveDutyPct": 3.25,
     "freightPct": 0.34,
     "upliftPct": 3.59,
     "upliftIndex": 1.0359,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 752406932,
     "sharePct": 9.7,
     "effectiveDutyPct": 5.81,
     "freightPct": 2.1,
     "upliftPct": 7.91,
     "upliftIndex": 1.0791,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 344360694,
     "sharePct": 4.4,
     "effectiveDutyPct": 7.3,
     "freightPct": 1.18,
     "upliftPct": 8.48,
     "upliftIndex": 1.0848,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 240729364,
     "sharePct": 3.1,
     "effectiveDutyPct": 9.7,
     "freightPct": 1.67,
     "upliftPct": 11.37,
     "upliftIndex": 1.1137,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 416992492,
     "sharePct": 5.4,
     "effectiveDutyPct": 9.28,
     "freightPct": 2.8,
     "upliftPct": 12.08,
     "upliftIndex": 1.1208,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 703301636,
     "sharePct": 9,
     "effectiveDutyPct": 10.63,
     "freightPct": 2.26,
     "upliftPct": 12.89,
     "upliftIndex": 1.1289,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 527960012,
     "sharePct": 6.8,
     "effectiveDutyPct": 10.52,
     "freightPct": 2.76,
     "upliftPct": 13.28,
     "upliftIndex": 1.1328,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 1243442912,
     "sharePct": 16,
     "effectiveDutyPct": 10.97,
     "freightPct": 5.36,
     "upliftPct": 16.33,
     "upliftIndex": 1.1633,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1155205510,
     "sharePct": 14.8,
     "effectiveDutyPct": 43.22,
     "freightPct": 5,
     "upliftPct": 48.22,
     "upliftIndex": 1.4822,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 45.36,
   "sourcing": {
    "hhi": 810,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 15.9,
    "namedSharePct": 79.7,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "industrial-furnaces",
   "label": "Industrial furnaces and ovens",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 68096256,
     "sharePct": 6.6,
     "effectiveDutyPct": 1.28,
     "freightPct": 0.68,
     "upliftPct": 1.96,
     "upliftIndex": 1.0196,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 108149524,
     "sharePct": 10.5,
     "effectiveDutyPct": 1.4,
     "freightPct": 1.15,
     "upliftPct": 2.55,
     "upliftIndex": 1.0255,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 59074437,
     "sharePct": 5.8,
     "effectiveDutyPct": 4.24,
     "freightPct": 1.73,
     "upliftPct": 5.97,
     "upliftIndex": 1.0597,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 133873658,
     "sharePct": 13.1,
     "effectiveDutyPct": 4.08,
     "freightPct": 3.41,
     "upliftPct": 7.49,
     "upliftIndex": 1.0749,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 228718184,
     "sharePct": 22.3,
     "effectiveDutyPct": 6.52,
     "freightPct": 2.1,
     "upliftPct": 8.62,
     "upliftIndex": 1.0862,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 36574133,
     "sharePct": 3.6,
     "effectiveDutyPct": 7.22,
     "freightPct": 1.57,
     "upliftPct": 8.79,
     "upliftIndex": 1.0879,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 121250071,
     "sharePct": 11.8,
     "effectiveDutyPct": 7.82,
     "freightPct": 2.78,
     "upliftPct": 10.6,
     "upliftIndex": 1.106,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 41233861,
     "sharePct": 4,
     "effectiveDutyPct": 11.2,
     "freightPct": 0.72,
     "upliftPct": 11.92,
     "upliftIndex": 1.1192,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 57632730,
     "sharePct": 5.6,
     "effectiveDutyPct": 7.96,
     "freightPct": 4.98,
     "upliftPct": 12.94,
     "upliftIndex": 1.1294,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 171084197,
     "sharePct": 16.7,
     "effectiveDutyPct": 29.54,
     "freightPct": 4.03,
     "upliftPct": 33.57,
     "upliftIndex": 1.3357,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 31.61,
   "sourcing": {
    "hhi": 780,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 17.1,
    "namedSharePct": 76.5,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "filtering-separation",
   "label": "Filtering and separation equipment",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1548493335,
     "sharePct": 14.1,
     "effectiveDutyPct": 1.16,
     "freightPct": 0.69,
     "upliftPct": 1.85,
     "upliftIndex": 1.0185,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 4213681240,
     "sharePct": 38.4,
     "effectiveDutyPct": 2.74,
     "freightPct": 0.72,
     "upliftPct": 3.46,
     "upliftIndex": 1.0346,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 445936440,
     "sharePct": 4.1,
     "effectiveDutyPct": 7.32,
     "freightPct": 2.87,
     "upliftPct": 10.19,
     "upliftIndex": 1.1019,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 300501374,
     "sharePct": 2.7,
     "effectiveDutyPct": 7.8,
     "freightPct": 3.33,
     "upliftPct": 11.13,
     "upliftIndex": 1.1113,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1451399974,
     "sharePct": 13.2,
     "effectiveDutyPct": 8.93,
     "freightPct": 2.74,
     "upliftPct": 11.67,
     "upliftIndex": 1.1167,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 601052078,
     "sharePct": 5.5,
     "effectiveDutyPct": 7.92,
     "freightPct": 4.54,
     "upliftPct": 12.46,
     "upliftIndex": 1.1246,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 573277788,
     "sharePct": 5.2,
     "effectiveDutyPct": 9.08,
     "freightPct": 3.52,
     "upliftPct": 12.6,
     "upliftIndex": 1.126,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 289207820,
     "sharePct": 2.6,
     "effectiveDutyPct": 11.12,
     "freightPct": 5.07,
     "upliftPct": 16.19,
     "upliftIndex": 1.1619,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 289070354,
     "sharePct": 2.6,
     "effectiveDutyPct": 13.6,
     "freightPct": 6.81,
     "upliftPct": 20.41,
     "upliftIndex": 1.2041,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1250243146,
     "sharePct": 11.4,
     "effectiveDutyPct": 42.84,
     "freightPct": 7.78,
     "upliftPct": 50.62,
     "upliftIndex": 1.5062,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 48.77,
   "sourcing": {
    "hhi": 1270,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 30,
    "namedSharePct": 78.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "plastics-rubber-machinery",
   "label": "Plastics and rubber machinery",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 18.9646,
   "basisUnitPrice": 18.9646,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 458369103,
     "sharePct": 15.4,
     "effectiveDutyPct": 2.26,
     "freightPct": 0.44,
     "upliftPct": 2.7,
     "upliftIndex": 1.027,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 114933651,
     "sharePct": 3.9,
     "effectiveDutyPct": 6.25,
     "freightPct": 1.75,
     "upliftPct": 8,
     "upliftIndex": 1.08,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 156879793,
     "sharePct": 5.3,
     "effectiveDutyPct": 8.11,
     "freightPct": 2.55,
     "upliftPct": 10.66,
     "upliftIndex": 1.1066,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 979787611,
     "sharePct": 32.9,
     "effectiveDutyPct": 8.56,
     "freightPct": 2.27,
     "upliftPct": 10.83,
     "upliftIndex": 1.1083,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 94058194,
     "sharePct": 3.2,
     "effectiveDutyPct": 8.78,
     "freightPct": 3.44,
     "upliftPct": 12.22,
     "upliftIndex": 1.1222,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 289771535,
     "sharePct": 9.7,
     "effectiveDutyPct": 8.69,
     "freightPct": 4.79,
     "upliftPct": 13.48,
     "upliftIndex": 1.1348,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 288772543,
     "sharePct": 9.7,
     "effectiveDutyPct": 10.53,
     "freightPct": 3.1,
     "upliftPct": 13.63,
     "upliftIndex": 1.1363,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 305286437,
     "sharePct": 10.2,
     "effectiveDutyPct": 9.55,
     "freightPct": 4.14,
     "upliftPct": 13.69,
     "upliftIndex": 1.1369,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 94014153,
     "sharePct": 3.2,
     "effectiveDutyPct": 16.04,
     "freightPct": 2.49,
     "upliftPct": 18.53,
     "upliftIndex": 1.1853,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 199847868,
     "sharePct": 6.7,
     "effectiveDutyPct": 45.53,
     "freightPct": 7.46,
     "upliftPct": 52.99,
     "upliftIndex": 1.5299,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 50.29,
   "sourcing": {
    "hhi": 1320,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 28.8,
    "namedSharePct": 87.6,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "industrial-robots",
   "label": "Robots and automated machinery",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 12.1577,
   "basisUnitPrice": 12.1577,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 1559335155,
     "sharePct": 15.6,
     "effectiveDutyPct": 2.42,
     "freightPct": 0.66,
     "upliftPct": 3.08,
     "upliftIndex": 1.0308,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1038113016,
     "sharePct": 10.4,
     "effectiveDutyPct": 6.12,
     "freightPct": 0.33,
     "upliftPct": 6.45,
     "upliftIndex": 1.0645,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 1039851166,
     "sharePct": 10.4,
     "effectiveDutyPct": 6.97,
     "freightPct": 2.65,
     "upliftPct": 9.62,
     "upliftIndex": 1.0962,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 366131503,
     "sharePct": 3.7,
     "effectiveDutyPct": 8.19,
     "freightPct": 1.94,
     "upliftPct": 10.13,
     "upliftIndex": 1.1013,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 695704727,
     "sharePct": 6.9,
     "effectiveDutyPct": 9.72,
     "freightPct": 2.72,
     "upliftPct": 12.44,
     "upliftIndex": 1.1244,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 2443423973,
     "sharePct": 24.4,
     "effectiveDutyPct": 11.31,
     "freightPct": 2.07,
     "upliftPct": 13.38,
     "upliftIndex": 1.1338,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 997765259,
     "sharePct": 9.9,
     "effectiveDutyPct": 14.58,
     "freightPct": 2.62,
     "upliftPct": 17.2,
     "upliftIndex": 1.172,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 385647341,
     "sharePct": 3.8,
     "effectiveDutyPct": 15.51,
     "freightPct": 1.88,
     "upliftPct": 17.39,
     "upliftIndex": 1.1739,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 277383289,
     "sharePct": 2.8,
     "effectiveDutyPct": 23.46,
     "freightPct": 6.01,
     "upliftPct": 29.47,
     "upliftIndex": 1.2947,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1224439725,
     "sharePct": 12.2,
     "effectiveDutyPct": 46.83,
     "freightPct": 6.32,
     "upliftPct": 53.15,
     "upliftIndex": 1.5315,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 50.07,
   "sourcing": {
    "hhi": 850,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 19.1,
    "namedSharePct": 78.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "semiconductor-equipment",
   "label": "Semiconductor and display equipment",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 1499.7352,
   "basisUnitPrice": 1499.7352,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Singapore",
     "rank": null,
     "customsValueUsd": 1385706116,
     "sharePct": 12.2,
     "effectiveDutyPct": 0.97,
     "freightPct": 1.13,
     "upliftPct": 2.1,
     "upliftIndex": 1.021,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 147352685,
     "sharePct": 1.3,
     "effectiveDutyPct": 1.69,
     "freightPct": 0.85,
     "upliftPct": 2.54,
     "upliftIndex": 1.0254,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 796324984,
     "sharePct": 7,
     "effectiveDutyPct": 2,
     "freightPct": 1.59,
     "upliftPct": 3.59,
     "upliftIndex": 1.0359,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 946504192,
     "sharePct": 8.3,
     "effectiveDutyPct": 2.65,
     "freightPct": 1.12,
     "upliftPct": 3.77,
     "upliftIndex": 1.0377,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 2979212981,
     "sharePct": 26.2,
     "effectiveDutyPct": 2.53,
     "freightPct": 1.37,
     "upliftPct": 3.9,
     "upliftIndex": 1.039,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 413156007,
     "sharePct": 3.6,
     "effectiveDutyPct": 2.39,
     "freightPct": 1.81,
     "upliftPct": 4.2,
     "upliftIndex": 1.042,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 955707098,
     "sharePct": 8.4,
     "effectiveDutyPct": 1.89,
     "freightPct": 2.49,
     "upliftPct": 4.38,
     "upliftIndex": 1.0438,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 2671371697,
     "sharePct": 23.5,
     "effectiveDutyPct": 1.39,
     "freightPct": 3.93,
     "upliftPct": 5.32,
     "upliftIndex": 1.0532,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 216787830,
     "sharePct": 1.9,
     "effectiveDutyPct": 6.81,
     "freightPct": 1.45,
     "upliftPct": 8.26,
     "upliftIndex": 1.0826,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 845008875,
     "sharePct": 7.4,
     "effectiveDutyPct": 32.37,
     "freightPct": 3.06,
     "upliftPct": 35.43,
     "upliftIndex": 1.3543,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 33.33,
   "sourcing": {
    "hhi": 1430,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 24.4,
    "namedSharePct": 93,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "gaskets-seals",
   "label": "Gaskets and mechanical seals",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 3.2609,
   "basisUnitPrice": 3.2609,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 184296994,
     "sharePct": 27.4,
     "effectiveDutyPct": 2.23,
     "freightPct": 1.14,
     "upliftPct": 3.37,
     "upliftIndex": 1.0337,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 29516581,
     "sharePct": 4.4,
     "effectiveDutyPct": 5.47,
     "freightPct": 1.34,
     "upliftPct": 6.81,
     "upliftIndex": 1.0681,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 35608847,
     "sharePct": 5.3,
     "effectiveDutyPct": 6.35,
     "freightPct": 1.84,
     "upliftPct": 8.19,
     "upliftIndex": 1.0819,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "United Kingdom",
     "rank": null,
     "customsValueUsd": 52479747,
     "sharePct": 7.8,
     "effectiveDutyPct": 7.63,
     "freightPct": 2.39,
     "upliftPct": 10.02,
     "upliftIndex": 1.1002,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 83422934,
     "sharePct": 12.4,
     "effectiveDutyPct": 9.84,
     "freightPct": 3.16,
     "upliftPct": 13,
     "upliftIndex": 1.13,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 127128939,
     "sharePct": 18.9,
     "effectiveDutyPct": 10.86,
     "freightPct": 2.28,
     "upliftPct": 13.14,
     "upliftIndex": 1.1314,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 39438253,
     "sharePct": 5.9,
     "effectiveDutyPct": 10.79,
     "freightPct": 2.57,
     "upliftPct": 13.36,
     "upliftIndex": 1.1336,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 33620805,
     "sharePct": 5,
     "effectiveDutyPct": 13.04,
     "freightPct": 3.04,
     "upliftPct": 16.08,
     "upliftIndex": 1.1608,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 37441399,
     "sharePct": 5.6,
     "effectiveDutyPct": 19.85,
     "freightPct": 4.71,
     "upliftPct": 24.56,
     "upliftIndex": 1.2456,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 50401564,
     "sharePct": 7.5,
     "effectiveDutyPct": 51.63,
     "freightPct": 4.89,
     "upliftPct": 56.52,
     "upliftIndex": 1.5652,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 53.15,
   "sourcing": {
    "hhi": 1000,
    "band": "diversified",
    "topCountry": "Mexico",
    "topSharePct": 22.3,
    "namedSharePct": 81.3,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "powered-hand-tools",
   "label": "Powered hand tools",
   "year": "2025",
   "unit": "unit",
   "basisCustomsUnitValue": 27.3303,
   "basisUnitPrice": 27.3303,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 1618087617,
     "sharePct": 25.8,
     "effectiveDutyPct": 9.38,
     "freightPct": 1.19,
     "upliftPct": 10.57,
     "upliftIndex": 1.1057,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 162952129,
     "sharePct": 2.6,
     "effectiveDutyPct": 8.92,
     "freightPct": 1.89,
     "upliftPct": 10.81,
     "upliftIndex": 1.1081,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 1426651313,
     "sharePct": 22.7,
     "effectiveDutyPct": 11.64,
     "freightPct": 0.11,
     "upliftPct": 11.75,
     "upliftIndex": 1.1175,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 467433412,
     "sharePct": 7.4,
     "effectiveDutyPct": 10.69,
     "freightPct": 1.18,
     "upliftPct": 11.87,
     "upliftIndex": 1.1187,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Taiwan",
     "rank": null,
     "customsValueUsd": 329849488,
     "sharePct": 5.3,
     "effectiveDutyPct": 9.73,
     "freightPct": 2.88,
     "upliftPct": 12.61,
     "upliftIndex": 1.1261,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 84732185,
     "sharePct": 1.3,
     "effectiveDutyPct": 9.5,
     "freightPct": 3.37,
     "upliftPct": 12.87,
     "upliftIndex": 1.1287,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 68505138,
     "sharePct": 1.1,
     "effectiveDutyPct": 12.73,
     "freightPct": 1.01,
     "upliftPct": 13.74,
     "upliftIndex": 1.1374,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Sweden",
     "rank": null,
     "customsValueUsd": 124676935,
     "sharePct": 2,
     "effectiveDutyPct": 13.22,
     "freightPct": 1.96,
     "upliftPct": 15.18,
     "upliftIndex": 1.1518,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 66591189,
     "sharePct": 1.1,
     "effectiveDutyPct": 19.86,
     "freightPct": 3.66,
     "upliftPct": 23.52,
     "upliftIndex": 1.2352,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 1929972703,
     "sharePct": 30.7,
     "effectiveDutyPct": 21.66,
     "freightPct": 3.4,
     "upliftPct": 25.06,
     "upliftIndex": 1.2506,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 14.49,
   "sourcing": {
    "hhi": 2000,
    "band": "moderately concentrated",
    "topCountry": "China",
    "topSharePct": 29.2,
    "namedSharePct": 94.9,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "packaging-machinery",
   "label": "Packaging and filling machinery",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 629945510,
     "sharePct": 12.7,
     "effectiveDutyPct": 0.83,
     "freightPct": 0.64,
     "upliftPct": 1.47,
     "upliftIndex": 1.0147,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 208740754,
     "sharePct": 4.2,
     "effectiveDutyPct": 6.38,
     "freightPct": 2.2,
     "upliftPct": 8.58,
     "upliftIndex": 1.0858,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Switzerland",
     "rank": null,
     "customsValueUsd": 266019981,
     "sharePct": 5.4,
     "effectiveDutyPct": 7.91,
     "freightPct": 0.99,
     "upliftPct": 8.9,
     "upliftIndex": 1.089,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 1462190295,
     "sharePct": 29.6,
     "effectiveDutyPct": 7.06,
     "freightPct": 2.58,
     "upliftPct": 9.64,
     "upliftIndex": 1.0964,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Spain",
     "rank": null,
     "customsValueUsd": 150084156,
     "sharePct": 3,
     "effectiveDutyPct": 7.89,
     "freightPct": 2.32,
     "upliftPct": 10.21,
     "upliftIndex": 1.1021,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 1155934103,
     "sharePct": 23.4,
     "effectiveDutyPct": 8.14,
     "freightPct": 2.61,
     "upliftPct": 10.75,
     "upliftIndex": 1.1075,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Netherlands",
     "rank": null,
     "customsValueUsd": 220957025,
     "sharePct": 4.5,
     "effectiveDutyPct": 8.9,
     "freightPct": 2.28,
     "upliftPct": 11.18,
     "upliftIndex": 1.1118,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "France",
     "rank": null,
     "customsValueUsd": 205751647,
     "sharePct": 4.2,
     "effectiveDutyPct": 8.49,
     "freightPct": 5.3,
     "upliftPct": 13.79,
     "upliftIndex": 1.1379,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 305991860,
     "sharePct": 6.2,
     "effectiveDutyPct": 9.26,
     "freightPct": 8.47,
     "upliftPct": 17.73,
     "upliftIndex": 1.1773,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 339871358,
     "sharePct": 6.9,
     "effectiveDutyPct": 41.89,
     "freightPct": 8.83,
     "upliftPct": 50.72,
     "upliftIndex": 1.5072,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 49.25,
   "sourcing": {
    "hhi": 1230,
    "band": "diversified",
    "topCountry": "Germany",
    "topSharePct": 24.7,
    "namedSharePct": 83.4,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "foundry-metallurgy",
   "label": "Foundry and rolling equipment",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Canada",
     "rank": null,
     "customsValueUsd": 137976980,
     "sharePct": 11.8,
     "effectiveDutyPct": 2.19,
     "freightPct": 0.81,
     "upliftPct": 3,
     "upliftIndex": 1.03,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cad",
      "windowPct": -0.17,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 82992051,
     "sharePct": 7.1,
     "effectiveDutyPct": 3.36,
     "freightPct": 3.47,
     "upliftPct": 6.83,
     "upliftIndex": 1.0683,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Italy",
     "rank": null,
     "customsValueUsd": 237693055,
     "sharePct": 20.3,
     "effectiveDutyPct": 6.03,
     "freightPct": 2.58,
     "upliftPct": 8.61,
     "upliftIndex": 1.0861,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "South Korea",
     "rank": null,
     "customsValueUsd": 77271993,
     "sharePct": 6.6,
     "effectiveDutyPct": 3.52,
     "freightPct": 5.13,
     "upliftPct": 8.65,
     "upliftIndex": 1.0865,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Austria",
     "rank": null,
     "customsValueUsd": 68067581,
     "sharePct": 5.8,
     "effectiveDutyPct": 4.94,
     "freightPct": 4.41,
     "upliftPct": 9.35,
     "upliftIndex": 1.0935,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 187528871,
     "sharePct": 16,
     "effectiveDutyPct": 7.72,
     "freightPct": 2.26,
     "upliftPct": 9.98,
     "upliftIndex": 1.0998,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 148312565,
     "sharePct": 12.7,
     "effectiveDutyPct": 7.66,
     "freightPct": 3.39,
     "upliftPct": 11.05,
     "upliftIndex": 1.1105,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "India",
     "rank": null,
     "customsValueUsd": 66110682,
     "sharePct": 5.7,
     "effectiveDutyPct": 12.57,
     "freightPct": 3.36,
     "upliftPct": 15.93,
     "upliftIndex": 1.1593,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Brazil",
     "rank": null,
     "customsValueUsd": 35769440,
     "sharePct": 3.1,
     "effectiveDutyPct": 12.41,
     "freightPct": 9.96,
     "upliftPct": 22.37,
     "upliftIndex": 1.2237,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 127209331,
     "sharePct": 10.9,
     "effectiveDutyPct": 34.89,
     "freightPct": 5.87,
     "upliftPct": 40.76,
     "upliftIndex": 1.4076,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 37.76,
   "sourcing": {
    "hhi": 850,
    "band": "diversified",
    "topCountry": "Italy",
    "topSharePct": 16.7,
    "namedSharePct": 82.2,
    "hhiIsLowerBound": true
   }
  },
  {
   "family": "optical-components",
   "label": "Optical elements and lenses",
   "year": "2025",
   "unit": null,
   "basisCustomsUnitValue": null,
   "basisUnitPrice": null,
   "hasUnitCost": false,
   "completeLaneCount": 0,
   "hasRankableLanes": false,
   "lanes": [
    {
     "country": "Mexico",
     "rank": null,
     "customsValueUsd": 533991422,
     "sharePct": 15.8,
     "effectiveDutyPct": 3.7,
     "freightPct": 0.39,
     "upliftPct": 4.09,
     "upliftIndex": 1.0409,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "mxn",
      "windowPct": -0.11,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    },
    {
     "country": "Singapore",
     "rank": null,
     "customsValueUsd": 118180390,
     "sharePct": 3.5,
     "effectiveDutyPct": 8.13,
     "freightPct": 1.71,
     "upliftPct": 9.84,
     "upliftIndex": 1.0984,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Germany",
     "rank": null,
     "customsValueUsd": 515327757,
     "sharePct": 15.3,
     "effectiveDutyPct": 9.82,
     "freightPct": 1.51,
     "upliftPct": 11.33,
     "upliftIndex": 1.1133,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Japan",
     "rank": null,
     "customsValueUsd": 729021509,
     "sharePct": 21.6,
     "effectiveDutyPct": 9.76,
     "freightPct": 1.87,
     "upliftPct": 11.63,
     "upliftIndex": 1.1163,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "jpy",
      "windowPct": 0.46,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "cheaper"
     },
     "partial": false
    },
    {
     "country": "Ireland",
     "rank": null,
     "customsValueUsd": 366833737,
     "sharePct": 10.9,
     "effectiveDutyPct": 9.86,
     "freightPct": 1.87,
     "upliftPct": 11.73,
     "upliftIndex": 1.1173,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "eur",
      "windowPct": 0.5,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "dearer"
     },
     "partial": false
    },
    {
     "country": "Thailand",
     "rank": null,
     "customsValueUsd": 350708354,
     "sharePct": 10.4,
     "effectiveDutyPct": 10.8,
     "freightPct": 1.85,
     "upliftPct": 12.65,
     "upliftIndex": 1.1265,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Malaysia",
     "rank": null,
     "customsValueUsd": 119130908,
     "sharePct": 3.5,
     "effectiveDutyPct": 12.42,
     "freightPct": 2.56,
     "upliftPct": 14.98,
     "upliftIndex": 1.1498,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Vietnam",
     "rank": null,
     "customsValueUsd": 138652898,
     "sharePct": 4.1,
     "effectiveDutyPct": 12.32,
     "freightPct": 2.96,
     "upliftPct": 15.28,
     "upliftIndex": 1.1528,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "Laos",
     "rank": null,
     "customsValueUsd": 128021962,
     "sharePct": 3.8,
     "effectiveDutyPct": 19.91,
     "freightPct": 1.96,
     "upliftPct": 21.87,
     "upliftIndex": 1.2187,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": null,
     "partial": false
    },
    {
     "country": "China",
     "rank": null,
     "customsValueUsd": 371838539,
     "sharePct": 11,
     "effectiveDutyPct": 47.96,
     "freightPct": 3.77,
     "upliftPct": 51.73,
     "upliftIndex": 1.5173,
     "sourceCustomsUnitValue": null,
     "sourceUnitPrice": null,
     "priceBasis": "unavailable",
     "landedUnitCost": null,
     "fx": {
      "currency": "cny",
      "windowPct": -0.26,
      "from": "2026-08-12",
      "to": "2026-08-28",
      "direction": "flat"
     },
     "partial": false
    }
   ],
   "cheapest": null,
   "priciest": null,
   "upliftSpreadPp": 47.64,
   "sourcing": {
    "hhi": 810,
    "band": "diversified",
    "topCountry": "Japan",
    "topSharePct": 16.7,
    "namedSharePct": 77.3,
    "hhiIsLowerBound": true
   }
  }
 ]
}
