{
 "version": "2.0.0",
 "name": "Reshoring Readiness Index",
 "asOf": "2026-06",
 "familyCount": 57,
 "trackedFamilyCount": 57,
 "eligibilityRequirements": [
  {
   "code": "tracked-family-data",
   "required": true,
   "description": "The tariff family must have persisted USITC family-level import data."
  },
  {
   "code": "observed-monthly-effective-rate",
   "required": true,
   "description": "At least one month must report a numeric observed effective calculated-duty rate; the tariff term is the minimum evidence required to score a family."
  },
  {
   "code": "optional-dependence-and-concentration",
   "required": false,
   "description": "Import dependence and source concentration strengthen the score when available; their frozen weights are renormalized over available terms rather than treating missing evidence as zero."
  }
 ],
 "unsupportedFamilies": [],
 "weights": {
  "tariff": 0.45,
  "importDependence": 0.3,
  "concentration": 0.25
 },
 "bands": {
  "building": 34,
  "strong": 67
 },
 "families": [
  {
   "family": "abrasives",
   "label": "Abrasives and grinding wheels",
   "latest": {
    "period": "2026-06",
    "rri": 39.4,
    "band": "building case",
    "tariffScore": 35.5,
    "levelScore": 31.8,
    "trendScore": 44,
    "dependenceScore": 72.2,
    "concentrationScore": 6.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.55,
    "exportRatio": 0.278,
    "hhi": 690,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 76.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2014-02",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-03",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-04",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2014-05",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-06",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-07",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-08",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-09",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-10",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2014-11",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2014-12",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-01",
     30.9,
     15.6,
     72.2,
     8.8
    ],
    [
     "2015-02",
     30.8,
     15.5,
     72.2,
     8.8
    ],
    [
     "2015-03",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2015-04",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-05",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-06",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-07",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-08",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2015-09",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-10",
     30.7,
     15.3,
     72.2,
     8.8
    ],
    [
     "2015-11",
     30.7,
     15.2,
     72.2,
     8.8
    ],
    [
     "2015-12",
     30.8,
     15.4,
     72.2,
     8.8
    ],
    [
     "2016-01",
     30.7,
     15.2,
     72.2,
     8.9
    ],
    [
     "2016-02",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-03",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-04",
     30.8,
     15.4,
     72.2,
     8.9
    ],
    [
     "2016-05",
     30.7,
     15.2,
     72.2,
     8.9
    ],
    [
     "2016-06",
     30.8,
     15.4,
     72.2,
     8.9
    ],
    [
     "2016-07",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-08",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-09",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-10",
     30.7,
     15.2,
     72.2,
     8.9
    ],
    [
     "2016-11",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2016-12",
     30.7,
     15.2,
     72.2,
     8.9
    ],
    [
     "2017-01",
     30.7,
     15.4,
     72.2,
     8.5
    ],
    [
     "2017-02",
     30.6,
     15.2,
     72.2,
     8.5
    ],
    [
     "2017-03",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-04",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-05",
     30.7,
     15.4,
     72.2,
     8.5
    ],
    [
     "2017-06",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-07",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-08",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-09",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-10",
     30.6,
     15.2,
     72.2,
     8.5
    ],
    [
     "2017-11",
     30.7,
     15.3,
     72.2,
     8.5
    ],
    [
     "2017-12",
     30.7,
     15.4,
     72.2,
     8.5
    ],
    [
     "2018-01",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-02",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-03",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-04",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-05",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-06",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-07",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-08",
     30.8,
     15.4,
     72.2,
     8.9
    ],
    [
     "2018-09",
     30.8,
     15.3,
     72.2,
     8.9
    ],
    [
     "2018-10",
     33.2,
     20.7,
     72.2,
     8.9
    ],
    [
     "2018-11",
     32.8,
     19.9,
     72.2,
     8.9
    ],
    [
     "2018-12",
     33.9,
     22.2,
     72.2,
     8.9
    ],
    [
     "2019-01",
     32.7,
     19.9,
     72.2,
     8.5
    ],
    [
     "2019-02",
     32.6,
     19.5,
     72.2,
     8.5
    ],
    [
     "2019-03",
     32.4,
     19.2,
     72.2,
     8.5
    ],
    [
     "2019-04",
     32.7,
     19.7,
     72.2,
     8.5
    ],
    [
     "2019-05",
     33.2,
     20.9,
     72.2,
     8.5
    ],
    [
     "2019-06",
     35.1,
     25.2,
     72.2,
     8.5
    ],
    [
     "2019-07",
     35.4,
     25.7,
     72.2,
     8.5
    ],
    [
     "2019-08",
     35.5,
     26,
     72.2,
     8.5
    ],
    [
     "2019-09",
     35.6,
     26.3,
     72.2,
     8.5
    ],
    [
     "2019-10",
     33.8,
     22.3,
     72.2,
     8.5
    ],
    [
     "2019-11",
     34.1,
     23,
     72.2,
     8.5
    ],
    [
     "2019-12",
     34.8,
     24.5,
     72.2,
     8.5
    ],
    [
     "2020-01",
     34.6,
     24.2,
     72.2,
     8.2
    ],
    [
     "2020-02",
     33.8,
     22.4,
     72.2,
     8.2
    ],
    [
     "2020-03",
     32.7,
     19.9,
     72.2,
     8.2
    ],
    [
     "2020-04",
     34.5,
     23.9,
     72.2,
     8.2
    ],
    [
     "2020-05",
     36.4,
     28.2,
     72.2,
     8.2
    ],
    [
     "2020-06",
     34.5,
     23.9,
     72.2,
     8.2
    ],
    [
     "2020-07",
     34.6,
     24.3,
     72.2,
     8.2
    ],
    [
     "2020-08",
     35.2,
     25.5,
     72.2,
     8.2
    ],
    [
     "2020-09",
     33.8,
     22.5,
     72.2,
     8.2
    ],
    [
     "2020-10",
     34.8,
     24.6,
     72.2,
     8.2
    ],
    [
     "2020-11",
     34.2,
     23.4,
     72.2,
     8.2
    ],
    [
     "2020-12",
     34,
     22.9,
     72.2,
     8.2
    ],
    [
     "2021-01",
     34.6,
     24.6,
     72.2,
     7.6
    ],
    [
     "2021-02",
     34.9,
     25.3,
     72.2,
     7.6
    ],
    [
     "2021-03",
     34.3,
     23.9,
     72.2,
     7.6
    ],
    [
     "2021-04",
     33.5,
     22.1,
     72.2,
     7.6
    ],
    [
     "2021-05",
     32.5,
     19.8,
     72.2,
     7.6
    ],
    [
     "2021-06",
     32.9,
     20.8,
     72.2,
     7.6
    ],
    [
     "2021-07",
     33.4,
     21.8,
     72.2,
     7.6
    ],
    [
     "2021-08",
     32.7,
     20.4,
     72.2,
     7.6
    ],
    [
     "2021-09",
     33.5,
     22,
     72.2,
     7.6
    ],
    [
     "2021-10",
     34.6,
     24.6,
     72.2,
     7.6
    ],
    [
     "2021-11",
     33.3,
     21.7,
     72.2,
     7.6
    ],
    [
     "2021-12",
     33.8,
     22.7,
     72.2,
     7.6
    ],
    [
     "2022-01",
     34.6,
     24.5,
     72.2,
     7.5
    ],
    [
     "2022-02",
     33.3,
     21.7,
     72.2,
     7.5
    ],
    [
     "2022-03",
     33.7,
     22.6,
     72.2,
     7.5
    ],
    [
     "2022-04",
     34.3,
     24,
     72.2,
     7.5
    ],
    [
     "2022-05",
     33.5,
     22.2,
     72.2,
     7.5
    ],
    [
     "2022-06",
     34.5,
     24.3,
     72.2,
     7.5
    ],
    [
     "2022-07",
     33,
     21,
     72.2,
     7.5
    ],
    [
     "2022-08",
     33.5,
     22.2,
     72.2,
     7.5
    ],
    [
     "2022-09",
     32.9,
     20.9,
     72.2,
     7.5
    ],
    [
     "2022-10",
     32.4,
     19.8,
     72.2,
     7.5
    ],
    [
     "2022-11",
     33,
     21.1,
     72.2,
     7.5
    ],
    [
     "2022-12",
     32.7,
     20.4,
     72.2,
     7.5
    ],
    [
     "2023-01",
     31.8,
     18.4,
     72.2,
     7.3
    ],
    [
     "2023-02",
     32.7,
     20.4,
     72.2,
     7.3
    ],
    [
     "2023-03",
     31.8,
     18.4,
     72.2,
     7.3
    ],
    [
     "2023-04",
     32.7,
     20.5,
     72.2,
     7.3
    ],
    [
     "2023-05",
     32.1,
     19.2,
     72.2,
     7.3
    ],
    [
     "2023-06",
     32.1,
     19.2,
     72.2,
     7.3
    ],
    [
     "2023-07",
     32.8,
     20.8,
     72.2,
     7.3
    ],
    [
     "2023-08",
     32.5,
     20,
     72.2,
     7.3
    ],
    [
     "2023-09",
     33.7,
     22.7,
     72.2,
     7.3
    ],
    [
     "2023-10",
     32.4,
     19.9,
     72.2,
     7.3
    ],
    [
     "2023-11",
     33.2,
     21.5,
     72.2,
     7.3
    ],
    [
     "2023-12",
     33.2,
     21.5,
     72.2,
     7.3
    ],
    [
     "2024-01",
     34,
     23.6,
     72.2,
     7
    ],
    [
     "2024-02",
     33.4,
     22.3,
     72.2,
     7
    ],
    [
     "2024-03",
     33.2,
     21.7,
     72.2,
     7
    ],
    [
     "2024-04",
     31.8,
     18.7,
     72.2,
     7
    ],
    [
     "2024-05",
     32.9,
     21,
     72.2,
     7
    ],
    [
     "2024-06",
     33.1,
     21.5,
     72.2,
     7
    ],
    [
     "2024-07",
     32.9,
     21.1,
     72.2,
     7
    ],
    [
     "2024-08",
     33.2,
     21.7,
     72.2,
     7
    ],
    [
     "2024-09",
     33,
     21.4,
     72.2,
     7
    ],
    [
     "2024-10",
     33,
     21.4,
     72.2,
     7
    ],
    [
     "2024-11",
     32.4,
     20,
     72.2,
     7
    ],
    [
     "2024-12",
     33.2,
     21.8,
     72.2,
     7
    ],
    [
     "2025-01",
     34.7,
     25.2,
     72.2,
     6.9
    ],
    [
     "2025-02",
     33.3,
     22,
     72.2,
     6.9
    ],
    [
     "2025-03",
     37,
     30.3,
     72.2,
     6.9
    ],
    [
     "2025-04",
     41,
     39.2,
     72.2,
     6.9
    ],
    [
     "2025-05",
     48.4,
     55.6,
     72.2,
     6.9
    ],
    [
     "2025-06",
     46.9,
     52.2,
     72.2,
     6.9
    ],
    [
     "2025-07",
     50.6,
     60.4,
     72.2,
     6.9
    ],
    [
     "2025-08",
     51.7,
     63,
     72.2,
     6.9
    ],
    [
     "2025-09",
     52.9,
     65.6,
     72.2,
     6.9
    ],
    [
     "2025-10",
     53.9,
     67.9,
     72.2,
     6.9
    ],
    [
     "2025-11",
     53.6,
     67.1,
     72.2,
     6.9
    ],
    [
     "2025-12",
     52.6,
     65,
     72.2,
     6.9
    ],
    [
     "2026-01",
     52.8,
     65.3,
     72.2,
     6.9
    ],
    [
     "2026-02",
     50.7,
     60.6,
     72.2,
     6.9
    ],
    [
     "2026-03",
     43.5,
     44.7,
     72.2,
     6.9
    ],
    [
     "2026-04",
     41.9,
     41.2,
     72.2,
     6.9
    ],
    [
     "2026-05",
     38.9,
     34.4,
     72.2,
     6.9
    ],
    [
     "2026-06",
     39.4,
     35.5,
     72.2,
     6.9
    ]
   ]
  },
  {
   "family": "adhesives-sealants",
   "label": "Adhesives and sealants",
   "latest": {
    "period": "2026-06",
    "rri": 19.9,
    "band": "weak case",
    "tariffScore": 38.1,
    "levelScore": 35.2,
    "trendScore": 44.7,
    "dependenceScore": 0,
    "concentrationScore": 11,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 10.57,
    "exportRatio": 1.01,
    "hhi": 1100,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 80.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     14.5,
     24.6,
     0,
     13.8
    ],
    [
     "2020-02",
     14.8,
     25.2,
     0,
     13.8
    ],
    [
     "2020-03",
     12.9,
     21,
     0,
     13.8
    ],
    [
     "2020-04",
     14.3,
     24.1,
     0,
     13.8
    ],
    [
     "2020-05",
     16.2,
     28.3,
     0,
     13.8
    ],
    [
     "2020-06",
     14.1,
     23.6,
     0,
     13.8
    ],
    [
     "2020-07",
     14,
     23.4,
     0,
     13.8
    ],
    [
     "2020-08",
     13.4,
     22.2,
     0,
     13.8
    ],
    [
     "2020-09",
     13.5,
     22.4,
     0,
     13.8
    ],
    [
     "2020-10",
     13.8,
     22.9,
     0,
     13.8
    ],
    [
     "2020-11",
     13.8,
     23,
     0,
     13.8
    ],
    [
     "2020-12",
     13.8,
     23.1,
     0,
     13.8
    ],
    [
     "2021-01",
     12.2,
     20.4,
     0,
     12.1
    ],
    [
     "2021-02",
     12.7,
     21.6,
     0,
     12.1
    ],
    [
     "2021-03",
     14.1,
     24.6,
     0,
     12.1
    ],
    [
     "2021-04",
     13.2,
     22.5,
     0,
     12.1
    ],
    [
     "2021-05",
     13,
     22.2,
     0,
     12.1
    ],
    [
     "2021-06",
     15.1,
     26.9,
     0,
     12.1
    ],
    [
     "2021-07",
     14,
     24.4,
     0,
     12.1
    ],
    [
     "2021-08",
     13.4,
     23,
     0,
     12.1
    ],
    [
     "2021-09",
     13.1,
     22.4,
     0,
     12.1
    ],
    [
     "2021-10",
     12.9,
     22,
     0,
     12.1
    ],
    [
     "2021-11",
     13,
     22.2,
     0,
     12.1
    ],
    [
     "2021-12",
     12.8,
     21.7,
     0,
     12.1
    ],
    [
     "2022-01",
     13.5,
     23.5,
     0,
     11.7
    ],
    [
     "2022-02",
     13.4,
     23.3,
     0,
     11.7
    ],
    [
     "2022-03",
     13.3,
     23,
     0,
     11.7
    ],
    [
     "2022-04",
     13.2,
     22.9,
     0,
     11.7
    ],
    [
     "2022-05",
     13.7,
     24,
     0,
     11.7
    ],
    [
     "2022-06",
     13.6,
     23.8,
     0,
     11.7
    ],
    [
     "2022-07",
     13.6,
     23.7,
     0,
     11.7
    ],
    [
     "2022-08",
     14.2,
     25.1,
     0,
     11.7
    ],
    [
     "2022-09",
     14.4,
     25.6,
     0,
     11.7
    ],
    [
     "2022-10",
     13.9,
     24.3,
     0,
     11.7
    ],
    [
     "2022-11",
     14.1,
     24.9,
     0,
     11.7
    ],
    [
     "2022-12",
     13.8,
     24.2,
     0,
     11.7
    ],
    [
     "2023-01",
     14,
     24.4,
     0,
     12
    ],
    [
     "2023-02",
     13.9,
     24.2,
     0,
     12
    ],
    [
     "2023-03",
     14.4,
     25.3,
     0,
     12
    ],
    [
     "2023-04",
     13.9,
     24.3,
     0,
     12
    ],
    [
     "2023-05",
     13.5,
     23.4,
     0,
     12
    ],
    [
     "2023-06",
     13.7,
     23.8,
     0,
     12
    ],
    [
     "2023-07",
     13.1,
     22.5,
     0,
     12
    ],
    [
     "2023-08",
     12.8,
     21.8,
     0,
     12
    ],
    [
     "2023-09",
     12.5,
     21.1,
     0,
     12
    ],
    [
     "2023-10",
     13.1,
     22.4,
     0,
     12
    ],
    [
     "2023-11",
     12.8,
     21.8,
     0,
     12
    ],
    [
     "2023-12",
     13.7,
     23.7,
     0,
     12
    ],
    [
     "2024-01",
     13.3,
     23.2,
     0,
     11.6
    ],
    [
     "2024-02",
     13.5,
     23.5,
     0,
     11.6
    ],
    [
     "2024-03",
     12.3,
     20.9,
     0,
     11.6
    ],
    [
     "2024-04",
     12.9,
     22.3,
     0,
     11.6
    ],
    [
     "2024-05",
     13.7,
     24,
     0,
     11.6
    ],
    [
     "2024-06",
     13.4,
     23.3,
     0,
     11.6
    ],
    [
     "2024-07",
     13.9,
     24.5,
     0,
     11.6
    ],
    [
     "2024-08",
     13.4,
     23.3,
     0,
     11.6
    ],
    [
     "2024-09",
     13.9,
     24.4,
     0,
     11.6
    ],
    [
     "2024-10",
     13.3,
     23.2,
     0,
     11.6
    ],
    [
     "2024-11",
     13.1,
     22.7,
     0,
     11.6
    ],
    [
     "2024-12",
     13.3,
     23.1,
     0,
     11.6
    ],
    [
     "2025-01",
     13.9,
     24.7,
     0,
     11
    ],
    [
     "2025-02",
     13.3,
     23.4,
     0,
     11
    ],
    [
     "2025-03",
     16.7,
     30.9,
     0,
     11
    ],
    [
     "2025-04",
     22.2,
     43.2,
     0,
     11
    ],
    [
     "2025-05",
     30.9,
     62.5,
     0,
     11
    ],
    [
     "2025-06",
     27.1,
     54,
     0,
     11
    ],
    [
     "2025-07",
     28.6,
     57.5,
     0,
     11
    ],
    [
     "2025-08",
     29.8,
     60.1,
     0,
     11
    ],
    [
     "2025-09",
     33.1,
     67.5,
     0,
     11
    ],
    [
     "2025-10",
     33.5,
     68.3,
     0,
     11
    ],
    [
     "2025-11",
     32.3,
     65.7,
     0,
     11
    ],
    [
     "2025-12",
     31.9,
     64.7,
     0,
     11
    ],
    [
     "2026-01",
     31.9,
     64.7,
     0,
     11
    ],
    [
     "2026-02",
     29,
     58.4,
     0,
     11
    ],
    [
     "2026-03",
     28.5,
     57.2,
     0,
     11
    ],
    [
     "2026-04",
     23.3,
     45.7,
     0,
     11
    ],
    [
     "2026-05",
     19.7,
     37.7,
     0,
     11
    ],
    [
     "2026-06",
     19.9,
     38.1,
     0,
     11
    ]
   ]
  },
  {
   "family": "aluminum-articles",
   "label": "Aluminum articles",
   "latest": {
    "period": "2026-06",
    "rri": 53.7,
    "band": "building case",
    "tariffScore": 89.4,
    "levelScore": 100,
    "trendScore": 64.6,
    "dependenceScore": 34.7,
    "concentrationScore": 12.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -4.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 44.08,
    "exportRatio": 0.653,
    "hhi": 1210,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 83.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     32.4,
     38.6,
     34.7,
     18.6
    ],
    [
     "2020-02",
     30.7,
     34.8,
     34.7,
     18.6
    ],
    [
     "2020-03",
     27.8,
     28.2,
     34.7,
     18.6
    ],
    [
     "2020-04",
     32,
     37.6,
     34.7,
     18.6
    ],
    [
     "2020-05",
     33,
     39.8,
     34.7,
     18.6
    ],
    [
     "2020-06",
     32.6,
     38.9,
     34.7,
     18.6
    ],
    [
     "2020-07",
     31.8,
     37.1,
     34.7,
     18.6
    ],
    [
     "2020-08",
     32.9,
     39.7,
     34.7,
     18.6
    ],
    [
     "2020-09",
     33.7,
     41.4,
     34.7,
     18.6
    ],
    [
     "2020-10",
     32.9,
     39.6,
     34.7,
     18.6
    ],
    [
     "2020-11",
     32.7,
     39.3,
     34.7,
     18.6
    ],
    [
     "2020-12",
     34.4,
     43,
     34.7,
     18.6
    ],
    [
     "2021-01",
     34.3,
     43,
     34.7,
     18
    ],
    [
     "2021-02",
     35.7,
     46.1,
     34.7,
     18
    ],
    [
     "2021-03",
     35,
     44.7,
     34.7,
     18
    ],
    [
     "2021-04",
     32.5,
     39.1,
     34.7,
     18
    ],
    [
     "2021-05",
     31.7,
     37.3,
     34.7,
     18
    ],
    [
     "2021-06",
     32.2,
     38.4,
     34.7,
     18
    ],
    [
     "2021-07",
     31.7,
     37.2,
     34.7,
     18
    ],
    [
     "2021-08",
     32.8,
     39.8,
     34.7,
     18
    ],
    [
     "2021-09",
     33.3,
     40.8,
     34.7,
     18
    ],
    [
     "2021-10",
     31.4,
     36.7,
     34.7,
     18
    ],
    [
     "2021-11",
     31.7,
     37.3,
     34.7,
     18
    ],
    [
     "2021-12",
     31.4,
     36.7,
     34.7,
     18
    ],
    [
     "2022-01",
     33.4,
     42,
     34.7,
     16.4
    ],
    [
     "2022-02",
     32.7,
     40.4,
     34.7,
     16.4
    ],
    [
     "2022-03",
     32.1,
     39.1,
     34.7,
     16.4
    ],
    [
     "2022-04",
     30.9,
     36.4,
     34.7,
     16.4
    ],
    [
     "2022-05",
     30.7,
     35.9,
     34.7,
     16.4
    ],
    [
     "2022-06",
     31.3,
     37.4,
     34.7,
     16.4
    ],
    [
     "2022-07",
     32,
     38.8,
     34.7,
     16.4
    ],
    [
     "2022-08",
     31,
     36.6,
     34.7,
     16.4
    ],
    [
     "2022-09",
     30.2,
     34.8,
     34.7,
     16.4
    ],
    [
     "2022-10",
     31.4,
     37.6,
     34.7,
     16.4
    ],
    [
     "2022-11",
     29.8,
     33.9,
     34.7,
     16.4
    ],
    [
     "2022-12",
     28.5,
     31,
     34.7,
     16.4
    ],
    [
     "2023-01",
     27.4,
     29.8,
     34.7,
     14.5
    ],
    [
     "2023-02",
     27.3,
     29.5,
     34.7,
     14.5
    ],
    [
     "2023-03",
     24.5,
     23.2,
     34.7,
     14.5
    ],
    [
     "2023-04",
     26,
     26.5,
     34.7,
     14.5
    ],
    [
     "2023-05",
     28.1,
     31.3,
     34.7,
     14.5
    ],
    [
     "2023-06",
     27.6,
     30.2,
     34.7,
     14.5
    ],
    [
     "2023-07",
     27.6,
     30.1,
     34.7,
     14.5
    ],
    [
     "2023-08",
     26.7,
     28.1,
     34.7,
     14.5
    ],
    [
     "2023-09",
     27.7,
     30.4,
     34.7,
     14.5
    ],
    [
     "2023-10",
     27,
     28.8,
     34.7,
     14.5
    ],
    [
     "2023-11",
     27.2,
     29.3,
     34.7,
     14.5
    ],
    [
     "2023-12",
     29.6,
     34.5,
     34.7,
     14.5
    ],
    [
     "2024-01",
     29.1,
     34.1,
     34.7,
     13.4
    ],
    [
     "2024-02",
     28.4,
     32.6,
     34.7,
     13.4
    ],
    [
     "2024-03",
     29.1,
     34.1,
     34.7,
     13.4
    ],
    [
     "2024-04",
     28.1,
     31.8,
     34.7,
     13.4
    ],
    [
     "2024-05",
     28.3,
     32.4,
     34.7,
     13.4
    ],
    [
     "2024-06",
     28.8,
     33.5,
     34.7,
     13.4
    ],
    [
     "2024-07",
     30.1,
     36.3,
     34.7,
     13.4
    ],
    [
     "2024-08",
     29.6,
     35.3,
     34.7,
     13.4
    ],
    [
     "2024-09",
     30,
     36,
     34.7,
     13.4
    ],
    [
     "2024-10",
     28.6,
     33,
     34.7,
     13.4
    ],
    [
     "2024-11",
     29.8,
     35.7,
     34.7,
     13.4
    ],
    [
     "2024-12",
     29,
     33.9,
     34.7,
     13.4
    ],
    [
     "2025-01",
     29.1,
     34.8,
     34.7,
     12.1
    ],
    [
     "2025-02",
     30.4,
     37.6,
     34.7,
     12.1
    ],
    [
     "2025-03",
     49.4,
     79.9,
     34.7,
     12.1
    ],
    [
     "2025-04",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-05",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-06",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-07",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-08",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-09",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-10",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-11",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2025-12",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2026-01",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2026-02",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2026-03",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2026-04",
     57,
     96.7,
     34.7,
     12.1
    ],
    [
     "2026-05",
     58.4,
     100,
     34.7,
     12.1
    ],
    [
     "2026-06",
     53.7,
     89.4,
     34.7,
     12.1
    ]
   ]
  },
  {
   "family": "aluminum-semis",
   "label": "Aluminum semi-finished products",
   "latest": {
    "period": "2026-06",
    "rri": 58.1,
    "band": "building case",
    "tariffScore": 100,
    "levelScore": 100,
    "trendScore": 100,
    "dependenceScore": 37.6,
    "concentrationScore": 7.2,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 0,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 53.09,
    "exportRatio": 0.624,
    "hhi": 720,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 65.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     23.7,
     19.1,
     37.6,
     15.1
    ],
    [
     "2014-02",
     23.6,
     19,
     37.6,
     15.1
    ],
    [
     "2014-03",
     23.6,
     19,
     37.6,
     15.1
    ],
    [
     "2014-04",
     23.7,
     19.1,
     37.6,
     15.1
    ],
    [
     "2014-05",
     23.5,
     18.8,
     37.6,
     15.1
    ],
    [
     "2014-06",
     23.4,
     18.5,
     37.6,
     15.1
    ],
    [
     "2014-07",
     23.7,
     19.2,
     37.6,
     15.1
    ],
    [
     "2014-08",
     23.7,
     19.1,
     37.6,
     15.1
    ],
    [
     "2014-09",
     23.7,
     19.3,
     37.6,
     15.1
    ],
    [
     "2014-10",
     23.7,
     19.3,
     37.6,
     15.1
    ],
    [
     "2014-11",
     23.8,
     19.4,
     37.6,
     15.1
    ],
    [
     "2014-12",
     23.9,
     19.6,
     37.6,
     15.1
    ],
    [
     "2015-01",
     24.1,
     19.6,
     37.6,
     16.1
    ],
    [
     "2015-02",
     23.7,
     18.6,
     37.6,
     16.1
    ],
    [
     "2015-03",
     24.2,
     19.7,
     37.6,
     16.1
    ],
    [
     "2015-04",
     24.4,
     20.2,
     37.6,
     16.1
    ],
    [
     "2015-05",
     24,
     19.3,
     37.6,
     16.1
    ],
    [
     "2015-06",
     24.4,
     20.3,
     37.6,
     16.1
    ],
    [
     "2015-07",
     24.3,
     20,
     37.6,
     16.1
    ],
    [
     "2015-08",
     24.3,
     19.9,
     37.6,
     16.1
    ],
    [
     "2015-09",
     24.1,
     19.5,
     37.6,
     16.1
    ],
    [
     "2015-10",
     24,
     19.3,
     37.6,
     16.1
    ],
    [
     "2015-11",
     23.9,
     19.2,
     37.6,
     16.1
    ],
    [
     "2015-12",
     24.3,
     19.9,
     37.6,
     16.1
    ],
    [
     "2016-01",
     23.8,
     19.2,
     37.6,
     15.5
    ],
    [
     "2016-02",
     24.2,
     20,
     37.6,
     15.5
    ],
    [
     "2016-03",
     23.8,
     19.3,
     37.6,
     15.5
    ],
    [
     "2016-04",
     23.7,
     18.9,
     37.6,
     15.5
    ],
    [
     "2016-05",
     23.9,
     19.5,
     37.6,
     15.5
    ],
    [
     "2016-06",
     23.8,
     19.3,
     37.6,
     15.5
    ],
    [
     "2016-07",
     23.8,
     19.1,
     37.6,
     15.5
    ],
    [
     "2016-08",
     23.8,
     19.2,
     37.6,
     15.5
    ],
    [
     "2016-09",
     23.8,
     19.2,
     37.6,
     15.5
    ],
    [
     "2016-10",
     23.9,
     19.4,
     37.6,
     15.5
    ],
    [
     "2016-11",
     23.9,
     19.5,
     37.6,
     15.5
    ],
    [
     "2016-12",
     23.9,
     19.4,
     37.6,
     15.5
    ],
    [
     "2017-01",
     23.4,
     19,
     37.6,
     14.3
    ],
    [
     "2017-02",
     23.3,
     18.8,
     37.6,
     14.3
    ],
    [
     "2017-03",
     23.5,
     19.2,
     37.6,
     14.3
    ],
    [
     "2017-04",
     23.6,
     19.5,
     37.6,
     14.3
    ],
    [
     "2017-05",
     23.7,
     19.7,
     37.6,
     14.3
    ],
    [
     "2017-06",
     23.8,
     19.8,
     37.6,
     14.3
    ],
    [
     "2017-07",
     23.7,
     19.6,
     37.6,
     14.3
    ],
    [
     "2017-08",
     23.3,
     18.8,
     37.6,
     14.3
    ],
    [
     "2017-09",
     23.4,
     18.9,
     37.6,
     14.3
    ],
    [
     "2017-10",
     23.3,
     18.7,
     37.6,
     14.3
    ],
    [
     "2017-11",
     23.3,
     18.7,
     37.6,
     14.3
    ],
    [
     "2017-12",
     23.4,
     19,
     37.6,
     14.3
    ],
    [
     "2018-01",
     22.3,
     19.9,
     37.6,
     8.1
    ],
    [
     "2018-02",
     21.8,
     18.9,
     37.6,
     8.1
    ],
    [
     "2018-03",
     22.9,
     21.4,
     37.6,
     8.1
    ],
    [
     "2018-04",
     24.3,
     24.5,
     37.6,
     8.1
    ],
    [
     "2018-05",
     27.6,
     31.8,
     37.6,
     8.1
    ],
    [
     "2018-06",
     38,
     54.8,
     37.6,
     8.1
    ],
    [
     "2018-07",
     38.1,
     55.1,
     37.6,
     8.1
    ],
    [
     "2018-08",
     37.5,
     53.7,
     37.6,
     8.1
    ],
    [
     "2018-09",
     37.1,
     52.8,
     37.6,
     8.1
    ],
    [
     "2018-10",
     37.2,
     53.1,
     37.6,
     8.1
    ],
    [
     "2018-11",
     36.7,
     52,
     37.6,
     8.1
    ],
    [
     "2018-12",
     36.1,
     50.7,
     37.6,
     8.1
    ],
    [
     "2019-01",
     33.6,
     46.8,
     37.6,
     5.2
    ],
    [
     "2019-02",
     34,
     47.7,
     37.6,
     5.2
    ],
    [
     "2019-03",
     33,
     45.4,
     37.6,
     5.2
    ],
    [
     "2019-04",
     34,
     47.6,
     37.6,
     5.2
    ],
    [
     "2019-05",
     31.8,
     42.7,
     37.6,
     5.2
    ],
    [
     "2019-06",
     26.2,
     30.2,
     37.6,
     5.2
    ],
    [
     "2019-07",
     25.4,
     28.5,
     37.6,
     5.2
    ],
    [
     "2019-08",
     25.5,
     28.6,
     37.6,
     5.2
    ],
    [
     "2019-09",
     27.4,
     33,
     37.6,
     5.2
    ],
    [
     "2019-10",
     27.1,
     32.2,
     37.6,
     5.2
    ],
    [
     "2019-11",
     26.7,
     31.3,
     37.6,
     5.2
    ],
    [
     "2019-12",
     27,
     32.1,
     37.6,
     5.2
    ],
    [
     "2020-01",
     27.4,
     31.7,
     37.6,
     7.5
    ],
    [
     "2020-02",
     26.6,
     29.8,
     37.6,
     7.5
    ],
    [
     "2020-03",
     27.2,
     31.2,
     37.6,
     7.5
    ],
    [
     "2020-04",
     27.6,
     32.1,
     37.6,
     7.5
    ],
    [
     "2020-05",
     27.7,
     32.3,
     37.6,
     7.5
    ],
    [
     "2020-06",
     27.9,
     32.8,
     37.6,
     7.5
    ],
    [
     "2020-07",
     27.6,
     32,
     37.6,
     7.5
    ],
    [
     "2020-08",
     27.2,
     31.1,
     37.6,
     7.5
    ],
    [
     "2020-09",
     25.8,
     28,
     37.6,
     7.5
    ],
    [
     "2020-10",
     25.4,
     27.2,
     37.6,
     7.5
    ],
    [
     "2020-11",
     26.4,
     29.4,
     37.6,
     7.5
    ],
    [
     "2020-12",
     26.9,
     30.6,
     37.6,
     7.5
    ],
    [
     "2021-01",
     25.2,
     26.8,
     37.6,
     7.5
    ],
    [
     "2021-02",
     25.9,
     28.4,
     37.6,
     7.5
    ],
    [
     "2021-03",
     25.8,
     28.2,
     37.6,
     7.5
    ],
    [
     "2021-04",
     25.7,
     27.8,
     37.6,
     7.5
    ],
    [
     "2021-05",
     24.9,
     26.1,
     37.6,
     7.5
    ],
    [
     "2021-06",
     25.1,
     26.6,
     37.6,
     7.5
    ],
    [
     "2021-07",
     24.8,
     25.8,
     37.6,
     7.5
    ],
    [
     "2021-08",
     26.2,
     28.9,
     37.6,
     7.5
    ],
    [
     "2021-09",
     26.2,
     28.9,
     37.6,
     7.5
    ],
    [
     "2021-10",
     25.7,
     27.9,
     37.6,
     7.5
    ],
    [
     "2021-11",
     25.8,
     28.2,
     37.6,
     7.5
    ],
    [
     "2021-12",
     25.7,
     27.8,
     37.6,
     7.5
    ],
    [
     "2022-01",
     26.6,
     30,
     37.6,
     7.2
    ],
    [
     "2022-02",
     25.1,
     26.6,
     37.6,
     7.2
    ],
    [
     "2022-03",
     24.8,
     26.1,
     37.6,
     7.2
    ],
    [
     "2022-04",
     24.6,
     25.6,
     37.6,
     7.2
    ],
    [
     "2022-05",
     26,
     28.7,
     37.6,
     7.2
    ],
    [
     "2022-06",
     25.4,
     27.4,
     37.6,
     7.2
    ],
    [
     "2022-07",
     26.2,
     29.2,
     37.6,
     7.2
    ],
    [
     "2022-08",
     25.5,
     27.6,
     37.6,
     7.2
    ],
    [
     "2022-09",
     25.4,
     27.4,
     37.6,
     7.2
    ],
    [
     "2022-10",
     26.4,
     29.6,
     37.6,
     7.2
    ],
    [
     "2022-11",
     25.5,
     27.6,
     37.6,
     7.2
    ],
    [
     "2022-12",
     27.3,
     31.5,
     37.6,
     7.2
    ],
    [
     "2023-01",
     26.1,
     28.1,
     37.6,
     8.6
    ],
    [
     "2023-02",
     25.2,
     26.2,
     37.6,
     8.6
    ],
    [
     "2023-03",
     25.2,
     26.1,
     37.6,
     8.6
    ],
    [
     "2023-04",
     25.9,
     27.8,
     37.6,
     8.6
    ],
    [
     "2023-05",
     24.8,
     25.3,
     37.6,
     8.6
    ],
    [
     "2023-06",
     25.6,
     27,
     37.6,
     8.6
    ],
    [
     "2023-07",
     24.4,
     24.4,
     37.6,
     8.6
    ],
    [
     "2023-08",
     24.2,
     23.9,
     37.6,
     8.6
    ],
    [
     "2023-09",
     23.7,
     22.9,
     37.6,
     8.6
    ],
    [
     "2023-10",
     24,
     23.4,
     37.6,
     8.6
    ],
    [
     "2023-11",
     25.2,
     26.2,
     37.6,
     8.6
    ],
    [
     "2023-12",
     25.2,
     26.2,
     37.6,
     8.6
    ],
    [
     "2024-01",
     25.3,
     26.8,
     37.6,
     8
    ],
    [
     "2024-02",
     25.7,
     27.7,
     37.6,
     8
    ],
    [
     "2024-03",
     25.6,
     27.3,
     37.6,
     8
    ],
    [
     "2024-04",
     25.9,
     28,
     37.6,
     8
    ],
    [
     "2024-05",
     26.5,
     29.4,
     37.6,
     8
    ],
    [
     "2024-06",
     25.3,
     26.8,
     37.6,
     8
    ],
    [
     "2024-07",
     27,
     30.4,
     37.6,
     8
    ],
    [
     "2024-08",
     26.7,
     29.9,
     37.6,
     8
    ],
    [
     "2024-09",
     28.1,
     32.9,
     37.6,
     8
    ],
    [
     "2024-10",
     29.3,
     35.5,
     37.6,
     8
    ],
    [
     "2024-11",
     31.2,
     39.8,
     37.6,
     8
    ],
    [
     "2024-12",
     29.6,
     36.3,
     37.6,
     8
    ],
    [
     "2025-01",
     30,
     37.5,
     37.6,
     7.2
    ],
    [
     "2025-02",
     28.4,
     34.1,
     37.6,
     7.2
    ],
    [
     "2025-03",
     43.7,
     68.1,
     37.6,
     7.2
    ],
    [
     "2025-04",
     53,
     88.7,
     37.6,
     7.2
    ],
    [
     "2025-05",
     53.9,
     90.6,
     37.6,
     7.2
    ],
    [
     "2025-06",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-07",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-08",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-09",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-10",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-11",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2025-12",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-01",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-02",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-03",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-04",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-05",
     58.1,
     100,
     37.6,
     7.2
    ],
    [
     "2026-06",
     58.1,
     100,
     37.6,
     7.2
    ]
   ]
  },
  {
   "family": "batteries",
   "label": "Batteries and storage cells",
   "latest": {
    "period": "2026-06",
    "rri": 48.5,
    "band": "building case",
    "tariffScore": 46.9,
    "levelScore": 53.6,
    "trendScore": 31.3,
    "dependenceScore": 70.6,
    "concentrationScore": 25,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -13.3,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 16.09,
    "exportRatio": 0.294,
    "hhi": 2500,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 92.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     43.3,
     30.5,
     70.6,
     33.7
    ],
    [
     "2023-02",
     43.3,
     30.4,
     70.6,
     33.7
    ],
    [
     "2023-03",
     42.8,
     29.3,
     70.6,
     33.7
    ],
    [
     "2023-04",
     42.3,
     28.3,
     70.6,
     33.7
    ],
    [
     "2023-05",
     41.9,
     27.4,
     70.6,
     33.7
    ],
    [
     "2023-06",
     42.3,
     28.2,
     70.6,
     33.7
    ],
    [
     "2023-07",
     42.3,
     28.2,
     70.6,
     33.7
    ],
    [
     "2023-08",
     42.7,
     29.2,
     70.6,
     33.7
    ],
    [
     "2023-09",
     42.6,
     28.9,
     70.6,
     33.7
    ],
    [
     "2023-10",
     42.3,
     28.3,
     70.6,
     33.7
    ],
    [
     "2023-11",
     42.6,
     28.8,
     70.6,
     33.7
    ],
    [
     "2023-12",
     42.7,
     29.2,
     70.6,
     33.7
    ],
    [
     "2024-01",
     40.8,
     24.7,
     70.6,
     34.2
    ],
    [
     "2024-02",
     42.2,
     27.8,
     70.6,
     34.2
    ],
    [
     "2024-03",
     43.9,
     31.4,
     70.6,
     34.2
    ],
    [
     "2024-04",
     44.6,
     33.1,
     70.6,
     34.2
    ],
    [
     "2024-05",
     44.5,
     32.9,
     70.6,
     34.2
    ],
    [
     "2024-06",
     44.4,
     32.6,
     70.6,
     34.2
    ],
    [
     "2024-07",
     43.6,
     30.8,
     70.6,
     34.2
    ],
    [
     "2024-08",
     42.3,
     28,
     70.6,
     34.2
    ],
    [
     "2024-09",
     41.2,
     25.4,
     70.6,
     34.2
    ],
    [
     "2024-10",
     44.2,
     32.2,
     70.6,
     34.2
    ],
    [
     "2024-11",
     41.9,
     27.1,
     70.6,
     34.2
    ],
    [
     "2024-12",
     41.3,
     25.7,
     70.6,
     34.2
    ],
    [
     "2025-01",
     41.9,
     32.2,
     70.6,
     25
    ],
    [
     "2025-02",
     42.1,
     32.6,
     70.6,
     25
    ],
    [
     "2025-03",
     50.3,
     50.9,
     70.6,
     25
    ],
    [
     "2025-04",
     53.4,
     57.7,
     70.6,
     25
    ],
    [
     "2025-05",
     61.3,
     75.2,
     70.6,
     25
    ],
    [
     "2025-06",
     61.8,
     76.3,
     70.6,
     25
    ],
    [
     "2025-07",
     62.6,
     78.2,
     70.6,
     25
    ],
    [
     "2025-08",
     60.7,
     74,
     70.6,
     25
    ],
    [
     "2025-09",
     64.2,
     81.8,
     70.6,
     25
    ],
    [
     "2025-10",
     64.6,
     82.7,
     70.6,
     25
    ],
    [
     "2025-11",
     63.6,
     80.3,
     70.6,
     25
    ],
    [
     "2025-12",
     58.4,
     68.9,
     70.6,
     25
    ],
    [
     "2026-01",
     63.8,
     80.8,
     70.6,
     25
    ],
    [
     "2026-02",
     60.6,
     73.6,
     70.6,
     25
    ],
    [
     "2026-03",
     54.4,
     60,
     70.6,
     25
    ],
    [
     "2026-04",
     53.8,
     58.5,
     70.6,
     25
    ],
    [
     "2026-05",
     50.6,
     51.4,
     70.6,
     25
    ],
    [
     "2026-06",
     48.5,
     46.9,
     70.6,
     25
    ]
   ]
  },
  {
   "family": "bearings",
   "label": "Bearings",
   "latest": {
    "period": "2026-06",
    "rri": 42.9,
    "band": "building case",
    "tariffScore": 62.3,
    "levelScore": 69.4,
    "trendScore": 45.8,
    "dependenceScore": 41.5,
    "concentrationScore": 9.6,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -8.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 20.82,
    "exportRatio": 0.585,
    "hhi": 960,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 84.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     29.1,
     29.7,
     41.5,
     13.2
    ],
    [
     "2014-02",
     29.2,
     29.8,
     41.5,
     13.2
    ],
    [
     "2014-03",
     29.1,
     29.7,
     41.5,
     13.2
    ],
    [
     "2014-04",
     29,
     29.5,
     41.5,
     13.2
    ],
    [
     "2014-05",
     29,
     29.5,
     41.5,
     13.2
    ],
    [
     "2014-06",
     29.1,
     29.7,
     41.5,
     13.2
    ],
    [
     "2014-07",
     29.1,
     29.6,
     41.5,
     13.2
    ],
    [
     "2014-08",
     29.1,
     29.7,
     41.5,
     13.2
    ],
    [
     "2014-09",
     29.1,
     29.6,
     41.5,
     13.2
    ],
    [
     "2014-10",
     29.1,
     29.6,
     41.5,
     13.2
    ],
    [
     "2014-11",
     29,
     29.5,
     41.5,
     13.2
    ],
    [
     "2014-12",
     29.1,
     29.6,
     41.5,
     13.2
    ],
    [
     "2015-01",
     29.1,
     29.8,
     41.5,
     12.9
    ],
    [
     "2015-02",
     29,
     29.7,
     41.5,
     12.9
    ],
    [
     "2015-03",
     29.2,
     30.1,
     41.5,
     12.9
    ],
    [
     "2015-04",
     29.1,
     29.8,
     41.5,
     12.9
    ],
    [
     "2015-05",
     28.9,
     29.4,
     41.5,
     12.9
    ],
    [
     "2015-06",
     28.6,
     28.8,
     41.5,
     12.9
    ],
    [
     "2015-07",
     28.9,
     29.4,
     41.5,
     12.9
    ],
    [
     "2015-08",
     28.7,
     29,
     41.5,
     12.9
    ],
    [
     "2015-09",
     28.7,
     28.9,
     41.5,
     12.9
    ],
    [
     "2015-10",
     28.7,
     28.9,
     41.5,
     12.9
    ],
    [
     "2015-11",
     28.8,
     29.2,
     41.5,
     12.9
    ],
    [
     "2015-12",
     28.8,
     29.2,
     41.5,
     12.9
    ],
    [
     "2016-01",
     28.7,
     29.4,
     41.5,
     12.2
    ],
    [
     "2016-02",
     28.7,
     29.4,
     41.5,
     12.2
    ],
    [
     "2016-03",
     28.4,
     28.6,
     41.5,
     12.2
    ],
    [
     "2016-04",
     28.5,
     28.9,
     41.5,
     12.2
    ],
    [
     "2016-05",
     28.5,
     28.9,
     41.5,
     12.2
    ],
    [
     "2016-06",
     28.6,
     29.1,
     41.5,
     12.2
    ],
    [
     "2016-07",
     28.6,
     29.2,
     41.5,
     12.2
    ],
    [
     "2016-08",
     28.6,
     29.1,
     41.5,
     12.2
    ],
    [
     "2016-09",
     28.6,
     29.2,
     41.5,
     12.2
    ],
    [
     "2016-10",
     28.7,
     29.3,
     41.5,
     12.2
    ],
    [
     "2016-11",
     28.6,
     29.1,
     41.5,
     12.2
    ],
    [
     "2016-12",
     28.7,
     29.4,
     41.5,
     12.2
    ],
    [
     "2017-01",
     28.6,
     29.1,
     41.5,
     12.3
    ],
    [
     "2017-02",
     28.7,
     29.3,
     41.5,
     12.3
    ],
    [
     "2017-03",
     28.8,
     29.4,
     41.5,
     12.3
    ],
    [
     "2017-04",
     28.8,
     29.5,
     41.5,
     12.3
    ],
    [
     "2017-05",
     28.8,
     29.6,
     41.5,
     12.3
    ],
    [
     "2017-06",
     28.7,
     29.2,
     41.5,
     12.3
    ],
    [
     "2017-07",
     28.9,
     29.7,
     41.5,
     12.3
    ],
    [
     "2017-08",
     28.8,
     29.5,
     41.5,
     12.3
    ],
    [
     "2017-09",
     28.7,
     29.3,
     41.5,
     12.3
    ],
    [
     "2017-10",
     28.8,
     29.4,
     41.5,
     12.3
    ],
    [
     "2017-11",
     28.6,
     29.1,
     41.5,
     12.3
    ],
    [
     "2017-12",
     29,
     29.9,
     41.5,
     12.3
    ],
    [
     "2018-01",
     28.6,
     29.2,
     41.5,
     12
    ],
    [
     "2018-02",
     28.5,
     29.1,
     41.5,
     12
    ],
    [
     "2018-03",
     28.4,
     28.7,
     41.5,
     12
    ],
    [
     "2018-04",
     28.3,
     28.5,
     41.5,
     12
    ],
    [
     "2018-05",
     28.4,
     28.8,
     41.5,
     12
    ],
    [
     "2018-06",
     28.4,
     28.7,
     41.5,
     12
    ],
    [
     "2018-07",
     31.6,
     35.9,
     41.5,
     12
    ],
    [
     "2018-08",
     32.6,
     38.2,
     41.5,
     12
    ],
    [
     "2018-09",
     32.4,
     37.6,
     41.5,
     12
    ],
    [
     "2018-10",
     32.1,
     37.1,
     41.5,
     12
    ],
    [
     "2018-11",
     32.2,
     37.3,
     41.5,
     12
    ],
    [
     "2018-12",
     32.3,
     37.4,
     41.5,
     12
    ],
    [
     "2019-01",
     33.1,
     39.2,
     41.5,
     12
    ],
    [
     "2019-02",
     32.1,
     37,
     41.5,
     12
    ],
    [
     "2019-03",
     31,
     34.6,
     41.5,
     12
    ],
    [
     "2019-04",
     32,
     36.7,
     41.5,
     12
    ],
    [
     "2019-05",
     32.1,
     37,
     41.5,
     12
    ],
    [
     "2019-06",
     31.7,
     36,
     41.5,
     12
    ],
    [
     "2019-07",
     30.4,
     33.2,
     41.5,
     12
    ],
    [
     "2019-08",
     30,
     32.3,
     41.5,
     12
    ],
    [
     "2019-09",
     29.9,
     32,
     41.5,
     12
    ],
    [
     "2019-10",
     29.8,
     31.9,
     41.5,
     12
    ],
    [
     "2019-11",
     29.4,
     31,
     41.5,
     12
    ],
    [
     "2019-12",
     29.5,
     31.3,
     41.5,
     12
    ],
    [
     "2020-01",
     31.7,
     36.3,
     41.5,
     11.6
    ],
    [
     "2020-02",
     31.1,
     34.9,
     41.5,
     11.6
    ],
    [
     "2020-03",
     30.6,
     33.8,
     41.5,
     11.6
    ],
    [
     "2020-04",
     32.8,
     38.8,
     41.5,
     11.6
    ],
    [
     "2020-05",
     33.7,
     40.8,
     41.5,
     11.6
    ],
    [
     "2020-06",
     33.5,
     40.4,
     41.5,
     11.6
    ],
    [
     "2020-07",
     33.2,
     39.7,
     41.5,
     11.6
    ],
    [
     "2020-08",
     33.8,
     40.9,
     41.5,
     11.6
    ],
    [
     "2020-09",
     33.6,
     40.6,
     41.5,
     11.6
    ],
    [
     "2020-10",
     34.3,
     42,
     41.5,
     11.6
    ],
    [
     "2020-11",
     35.1,
     43.9,
     41.5,
     11.6
    ],
    [
     "2020-12",
     35.5,
     44.7,
     41.5,
     11.6
    ],
    [
     "2021-01",
     35.3,
     44.1,
     41.5,
     12
    ],
    [
     "2021-02",
     34.2,
     41.6,
     41.5,
     12
    ],
    [
     "2021-03",
     35.3,
     44,
     41.5,
     12
    ],
    [
     "2021-04",
     33.3,
     39.7,
     41.5,
     12
    ],
    [
     "2021-05",
     34.4,
     42.2,
     41.5,
     12
    ],
    [
     "2021-06",
     32.7,
     38.3,
     41.5,
     12
    ],
    [
     "2021-07",
     35.2,
     43.8,
     41.5,
     12
    ],
    [
     "2021-08",
     33.7,
     40.5,
     41.5,
     12
    ],
    [
     "2021-09",
     35,
     43.5,
     41.5,
     12
    ],
    [
     "2021-10",
     35,
     43.5,
     41.5,
     12
    ],
    [
     "2021-11",
     34.1,
     41.5,
     41.5,
     12
    ],
    [
     "2021-12",
     33.9,
     41.1,
     41.5,
     12
    ],
    [
     "2022-01",
     33.5,
     40.7,
     41.5,
     10.9
    ],
    [
     "2022-02",
     33.4,
     40.6,
     41.5,
     10.9
    ],
    [
     "2022-03",
     32.6,
     38.7,
     41.5,
     10.9
    ],
    [
     "2022-04",
     32.6,
     38.7,
     41.5,
     10.9
    ],
    [
     "2022-05",
     32.3,
     38,
     41.5,
     10.9
    ],
    [
     "2022-06",
     32.7,
     39,
     41.5,
     10.9
    ],
    [
     "2022-07",
     32.5,
     38.6,
     41.5,
     10.9
    ],
    [
     "2022-08",
     33.5,
     40.7,
     41.5,
     10.9
    ],
    [
     "2022-09",
     32,
     37.3,
     41.5,
     10.9
    ],
    [
     "2022-10",
     32.5,
     38.5,
     41.5,
     10.9
    ],
    [
     "2022-11",
     32.2,
     37.8,
     41.5,
     10.9
    ],
    [
     "2022-12",
     32.1,
     37.5,
     41.5,
     10.9
    ],
    [
     "2023-01",
     31.2,
     36,
     41.5,
     10.2
    ],
    [
     "2023-02",
     31.4,
     36.5,
     41.5,
     10.2
    ],
    [
     "2023-03",
     31,
     35.5,
     41.5,
     10.2
    ],
    [
     "2023-04",
     32.1,
     38,
     41.5,
     10.2
    ],
    [
     "2023-05",
     31.6,
     36.8,
     41.5,
     10.2
    ],
    [
     "2023-06",
     31.6,
     36.8,
     41.5,
     10.2
    ],
    [
     "2023-07",
     31.9,
     37.6,
     41.5,
     10.2
    ],
    [
     "2023-08",
     30.6,
     34.7,
     41.5,
     10.2
    ],
    [
     "2023-09",
     31.5,
     36.7,
     41.5,
     10.2
    ],
    [
     "2023-10",
     31.4,
     36.4,
     41.5,
     10.2
    ],
    [
     "2023-11",
     30.8,
     35.1,
     41.5,
     10.2
    ],
    [
     "2023-12",
     31.2,
     36.1,
     41.5,
     10.2
    ],
    [
     "2024-01",
     32.2,
     38.6,
     41.5,
     9.7
    ],
    [
     "2024-02",
     31,
     35.9,
     41.5,
     9.7
    ],
    [
     "2024-03",
     31.2,
     36.3,
     41.5,
     9.7
    ],
    [
     "2024-04",
     31.1,
     36.1,
     41.5,
     9.7
    ],
    [
     "2024-05",
     31.3,
     36.6,
     41.5,
     9.7
    ],
    [
     "2024-06",
     31,
     35.8,
     41.5,
     9.7
    ],
    [
     "2024-07",
     31.4,
     36.7,
     41.5,
     9.7
    ],
    [
     "2024-08",
     31.8,
     37.5,
     41.5,
     9.7
    ],
    [
     "2024-09",
     30.9,
     35.7,
     41.5,
     9.7
    ],
    [
     "2024-10",
     29.8,
     33.1,
     41.5,
     9.7
    ],
    [
     "2024-11",
     31.6,
     37.2,
     41.5,
     9.7
    ],
    [
     "2024-12",
     31.4,
     36.8,
     41.5,
     9.7
    ],
    [
     "2025-01",
     32,
     38.2,
     41.5,
     9.6
    ],
    [
     "2025-02",
     31.6,
     37.3,
     41.5,
     9.6
    ],
    [
     "2025-03",
     34.2,
     43.1,
     41.5,
     9.6
    ],
    [
     "2025-04",
     38.4,
     52.4,
     41.5,
     9.6
    ],
    [
     "2025-05",
     51.7,
     82,
     41.5,
     9.6
    ],
    [
     "2025-06",
     51.1,
     80.5,
     41.5,
     9.6
    ],
    [
     "2025-07",
     52.7,
     84,
     41.5,
     9.6
    ],
    [
     "2025-08",
     56.5,
     92.5,
     41.5,
     9.6
    ],
    [
     "2025-09",
     59.9,
     100,
     41.5,
     9.6
    ],
    [
     "2025-10",
     59.9,
     100,
     41.5,
     9.6
    ],
    [
     "2025-11",
     59.9,
     100,
     41.5,
     9.6
    ],
    [
     "2025-12",
     59.2,
     98.6,
     41.5,
     9.6
    ],
    [
     "2026-01",
     59.4,
     99,
     41.5,
     9.6
    ],
    [
     "2026-02",
     57.5,
     94.7,
     41.5,
     9.6
    ],
    [
     "2026-03",
     54.3,
     87.7,
     41.5,
     9.6
    ],
    [
     "2026-04",
     49.5,
     76.9,
     41.5,
     9.6
    ],
    [
     "2026-05",
     30.6,
     35.1,
     41.5,
     9.6
    ],
    [
     "2026-06",
     42.9,
     62.3,
     41.5,
     9.6
    ]
   ]
  },
  {
   "family": "carbon-insulators",
   "label": "Carbon products and insulators",
   "latest": {
    "period": "2026-06",
    "rri": 37.9,
    "band": "building case",
    "tariffScore": 43.4,
    "levelScore": 48.2,
    "trendScore": 32.1,
    "dependenceScore": 52.7,
    "concentrationScore": 10.2,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -12.9,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 14.46,
    "exportRatio": 0.473,
    "hhi": 1020,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 83.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     26.2,
     16.6,
     52.7,
     11.6
    ],
    [
     "2014-02",
     26.3,
     16.9,
     52.7,
     11.6
    ],
    [
     "2014-03",
     26.1,
     16.4,
     52.7,
     11.6
    ],
    [
     "2014-04",
     26.2,
     16.6,
     52.7,
     11.6
    ],
    [
     "2014-05",
     26.3,
     16.9,
     52.7,
     11.6
    ],
    [
     "2014-06",
     26.2,
     16.7,
     52.7,
     11.6
    ],
    [
     "2014-07",
     26.1,
     16.5,
     52.7,
     11.6
    ],
    [
     "2014-08",
     26.2,
     16.6,
     52.7,
     11.6
    ],
    [
     "2014-09",
     26.1,
     16.4,
     52.7,
     11.6
    ],
    [
     "2014-10",
     26.1,
     16.4,
     52.7,
     11.6
    ],
    [
     "2014-11",
     26.2,
     16.7,
     52.7,
     11.6
    ],
    [
     "2014-12",
     26.1,
     16.5,
     52.7,
     11.6
    ],
    [
     "2015-01",
     26.5,
     16.7,
     52.7,
     12.5
    ],
    [
     "2015-02",
     26.2,
     16.1,
     52.7,
     12.5
    ],
    [
     "2015-03",
     26.7,
     17.2,
     52.7,
     12.5
    ],
    [
     "2015-04",
     26.5,
     16.8,
     52.7,
     12.5
    ],
    [
     "2015-05",
     26.3,
     16.4,
     52.7,
     12.5
    ],
    [
     "2015-06",
     26.3,
     16.4,
     52.7,
     12.5
    ],
    [
     "2015-07",
     26.6,
     17,
     52.7,
     12.5
    ],
    [
     "2015-08",
     26.4,
     16.6,
     52.7,
     12.5
    ],
    [
     "2015-09",
     26.6,
     17,
     52.7,
     12.5
    ],
    [
     "2015-10",
     26.7,
     17.2,
     52.7,
     12.5
    ],
    [
     "2015-11",
     26.6,
     17,
     52.7,
     12.5
    ],
    [
     "2015-12",
     26.7,
     17.2,
     52.7,
     12.5
    ],
    [
     "2016-01",
     26.6,
     17.2,
     52.7,
     12.3
    ],
    [
     "2016-02",
     26.9,
     17.7,
     52.7,
     12.3
    ],
    [
     "2016-03",
     26.6,
     17.2,
     52.7,
     12.3
    ],
    [
     "2016-04",
     26.8,
     17.5,
     52.7,
     12.3
    ],
    [
     "2016-05",
     26.6,
     17.2,
     52.7,
     12.3
    ],
    [
     "2016-06",
     26.7,
     17.4,
     52.7,
     12.3
    ],
    [
     "2016-07",
     26.5,
     16.9,
     52.7,
     12.3
    ],
    [
     "2016-08",
     26.5,
     16.9,
     52.7,
     12.3
    ],
    [
     "2016-09",
     26.6,
     17.1,
     52.7,
     12.3
    ],
    [
     "2016-10",
     26.6,
     17.1,
     52.7,
     12.3
    ],
    [
     "2016-11",
     26.7,
     17.3,
     52.7,
     12.3
    ],
    [
     "2016-12",
     26.9,
     17.8,
     52.7,
     12.3
    ],
    [
     "2017-01",
     26.9,
     17.1,
     52.7,
     13.6
    ],
    [
     "2017-02",
     27,
     17.2,
     52.7,
     13.6
    ],
    [
     "2017-03",
     26.8,
     16.8,
     52.7,
     13.6
    ],
    [
     "2017-04",
     27,
     17.2,
     52.7,
     13.6
    ],
    [
     "2017-05",
     27,
     17.3,
     52.7,
     13.6
    ],
    [
     "2017-06",
     26.7,
     16.7,
     52.7,
     13.6
    ],
    [
     "2017-07",
     26.9,
     17.1,
     52.7,
     13.6
    ],
    [
     "2017-08",
     26.9,
     17,
     52.7,
     13.6
    ],
    [
     "2017-09",
     26.6,
     16.5,
     52.7,
     13.6
    ],
    [
     "2017-10",
     26.6,
     16.4,
     52.7,
     13.6
    ],
    [
     "2017-11",
     26.8,
     16.8,
     52.7,
     13.6
    ],
    [
     "2017-12",
     26.7,
     16.7,
     52.7,
     13.6
    ],
    [
     "2018-01",
     27.5,
     16.6,
     52.7,
     16.9
    ],
    [
     "2018-02",
     27.5,
     16.6,
     52.7,
     16.9
    ],
    [
     "2018-03",
     27.4,
     16.3,
     52.7,
     16.9
    ],
    [
     "2018-04",
     27.3,
     16.2,
     52.7,
     16.9
    ],
    [
     "2018-05",
     27.4,
     16.3,
     52.7,
     16.9
    ],
    [
     "2018-06",
     27.4,
     16.3,
     52.7,
     16.9
    ],
    [
     "2018-07",
     27.3,
     16.2,
     52.7,
     16.9
    ],
    [
     "2018-08",
     27.3,
     16.2,
     52.7,
     16.9
    ],
    [
     "2018-09",
     27.5,
     16.5,
     52.7,
     16.9
    ],
    [
     "2018-10",
     31.3,
     25,
     52.7,
     16.9
    ],
    [
     "2018-11",
     32.1,
     26.7,
     52.7,
     16.9
    ],
    [
     "2018-12",
     33.1,
     29,
     52.7,
     16.9
    ],
    [
     "2019-01",
     29.7,
     24.8,
     52.7,
     10.9
    ],
    [
     "2019-02",
     28.6,
     22.4,
     52.7,
     10.9
    ],
    [
     "2019-03",
     27.6,
     20.1,
     52.7,
     10.9
    ],
    [
     "2019-04",
     28,
     21,
     52.7,
     10.9
    ],
    [
     "2019-05",
     28.8,
     22.7,
     52.7,
     10.9
    ],
    [
     "2019-06",
     32.3,
     30.6,
     52.7,
     10.9
    ],
    [
     "2019-07",
     32.8,
     31.6,
     52.7,
     10.9
    ],
    [
     "2019-08",
     32.7,
     31.5,
     52.7,
     10.9
    ],
    [
     "2019-09",
     33.9,
     34.1,
     52.7,
     10.9
    ],
    [
     "2019-10",
     31.9,
     29.6,
     52.7,
     10.9
    ],
    [
     "2019-11",
     30.3,
     26.2,
     52.7,
     10.9
    ],
    [
     "2019-12",
     29.9,
     25.2,
     52.7,
     10.9
    ],
    [
     "2020-01",
     34.1,
     33.7,
     52.7,
     12.6
    ],
    [
     "2020-02",
     31.7,
     28.4,
     52.7,
     12.6
    ],
    [
     "2020-03",
     31.3,
     27.4,
     52.7,
     12.6
    ],
    [
     "2020-04",
     34.3,
     34,
     52.7,
     12.6
    ],
    [
     "2020-05",
     33.7,
     32.7,
     52.7,
     12.6
    ],
    [
     "2020-06",
     33.6,
     32.6,
     52.7,
     12.6
    ],
    [
     "2020-07",
     32.4,
     29.9,
     52.7,
     12.6
    ],
    [
     "2020-08",
     33.9,
     33.1,
     52.7,
     12.6
    ],
    [
     "2020-09",
     33,
     31.2,
     52.7,
     12.6
    ],
    [
     "2020-10",
     32.3,
     29.6,
     52.7,
     12.6
    ],
    [
     "2020-11",
     32.3,
     29.6,
     52.7,
     12.6
    ],
    [
     "2020-12",
     34.2,
     33.9,
     52.7,
     12.6
    ],
    [
     "2021-01",
     32.9,
     30.6,
     52.7,
     13.2
    ],
    [
     "2021-02",
     32.7,
     30.3,
     52.7,
     13.2
    ],
    [
     "2021-03",
     33.6,
     32.2,
     52.7,
     13.2
    ],
    [
     "2021-04",
     31.8,
     28.3,
     52.7,
     13.2
    ],
    [
     "2021-05",
     31.7,
     27.9,
     52.7,
     13.2
    ],
    [
     "2021-06",
     31.7,
     28,
     52.7,
     13.2
    ],
    [
     "2021-07",
     31.6,
     27.7,
     52.7,
     13.2
    ],
    [
     "2021-08",
     31,
     26.4,
     52.7,
     13.2
    ],
    [
     "2021-09",
     30.4,
     25.1,
     52.7,
     13.2
    ],
    [
     "2021-10",
     31.4,
     27.3,
     52.7,
     13.2
    ],
    [
     "2021-11",
     31.7,
     28,
     52.7,
     13.2
    ],
    [
     "2021-12",
     30.9,
     26.1,
     52.7,
     13.2
    ],
    [
     "2022-01",
     29.7,
     24.9,
     52.7,
     10.8
    ],
    [
     "2022-02",
     29.6,
     24.6,
     52.7,
     10.8
    ],
    [
     "2022-03",
     29.7,
     24.9,
     52.7,
     10.8
    ],
    [
     "2022-04",
     30.7,
     27,
     52.7,
     10.8
    ],
    [
     "2022-05",
     29.6,
     24.6,
     52.7,
     10.8
    ],
    [
     "2022-06",
     31,
     27.7,
     52.7,
     10.8
    ],
    [
     "2022-07",
     32.2,
     30.5,
     52.7,
     10.8
    ],
    [
     "2022-08",
     33,
     32.1,
     52.7,
     10.8
    ],
    [
     "2022-09",
     33.9,
     34.3,
     52.7,
     10.8
    ],
    [
     "2022-10",
     33.9,
     34.1,
     52.7,
     10.8
    ],
    [
     "2022-11",
     34.3,
     35.1,
     52.7,
     10.8
    ],
    [
     "2022-12",
     33.5,
     33.2,
     52.7,
     10.8
    ],
    [
     "2023-01",
     32.6,
     31.5,
     52.7,
     10.3
    ],
    [
     "2023-02",
     34.1,
     35,
     52.7,
     10.3
    ],
    [
     "2023-03",
     29.6,
     24.9,
     52.7,
     10.3
    ],
    [
     "2023-04",
     31.2,
     28.5,
     52.7,
     10.3
    ],
    [
     "2023-05",
     32.5,
     31.3,
     52.7,
     10.3
    ],
    [
     "2023-06",
     32.4,
     31.1,
     52.7,
     10.3
    ],
    [
     "2023-07",
     29.1,
     23.9,
     52.7,
     10.3
    ],
    [
     "2023-08",
     30.1,
     26,
     52.7,
     10.3
    ],
    [
     "2023-09",
     29.6,
     25,
     52.7,
     10.3
    ],
    [
     "2023-10",
     32.7,
     31.7,
     52.7,
     10.3
    ],
    [
     "2023-11",
     31.1,
     28.2,
     52.7,
     10.3
    ],
    [
     "2023-12",
     31.5,
     29.1,
     52.7,
     10.3
    ],
    [
     "2024-01",
     32,
     29.6,
     52.7,
     11.4
    ],
    [
     "2024-02",
     31.6,
     28.8,
     52.7,
     11.4
    ],
    [
     "2024-03",
     32,
     29.7,
     52.7,
     11.4
    ],
    [
     "2024-04",
     32.6,
     30.9,
     52.7,
     11.4
    ],
    [
     "2024-05",
     33.4,
     32.7,
     52.7,
     11.4
    ],
    [
     "2024-06",
     31.2,
     27.9,
     52.7,
     11.4
    ],
    [
     "2024-07",
     35.9,
     38.2,
     52.7,
     11.4
    ],
    [
     "2024-08",
     32.4,
     30.5,
     52.7,
     11.4
    ],
    [
     "2024-09",
     34,
     34,
     52.7,
     11.4
    ],
    [
     "2024-10",
     32.1,
     29.8,
     52.7,
     11.4
    ],
    [
     "2024-11",
     33.7,
     33.5,
     52.7,
     11.4
    ],
    [
     "2024-12",
     33,
     31.8,
     52.7,
     11.4
    ],
    [
     "2025-01",
     35.4,
     37.9,
     52.7,
     10.2
    ],
    [
     "2025-02",
     33.2,
     32.9,
     52.7,
     10.2
    ],
    [
     "2025-03",
     36.3,
     39.9,
     52.7,
     10.2
    ],
    [
     "2025-04",
     45.1,
     59.4,
     52.7,
     10.2
    ],
    [
     "2025-05",
     53.3,
     77.7,
     52.7,
     10.2
    ],
    [
     "2025-06",
     50.8,
     72.1,
     52.7,
     10.2
    ],
    [
     "2025-07",
     53.1,
     77.1,
     52.7,
     10.2
    ],
    [
     "2025-08",
     53.6,
     78.3,
     52.7,
     10.2
    ],
    [
     "2025-09",
     54.5,
     80.4,
     52.7,
     10.2
    ],
    [
     "2025-10",
     61.2,
     95.2,
     52.7,
     10.2
    ],
    [
     "2025-11",
     56.4,
     84.5,
     52.7,
     10.2
    ],
    [
     "2025-12",
     56.9,
     85.7,
     52.7,
     10.2
    ],
    [
     "2026-01",
     57.6,
     87.2,
     52.7,
     10.2
    ],
    [
     "2026-02",
     52.6,
     76.1,
     52.7,
     10.2
    ],
    [
     "2026-03",
     44.6,
     58.2,
     52.7,
     10.2
    ],
    [
     "2026-04",
     43.2,
     55.1,
     52.7,
     10.2
    ],
    [
     "2026-05",
     37.6,
     42.8,
     52.7,
     10.2
    ],
    [
     "2026-06",
     37.9,
     43.4,
     52.7,
     10.2
    ]
   ]
  },
  {
   "family": "coatings-paints",
   "label": "Paints, coatings, and finishes",
   "latest": {
    "period": "2026-06",
    "rri": 18.6,
    "band": "weak case",
    "tariffScore": 33.8,
    "levelScore": 29.7,
    "trendScore": 43.4,
    "dependenceScore": 0,
    "concentrationScore": 13.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 8.92,
    "exportRatio": 2.25,
    "hhi": 1340,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 88,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2014-02",
     13.1,
     19.4,
     0,
     17.6
    ],
    [
     "2014-03",
     13.3,
     19.8,
     0,
     17.6
    ],
    [
     "2014-04",
     13.4,
     19.9,
     0,
     17.6
    ],
    [
     "2014-05",
     13.1,
     19.4,
     0,
     17.6
    ],
    [
     "2014-06",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2014-07",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2014-08",
     13.3,
     19.8,
     0,
     17.6
    ],
    [
     "2014-09",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2014-10",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2014-11",
     13.5,
     20.2,
     0,
     17.6
    ],
    [
     "2014-12",
     13.4,
     20,
     0,
     17.6
    ],
    [
     "2015-01",
     13.6,
     20.1,
     0,
     18.3
    ],
    [
     "2015-02",
     13.2,
     19.1,
     0,
     18.3
    ],
    [
     "2015-03",
     13.4,
     19.7,
     0,
     18.3
    ],
    [
     "2015-04",
     13.4,
     19.7,
     0,
     18.3
    ],
    [
     "2015-05",
     13.4,
     19.6,
     0,
     18.3
    ],
    [
     "2015-06",
     13.5,
     19.8,
     0,
     18.3
    ],
    [
     "2015-07",
     13.6,
     20.1,
     0,
     18.3
    ],
    [
     "2015-08",
     13.2,
     19.2,
     0,
     18.3
    ],
    [
     "2015-09",
     13,
     18.7,
     0,
     18.3
    ],
    [
     "2015-10",
     13.3,
     19.3,
     0,
     18.3
    ],
    [
     "2015-11",
     12.9,
     18.6,
     0,
     18.3
    ],
    [
     "2015-12",
     13.4,
     19.5,
     0,
     18.3
    ],
    [
     "2016-01",
     13.1,
     19,
     0,
     18.3
    ],
    [
     "2016-02",
     13.4,
     19.7,
     0,
     18.3
    ],
    [
     "2016-03",
     13.6,
     20,
     0,
     18.3
    ],
    [
     "2016-04",
     13.1,
     18.9,
     0,
     18.3
    ],
    [
     "2016-05",
     13.3,
     19.4,
     0,
     18.3
    ],
    [
     "2016-06",
     13.4,
     19.5,
     0,
     18.3
    ],
    [
     "2016-07",
     13.3,
     19.4,
     0,
     18.3
    ],
    [
     "2016-08",
     13.3,
     19.3,
     0,
     18.3
    ],
    [
     "2016-09",
     13.4,
     19.7,
     0,
     18.3
    ],
    [
     "2016-10",
     13.3,
     19.4,
     0,
     18.3
    ],
    [
     "2016-11",
     13.7,
     20.3,
     0,
     18.3
    ],
    [
     "2016-12",
     13.6,
     20.1,
     0,
     18.3
    ],
    [
     "2017-01",
     13,
     19,
     0,
     17.7
    ],
    [
     "2017-02",
     13.2,
     19.4,
     0,
     17.7
    ],
    [
     "2017-03",
     13.2,
     19.6,
     0,
     17.7
    ],
    [
     "2017-04",
     13.5,
     20.2,
     0,
     17.7
    ],
    [
     "2017-05",
     13.3,
     19.8,
     0,
     17.7
    ],
    [
     "2017-06",
     13.5,
     20.2,
     0,
     17.7
    ],
    [
     "2017-07",
     13.5,
     20.2,
     0,
     17.7
    ],
    [
     "2017-08",
     14,
     21.3,
     0,
     17.7
    ],
    [
     "2017-09",
     13.8,
     20.9,
     0,
     17.7
    ],
    [
     "2017-10",
     13.7,
     20.7,
     0,
     17.7
    ],
    [
     "2017-11",
     13.4,
     20,
     0,
     17.7
    ],
    [
     "2017-12",
     13.5,
     20.2,
     0,
     17.7
    ],
    [
     "2018-01",
     13.4,
     20.1,
     0,
     17.6
    ],
    [
     "2018-02",
     13.4,
     20,
     0,
     17.6
    ],
    [
     "2018-03",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2018-04",
     13.4,
     20.1,
     0,
     17.6
    ],
    [
     "2018-05",
     13.2,
     19.5,
     0,
     17.6
    ],
    [
     "2018-06",
     13.4,
     20,
     0,
     17.6
    ],
    [
     "2018-07",
     13.6,
     20.4,
     0,
     17.6
    ],
    [
     "2018-08",
     13,
     19.1,
     0,
     17.6
    ],
    [
     "2018-09",
     13.2,
     19.6,
     0,
     17.6
    ],
    [
     "2018-10",
     13.4,
     20.1,
     0,
     17.6
    ],
    [
     "2018-11",
     13.7,
     20.6,
     0,
     17.6
    ],
    [
     "2018-12",
     14.1,
     21.6,
     0,
     17.6
    ],
    [
     "2019-01",
     13.7,
     20.6,
     0,
     17.8
    ],
    [
     "2019-02",
     13.7,
     20.6,
     0,
     17.8
    ],
    [
     "2019-03",
     13.9,
     21,
     0,
     17.8
    ],
    [
     "2019-04",
     13.9,
     20.9,
     0,
     17.8
    ],
    [
     "2019-05",
     14.1,
     21.4,
     0,
     17.8
    ],
    [
     "2019-06",
     14.5,
     22.3,
     0,
     17.8
    ],
    [
     "2019-07",
     14.5,
     22.4,
     0,
     17.8
    ],
    [
     "2019-08",
     14.5,
     22.4,
     0,
     17.8
    ],
    [
     "2019-09",
     14.2,
     21.7,
     0,
     17.8
    ],
    [
     "2019-10",
     14.1,
     21.4,
     0,
     17.8
    ],
    [
     "2019-11",
     13.9,
     20.9,
     0,
     17.8
    ],
    [
     "2019-12",
     14.4,
     22.1,
     0,
     17.8
    ],
    [
     "2020-01",
     13.4,
     20.4,
     0,
     17
    ],
    [
     "2020-02",
     13.7,
     21.1,
     0,
     17
    ],
    [
     "2020-03",
     13.8,
     21.2,
     0,
     17
    ],
    [
     "2020-04",
     15.1,
     24.1,
     0,
     17
    ],
    [
     "2020-05",
     14.7,
     23.3,
     0,
     17
    ],
    [
     "2020-06",
     13.6,
     20.7,
     0,
     17
    ],
    [
     "2020-07",
     14.5,
     22.8,
     0,
     17
    ],
    [
     "2020-08",
     14.6,
     22.9,
     0,
     17
    ],
    [
     "2020-09",
     15.1,
     24,
     0,
     17
    ],
    [
     "2020-10",
     14.9,
     23.6,
     0,
     17
    ],
    [
     "2020-11",
     15.1,
     24.1,
     0,
     17
    ],
    [
     "2020-12",
     15.5,
     24.9,
     0,
     17
    ],
    [
     "2021-01",
     14.8,
     23.9,
     0,
     16
    ],
    [
     "2021-02",
     13.9,
     21.9,
     0,
     16
    ],
    [
     "2021-03",
     14.3,
     22.8,
     0,
     16
    ],
    [
     "2021-04",
     13.8,
     21.8,
     0,
     16
    ],
    [
     "2021-05",
     14.2,
     22.6,
     0,
     16
    ],
    [
     "2021-06",
     13.8,
     21.7,
     0,
     16
    ],
    [
     "2021-07",
     14.4,
     23,
     0,
     16
    ],
    [
     "2021-08",
     13.8,
     21.7,
     0,
     16
    ],
    [
     "2021-09",
     13.8,
     21.7,
     0,
     16
    ],
    [
     "2021-10",
     13.5,
     21.2,
     0,
     16
    ],
    [
     "2021-11",
     14,
     22.2,
     0,
     16
    ],
    [
     "2021-12",
     13.4,
     20.8,
     0,
     16
    ],
    [
     "2022-01",
     13.5,
     20.9,
     0,
     16.5
    ],
    [
     "2022-02",
     13.5,
     20.9,
     0,
     16.5
    ],
    [
     "2022-03",
     13.4,
     20.5,
     0,
     16.5
    ],
    [
     "2022-04",
     13.7,
     21.3,
     0,
     16.5
    ],
    [
     "2022-05",
     13.4,
     20.5,
     0,
     16.5
    ],
    [
     "2022-06",
     13.5,
     20.9,
     0,
     16.5
    ],
    [
     "2022-07",
     13.2,
     20.1,
     0,
     16.5
    ],
    [
     "2022-08",
     13.8,
     21.4,
     0,
     16.5
    ],
    [
     "2022-09",
     13.5,
     20.9,
     0,
     16.5
    ],
    [
     "2022-10",
     13.9,
     21.8,
     0,
     16.5
    ],
    [
     "2022-11",
     13.7,
     21.3,
     0,
     16.5
    ],
    [
     "2022-12",
     13.8,
     21.4,
     0,
     16.5
    ],
    [
     "2023-01",
     13.5,
     20.9,
     0,
     16.3
    ],
    [
     "2023-02",
     13.4,
     20.8,
     0,
     16.3
    ],
    [
     "2023-03",
     13.5,
     20.9,
     0,
     16.3
    ],
    [
     "2023-04",
     14.2,
     22.5,
     0,
     16.3
    ],
    [
     "2023-05",
     13.6,
     21.1,
     0,
     16.3
    ],
    [
     "2023-06",
     14.1,
     22.2,
     0,
     16.3
    ],
    [
     "2023-07",
     13.8,
     21.7,
     0,
     16.3
    ],
    [
     "2023-08",
     13.7,
     21.3,
     0,
     16.3
    ],
    [
     "2023-09",
     13.9,
     21.8,
     0,
     16.3
    ],
    [
     "2023-10",
     13.8,
     21.6,
     0,
     16.3
    ],
    [
     "2023-11",
     13.6,
     21.2,
     0,
     16.3
    ],
    [
     "2023-12",
     14.2,
     22.5,
     0,
     16.3
    ],
    [
     "2024-01",
     13.1,
     21.3,
     0,
     14
    ],
    [
     "2024-02",
     13.4,
     21.9,
     0,
     14
    ],
    [
     "2024-03",
     13.1,
     21.4,
     0,
     14
    ],
    [
     "2024-04",
     13,
     21.2,
     0,
     14
    ],
    [
     "2024-05",
     13.2,
     21.5,
     0,
     14
    ],
    [
     "2024-06",
     12.9,
     20.9,
     0,
     14
    ],
    [
     "2024-07",
     13.7,
     22.7,
     0,
     14
    ],
    [
     "2024-08",
     13.9,
     23,
     0,
     14
    ],
    [
     "2024-09",
     13.4,
     22.1,
     0,
     14
    ],
    [
     "2024-10",
     13.3,
     21.7,
     0,
     14
    ],
    [
     "2024-11",
     14,
     23.3,
     0,
     14
    ],
    [
     "2024-12",
     14,
     23.3,
     0,
     14
    ],
    [
     "2025-01",
     13.8,
     23.2,
     0,
     13.4
    ],
    [
     "2025-02",
     13.4,
     22.4,
     0,
     13.4
    ],
    [
     "2025-03",
     16.7,
     29.7,
     0,
     13.4
    ],
    [
     "2025-04",
     20.2,
     37.5,
     0,
     13.4
    ],
    [
     "2025-05",
     25.2,
     48.5,
     0,
     13.4
    ],
    [
     "2025-06",
     26,
     50.3,
     0,
     13.4
    ],
    [
     "2025-07",
     27.3,
     53.2,
     0,
     13.4
    ],
    [
     "2025-08",
     30.8,
     61,
     0,
     13.4
    ],
    [
     "2025-09",
     31.3,
     62.1,
     0,
     13.4
    ],
    [
     "2025-10",
     31.3,
     62.2,
     0,
     13.4
    ],
    [
     "2025-11",
     31.9,
     63.5,
     0,
     13.4
    ],
    [
     "2025-12",
     32,
     63.7,
     0,
     13.4
    ],
    [
     "2026-01",
     31.3,
     62,
     0,
     13.4
    ],
    [
     "2026-02",
     26.9,
     52.3,
     0,
     13.4
    ],
    [
     "2026-03",
     24.3,
     46.5,
     0,
     13.4
    ],
    [
     "2026-04",
     21.6,
     40.5,
     0,
     13.4
    ],
    [
     "2026-05",
     18.7,
     34.2,
     0,
     13.4
    ],
    [
     "2026-06",
     18.6,
     33.8,
     0,
     13.4
    ]
   ]
  },
  {
   "family": "compressors-fans",
   "label": "Compressors and fans",
   "latest": {
    "period": "2026-06",
    "rri": 41.7,
    "band": "building case",
    "tariffScore": 38,
    "levelScore": 40.2,
    "trendScore": 33.1,
    "dependenceScore": 72.2,
    "concentrationScore": 11.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -12.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.05,
    "exportRatio": 0.278,
    "hhi": 1170,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.7,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     35.8,
     24.8,
     72.2,
     12.1
    ],
    [
     "2023-02",
     35.6,
     24.2,
     72.2,
     12.1
    ],
    [
     "2023-03",
     35.3,
     23.6,
     72.2,
     12.1
    ],
    [
     "2023-04",
     35.7,
     24.4,
     72.2,
     12.1
    ],
    [
     "2023-05",
     35.6,
     24.3,
     72.2,
     12.1
    ],
    [
     "2023-06",
     35.4,
     23.8,
     72.2,
     12.1
    ],
    [
     "2023-07",
     35.1,
     23.1,
     72.2,
     12.1
    ],
    [
     "2023-08",
     34.9,
     22.8,
     72.2,
     12.1
    ],
    [
     "2023-09",
     34.9,
     22.7,
     72.2,
     12.1
    ],
    [
     "2023-10",
     34.9,
     22.7,
     72.2,
     12.1
    ],
    [
     "2023-11",
     35,
     22.9,
     72.2,
     12.1
    ],
    [
     "2023-12",
     35.2,
     23.3,
     72.2,
     12.1
    ],
    [
     "2024-01",
     35.5,
     24.1,
     72.2,
     11.8
    ],
    [
     "2024-02",
     35.3,
     23.7,
     72.2,
     11.8
    ],
    [
     "2024-03",
     34.9,
     22.8,
     72.2,
     11.8
    ],
    [
     "2024-04",
     34.6,
     22.3,
     72.2,
     11.8
    ],
    [
     "2024-05",
     34.9,
     22.8,
     72.2,
     11.8
    ],
    [
     "2024-06",
     34.7,
     22.5,
     72.2,
     11.8
    ],
    [
     "2024-07",
     35.2,
     23.5,
     72.2,
     11.8
    ],
    [
     "2024-08",
     35.5,
     24.3,
     72.2,
     11.8
    ],
    [
     "2024-09",
     35.2,
     23.5,
     72.2,
     11.8
    ],
    [
     "2024-10",
     35,
     23.1,
     72.2,
     11.8
    ],
    [
     "2024-11",
     35.1,
     23.3,
     72.2,
     11.8
    ],
    [
     "2024-12",
     35.8,
     24.8,
     72.2,
     11.8
    ],
    [
     "2025-01",
     35.8,
     25,
     72.2,
     11.7
    ],
    [
     "2025-02",
     36,
     25.4,
     72.2,
     11.7
    ],
    [
     "2025-03",
     45.8,
     47.1,
     72.2,
     11.7
    ],
    [
     "2025-04",
     53,
     63.1,
     72.2,
     11.7
    ],
    [
     "2025-05",
     57.7,
     73.6,
     72.2,
     11.7
    ],
    [
     "2025-06",
     54.3,
     66,
     72.2,
     11.7
    ],
    [
     "2025-07",
     55.6,
     69,
     72.2,
     11.7
    ],
    [
     "2025-08",
     57.6,
     73.3,
     72.2,
     11.7
    ],
    [
     "2025-09",
     58.7,
     75.9,
     72.2,
     11.7
    ],
    [
     "2025-10",
     58.7,
     75.8,
     72.2,
     11.7
    ],
    [
     "2025-11",
     59.1,
     76.6,
     72.2,
     11.7
    ],
    [
     "2025-12",
     59,
     76.4,
     72.2,
     11.7
    ],
    [
     "2026-01",
     57.8,
     73.8,
     72.2,
     11.7
    ],
    [
     "2026-02",
     55.6,
     68.9,
     72.2,
     11.7
    ],
    [
     "2026-03",
     47.5,
     50.9,
     72.2,
     11.7
    ],
    [
     "2026-04",
     43.1,
     41.2,
     72.2,
     11.7
    ],
    [
     "2026-05",
     39.6,
     33.3,
     72.2,
     11.7
    ],
    [
     "2026-06",
     41.7,
     38,
     72.2,
     11.7
    ]
   ]
  },
  {
   "family": "copper-semis",
   "label": "Copper semi-finished products",
   "latest": {
    "period": "2026-06",
    "rri": 65.4,
    "band": "building case",
    "tariffScore": 100,
    "levelScore": 100,
    "trendScore": 100,
    "dependenceScore": 59.3,
    "concentrationScore": 10.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 36.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 41.16,
    "exportRatio": 0.407,
    "hhi": 1040,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 77.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     29.6,
     16.5,
     59.3,
     17.6
    ],
    [
     "2014-02",
     29.6,
     16.5,
     59.3,
     17.6
    ],
    [
     "2014-03",
     29.7,
     16.6,
     59.3,
     17.6
    ],
    [
     "2014-04",
     29.8,
     16.8,
     59.3,
     17.6
    ],
    [
     "2014-05",
     29.6,
     16.5,
     59.3,
     17.6
    ],
    [
     "2014-06",
     29.7,
     16.6,
     59.3,
     17.6
    ],
    [
     "2014-07",
     29.7,
     16.7,
     59.3,
     17.6
    ],
    [
     "2014-08",
     29.8,
     16.8,
     59.3,
     17.6
    ],
    [
     "2014-09",
     29.8,
     16.8,
     59.3,
     17.6
    ],
    [
     "2014-10",
     29.7,
     16.7,
     59.3,
     17.6
    ],
    [
     "2014-11",
     29.7,
     16.7,
     59.3,
     17.6
    ],
    [
     "2014-12",
     29.8,
     16.8,
     59.3,
     17.6
    ],
    [
     "2015-01",
     29.4,
     16.8,
     59.3,
     16.1
    ],
    [
     "2015-02",
     29.4,
     16.8,
     59.3,
     16.1
    ],
    [
     "2015-03",
     29.5,
     17,
     59.3,
     16.1
    ],
    [
     "2015-04",
     29.3,
     16.7,
     59.3,
     16.1
    ],
    [
     "2015-05",
     29.5,
     17.1,
     59.3,
     16.1
    ],
    [
     "2015-06",
     29.3,
     16.7,
     59.3,
     16.1
    ],
    [
     "2015-07",
     29.4,
     16.8,
     59.3,
     16.1
    ],
    [
     "2015-08",
     29.4,
     16.9,
     59.3,
     16.1
    ],
    [
     "2015-09",
     29.4,
     16.9,
     59.3,
     16.1
    ],
    [
     "2015-10",
     29.5,
     17,
     59.3,
     16.1
    ],
    [
     "2015-11",
     29.3,
     16.7,
     59.3,
     16.1
    ],
    [
     "2015-12",
     29.4,
     16.9,
     59.3,
     16.1
    ],
    [
     "2016-01",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2016-02",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2016-03",
     29.6,
     16.9,
     59.3,
     17
    ],
    [
     "2016-04",
     29.6,
     16.8,
     59.3,
     17
    ],
    [
     "2016-05",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2016-06",
     29.7,
     17,
     59.3,
     17
    ],
    [
     "2016-07",
     29.8,
     17.2,
     59.3,
     17
    ],
    [
     "2016-08",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2016-09",
     29.6,
     16.8,
     59.3,
     17
    ],
    [
     "2016-10",
     29.7,
     17.1,
     59.3,
     17
    ],
    [
     "2016-11",
     29.7,
     17.1,
     59.3,
     17
    ],
    [
     "2016-12",
     29.7,
     17,
     59.3,
     17
    ],
    [
     "2017-01",
     29.5,
     16.9,
     59.3,
     16.3
    ],
    [
     "2017-02",
     29.4,
     16.8,
     59.3,
     16.3
    ],
    [
     "2017-03",
     29.4,
     16.8,
     59.3,
     16.3
    ],
    [
     "2017-04",
     29.6,
     17.2,
     59.3,
     16.3
    ],
    [
     "2017-05",
     29.5,
     17,
     59.3,
     16.3
    ],
    [
     "2017-06",
     29.4,
     16.8,
     59.3,
     16.3
    ],
    [
     "2017-07",
     29.4,
     16.8,
     59.3,
     16.3
    ],
    [
     "2017-08",
     29.5,
     17,
     59.3,
     16.3
    ],
    [
     "2017-09",
     29.4,
     16.8,
     59.3,
     16.3
    ],
    [
     "2017-10",
     29.3,
     16.5,
     59.3,
     16.3
    ],
    [
     "2017-11",
     29.3,
     16.6,
     59.3,
     16.3
    ],
    [
     "2017-12",
     29.5,
     17,
     59.3,
     16.3
    ],
    [
     "2018-01",
     29.6,
     16.6,
     59.3,
     17.3
    ],
    [
     "2018-02",
     29.6,
     16.6,
     59.3,
     17.3
    ],
    [
     "2018-03",
     29.7,
     16.9,
     59.3,
     17.3
    ],
    [
     "2018-04",
     29.6,
     16.6,
     59.3,
     17.3
    ],
    [
     "2018-05",
     29.5,
     16.5,
     59.3,
     17.3
    ],
    [
     "2018-06",
     29.7,
     16.9,
     59.3,
     17.3
    ],
    [
     "2018-07",
     29.7,
     16.8,
     59.3,
     17.3
    ],
    [
     "2018-08",
     29.7,
     16.8,
     59.3,
     17.3
    ],
    [
     "2018-09",
     29.9,
     17.3,
     59.3,
     17.3
    ],
    [
     "2018-10",
     30.2,
     17.9,
     59.3,
     17.3
    ],
    [
     "2018-11",
     30.4,
     18.5,
     59.3,
     17.3
    ],
    [
     "2018-12",
     30.7,
     19,
     59.3,
     17.3
    ],
    [
     "2019-01",
     30.6,
     17.8,
     59.3,
     19
    ],
    [
     "2019-02",
     30.6,
     17.8,
     59.3,
     19
    ],
    [
     "2019-03",
     30.2,
     17.1,
     59.3,
     19
    ],
    [
     "2019-04",
     30.4,
     17.4,
     59.3,
     19
    ],
    [
     "2019-05",
     30.5,
     17.7,
     59.3,
     19
    ],
    [
     "2019-06",
     31.1,
     19.1,
     59.3,
     19
    ],
    [
     "2019-07",
     30.8,
     18.4,
     59.3,
     19
    ],
    [
     "2019-08",
     30.9,
     18.6,
     59.3,
     19
    ],
    [
     "2019-09",
     30.9,
     18.5,
     59.3,
     19
    ],
    [
     "2019-10",
     30.6,
     17.9,
     59.3,
     19
    ],
    [
     "2019-11",
     30.4,
     17.4,
     59.3,
     19
    ],
    [
     "2019-12",
     30.4,
     17.5,
     59.3,
     19
    ],
    [
     "2020-01",
     30.4,
     18,
     59.3,
     18.1
    ],
    [
     "2020-02",
     30,
     17,
     59.3,
     18.1
    ],
    [
     "2020-03",
     30.2,
     17.5,
     59.3,
     18.1
    ],
    [
     "2020-04",
     30.6,
     18.3,
     59.3,
     18.1
    ],
    [
     "2020-05",
     30.7,
     18.7,
     59.3,
     18.1
    ],
    [
     "2020-06",
     30.5,
     18.2,
     59.3,
     18.1
    ],
    [
     "2020-07",
     30.4,
     18,
     59.3,
     18.1
    ],
    [
     "2020-08",
     30.1,
     17.4,
     59.3,
     18.1
    ],
    [
     "2020-09",
     29.9,
     16.9,
     59.3,
     18.1
    ],
    [
     "2020-10",
     30.1,
     17.2,
     59.3,
     18.1
    ],
    [
     "2020-11",
     29.8,
     16.6,
     59.3,
     18.1
    ],
    [
     "2020-12",
     30.1,
     17.3,
     59.3,
     18.1
    ],
    [
     "2021-01",
     30.2,
     17.2,
     59.3,
     18.8
    ],
    [
     "2021-02",
     30.4,
     17.6,
     59.3,
     18.8
    ],
    [
     "2021-03",
     30.1,
     17,
     59.3,
     18.8
    ],
    [
     "2021-04",
     30.4,
     17.5,
     59.3,
     18.8
    ],
    [
     "2021-05",
     30,
     16.6,
     59.3,
     18.8
    ],
    [
     "2021-06",
     30.1,
     16.8,
     59.3,
     18.8
    ],
    [
     "2021-07",
     29.9,
     16.5,
     59.3,
     18.8
    ],
    [
     "2021-08",
     30.6,
     18,
     59.3,
     18.8
    ],
    [
     "2021-09",
     30.4,
     17.6,
     59.3,
     18.8
    ],
    [
     "2021-10",
     30.5,
     17.7,
     59.3,
     18.8
    ],
    [
     "2021-11",
     31.1,
     19.2,
     59.3,
     18.8
    ],
    [
     "2021-12",
     30.9,
     18.6,
     59.3,
     18.8
    ],
    [
     "2022-01",
     30,
     18.8,
     59.3,
     14.9
    ],
    [
     "2022-02",
     29.8,
     18.4,
     59.3,
     14.9
    ],
    [
     "2022-03",
     29.8,
     18.3,
     59.3,
     14.9
    ],
    [
     "2022-04",
     29.8,
     18.4,
     59.3,
     14.9
    ],
    [
     "2022-05",
     30.2,
     19.3,
     59.3,
     14.9
    ],
    [
     "2022-06",
     30.2,
     19.3,
     59.3,
     14.9
    ],
    [
     "2022-07",
     30.6,
     20.1,
     59.3,
     14.9
    ],
    [
     "2022-08",
     30.2,
     19.2,
     59.3,
     14.9
    ],
    [
     "2022-09",
     29.8,
     18.4,
     59.3,
     14.9
    ],
    [
     "2022-10",
     30,
     18.9,
     59.3,
     14.9
    ],
    [
     "2022-11",
     29.8,
     18.4,
     59.3,
     14.9
    ],
    [
     "2022-12",
     30.2,
     19.3,
     59.3,
     14.9
    ],
    [
     "2023-01",
     30,
     17.6,
     59.3,
     17
    ],
    [
     "2023-02",
     29.7,
     17.1,
     59.3,
     17
    ],
    [
     "2023-03",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2023-04",
     29.5,
     16.6,
     59.3,
     17
    ],
    [
     "2023-05",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2023-06",
     30.2,
     18.1,
     59.3,
     17
    ],
    [
     "2023-07",
     29.6,
     16.8,
     59.3,
     17
    ],
    [
     "2023-08",
     29.6,
     16.9,
     59.3,
     17
    ],
    [
     "2023-09",
     29.6,
     16.7,
     59.3,
     17
    ],
    [
     "2023-10",
     29.4,
     16.3,
     59.3,
     17
    ],
    [
     "2023-11",
     29.3,
     16.1,
     59.3,
     17
    ],
    [
     "2023-12",
     29.3,
     16.1,
     59.3,
     17
    ],
    [
     "2024-01",
     29.6,
     17.3,
     59.3,
     16.1
    ],
    [
     "2024-02",
     29.4,
     16.9,
     59.3,
     16.1
    ],
    [
     "2024-03",
     29.6,
     17.2,
     59.3,
     16.1
    ],
    [
     "2024-04",
     29.6,
     17.4,
     59.3,
     16.1
    ],
    [
     "2024-05",
     29.5,
     17.1,
     59.3,
     16.1
    ],
    [
     "2024-06",
     29.3,
     16.6,
     59.3,
     16.1
    ],
    [
     "2024-07",
     29.4,
     16.9,
     59.3,
     16.1
    ],
    [
     "2024-08",
     29.7,
     17.5,
     59.3,
     16.1
    ],
    [
     "2024-09",
     29.5,
     17.1,
     59.3,
     16.1
    ],
    [
     "2024-10",
     29.7,
     17.5,
     59.3,
     16.1
    ],
    [
     "2024-11",
     29.9,
     17.9,
     59.3,
     16.1
    ],
    [
     "2024-12",
     29.8,
     17.8,
     59.3,
     16.1
    ],
    [
     "2025-01",
     28.3,
     17.5,
     59.3,
     10.4
    ],
    [
     "2025-02",
     28.2,
     17.3,
     59.3,
     10.4
    ],
    [
     "2025-03",
     29.2,
     19.5,
     59.3,
     10.4
    ],
    [
     "2025-04",
     29.3,
     19.9,
     59.3,
     10.4
    ],
    [
     "2025-05",
     29.4,
     20,
     59.3,
     10.4
    ],
    [
     "2025-06",
     29.2,
     19.5,
     59.3,
     10.4
    ],
    [
     "2025-07",
     28,
     17,
     59.3,
     10.4
    ],
    [
     "2025-08",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2025-09",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2025-10",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2025-11",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2025-12",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-01",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-02",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-03",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-04",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-05",
     65.4,
     100,
     59.3,
     10.4
    ],
    [
     "2026-06",
     65.4,
     100,
     59.3,
     10.4
    ]
   ]
  },
  {
   "family": "cutting-tools",
   "label": "Cutting tools and inserts",
   "latest": {
    "period": "2026-06",
    "rri": 44,
    "band": "building case",
    "tariffScore": 46.9,
    "levelScore": 47.5,
    "trendScore": 45.5,
    "dependenceScore": 69.6,
    "concentrationScore": 7.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 14.26,
    "exportRatio": 0.304,
    "hhi": 790,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 76.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     33.4,
     22,
     69.6,
     10.3
    ],
    [
     "2014-02",
     33.3,
     21.8,
     69.6,
     10.3
    ],
    [
     "2014-03",
     33.3,
     21.8,
     69.6,
     10.3
    ],
    [
     "2014-04",
     33.4,
     22,
     69.6,
     10.3
    ],
    [
     "2014-05",
     33.4,
     22.1,
     69.6,
     10.3
    ],
    [
     "2014-06",
     33.4,
     22.1,
     69.6,
     10.3
    ],
    [
     "2014-07",
     33.2,
     21.7,
     69.6,
     10.3
    ],
    [
     "2014-08",
     33.4,
     22,
     69.6,
     10.3
    ],
    [
     "2014-09",
     33.5,
     22.3,
     69.6,
     10.3
    ],
    [
     "2014-10",
     33.5,
     22.4,
     69.6,
     10.3
    ],
    [
     "2014-11",
     33.4,
     22.2,
     69.6,
     10.3
    ],
    [
     "2014-12",
     33.3,
     21.8,
     69.6,
     10.3
    ],
    [
     "2015-01",
     33.6,
     22.1,
     69.6,
     11.1
    ],
    [
     "2015-02",
     33.7,
     22.4,
     69.6,
     11.1
    ],
    [
     "2015-03",
     33.8,
     22.6,
     69.6,
     11.1
    ],
    [
     "2015-04",
     33.5,
     21.9,
     69.6,
     11.1
    ],
    [
     "2015-05",
     33.3,
     21.5,
     69.6,
     11.1
    ],
    [
     "2015-06",
     33.6,
     22,
     69.6,
     11.1
    ],
    [
     "2015-07",
     33.6,
     22.2,
     69.6,
     11.1
    ],
    [
     "2015-08",
     33.4,
     21.6,
     69.6,
     11.1
    ],
    [
     "2015-09",
     33.6,
     22,
     69.6,
     11.1
    ],
    [
     "2015-10",
     33.6,
     22,
     69.6,
     11.1
    ],
    [
     "2015-11",
     33.3,
     21.5,
     69.6,
     11.1
    ],
    [
     "2015-12",
     33.8,
     22.5,
     69.6,
     11.1
    ],
    [
     "2016-01",
     33.8,
     22.3,
     69.6,
     11.7
    ],
    [
     "2016-02",
     33.8,
     22.3,
     69.6,
     11.7
    ],
    [
     "2016-03",
     34.1,
     22.8,
     69.6,
     11.7
    ],
    [
     "2016-04",
     34.2,
     23.1,
     69.6,
     11.7
    ],
    [
     "2016-05",
     34.1,
     22.8,
     69.6,
     11.7
    ],
    [
     "2016-06",
     34,
     22.7,
     69.6,
     11.7
    ],
    [
     "2016-07",
     34.3,
     23.3,
     69.6,
     11.7
    ],
    [
     "2016-08",
     34.3,
     23.4,
     69.6,
     11.7
    ],
    [
     "2016-09",
     34.2,
     23.1,
     69.6,
     11.7
    ],
    [
     "2016-10",
     34.1,
     22.8,
     69.6,
     11.7
    ],
    [
     "2016-11",
     34.1,
     22.8,
     69.6,
     11.7
    ],
    [
     "2016-12",
     34,
     22.7,
     69.6,
     11.7
    ],
    [
     "2017-01",
     33.9,
     22.6,
     69.6,
     11.5
    ],
    [
     "2017-02",
     33.9,
     22.6,
     69.6,
     11.5
    ],
    [
     "2017-03",
     33.7,
     22.1,
     69.6,
     11.5
    ],
    [
     "2017-04",
     33.7,
     22,
     69.6,
     11.5
    ],
    [
     "2017-05",
     33.9,
     22.6,
     69.6,
     11.5
    ],
    [
     "2017-06",
     33.9,
     22.5,
     69.6,
     11.5
    ],
    [
     "2017-07",
     33.7,
     22.2,
     69.6,
     11.5
    ],
    [
     "2017-08",
     33.7,
     22,
     69.6,
     11.5
    ],
    [
     "2017-09",
     33.7,
     22,
     69.6,
     11.5
    ],
    [
     "2017-10",
     33.4,
     21.5,
     69.6,
     11.5
    ],
    [
     "2017-11",
     34,
     22.7,
     69.6,
     11.5
    ],
    [
     "2017-12",
     33.7,
     22.1,
     69.6,
     11.5
    ],
    [
     "2018-01",
     33.8,
     22.2,
     69.6,
     11.9
    ],
    [
     "2018-02",
     33.8,
     22.2,
     69.6,
     11.9
    ],
    [
     "2018-03",
     34.2,
     23,
     69.6,
     11.9
    ],
    [
     "2018-04",
     33.9,
     22.4,
     69.6,
     11.9
    ],
    [
     "2018-05",
     33.8,
     22,
     69.6,
     11.9
    ],
    [
     "2018-06",
     33.8,
     22.2,
     69.6,
     11.9
    ],
    [
     "2018-07",
     33.9,
     22.4,
     69.6,
     11.9
    ],
    [
     "2018-08",
     34,
     22.6,
     69.6,
     11.9
    ],
    [
     "2018-09",
     34.9,
     24.5,
     69.6,
     11.9
    ],
    [
     "2018-10",
     37.3,
     29.8,
     69.6,
     11.9
    ],
    [
     "2018-11",
     37,
     29.3,
     69.6,
     11.9
    ],
    [
     "2018-12",
     38.7,
     33,
     69.6,
     11.9
    ],
    [
     "2019-01",
     37,
     29.7,
     69.6,
     11
    ],
    [
     "2019-02",
     36.3,
     28.2,
     69.6,
     11
    ],
    [
     "2019-03",
     36,
     27.4,
     69.6,
     11
    ],
    [
     "2019-04",
     36.5,
     28.6,
     69.6,
     11
    ],
    [
     "2019-05",
     37.6,
     31.1,
     69.6,
     11
    ],
    [
     "2019-06",
     40.3,
     37.1,
     69.6,
     11
    ],
    [
     "2019-07",
     40.6,
     37.7,
     69.6,
     11
    ],
    [
     "2019-08",
     41.9,
     40.6,
     69.6,
     11
    ],
    [
     "2019-09",
     41.8,
     40.4,
     69.6,
     11
    ],
    [
     "2019-10",
     39.5,
     35.2,
     69.6,
     11
    ],
    [
     "2019-11",
     38.8,
     33.6,
     69.6,
     11
    ],
    [
     "2019-12",
     37.9,
     31.8,
     69.6,
     11
    ],
    [
     "2020-01",
     40.4,
     37.3,
     69.6,
     10.9
    ],
    [
     "2020-02",
     38.7,
     33.6,
     69.6,
     10.9
    ],
    [
     "2020-03",
     36.7,
     29.1,
     69.6,
     10.9
    ],
    [
     "2020-04",
     38.6,
     33.3,
     69.6,
     10.9
    ],
    [
     "2020-05",
     41,
     38.7,
     69.6,
     10.9
    ],
    [
     "2020-06",
     40.8,
     38.2,
     69.6,
     10.9
    ],
    [
     "2020-07",
     39.3,
     34.8,
     69.6,
     10.9
    ],
    [
     "2020-08",
     39.4,
     35.1,
     69.6,
     10.9
    ],
    [
     "2020-09",
     38.5,
     33.1,
     69.6,
     10.9
    ],
    [
     "2020-10",
     38,
     31.9,
     69.6,
     10.9
    ],
    [
     "2020-11",
     36.9,
     29.6,
     69.6,
     10.9
    ],
    [
     "2020-12",
     37.1,
     30,
     69.6,
     10.9
    ],
    [
     "2021-01",
     36.9,
     30.3,
     69.6,
     9.6
    ],
    [
     "2021-02",
     38.2,
     33.2,
     69.6,
     9.6
    ],
    [
     "2021-03",
     38.7,
     34.3,
     69.6,
     9.6
    ],
    [
     "2021-04",
     37.2,
     31,
     69.6,
     9.6
    ],
    [
     "2021-05",
     36.6,
     29.7,
     69.6,
     9.6
    ],
    [
     "2021-06",
     35.9,
     28.1,
     69.6,
     9.6
    ],
    [
     "2021-07",
     35.9,
     28,
     69.6,
     9.6
    ],
    [
     "2021-08",
     36.1,
     28.4,
     69.6,
     9.6
    ],
    [
     "2021-09",
     36.1,
     28.5,
     69.6,
     9.6
    ],
    [
     "2021-10",
     38.3,
     33.3,
     69.6,
     9.6
    ],
    [
     "2021-11",
     39,
     35,
     69.6,
     9.6
    ],
    [
     "2021-12",
     38.5,
     33.9,
     69.6,
     9.6
    ],
    [
     "2022-01",
     39.9,
     37.3,
     69.6,
     9.1
    ],
    [
     "2022-02",
     37.3,
     31.4,
     69.6,
     9.1
    ],
    [
     "2022-03",
     36.8,
     30.4,
     69.6,
     9.1
    ],
    [
     "2022-04",
     37.2,
     31.1,
     69.6,
     9.1
    ],
    [
     "2022-05",
     36.3,
     29.3,
     69.6,
     9.1
    ],
    [
     "2022-06",
     38,
     33,
     69.6,
     9.1
    ],
    [
     "2022-07",
     36.5,
     29.7,
     69.6,
     9.1
    ],
    [
     "2022-08",
     38.1,
     33.3,
     69.6,
     9.1
    ],
    [
     "2022-09",
     38.2,
     33.5,
     69.6,
     9.1
    ],
    [
     "2022-10",
     37,
     30.8,
     69.6,
     9.1
    ],
    [
     "2022-11",
     37.2,
     31.1,
     69.6,
     9.1
    ],
    [
     "2022-12",
     35.4,
     27.3,
     69.6,
     9.1
    ],
    [
     "2023-01",
     35.4,
     27.6,
     69.6,
     8.3
    ],
    [
     "2023-02",
     35.2,
     27.2,
     69.6,
     8.3
    ],
    [
     "2023-03",
     35.5,
     27.8,
     69.6,
     8.3
    ],
    [
     "2023-04",
     35.7,
     28.3,
     69.6,
     8.3
    ],
    [
     "2023-05",
     36.1,
     29.1,
     69.6,
     8.3
    ],
    [
     "2023-06",
     34.7,
     26.2,
     69.6,
     8.3
    ],
    [
     "2023-07",
     36.1,
     29.2,
     69.6,
     8.3
    ],
    [
     "2023-08",
     35.2,
     27.1,
     69.6,
     8.3
    ],
    [
     "2023-09",
     35.6,
     28,
     69.6,
     8.3
    ],
    [
     "2023-10",
     35.4,
     27.6,
     69.6,
     8.3
    ],
    [
     "2023-11",
     34.8,
     26.3,
     69.6,
     8.3
    ],
    [
     "2023-12",
     36.7,
     30.5,
     69.6,
     8.3
    ],
    [
     "2024-01",
     35.8,
     28.7,
     69.6,
     8.1
    ],
    [
     "2024-02",
     36.7,
     30.7,
     69.6,
     8.1
    ],
    [
     "2024-03",
     36.2,
     29.5,
     69.6,
     8.1
    ],
    [
     "2024-04",
     34.8,
     26.5,
     69.6,
     8.1
    ],
    [
     "2024-05",
     35.7,
     28.5,
     69.6,
     8.1
    ],
    [
     "2024-06",
     36.7,
     30.7,
     69.6,
     8.1
    ],
    [
     "2024-07",
     36.5,
     30.3,
     69.6,
     8.1
    ],
    [
     "2024-08",
     36,
     29,
     69.6,
     8.1
    ],
    [
     "2024-09",
     37.4,
     32.2,
     69.6,
     8.1
    ],
    [
     "2024-10",
     36.2,
     29.5,
     69.6,
     8.1
    ],
    [
     "2024-11",
     36.3,
     29.7,
     69.6,
     8.1
    ],
    [
     "2024-12",
     35.8,
     28.7,
     69.6,
     8.1
    ],
    [
     "2025-01",
     37.8,
     33.1,
     69.6,
     7.9
    ],
    [
     "2025-02",
     37.3,
     32.1,
     69.6,
     7.9
    ],
    [
     "2025-03",
     38.7,
     35.3,
     69.6,
     7.9
    ],
    [
     "2025-04",
     49.7,
     59.7,
     69.6,
     7.9
    ],
    [
     "2025-05",
     54.1,
     69.4,
     69.6,
     7.9
    ],
    [
     "2025-06",
     51.5,
     63.6,
     69.6,
     7.9
    ],
    [
     "2025-07",
     54.3,
     69.8,
     69.6,
     7.9
    ],
    [
     "2025-08",
     57.9,
     77.9,
     69.6,
     7.9
    ],
    [
     "2025-09",
     59.5,
     81.5,
     69.6,
     7.9
    ],
    [
     "2025-10",
     58.9,
     80.1,
     69.6,
     7.9
    ],
    [
     "2025-11",
     57.8,
     77.6,
     69.6,
     7.9
    ],
    [
     "2025-12",
     57.6,
     77.2,
     69.6,
     7.9
    ],
    [
     "2026-01",
     58.1,
     78.3,
     69.6,
     7.9
    ],
    [
     "2026-02",
     55.4,
     72.3,
     69.6,
     7.9
    ],
    [
     "2026-03",
     49.3,
     58.7,
     69.6,
     7.9
    ],
    [
     "2026-04",
     44.2,
     47.5,
     69.6,
     7.9
    ],
    [
     "2026-05",
     42.4,
     43.4,
     69.6,
     7.9
    ],
    [
     "2026-06",
     44,
     46.9,
     69.6,
     7.9
    ]
   ]
  },
  {
   "family": "electric-motors",
   "label": "Electric motors and generators",
   "latest": {
    "period": "2026-06",
    "rri": 46.6,
    "band": "building case",
    "tariffScore": 43,
    "levelScore": 40.1,
    "trendScore": 49.6,
    "dependenceScore": 80.3,
    "concentrationScore": 12.6,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.04,
    "exportRatio": 0.197,
    "hhi": 1260,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 80.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     38.9,
     25.3,
     80.3,
     13.5
    ],
    [
     "2023-02",
     38.8,
     25.2,
     80.3,
     13.5
    ],
    [
     "2023-03",
     38.6,
     24.7,
     80.3,
     13.5
    ],
    [
     "2023-04",
     38.4,
     24.4,
     80.3,
     13.5
    ],
    [
     "2023-05",
     38.7,
     24.9,
     80.3,
     13.5
    ],
    [
     "2023-06",
     38.6,
     24.7,
     80.3,
     13.5
    ],
    [
     "2023-07",
     38.6,
     24.8,
     80.3,
     13.5
    ],
    [
     "2023-08",
     38.7,
     25,
     80.3,
     13.5
    ],
    [
     "2023-09",
     38.6,
     24.7,
     80.3,
     13.5
    ],
    [
     "2023-10",
     38.6,
     24.7,
     80.3,
     13.5
    ],
    [
     "2023-11",
     38.6,
     24.7,
     80.3,
     13.5
    ],
    [
     "2023-12",
     38.7,
     24.9,
     80.3,
     13.5
    ],
    [
     "2024-01",
     38.6,
     25.1,
     80.3,
     12.9
    ],
    [
     "2024-02",
     38.4,
     24.7,
     80.3,
     12.9
    ],
    [
     "2024-03",
     38.3,
     24.3,
     80.3,
     12.9
    ],
    [
     "2024-04",
     38.3,
     24.4,
     80.3,
     12.9
    ],
    [
     "2024-05",
     38.3,
     24.5,
     80.3,
     12.9
    ],
    [
     "2024-06",
     38.5,
     24.8,
     80.3,
     12.9
    ],
    [
     "2024-07",
     38.9,
     25.8,
     80.3,
     12.9
    ],
    [
     "2024-08",
     38.3,
     24.5,
     80.3,
     12.9
    ],
    [
     "2024-09",
     38.5,
     24.9,
     80.3,
     12.9
    ],
    [
     "2024-10",
     38.3,
     24.3,
     80.3,
     12.9
    ],
    [
     "2024-11",
     37.9,
     23.5,
     80.3,
     12.9
    ],
    [
     "2024-12",
     38.7,
     25.2,
     80.3,
     12.9
    ],
    [
     "2025-01",
     38.6,
     25.2,
     80.3,
     12.6
    ],
    [
     "2025-02",
     38.7,
     25.4,
     80.3,
     12.6
    ],
    [
     "2025-03",
     43.6,
     36.3,
     80.3,
     12.6
    ],
    [
     "2025-04",
     47.4,
     44.9,
     80.3,
     12.6
    ],
    [
     "2025-05",
     53.7,
     58.7,
     80.3,
     12.6
    ],
    [
     "2025-06",
     52.1,
     55.2,
     80.3,
     12.6
    ],
    [
     "2025-07",
     53.4,
     58.2,
     80.3,
     12.6
    ],
    [
     "2025-08",
     57.6,
     67.5,
     80.3,
     12.6
    ],
    [
     "2025-09",
     63.1,
     79.7,
     80.3,
     12.6
    ],
    [
     "2025-10",
     65,
     83.9,
     80.3,
     12.6
    ],
    [
     "2025-11",
     62.6,
     78.5,
     80.3,
     12.6
    ],
    [
     "2025-12",
     62.1,
     77.4,
     80.3,
     12.6
    ],
    [
     "2026-01",
     60.7,
     74.3,
     80.3,
     12.6
    ],
    [
     "2026-02",
     57.5,
     67.2,
     80.3,
     12.6
    ],
    [
     "2026-03",
     50.3,
     51.2,
     80.3,
     12.6
    ],
    [
     "2026-04",
     47.5,
     45,
     80.3,
     12.6
    ],
    [
     "2026-05",
     45.8,
     41.2,
     80.3,
     12.6
    ],
    [
     "2026-06",
     46.6,
     43,
     80.3,
     12.6
    ]
   ]
  },
  {
   "family": "engines",
   "label": "Internal combustion engines",
   "latest": {
    "period": "2026-06",
    "rri": 36.6,
    "band": "building case",
    "tariffScore": 25.9,
    "levelScore": 23,
    "trendScore": 32.8,
    "dependenceScore": 68.3,
    "concentrationScore": 17.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -11.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 6.91,
    "exportRatio": 0.317,
    "hhi": 1780,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 90.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     32.1,
     16.9,
     68.3,
     15.9
    ],
    [
     "2014-02",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2014-03",
     32,
     16.7,
     68.3,
     15.9
    ],
    [
     "2014-04",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2014-05",
     32.1,
     16.9,
     68.3,
     15.9
    ],
    [
     "2014-06",
     32,
     16.7,
     68.3,
     15.9
    ],
    [
     "2014-07",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2014-08",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2014-09",
     32,
     16.7,
     68.3,
     15.9
    ],
    [
     "2014-10",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2014-11",
     32,
     16.7,
     68.3,
     15.9
    ],
    [
     "2014-12",
     32,
     16.8,
     68.3,
     15.9
    ],
    [
     "2015-01",
     32.1,
     17,
     68.3,
     15.7
    ],
    [
     "2015-02",
     32.1,
     17,
     68.3,
     15.7
    ],
    [
     "2015-03",
     32.1,
     17.1,
     68.3,
     15.7
    ],
    [
     "2015-04",
     32,
     16.8,
     68.3,
     15.7
    ],
    [
     "2015-05",
     31.9,
     16.7,
     68.3,
     15.7
    ],
    [
     "2015-06",
     31.9,
     16.6,
     68.3,
     15.7
    ],
    [
     "2015-07",
     32,
     16.8,
     68.3,
     15.7
    ],
    [
     "2015-08",
     31.9,
     16.7,
     68.3,
     15.7
    ],
    [
     "2015-09",
     31.8,
     16.5,
     68.3,
     15.7
    ],
    [
     "2015-10",
     32,
     16.8,
     68.3,
     15.7
    ],
    [
     "2015-11",
     31.9,
     16.7,
     68.3,
     15.7
    ],
    [
     "2015-12",
     32,
     16.8,
     68.3,
     15.7
    ],
    [
     "2016-01",
     32.5,
     16.6,
     68.3,
     18.3
    ],
    [
     "2016-02",
     32.4,
     16.4,
     68.3,
     18.3
    ],
    [
     "2016-03",
     32.4,
     16.3,
     68.3,
     18.3
    ],
    [
     "2016-04",
     32.4,
     16.4,
     68.3,
     18.3
    ],
    [
     "2016-05",
     32.5,
     16.5,
     68.3,
     18.3
    ],
    [
     "2016-06",
     32.5,
     16.5,
     68.3,
     18.3
    ],
    [
     "2016-07",
     32.4,
     16.4,
     68.3,
     18.3
    ],
    [
     "2016-08",
     32.4,
     16.4,
     68.3,
     18.3
    ],
    [
     "2016-09",
     32.4,
     16.4,
     68.3,
     18.3
    ],
    [
     "2016-10",
     32.4,
     16.3,
     68.3,
     18.3
    ],
    [
     "2016-11",
     32.3,
     16.1,
     68.3,
     18.3
    ],
    [
     "2016-12",
     32.3,
     16.1,
     68.3,
     18.3
    ],
    [
     "2017-01",
     32.2,
     16.2,
     68.3,
     17.7
    ],
    [
     "2017-02",
     32.3,
     16.4,
     68.3,
     17.7
    ],
    [
     "2017-03",
     32.3,
     16.3,
     68.3,
     17.7
    ],
    [
     "2017-04",
     32.2,
     16.2,
     68.3,
     17.7
    ],
    [
     "2017-05",
     32.2,
     16.2,
     68.3,
     17.7
    ],
    [
     "2017-06",
     32.2,
     16.2,
     68.3,
     17.7
    ],
    [
     "2017-07",
     32.4,
     16.6,
     68.3,
     17.7
    ],
    [
     "2017-08",
     32.3,
     16.4,
     68.3,
     17.7
    ],
    [
     "2017-09",
     32.3,
     16.4,
     68.3,
     17.7
    ],
    [
     "2017-10",
     32.7,
     17.2,
     68.3,
     17.7
    ],
    [
     "2017-11",
     32.4,
     16.6,
     68.3,
     17.7
    ],
    [
     "2017-12",
     32.4,
     16.7,
     68.3,
     17.7
    ],
    [
     "2018-01",
     32.1,
     16.5,
     68.3,
     16.8
    ],
    [
     "2018-02",
     32.2,
     16.6,
     68.3,
     16.8
    ],
    [
     "2018-03",
     32.2,
     16.6,
     68.3,
     16.8
    ],
    [
     "2018-04",
     32.3,
     16.8,
     68.3,
     16.8
    ],
    [
     "2018-05",
     32.1,
     16.5,
     68.3,
     16.8
    ],
    [
     "2018-06",
     32.1,
     16.4,
     68.3,
     16.8
    ],
    [
     "2018-07",
     32.2,
     16.7,
     68.3,
     16.8
    ],
    [
     "2018-08",
     32.3,
     17,
     68.3,
     16.8
    ],
    [
     "2018-09",
     32.6,
     17.6,
     68.3,
     16.8
    ],
    [
     "2018-10",
     33.2,
     19,
     68.3,
     16.8
    ],
    [
     "2018-11",
     33.3,
     19.2,
     68.3,
     16.8
    ],
    [
     "2018-12",
     33.8,
     20.2,
     68.3,
     16.8
    ],
    [
     "2019-01",
     33.9,
     20.3,
     68.3,
     17.2
    ],
    [
     "2019-02",
     33.3,
     18.8,
     68.3,
     17.2
    ],
    [
     "2019-03",
     33.3,
     18.8,
     68.3,
     17.2
    ],
    [
     "2019-04",
     33.4,
     19.2,
     68.3,
     17.2
    ],
    [
     "2019-05",
     33.3,
     18.9,
     68.3,
     17.2
    ],
    [
     "2019-06",
     33.8,
     20.1,
     68.3,
     17.2
    ],
    [
     "2019-07",
     33.8,
     20.1,
     68.3,
     17.2
    ],
    [
     "2019-08",
     33.8,
     20,
     68.3,
     17.2
    ],
    [
     "2019-09",
     33.8,
     20.1,
     68.3,
     17.2
    ],
    [
     "2019-10",
     33.4,
     19.1,
     68.3,
     17.2
    ],
    [
     "2019-11",
     33,
     18.2,
     68.3,
     17.2
    ],
    [
     "2019-12",
     33.3,
     18.9,
     68.3,
     17.2
    ],
    [
     "2020-01",
     33.4,
     19.3,
     68.3,
     17.1
    ],
    [
     "2020-02",
     33.2,
     18.7,
     68.3,
     17.1
    ],
    [
     "2020-03",
     33,
     18.4,
     68.3,
     17.1
    ],
    [
     "2020-04",
     35.4,
     23.6,
     68.3,
     17.1
    ],
    [
     "2020-05",
     35.3,
     23.4,
     68.3,
     17.1
    ],
    [
     "2020-06",
     33.1,
     18.5,
     68.3,
     17.1
    ],
    [
     "2020-07",
     33.4,
     19.3,
     68.3,
     17.1
    ],
    [
     "2020-08",
     33.7,
     19.8,
     68.3,
     17.1
    ],
    [
     "2020-09",
     33.6,
     19.7,
     68.3,
     17.1
    ],
    [
     "2020-10",
     33.9,
     20.3,
     68.3,
     17.1
    ],
    [
     "2020-11",
     34.2,
     21,
     68.3,
     17.1
    ],
    [
     "2020-12",
     34.3,
     21.1,
     68.3,
     17.1
    ],
    [
     "2021-01",
     34.3,
     21.5,
     68.3,
     16.6
    ],
    [
     "2021-02",
     34.7,
     22.3,
     68.3,
     16.6
    ],
    [
     "2021-03",
     34.6,
     22.1,
     68.3,
     16.6
    ],
    [
     "2021-04",
     34,
     20.7,
     68.3,
     16.6
    ],
    [
     "2021-05",
     33.8,
     20.3,
     68.3,
     16.6
    ],
    [
     "2021-06",
     34.8,
     22.6,
     68.3,
     16.6
    ],
    [
     "2021-07",
     34.7,
     22.3,
     68.3,
     16.6
    ],
    [
     "2021-08",
     34.9,
     22.7,
     68.3,
     16.6
    ],
    [
     "2021-09",
     35,
     23.1,
     68.3,
     16.6
    ],
    [
     "2021-10",
     34.5,
     21.9,
     68.3,
     16.6
    ],
    [
     "2021-11",
     34.2,
     21.2,
     68.3,
     16.6
    ],
    [
     "2021-12",
     34.2,
     21.3,
     68.3,
     16.6
    ],
    [
     "2022-01",
     34,
     20.7,
     68.3,
     16.7
    ],
    [
     "2022-02",
     34,
     20.8,
     68.3,
     16.7
    ],
    [
     "2022-03",
     34,
     20.8,
     68.3,
     16.7
    ],
    [
     "2022-04",
     34.1,
     21,
     68.3,
     16.7
    ],
    [
     "2022-05",
     34.1,
     20.9,
     68.3,
     16.7
    ],
    [
     "2022-06",
     34.3,
     21.5,
     68.3,
     16.7
    ],
    [
     "2022-07",
     34.5,
     21.8,
     68.3,
     16.7
    ],
    [
     "2022-08",
     34.4,
     21.7,
     68.3,
     16.7
    ],
    [
     "2022-09",
     34,
     20.7,
     68.3,
     16.7
    ],
    [
     "2022-10",
     34.3,
     21.5,
     68.3,
     16.7
    ],
    [
     "2022-11",
     34,
     20.7,
     68.3,
     16.7
    ],
    [
     "2022-12",
     33.1,
     18.8,
     68.3,
     16.7
    ],
    [
     "2023-01",
     33.5,
     19.4,
     68.3,
     17.3
    ],
    [
     "2023-02",
     33.5,
     19.2,
     68.3,
     17.3
    ],
    [
     "2023-03",
     33.5,
     19.2,
     68.3,
     17.3
    ],
    [
     "2023-04",
     33.7,
     19.8,
     68.3,
     17.3
    ],
    [
     "2023-05",
     33.6,
     19.5,
     68.3,
     17.3
    ],
    [
     "2023-06",
     33.5,
     19.2,
     68.3,
     17.3
    ],
    [
     "2023-07",
     33.4,
     19,
     68.3,
     17.3
    ],
    [
     "2023-08",
     33.1,
     18.4,
     68.3,
     17.3
    ],
    [
     "2023-09",
     33.6,
     19.6,
     68.3,
     17.3
    ],
    [
     "2023-10",
     33.6,
     19.5,
     68.3,
     17.3
    ],
    [
     "2023-11",
     33.3,
     18.8,
     68.3,
     17.3
    ],
    [
     "2023-12",
     34.2,
     20.9,
     68.3,
     17.3
    ],
    [
     "2024-01",
     34.7,
     21.1,
     68.3,
     18.9
    ],
    [
     "2024-02",
     34.4,
     20.3,
     68.3,
     18.9
    ],
    [
     "2024-03",
     34.2,
     20,
     68.3,
     18.9
    ],
    [
     "2024-04",
     34.2,
     20,
     68.3,
     18.9
    ],
    [
     "2024-05",
     34.3,
     20.1,
     68.3,
     18.9
    ],
    [
     "2024-06",
     34.4,
     20.4,
     68.3,
     18.9
    ],
    [
     "2024-07",
     34.7,
     21,
     68.3,
     18.9
    ],
    [
     "2024-08",
     34.4,
     20.4,
     68.3,
     18.9
    ],
    [
     "2024-09",
     34.5,
     20.7,
     68.3,
     18.9
    ],
    [
     "2024-10",
     34.7,
     21.1,
     68.3,
     18.9
    ],
    [
     "2024-11",
     34.7,
     21,
     68.3,
     18.9
    ],
    [
     "2024-12",
     34.7,
     21,
     68.3,
     18.9
    ],
    [
     "2025-01",
     34.9,
     22.2,
     68.3,
     17.8
    ],
    [
     "2025-02",
     34.9,
     22.1,
     68.3,
     17.8
    ],
    [
     "2025-03",
     43.3,
     40.8,
     68.3,
     17.8
    ],
    [
     "2025-04",
     47.2,
     49.5,
     68.3,
     17.8
    ],
    [
     "2025-05",
     53,
     62.3,
     68.3,
     17.8
    ],
    [
     "2025-06",
     48,
     51.3,
     68.3,
     17.8
    ],
    [
     "2025-07",
     51,
     57.8,
     68.3,
     17.8
    ],
    [
     "2025-08",
     56.2,
     69.4,
     68.3,
     17.8
    ],
    [
     "2025-09",
     59.4,
     76.6,
     68.3,
     17.8
    ],
    [
     "2025-10",
     57.8,
     73.1,
     68.3,
     17.8
    ],
    [
     "2025-11",
     57,
     71.3,
     68.3,
     17.8
    ],
    [
     "2025-12",
     55.4,
     67.6,
     68.3,
     17.8
    ],
    [
     "2026-01",
     55.2,
     67.2,
     68.3,
     17.8
    ],
    [
     "2026-02",
     51.7,
     59.5,
     68.3,
     17.8
    ],
    [
     "2026-03",
     45.9,
     46.6,
     68.3,
     17.8
    ],
    [
     "2026-04",
     40.7,
     35,
     68.3,
     17.8
    ],
    [
     "2026-05",
     35.3,
     23.1,
     68.3,
     17.8
    ],
    [
     "2026-06",
     36.6,
     25.9,
     68.3,
     17.8
    ]
   ]
  },
  {
   "family": "filtering-separation",
   "label": "Filtering and separation equipment",
   "latest": {
    "period": "2026-06",
    "rri": 25.7,
    "band": "weak case",
    "tariffScore": 33.9,
    "levelScore": 30,
    "trendScore": 43.2,
    "dependenceScore": 24.2,
    "concentrationScore": 12.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.8,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 8.99,
    "exportRatio": 0.758,
    "hhi": 1270,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 78.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     19.6,
     20.5,
     24.2,
     12.4
    ],
    [
     "2023-02",
     19.2,
     19.6,
     24.2,
     12.4
    ],
    [
     "2023-03",
     18.8,
     18.8,
     24.2,
     12.4
    ],
    [
     "2023-04",
     19.1,
     19.5,
     24.2,
     12.4
    ],
    [
     "2023-05",
     19.3,
     19.9,
     24.2,
     12.4
    ],
    [
     "2023-06",
     19,
     19.2,
     24.2,
     12.4
    ],
    [
     "2023-07",
     19,
     19.3,
     24.2,
     12.4
    ],
    [
     "2023-08",
     19,
     19.2,
     24.2,
     12.4
    ],
    [
     "2023-09",
     19.2,
     19.7,
     24.2,
     12.4
    ],
    [
     "2023-10",
     19.3,
     19.9,
     24.2,
     12.4
    ],
    [
     "2023-11",
     19.3,
     19.9,
     24.2,
     12.4
    ],
    [
     "2023-12",
     19.6,
     20.6,
     24.2,
     12.4
    ],
    [
     "2024-01",
     20.4,
     21.9,
     24.2,
     13
    ],
    [
     "2024-02",
     20.4,
     21.9,
     24.2,
     13
    ],
    [
     "2024-03",
     19.9,
     20.8,
     24.2,
     13
    ],
    [
     "2024-04",
     19.8,
     20.6,
     24.2,
     13
    ],
    [
     "2024-05",
     19.6,
     20.3,
     24.2,
     13
    ],
    [
     "2024-06",
     20,
     21,
     24.2,
     13
    ],
    [
     "2024-07",
     20,
     21.1,
     24.2,
     13
    ],
    [
     "2024-08",
     19.8,
     20.7,
     24.2,
     13
    ],
    [
     "2024-09",
     19.4,
     19.8,
     24.2,
     13
    ],
    [
     "2024-10",
     19.1,
     19.1,
     24.2,
     13
    ],
    [
     "2024-11",
     19.3,
     19.6,
     24.2,
     13
    ],
    [
     "2024-12",
     19.9,
     20.8,
     24.2,
     13
    ],
    [
     "2025-01",
     19.9,
     21,
     24.2,
     12.7
    ],
    [
     "2025-02",
     19.7,
     20.5,
     24.2,
     12.7
    ],
    [
     "2025-03",
     23.6,
     29.2,
     24.2,
     12.7
    ],
    [
     "2025-04",
     29.4,
     42.2,
     24.2,
     12.7
    ],
    [
     "2025-05",
     35.6,
     56,
     24.2,
     12.7
    ],
    [
     "2025-06",
     33.5,
     51.3,
     24.2,
     12.7
    ],
    [
     "2025-07",
     34.6,
     53.6,
     24.2,
     12.7
    ],
    [
     "2025-08",
     35.8,
     56.4,
     24.2,
     12.7
    ],
    [
     "2025-09",
     38.2,
     61.8,
     24.2,
     12.7
    ],
    [
     "2025-10",
     39,
     63.5,
     24.2,
     12.7
    ],
    [
     "2025-11",
     37.7,
     60.6,
     24.2,
     12.7
    ],
    [
     "2025-12",
     38,
     61.2,
     24.2,
     12.7
    ],
    [
     "2026-01",
     38.7,
     62.9,
     24.2,
     12.7
    ],
    [
     "2026-02",
     36.4,
     57.6,
     24.2,
     12.7
    ],
    [
     "2026-03",
     29.7,
     42.7,
     24.2,
     12.7
    ],
    [
     "2026-04",
     27.9,
     38.7,
     24.2,
     12.7
    ],
    [
     "2026-05",
     24.7,
     31.6,
     24.2,
     12.7
    ],
    [
     "2026-06",
     25.7,
     33.9,
     24.2,
     12.7
    ]
   ]
  },
  {
   "family": "foundry-metallurgy",
   "label": "Foundry and rolling equipment",
   "latest": {
    "period": "2026-06",
    "rri": 43.7,
    "band": "building case",
    "tariffScore": 39.6,
    "levelScore": 34.2,
    "trendScore": 52.4,
    "dependenceScore": 79.3,
    "concentrationScore": 8.5,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 10.26,
    "exportRatio": 0.207,
    "hhi": 850,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-02",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-03",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-04",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-05",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-06",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-07",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-08",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-09",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-10",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-11",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2014-12",
     33.9,
     15,
     79.3,
     13.3
    ],
    [
     "2015-01",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-02",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-03",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-04",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-05",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-06",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-07",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-08",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-09",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-10",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-11",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2015-12",
     33.7,
     15,
     79.3,
     12.8
    ],
    [
     "2016-01",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-02",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-03",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-04",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-05",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-06",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-07",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-08",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-09",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-10",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-11",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2016-12",
     33.5,
     15,
     79.3,
     12
    ],
    [
     "2017-01",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-02",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-03",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-04",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-05",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-06",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-07",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-08",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-09",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-10",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-11",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2017-12",
     35.2,
     15,
     79.3,
     18.7
    ],
    [
     "2018-01",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-02",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-03",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-04",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-05",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-06",
     33.5,
     15,
     79.3,
     11.8
    ],
    [
     "2018-07",
     35.1,
     18.5,
     79.3,
     11.8
    ],
    [
     "2018-08",
     36.4,
     21.5,
     79.3,
     11.8
    ],
    [
     "2018-09",
     36.6,
     22,
     79.3,
     11.8
    ],
    [
     "2018-10",
     36.4,
     21.5,
     79.3,
     11.8
    ],
    [
     "2018-11",
     37,
     22.7,
     79.3,
     11.8
    ],
    [
     "2018-12",
     36.1,
     20.9,
     79.3,
     11.8
    ],
    [
     "2019-01",
     38.7,
     27.6,
     79.3,
     9.8
    ],
    [
     "2019-02",
     36.3,
     22.3,
     79.3,
     9.8
    ],
    [
     "2019-03",
     35.7,
     21,
     79.3,
     9.8
    ],
    [
     "2019-04",
     35.7,
     21.1,
     79.3,
     9.8
    ],
    [
     "2019-05",
     35.6,
     20.8,
     79.3,
     9.8
    ],
    [
     "2019-06",
     36.2,
     22.2,
     79.3,
     9.8
    ],
    [
     "2019-07",
     35.2,
     19.8,
     79.3,
     9.8
    ],
    [
     "2019-08",
     34.3,
     18,
     79.3,
     9.8
    ],
    [
     "2019-09",
     34.8,
     19.1,
     79.3,
     9.8
    ],
    [
     "2019-10",
     35.6,
     20.8,
     79.3,
     9.8
    ],
    [
     "2019-11",
     34.3,
     17.8,
     79.3,
     9.8
    ],
    [
     "2019-12",
     34,
     17.3,
     79.3,
     9.8
    ],
    [
     "2020-01",
     33.3,
     15.7,
     79.3,
     9.7
    ],
    [
     "2020-02",
     34.4,
     18.2,
     79.3,
     9.7
    ],
    [
     "2020-03",
     32.8,
     14.6,
     79.3,
     9.7
    ],
    [
     "2020-04",
     34.5,
     18.4,
     79.3,
     9.7
    ],
    [
     "2020-05",
     34,
     17.2,
     79.3,
     9.7
    ],
    [
     "2020-06",
     32.7,
     14.5,
     79.3,
     9.7
    ],
    [
     "2020-07",
     33.3,
     15.8,
     79.3,
     9.7
    ],
    [
     "2020-08",
     33,
     15,
     79.3,
     9.7
    ],
    [
     "2020-09",
     33.1,
     15.3,
     79.3,
     9.7
    ],
    [
     "2020-10",
     33.9,
     17.1,
     79.3,
     9.7
    ],
    [
     "2020-11",
     33,
     15,
     79.3,
     9.7
    ],
    [
     "2020-12",
     36,
     21.7,
     79.3,
     9.7
    ],
    [
     "2021-01",
     35.9,
     21.9,
     79.3,
     9.1
    ],
    [
     "2021-02",
     33.6,
     16.7,
     79.3,
     9.1
    ],
    [
     "2021-03",
     34.8,
     19.3,
     79.3,
     9.1
    ],
    [
     "2021-04",
     33.8,
     17.2,
     79.3,
     9.1
    ],
    [
     "2021-05",
     35.3,
     20.6,
     79.3,
     9.1
    ],
    [
     "2021-06",
     36,
     22,
     79.3,
     9.1
    ],
    [
     "2021-07",
     38.5,
     27.6,
     79.3,
     9.1
    ],
    [
     "2021-08",
     35.3,
     20.5,
     79.3,
     9.1
    ],
    [
     "2021-09",
     34.7,
     19.1,
     79.3,
     9.1
    ],
    [
     "2021-10",
     34.7,
     19.1,
     79.3,
     9.1
    ],
    [
     "2021-11",
     35.4,
     20.7,
     79.3,
     9.1
    ],
    [
     "2021-12",
     35.2,
     20.3,
     79.3,
     9.1
    ],
    [
     "2022-01",
     34.6,
     19.1,
     79.3,
     8.9
    ],
    [
     "2022-02",
     34.3,
     18.5,
     79.3,
     8.9
    ],
    [
     "2022-03",
     34.6,
     19,
     79.3,
     8.9
    ],
    [
     "2022-04",
     35.4,
     20.9,
     79.3,
     8.9
    ],
    [
     "2022-05",
     33.5,
     16.7,
     79.3,
     8.9
    ],
    [
     "2022-06",
     35,
     19.9,
     79.3,
     8.9
    ],
    [
     "2022-07",
     33.7,
     17,
     79.3,
     8.9
    ],
    [
     "2022-08",
     35.4,
     20.8,
     79.3,
     8.9
    ],
    [
     "2022-09",
     35.8,
     21.8,
     79.3,
     8.9
    ],
    [
     "2022-10",
     35.2,
     20.4,
     79.3,
     8.9
    ],
    [
     "2022-11",
     35.2,
     20.3,
     79.3,
     8.9
    ],
    [
     "2022-12",
     33.4,
     16.3,
     79.3,
     8.9
    ],
    [
     "2023-01",
     34.9,
     19.3,
     79.3,
     9.7
    ],
    [
     "2023-02",
     35,
     19.6,
     79.3,
     9.7
    ],
    [
     "2023-03",
     34.1,
     17.6,
     79.3,
     9.7
    ],
    [
     "2023-04",
     34.1,
     17.6,
     79.3,
     9.7
    ],
    [
     "2023-05",
     35.3,
     20.3,
     79.3,
     9.7
    ],
    [
     "2023-06",
     35,
     19.6,
     79.3,
     9.7
    ],
    [
     "2023-07",
     34.9,
     19.4,
     79.3,
     9.7
    ],
    [
     "2023-08",
     34.6,
     18.7,
     79.3,
     9.7
    ],
    [
     "2023-09",
     34.8,
     19.1,
     79.3,
     9.7
    ],
    [
     "2023-10",
     34.8,
     19.1,
     79.3,
     9.7
    ],
    [
     "2023-11",
     34.4,
     18.2,
     79.3,
     9.7
    ],
    [
     "2023-12",
     35.3,
     20.2,
     79.3,
     9.7
    ],
    [
     "2024-01",
     34.5,
     18.1,
     79.3,
     10.3
    ],
    [
     "2024-02",
     34.5,
     18.1,
     79.3,
     10.3
    ],
    [
     "2024-03",
     34.2,
     17.5,
     79.3,
     10.3
    ],
    [
     "2024-04",
     33.9,
     16.7,
     79.3,
     10.3
    ],
    [
     "2024-05",
     33.9,
     16.8,
     79.3,
     10.3
    ],
    [
     "2024-06",
     33.5,
     15.9,
     79.3,
     10.3
    ],
    [
     "2024-07",
     34.4,
     17.9,
     79.3,
     10.3
    ],
    [
     "2024-08",
     34.4,
     17.9,
     79.3,
     10.3
    ],
    [
     "2024-09",
     33.8,
     16.5,
     79.3,
     10.3
    ],
    [
     "2024-10",
     34.3,
     17.6,
     79.3,
     10.3
    ],
    [
     "2024-11",
     35.8,
     21,
     79.3,
     10.3
    ],
    [
     "2024-12",
     35,
     19.1,
     79.3,
     10.3
    ],
    [
     "2025-01",
     34.4,
     18.8,
     79.3,
     8.5
    ],
    [
     "2025-02",
     33.5,
     16.8,
     79.3,
     8.5
    ],
    [
     "2025-03",
     33.9,
     17.7,
     79.3,
     8.5
    ],
    [
     "2025-04",
     38.7,
     28.5,
     79.3,
     8.5
    ],
    [
     "2025-05",
     51.7,
     57.2,
     79.3,
     8.5
    ],
    [
     "2025-06",
     48.9,
     51,
     79.3,
     8.5
    ],
    [
     "2025-07",
     50.8,
     55.2,
     79.3,
     8.5
    ],
    [
     "2025-08",
     53,
     60.1,
     79.3,
     8.5
    ],
    [
     "2025-09",
     59.2,
     74,
     79.3,
     8.5
    ],
    [
     "2025-10",
     60.6,
     77.1,
     79.3,
     8.5
    ],
    [
     "2025-11",
     59.9,
     75.5,
     79.3,
     8.5
    ],
    [
     "2025-12",
     55.8,
     66.4,
     79.3,
     8.5
    ],
    [
     "2026-01",
     56.8,
     68.6,
     79.3,
     8.5
    ],
    [
     "2026-02",
     61.1,
     78.1,
     79.3,
     8.5
    ],
    [
     "2026-03",
     55.8,
     66.4,
     79.3,
     8.5
    ],
    [
     "2026-04",
     46.2,
     45,
     79.3,
     8.5
    ],
    [
     "2026-05",
     39.6,
     30.3,
     79.3,
     8.5
    ],
    [
     "2026-06",
     43.7,
     39.6,
     79.3,
     8.5
    ]
   ]
  },
  {
   "family": "gaskets-seals",
   "label": "Gaskets and mechanical seals",
   "latest": {
    "period": "2026-06",
    "rri": 18.3,
    "band": "weak case",
    "tariffScore": 35.1,
    "levelScore": 32,
    "trendScore": 42.2,
    "dependenceScore": 0,
    "concentrationScore": 10,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -7.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.61,
    "exportRatio": 1.4,
    "hhi": 1000,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 81.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     12,
     20.2,
     0,
     11.8
    ],
    [
     "2014-02",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2014-03",
     12.2,
     20.5,
     0,
     11.8
    ],
    [
     "2014-04",
     12.1,
     20.3,
     0,
     11.8
    ],
    [
     "2014-05",
     12,
     20.2,
     0,
     11.8
    ],
    [
     "2014-06",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2014-07",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2014-08",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2014-09",
     12.1,
     20.3,
     0,
     11.8
    ],
    [
     "2014-10",
     12.1,
     20.3,
     0,
     11.8
    ],
    [
     "2014-11",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2014-12",
     12.1,
     20.4,
     0,
     11.8
    ],
    [
     "2015-01",
     12.3,
     20.4,
     0,
     12.4
    ],
    [
     "2015-02",
     12.2,
     20.2,
     0,
     12.4
    ],
    [
     "2015-03",
     12.2,
     20.3,
     0,
     12.4
    ],
    [
     "2015-04",
     12.3,
     20.4,
     0,
     12.4
    ],
    [
     "2015-05",
     12.3,
     20.4,
     0,
     12.4
    ],
    [
     "2015-06",
     12.2,
     20.3,
     0,
     12.4
    ],
    [
     "2015-07",
     12.3,
     20.5,
     0,
     12.4
    ],
    [
     "2015-08",
     12.2,
     20.3,
     0,
     12.4
    ],
    [
     "2015-09",
     12.4,
     20.6,
     0,
     12.4
    ],
    [
     "2015-10",
     12.3,
     20.4,
     0,
     12.4
    ],
    [
     "2015-11",
     12.1,
     20,
     0,
     12.4
    ],
    [
     "2015-12",
     12.4,
     20.6,
     0,
     12.4
    ],
    [
     "2016-01",
     12.4,
     20.6,
     0,
     12.6
    ],
    [
     "2016-02",
     12.2,
     20.1,
     0,
     12.6
    ],
    [
     "2016-03",
     12.4,
     20.5,
     0,
     12.6
    ],
    [
     "2016-04",
     12.2,
     20.2,
     0,
     12.6
    ],
    [
     "2016-05",
     12.3,
     20.3,
     0,
     12.6
    ],
    [
     "2016-06",
     12.3,
     20.4,
     0,
     12.6
    ],
    [
     "2016-07",
     12.3,
     20.3,
     0,
     12.6
    ],
    [
     "2016-08",
     12.3,
     20.4,
     0,
     12.6
    ],
    [
     "2016-09",
     12.3,
     20.4,
     0,
     12.6
    ],
    [
     "2016-10",
     12.3,
     20.3,
     0,
     12.6
    ],
    [
     "2016-11",
     12.2,
     20.2,
     0,
     12.6
    ],
    [
     "2016-12",
     12.4,
     20.5,
     0,
     12.6
    ],
    [
     "2017-01",
     12.1,
     20.5,
     0,
     11.4
    ],
    [
     "2017-02",
     12.1,
     20.6,
     0,
     11.4
    ],
    [
     "2017-03",
     12,
     20.4,
     0,
     11.4
    ],
    [
     "2017-04",
     12.1,
     20.6,
     0,
     11.4
    ],
    [
     "2017-05",
     11.9,
     20.2,
     0,
     11.4
    ],
    [
     "2017-06",
     12.1,
     20.5,
     0,
     11.4
    ],
    [
     "2017-07",
     12.1,
     20.6,
     0,
     11.4
    ],
    [
     "2017-08",
     12,
     20.4,
     0,
     11.4
    ],
    [
     "2017-09",
     12,
     20.3,
     0,
     11.4
    ],
    [
     "2017-10",
     12,
     20.4,
     0,
     11.4
    ],
    [
     "2017-11",
     12.2,
     20.8,
     0,
     11.4
    ],
    [
     "2017-12",
     12.1,
     20.6,
     0,
     11.4
    ],
    [
     "2018-01",
     12,
     20.6,
     0,
     11
    ],
    [
     "2018-02",
     12,
     20.6,
     0,
     11
    ],
    [
     "2018-03",
     12.3,
     21.2,
     0,
     11
    ],
    [
     "2018-04",
     12,
     20.6,
     0,
     11
    ],
    [
     "2018-05",
     12,
     20.5,
     0,
     11
    ],
    [
     "2018-06",
     11.9,
     20.3,
     0,
     11
    ],
    [
     "2018-07",
     13.8,
     24.6,
     0,
     11
    ],
    [
     "2018-08",
     15.5,
     28.3,
     0,
     11
    ],
    [
     "2018-09",
     14.8,
     26.7,
     0,
     11
    ],
    [
     "2018-10",
     14.6,
     26.4,
     0,
     11
    ],
    [
     "2018-11",
     14.7,
     26.6,
     0,
     11
    ],
    [
     "2018-12",
     15.3,
     27.9,
     0,
     11
    ],
    [
     "2019-01",
     14.8,
     26.5,
     0,
     11.4
    ],
    [
     "2019-02",
     14.6,
     26.2,
     0,
     11.4
    ],
    [
     "2019-03",
     13.8,
     24.4,
     0,
     11.4
    ],
    [
     "2019-04",
     14.5,
     25.9,
     0,
     11.4
    ],
    [
     "2019-05",
     15.3,
     27.7,
     0,
     11.4
    ],
    [
     "2019-06",
     14.8,
     26.5,
     0,
     11.4
    ],
    [
     "2019-07",
     14.1,
     25.1,
     0,
     11.4
    ],
    [
     "2019-08",
     13.2,
     23,
     0,
     11.4
    ],
    [
     "2019-09",
     14.1,
     25.1,
     0,
     11.4
    ],
    [
     "2019-10",
     13.8,
     24.4,
     0,
     11.4
    ],
    [
     "2019-11",
     13.6,
     23.8,
     0,
     11.4
    ],
    [
     "2019-12",
     13.7,
     24.2,
     0,
     11.4
    ],
    [
     "2020-01",
     13.5,
     24,
     0,
     10.8
    ],
    [
     "2020-02",
     13,
     22.9,
     0,
     10.8
    ],
    [
     "2020-03",
     13.4,
     23.8,
     0,
     10.8
    ],
    [
     "2020-04",
     13.2,
     23.4,
     0,
     10.8
    ],
    [
     "2020-05",
     13.6,
     24.3,
     0,
     10.8
    ],
    [
     "2020-06",
     14,
     25.1,
     0,
     10.8
    ],
    [
     "2020-07",
     13,
     22.8,
     0,
     10.8
    ],
    [
     "2020-08",
     13.1,
     23.1,
     0,
     10.8
    ],
    [
     "2020-09",
     12.8,
     22.4,
     0,
     10.8
    ],
    [
     "2020-10",
     13.1,
     23.1,
     0,
     10.8
    ],
    [
     "2020-11",
     13.2,
     23.4,
     0,
     10.8
    ],
    [
     "2020-12",
     13.5,
     24,
     0,
     10.8
    ],
    [
     "2021-01",
     13.7,
     24.5,
     0,
     10.5
    ],
    [
     "2021-02",
     13.7,
     24.5,
     0,
     10.5
    ],
    [
     "2021-03",
     13.7,
     24.5,
     0,
     10.5
    ],
    [
     "2021-04",
     13.4,
     24,
     0,
     10.5
    ],
    [
     "2021-05",
     13.7,
     24.5,
     0,
     10.5
    ],
    [
     "2021-06",
     13.4,
     24,
     0,
     10.5
    ],
    [
     "2021-07",
     14.1,
     25.6,
     0,
     10.5
    ],
    [
     "2021-08",
     14.7,
     26.9,
     0,
     10.5
    ],
    [
     "2021-09",
     14.6,
     26.6,
     0,
     10.5
    ],
    [
     "2021-10",
     14.1,
     25.5,
     0,
     10.5
    ],
    [
     "2021-11",
     13.8,
     24.8,
     0,
     10.5
    ],
    [
     "2021-12",
     14.1,
     25.5,
     0,
     10.5
    ],
    [
     "2022-01",
     14.6,
     26.9,
     0,
     10.1
    ],
    [
     "2022-02",
     14,
     25.4,
     0,
     10.1
    ],
    [
     "2022-03",
     13.7,
     24.8,
     0,
     10.1
    ],
    [
     "2022-04",
     13.3,
     24,
     0,
     10.1
    ],
    [
     "2022-05",
     13.3,
     24,
     0,
     10.1
    ],
    [
     "2022-06",
     14.5,
     26.7,
     0,
     10.1
    ],
    [
     "2022-07",
     13.6,
     24.5,
     0,
     10.1
    ],
    [
     "2022-08",
     14.5,
     26.6,
     0,
     10.1
    ],
    [
     "2022-09",
     13.3,
     24,
     0,
     10.1
    ],
    [
     "2022-10",
     13.6,
     24.5,
     0,
     10.1
    ],
    [
     "2022-11",
     13.4,
     24.1,
     0,
     10.1
    ],
    [
     "2022-12",
     13.4,
     24.1,
     0,
     10.1
    ],
    [
     "2023-01",
     13.4,
     24,
     0,
     10.5
    ],
    [
     "2023-02",
     12.8,
     22.6,
     0,
     10.5
    ],
    [
     "2023-03",
     12.9,
     22.9,
     0,
     10.5
    ],
    [
     "2023-04",
     14,
     25.3,
     0,
     10.5
    ],
    [
     "2023-05",
     13.7,
     24.6,
     0,
     10.5
    ],
    [
     "2023-06",
     13.2,
     23.5,
     0,
     10.5
    ],
    [
     "2023-07",
     13.7,
     24.6,
     0,
     10.5
    ],
    [
     "2023-08",
     12.9,
     22.8,
     0,
     10.5
    ],
    [
     "2023-09",
     13.9,
     25.1,
     0,
     10.5
    ],
    [
     "2023-10",
     13.1,
     23.2,
     0,
     10.5
    ],
    [
     "2023-11",
     13,
     23,
     0,
     10.5
    ],
    [
     "2023-12",
     12.9,
     22.8,
     0,
     10.5
    ],
    [
     "2024-01",
     13.1,
     23.3,
     0,
     10.5
    ],
    [
     "2024-02",
     13.7,
     24.5,
     0,
     10.5
    ],
    [
     "2024-03",
     13.2,
     23.5,
     0,
     10.5
    ],
    [
     "2024-04",
     12.3,
     21.6,
     0,
     10.5
    ],
    [
     "2024-05",
     13.1,
     23.2,
     0,
     10.5
    ],
    [
     "2024-06",
     13.5,
     24.1,
     0,
     10.5
    ],
    [
     "2024-07",
     14,
     25.2,
     0,
     10.5
    ],
    [
     "2024-08",
     14.1,
     25.5,
     0,
     10.5
    ],
    [
     "2024-09",
     13.2,
     23.4,
     0,
     10.5
    ],
    [
     "2024-10",
     13.5,
     24.2,
     0,
     10.5
    ],
    [
     "2024-11",
     13,
     23.1,
     0,
     10.5
    ],
    [
     "2024-12",
     13.6,
     24.3,
     0,
     10.5
    ],
    [
     "2025-01",
     14.5,
     26.7,
     0,
     10
    ],
    [
     "2025-02",
     13.8,
     25.2,
     0,
     10
    ],
    [
     "2025-03",
     16.5,
     31,
     0,
     10
    ],
    [
     "2025-04",
     25.5,
     51.1,
     0,
     10
    ],
    [
     "2025-05",
     28.8,
     58.4,
     0,
     10
    ],
    [
     "2025-06",
     25.9,
     52,
     0,
     10
    ],
    [
     "2025-07",
     28.6,
     58,
     0,
     10
    ],
    [
     "2025-08",
     27.3,
     55.2,
     0,
     10
    ],
    [
     "2025-09",
     30.3,
     61.8,
     0,
     10
    ],
    [
     "2025-10",
     31.6,
     64.7,
     0,
     10
    ],
    [
     "2025-11",
     31.2,
     63.7,
     0,
     10
    ],
    [
     "2025-12",
     30.6,
     62.4,
     0,
     10
    ],
    [
     "2026-01",
     31.5,
     64.4,
     0,
     10
    ],
    [
     "2026-02",
     28.7,
     58.2,
     0,
     10
    ],
    [
     "2026-03",
     22,
     43.3,
     0,
     10
    ],
    [
     "2026-04",
     18.5,
     35.6,
     0,
     10
    ],
    [
     "2026-05",
     17.3,
     32.8,
     0,
     10
    ],
    [
     "2026-06",
     18.3,
     35.1,
     0,
     10
    ]
   ]
  },
  {
   "family": "glass-fiber",
   "label": "Glass fiber and reinforcements",
   "latest": {
    "period": "2026-06",
    "rri": 27.3,
    "band": "weak case",
    "tariffScore": 37.6,
    "levelScore": 35.8,
    "trendScore": 41.9,
    "dependenceScore": 23.1,
    "concentrationScore": 13.6,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 10.73,
    "exportRatio": 0.769,
    "hhi": 1360,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 80.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     24.6,
     31.4,
     23.1,
     14.3
    ],
    [
     "2023-02",
     24.1,
     30.2,
     23.1,
     14.3
    ],
    [
     "2023-03",
     23.7,
     29.3,
     23.1,
     14.3
    ],
    [
     "2023-04",
     23.3,
     28.5,
     23.1,
     14.3
    ],
    [
     "2023-05",
     23.2,
     28.3,
     23.1,
     14.3
    ],
    [
     "2023-06",
     22.7,
     27.2,
     23.1,
     14.3
    ],
    [
     "2023-07",
     23.6,
     29,
     23.1,
     14.3
    ],
    [
     "2023-08",
     22.9,
     27.6,
     23.1,
     14.3
    ],
    [
     "2023-09",
     24.1,
     30.3,
     23.1,
     14.3
    ],
    [
     "2023-10",
     24.6,
     31.3,
     23.1,
     14.3
    ],
    [
     "2023-11",
     23.1,
     27.9,
     23.1,
     14.3
    ],
    [
     "2023-12",
     23.7,
     29.4,
     23.1,
     14.3
    ],
    [
     "2024-01",
     24,
     30.1,
     23.1,
     14
    ],
    [
     "2024-02",
     23.7,
     29.4,
     23.1,
     14
    ],
    [
     "2024-03",
     24.6,
     31.5,
     23.1,
     14
    ],
    [
     "2024-04",
     23.8,
     29.8,
     23.1,
     14
    ],
    [
     "2024-05",
     24.8,
     31.9,
     23.1,
     14
    ],
    [
     "2024-06",
     25.1,
     32.6,
     23.1,
     14
    ],
    [
     "2024-07",
     25.1,
     32.7,
     23.1,
     14
    ],
    [
     "2024-08",
     25.5,
     33.5,
     23.1,
     14
    ],
    [
     "2024-09",
     23.4,
     28.8,
     23.1,
     14
    ],
    [
     "2024-10",
     23.2,
     28.4,
     23.1,
     14
    ],
    [
     "2024-11",
     24.7,
     31.8,
     23.1,
     14
    ],
    [
     "2024-12",
     23.6,
     29.3,
     23.1,
     14
    ],
    [
     "2025-01",
     24.1,
     30.6,
     23.1,
     13.6
    ],
    [
     "2025-02",
     22.8,
     27.8,
     23.1,
     13.6
    ],
    [
     "2025-03",
     27.6,
     38.3,
     23.1,
     13.6
    ],
    [
     "2025-04",
     32,
     48.2,
     23.1,
     13.6
    ],
    [
     "2025-05",
     36.6,
     58.4,
     23.1,
     13.6
    ],
    [
     "2025-06",
     33.9,
     52.4,
     23.1,
     13.6
    ],
    [
     "2025-07",
     39.2,
     64.2,
     23.1,
     13.6
    ],
    [
     "2025-08",
     37.7,
     60.8,
     23.1,
     13.6
    ],
    [
     "2025-09",
     39.1,
     63.9,
     23.1,
     13.6
    ],
    [
     "2025-10",
     37.5,
     60.3,
     23.1,
     13.6
    ],
    [
     "2025-11",
     36.3,
     57.8,
     23.1,
     13.6
    ],
    [
     "2025-12",
     39.1,
     64,
     23.1,
     13.6
    ],
    [
     "2026-01",
     37.6,
     60.5,
     23.1,
     13.6
    ],
    [
     "2026-02",
     34.5,
     53.7,
     23.1,
     13.6
    ],
    [
     "2026-03",
     28.7,
     40.9,
     23.1,
     13.6
    ],
    [
     "2026-04",
     27.8,
     38.9,
     23.1,
     13.6
    ],
    [
     "2026-05",
     25.6,
     33.9,
     23.1,
     13.6
    ],
    [
     "2026-06",
     27.3,
     37.6,
     23.1,
     13.6
    ]
   ]
  },
  {
   "family": "hand-tools",
   "label": "Hand tools",
   "latest": {
    "period": "2026-06",
    "rri": 58.2,
    "band": "building case",
    "tariffScore": 65.2,
    "levelScore": 72.7,
    "trendScore": 47.6,
    "dependenceScore": 81,
    "concentrationScore": 18.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.8,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 21.82,
    "exportRatio": 0.19,
    "hhi": 1840,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 89.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     45.2,
     27.3,
     81,
     34.3
    ],
    [
     "2014-02",
     45.1,
     27.1,
     81,
     34.3
    ],
    [
     "2014-03",
     44.9,
     26.8,
     81,
     34.3
    ],
    [
     "2014-04",
     45.2,
     27.4,
     81,
     34.3
    ],
    [
     "2014-05",
     45.3,
     27.5,
     81,
     34.3
    ],
    [
     "2014-06",
     45.3,
     27.6,
     81,
     34.3
    ],
    [
     "2014-07",
     45.3,
     27.6,
     81,
     34.3
    ],
    [
     "2014-08",
     45.3,
     27.6,
     81,
     34.3
    ],
    [
     "2014-09",
     45.7,
     28.4,
     81,
     34.3
    ],
    [
     "2014-10",
     45.8,
     28.8,
     81,
     34.3
    ],
    [
     "2014-11",
     45.3,
     27.5,
     81,
     34.3
    ],
    [
     "2014-12",
     45,
     26.9,
     81,
     34.3
    ],
    [
     "2015-01",
     44.9,
     27,
     81,
     33.9
    ],
    [
     "2015-02",
     44.6,
     26.3,
     81,
     33.9
    ],
    [
     "2015-03",
     45.2,
     27.5,
     81,
     33.9
    ],
    [
     "2015-04",
     45.1,
     27.4,
     81,
     33.9
    ],
    [
     "2015-05",
     44.8,
     26.8,
     81,
     33.9
    ],
    [
     "2015-06",
     44.8,
     26.7,
     81,
     33.9
    ],
    [
     "2015-07",
     44.7,
     26.4,
     81,
     33.9
    ],
    [
     "2015-08",
     45.2,
     27.7,
     81,
     33.9
    ],
    [
     "2015-09",
     45.2,
     27.7,
     81,
     33.9
    ],
    [
     "2015-10",
     45,
     27.1,
     81,
     33.9
    ],
    [
     "2015-11",
     44.8,
     26.8,
     81,
     33.9
    ],
    [
     "2015-12",
     45.1,
     27.4,
     81,
     33.9
    ],
    [
     "2016-01",
     45.1,
     27.6,
     81,
     33.5
    ],
    [
     "2016-02",
     45.1,
     27.5,
     81,
     33.5
    ],
    [
     "2016-03",
     44.8,
     26.9,
     81,
     33.5
    ],
    [
     "2016-04",
     45,
     27.4,
     81,
     33.5
    ],
    [
     "2016-05",
     44.8,
     27,
     81,
     33.5
    ],
    [
     "2016-06",
     44.7,
     26.7,
     81,
     33.5
    ],
    [
     "2016-07",
     44.9,
     27.1,
     81,
     33.5
    ],
    [
     "2016-08",
     45,
     27.3,
     81,
     33.5
    ],
    [
     "2016-09",
     45.4,
     28.2,
     81,
     33.5
    ],
    [
     "2016-10",
     45,
     27.3,
     81,
     33.5
    ],
    [
     "2016-11",
     44.7,
     26.8,
     81,
     33.5
    ],
    [
     "2016-12",
     44.7,
     26.8,
     81,
     33.5
    ],
    [
     "2017-01",
     45,
     27.4,
     81,
     33.4
    ],
    [
     "2017-02",
     44.8,
     27,
     81,
     33.4
    ],
    [
     "2017-03",
     44.8,
     27.1,
     81,
     33.4
    ],
    [
     "2017-04",
     44.9,
     27.2,
     81,
     33.4
    ],
    [
     "2017-05",
     44.7,
     26.8,
     81,
     33.4
    ],
    [
     "2017-06",
     44.7,
     26.7,
     81,
     33.4
    ],
    [
     "2017-07",
     44.8,
     27,
     81,
     33.4
    ],
    [
     "2017-08",
     44.9,
     27.2,
     81,
     33.4
    ],
    [
     "2017-09",
     44.9,
     27.3,
     81,
     33.4
    ],
    [
     "2017-10",
     45.2,
     27.9,
     81,
     33.4
    ],
    [
     "2017-11",
     45,
     27.5,
     81,
     33.4
    ],
    [
     "2017-12",
     44.9,
     27.2,
     81,
     33.4
    ],
    [
     "2018-01",
     45.1,
     27,
     81,
     34.5
    ],
    [
     "2018-02",
     44.9,
     26.7,
     81,
     34.5
    ],
    [
     "2018-03",
     44.9,
     26.5,
     81,
     34.5
    ],
    [
     "2018-04",
     45,
     26.9,
     81,
     34.5
    ],
    [
     "2018-05",
     45.1,
     27.1,
     81,
     34.5
    ],
    [
     "2018-06",
     45.3,
     27.5,
     81,
     34.5
    ],
    [
     "2018-07",
     45.1,
     27.1,
     81,
     34.5
    ],
    [
     "2018-08",
     45.3,
     27.6,
     81,
     34.5
    ],
    [
     "2018-09",
     47.3,
     32,
     81,
     34.5
    ],
    [
     "2018-10",
     54.7,
     48.4,
     81,
     34.5
    ],
    [
     "2018-11",
     54.4,
     47.7,
     81,
     34.5
    ],
    [
     "2018-12",
     55.8,
     50.9,
     81,
     34.5
    ],
    [
     "2019-01",
     54.2,
     48.9,
     81,
     31.7
    ],
    [
     "2019-02",
     53.4,
     47.1,
     81,
     31.7
    ],
    [
     "2019-03",
     52.5,
     45,
     81,
     31.7
    ],
    [
     "2019-04",
     52.5,
     45,
     81,
     31.7
    ],
    [
     "2019-05",
     54.5,
     49.4,
     81,
     31.7
    ],
    [
     "2019-06",
     62.3,
     66.9,
     81,
     31.7
    ],
    [
     "2019-07",
     63.9,
     70.4,
     81,
     31.7
    ],
    [
     "2019-08",
     64.8,
     72.3,
     81,
     31.7
    ],
    [
     "2019-09",
     64.5,
     71.8,
     81,
     31.7
    ],
    [
     "2019-10",
     59.8,
     61.3,
     81,
     31.7
    ],
    [
     "2019-11",
     60.7,
     63.2,
     81,
     31.7
    ],
    [
     "2019-12",
     59.2,
     60,
     81,
     31.7
    ],
    [
     "2020-01",
     60.5,
     63.4,
     81,
     30.8
    ],
    [
     "2020-02",
     58.5,
     58.8,
     81,
     30.8
    ],
    [
     "2020-03",
     52,
     44.5,
     81,
     30.8
    ],
    [
     "2020-04",
     58.1,
     58,
     81,
     30.8
    ],
    [
     "2020-05",
     61,
     64.4,
     81,
     30.8
    ],
    [
     "2020-06",
     56.2,
     53.8,
     81,
     30.8
    ],
    [
     "2020-07",
     56.8,
     55,
     81,
     30.8
    ],
    [
     "2020-08",
     56.8,
     55.2,
     81,
     30.8
    ],
    [
     "2020-09",
     55,
     51,
     81,
     30.8
    ],
    [
     "2020-10",
     56,
     53.3,
     81,
     30.8
    ],
    [
     "2020-11",
     55.6,
     52.5,
     81,
     30.8
    ],
    [
     "2020-12",
     55.3,
     51.7,
     81,
     30.8
    ],
    [
     "2021-01",
     57.4,
     58,
     81,
     27.8
    ],
    [
     "2021-02",
     57.8,
     59,
     81,
     27.8
    ],
    [
     "2021-03",
     58.7,
     61,
     81,
     27.8
    ],
    [
     "2021-04",
     53.7,
     49.8,
     81,
     27.8
    ],
    [
     "2021-05",
     53.2,
     48.7,
     81,
     27.8
    ],
    [
     "2021-06",
     54.6,
     51.9,
     81,
     27.8
    ],
    [
     "2021-07",
     53.7,
     49.8,
     81,
     27.8
    ],
    [
     "2021-08",
     54.6,
     51.8,
     81,
     27.8
    ],
    [
     "2021-09",
     54.3,
     51.3,
     81,
     27.8
    ],
    [
     "2021-10",
     53,
     48.4,
     81,
     27.8
    ],
    [
     "2021-11",
     54,
     50.6,
     81,
     27.8
    ],
    [
     "2021-12",
     53.3,
     49,
     81,
     27.8
    ],
    [
     "2022-01",
     53.2,
     50.2,
     81,
     25.4
    ],
    [
     "2022-02",
     52.3,
     48.1,
     81,
     25.4
    ],
    [
     "2022-03",
     51.1,
     45.5,
     81,
     25.4
    ],
    [
     "2022-04",
     51.6,
     46.5,
     81,
     25.4
    ],
    [
     "2022-05",
     50.9,
     44.9,
     81,
     25.4
    ],
    [
     "2022-06",
     49.9,
     42.8,
     81,
     25.4
    ],
    [
     "2022-07",
     52.3,
     48,
     81,
     25.4
    ],
    [
     "2022-08",
     51.7,
     46.7,
     81,
     25.4
    ],
    [
     "2022-09",
     50.9,
     45,
     81,
     25.4
    ],
    [
     "2022-10",
     51.4,
     46.2,
     81,
     25.4
    ],
    [
     "2022-11",
     50.4,
     43.9,
     81,
     25.4
    ],
    [
     "2022-12",
     50.8,
     44.7,
     81,
     25.4
    ],
    [
     "2023-01",
     50.5,
     45.3,
     81,
     23.1
    ],
    [
     "2023-02",
     50.4,
     45.1,
     81,
     23.1
    ],
    [
     "2023-03",
     48.9,
     41.8,
     81,
     23.1
    ],
    [
     "2023-04",
     50.8,
     46,
     81,
     23.1
    ],
    [
     "2023-05",
     51.1,
     46.7,
     81,
     23.1
    ],
    [
     "2023-06",
     51.3,
     47.1,
     81,
     23.1
    ],
    [
     "2023-07",
     51.5,
     47.5,
     81,
     23.1
    ],
    [
     "2023-08",
     50.1,
     44.4,
     81,
     23.1
    ],
    [
     "2023-09",
     51.1,
     46.7,
     81,
     23.1
    ],
    [
     "2023-10",
     50.9,
     46.2,
     81,
     23.1
    ],
    [
     "2023-11",
     50.6,
     45.7,
     81,
     23.1
    ],
    [
     "2023-12",
     51.3,
     47.2,
     81,
     23.1
    ],
    [
     "2024-01",
     51.8,
     48.9,
     81,
     21.9
    ],
    [
     "2024-02",
     50.8,
     46.7,
     81,
     21.9
    ],
    [
     "2024-03",
     50.8,
     46.8,
     81,
     21.9
    ],
    [
     "2024-04",
     48.9,
     42.6,
     81,
     21.9
    ],
    [
     "2024-05",
     50.8,
     46.7,
     81,
     21.9
    ],
    [
     "2024-06",
     50.7,
     46.6,
     81,
     21.9
    ],
    [
     "2024-07",
     50.4,
     45.8,
     81,
     21.9
    ],
    [
     "2024-08",
     50.9,
     46.9,
     81,
     21.9
    ],
    [
     "2024-09",
     50,
     44.9,
     81,
     21.9
    ],
    [
     "2024-10",
     50.1,
     45.2,
     81,
     21.9
    ],
    [
     "2024-11",
     50,
     44.9,
     81,
     21.9
    ],
    [
     "2024-12",
     51.3,
     47.8,
     81,
     21.9
    ],
    [
     "2025-01",
     50.1,
     47.1,
     81,
     18.4
    ],
    [
     "2025-02",
     50.9,
     48.8,
     81,
     18.4
    ],
    [
     "2025-03",
     54.7,
     57.4,
     81,
     18.4
    ],
    [
     "2025-04",
     62.5,
     74.6,
     81,
     18.4
    ],
    [
     "2025-05",
     69.7,
     90.6,
     81,
     18.4
    ],
    [
     "2025-06",
     65,
     80.2,
     81,
     18.4
    ],
    [
     "2025-07",
     72.1,
     96,
     81,
     18.4
    ],
    [
     "2025-08",
     73,
     98,
     81,
     18.4
    ],
    [
     "2025-09",
     73.9,
     100,
     81,
     18.4
    ],
    [
     "2025-10",
     73.9,
     100,
     81,
     18.4
    ],
    [
     "2025-11",
     73.9,
     100,
     81,
     18.4
    ],
    [
     "2025-12",
     73.9,
     100,
     81,
     18.4
    ],
    [
     "2026-01",
     73.9,
     100,
     81,
     18.4
    ],
    [
     "2026-02",
     72.6,
     97,
     81,
     18.4
    ],
    [
     "2026-03",
     63.4,
     76.7,
     81,
     18.4
    ],
    [
     "2026-04",
     58.1,
     64.9,
     81,
     18.4
    ],
    [
     "2026-05",
     56,
     60.3,
     81,
     18.4
    ],
    [
     "2026-06",
     58.2,
     65.2,
     81,
     18.4
    ]
   ]
  },
  {
   "family": "heat-exchange",
   "label": "Heat exchange and process heating",
   "latest": {
    "period": "2026-06",
    "rri": 42.6,
    "band": "building case",
    "tariffScore": 40.7,
    "levelScore": 37.2,
    "trendScore": 48.9,
    "dependenceScore": 74.3,
    "concentrationScore": 8.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 11.17,
    "exportRatio": 0.257,
    "hhi": 810,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 79.7,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     34,
     21.3,
     74.3,
     8.5
    ],
    [
     "2023-02",
     34,
     21.3,
     74.3,
     8.5
    ],
    [
     "2023-03",
     33.9,
     21,
     74.3,
     8.5
    ],
    [
     "2023-04",
     34.1,
     21.5,
     74.3,
     8.5
    ],
    [
     "2023-05",
     34.4,
     22.2,
     74.3,
     8.5
    ],
    [
     "2023-06",
     34.3,
     21.9,
     74.3,
     8.5
    ],
    [
     "2023-07",
     34,
     21.3,
     74.3,
     8.5
    ],
    [
     "2023-08",
     34.1,
     21.6,
     74.3,
     8.5
    ],
    [
     "2023-09",
     34,
     21.2,
     74.3,
     8.5
    ],
    [
     "2023-10",
     34.2,
     21.8,
     74.3,
     8.5
    ],
    [
     "2023-11",
     34.1,
     21.5,
     74.3,
     8.5
    ],
    [
     "2023-12",
     34,
     21.2,
     74.3,
     8.5
    ],
    [
     "2024-01",
     34.1,
     21.8,
     74.3,
     8.1
    ],
    [
     "2024-02",
     33.4,
     20.3,
     74.3,
     8.1
    ],
    [
     "2024-03",
     34.2,
     22,
     74.3,
     8.1
    ],
    [
     "2024-04",
     33.6,
     20.7,
     74.3,
     8.1
    ],
    [
     "2024-05",
     33.7,
     20.8,
     74.3,
     8.1
    ],
    [
     "2024-06",
     33.5,
     20.5,
     74.3,
     8.1
    ],
    [
     "2024-07",
     34.1,
     21.8,
     74.3,
     8.1
    ],
    [
     "2024-08",
     34.2,
     21.9,
     74.3,
     8.1
    ],
    [
     "2024-09",
     33.9,
     21.3,
     74.3,
     8.1
    ],
    [
     "2024-10",
     33.9,
     21.4,
     74.3,
     8.1
    ],
    [
     "2024-11",
     34.5,
     22.7,
     74.3,
     8.1
    ],
    [
     "2024-12",
     34.7,
     23,
     74.3,
     8.1
    ],
    [
     "2025-01",
     35.4,
     24.7,
     74.3,
     8.1
    ],
    [
     "2025-02",
     35.2,
     24.1,
     74.3,
     8.1
    ],
    [
     "2025-03",
     40.5,
     35.9,
     74.3,
     8.1
    ],
    [
     "2025-04",
     47.1,
     50.7,
     74.3,
     8.1
    ],
    [
     "2025-05",
     51.9,
     61.4,
     74.3,
     8.1
    ],
    [
     "2025-06",
     49,
     54.8,
     74.3,
     8.1
    ],
    [
     "2025-07",
     53.5,
     64.9,
     74.3,
     8.1
    ],
    [
     "2025-08",
     54.1,
     66.1,
     74.3,
     8.1
    ],
    [
     "2025-09",
     54.6,
     67.2,
     74.3,
     8.1
    ],
    [
     "2025-10",
     53.9,
     65.8,
     74.3,
     8.1
    ],
    [
     "2025-11",
     56,
     70.4,
     74.3,
     8.1
    ],
    [
     "2025-12",
     55.1,
     68.3,
     74.3,
     8.1
    ],
    [
     "2026-01",
     54.5,
     67.1,
     74.3,
     8.1
    ],
    [
     "2026-02",
     52.1,
     61.8,
     74.3,
     8.1
    ],
    [
     "2026-03",
     44.9,
     45.8,
     74.3,
     8.1
    ],
    [
     "2026-04",
     43.5,
     42.6,
     74.3,
     8.1
    ],
    [
     "2026-05",
     40.4,
     35.7,
     74.3,
     8.1
    ],
    [
     "2026-06",
     42.6,
     40.7,
     74.3,
     8.1
    ]
   ]
  },
  {
   "family": "industrial-furnaces",
   "label": "Industrial furnaces and ovens",
   "latest": {
    "period": "2026-06",
    "rri": 30.9,
    "band": "weak case",
    "tariffScore": 40.4,
    "levelScore": 33.3,
    "trendScore": 57,
    "dependenceScore": 35.8,
    "concentrationScore": 7.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -1,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.98,
    "exportRatio": 0.642,
    "hhi": 780,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 76.5,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     22,
     20.5,
     35.8,
     8
    ],
    [
     "2023-02",
     22.2,
     21,
     35.8,
     8
    ],
    [
     "2023-03",
     21.9,
     20.3,
     35.8,
     8
    ],
    [
     "2023-04",
     21.8,
     20.2,
     35.8,
     8
    ],
    [
     "2023-05",
     21.2,
     18.8,
     35.8,
     8
    ],
    [
     "2023-06",
     21.6,
     19.7,
     35.8,
     8
    ],
    [
     "2023-07",
     21.4,
     19.3,
     35.8,
     8
    ],
    [
     "2023-08",
     21.8,
     20.2,
     35.8,
     8
    ],
    [
     "2023-09",
     20.9,
     18.2,
     35.8,
     8
    ],
    [
     "2023-10",
     22.5,
     21.8,
     35.8,
     8
    ],
    [
     "2023-11",
     21.9,
     20.4,
     35.8,
     8
    ],
    [
     "2023-12",
     22,
     20.6,
     35.8,
     8
    ],
    [
     "2024-01",
     22.2,
     19.9,
     35.8,
     9.9
    ],
    [
     "2024-02",
     21.4,
     18.1,
     35.8,
     9.9
    ],
    [
     "2024-03",
     21.5,
     18.5,
     35.8,
     9.9
    ],
    [
     "2024-04",
     23.7,
     23.2,
     35.8,
     9.9
    ],
    [
     "2024-05",
     21.6,
     18.7,
     35.8,
     9.9
    ],
    [
     "2024-06",
     24.6,
     25.2,
     35.8,
     9.9
    ],
    [
     "2024-07",
     21.8,
     19.1,
     35.8,
     9.9
    ],
    [
     "2024-08",
     22.1,
     19.8,
     35.8,
     9.9
    ],
    [
     "2024-09",
     23.9,
     23.7,
     35.8,
     9.9
    ],
    [
     "2024-10",
     22.4,
     20.5,
     35.8,
     9.9
    ],
    [
     "2024-11",
     24.3,
     24.7,
     35.8,
     9.9
    ],
    [
     "2024-12",
     23.4,
     22.7,
     35.8,
     9.9
    ],
    [
     "2025-01",
     21.2,
     19,
     35.8,
     7.8
    ],
    [
     "2025-02",
     21.2,
     19,
     35.8,
     7.8
    ],
    [
     "2025-03",
     23.4,
     23.8,
     35.8,
     7.8
    ],
    [
     "2025-04",
     28.4,
     34.9,
     35.8,
     7.8
    ],
    [
     "2025-05",
     36.8,
     53.6,
     35.8,
     7.8
    ],
    [
     "2025-06",
     31.9,
     42.8,
     35.8,
     7.8
    ],
    [
     "2025-07",
     33.7,
     46.7,
     35.8,
     7.8
    ],
    [
     "2025-08",
     45.9,
     73.8,
     35.8,
     7.8
    ],
    [
     "2025-09",
     47,
     76.3,
     35.8,
     7.8
    ],
    [
     "2025-10",
     49.2,
     81.1,
     35.8,
     7.8
    ],
    [
     "2025-11",
     44.9,
     71.6,
     35.8,
     7.8
    ],
    [
     "2025-12",
     46.5,
     75.2,
     35.8,
     7.8
    ],
    [
     "2026-01",
     44.2,
     70,
     35.8,
     7.8
    ],
    [
     "2026-02",
     39.7,
     60.1,
     35.8,
     7.8
    ],
    [
     "2026-03",
     37.2,
     54.5,
     35.8,
     7.8
    ],
    [
     "2026-04",
     30,
     38.5,
     35.8,
     7.8
    ],
    [
     "2026-05",
     29.3,
     36.9,
     35.8,
     7.8
    ],
    [
     "2026-06",
     30.9,
     40.4,
     35.8,
     7.8
    ]
   ]
  },
  {
   "family": "industrial-lighting",
   "label": "Lamps and LED lighting",
   "latest": {
    "period": "2026-06",
    "rri": 47.7,
    "band": "building case",
    "tariffScore": 31.5,
    "levelScore": 42.4,
    "trendScore": 5.9,
    "dependenceScore": 85.3,
    "concentrationScore": 31.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -22,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.72,
    "exportRatio": 0.147,
    "hhi": 3190,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 87.7,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     48.8,
     24.2,
     85.3,
     49.4
    ],
    [
     "2023-02",
     48.2,
     22.8,
     85.3,
     49.4
    ],
    [
     "2023-03",
     48,
     22.4,
     85.3,
     49.4
    ],
    [
     "2023-04",
     48.3,
     23.1,
     85.3,
     49.4
    ],
    [
     "2023-05",
     48.3,
     23,
     85.3,
     49.4
    ],
    [
     "2023-06",
     48.4,
     23.3,
     85.3,
     49.4
    ],
    [
     "2023-07",
     48.7,
     23.9,
     85.3,
     49.4
    ],
    [
     "2023-08",
     48.3,
     23.1,
     85.3,
     49.4
    ],
    [
     "2023-09",
     48.6,
     23.7,
     85.3,
     49.4
    ],
    [
     "2023-10",
     48.5,
     23.4,
     85.3,
     49.4
    ],
    [
     "2023-11",
     48.4,
     23.2,
     85.3,
     49.4
    ],
    [
     "2023-12",
     48.5,
     23.4,
     85.3,
     49.4
    ],
    [
     "2024-01",
     48.8,
     23.8,
     85.3,
     49.8
    ],
    [
     "2024-02",
     48.6,
     23.4,
     85.3,
     49.8
    ],
    [
     "2024-03",
     48.7,
     23.7,
     85.3,
     49.8
    ],
    [
     "2024-04",
     48.5,
     23.2,
     85.3,
     49.8
    ],
    [
     "2024-05",
     48.3,
     22.9,
     85.3,
     49.8
    ],
    [
     "2024-06",
     48.3,
     22.8,
     85.3,
     49.8
    ],
    [
     "2024-07",
     48.8,
     23.8,
     85.3,
     49.8
    ],
    [
     "2024-08",
     48.4,
     23,
     85.3,
     49.8
    ],
    [
     "2024-09",
     48.3,
     22.9,
     85.3,
     49.8
    ],
    [
     "2024-10",
     48.5,
     23.2,
     85.3,
     49.8
    ],
    [
     "2024-11",
     48.3,
     22.9,
     85.3,
     49.8
    ],
    [
     "2024-12",
     48.7,
     23.7,
     85.3,
     49.8
    ],
    [
     "2025-01",
     43.9,
     22.9,
     85.3,
     31.9
    ],
    [
     "2025-02",
     44.9,
     25.2,
     85.3,
     31.9
    ],
    [
     "2025-03",
     60.6,
     60.1,
     85.3,
     31.9
    ],
    [
     "2025-04",
     69,
     78.7,
     85.3,
     31.9
    ],
    [
     "2025-05",
     75.1,
     92.2,
     85.3,
     31.9
    ],
    [
     "2025-06",
     69.7,
     80.3,
     85.3,
     31.9
    ],
    [
     "2025-07",
     71.4,
     84,
     85.3,
     31.9
    ],
    [
     "2025-08",
     72.1,
     85.7,
     85.3,
     31.9
    ],
    [
     "2025-09",
     73.1,
     87.8,
     85.3,
     31.9
    ],
    [
     "2025-10",
     73.5,
     88.8,
     85.3,
     31.9
    ],
    [
     "2025-11",
     70.1,
     81.1,
     85.3,
     31.9
    ],
    [
     "2025-12",
     68.9,
     78.6,
     85.3,
     31.9
    ],
    [
     "2026-01",
     68.9,
     78.5,
     85.3,
     31.9
    ],
    [
     "2026-02",
     66.8,
     73.8,
     85.3,
     31.9
    ],
    [
     "2026-03",
     53,
     43.2,
     85.3,
     31.9
    ],
    [
     "2026-04",
     47.8,
     31.6,
     85.3,
     31.9
    ],
    [
     "2026-05",
     46.7,
     29.1,
     85.3,
     31.9
    ],
    [
     "2026-06",
     47.7,
     31.5,
     85.3,
     31.9
    ]
   ]
  },
  {
   "family": "industrial-robots",
   "label": "Robots and automated machinery",
   "latest": {
    "period": "2026-06",
    "rri": 45.3,
    "band": "building case",
    "tariffScore": 37,
    "levelScore": 39.2,
    "trendScore": 31.8,
    "dependenceScore": 88.4,
    "concentrationScore": 8.5,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -13,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 11.76,
    "exportRatio": 0.116,
    "hhi": 850,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 78.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     38.3,
     21.3,
     88.4,
     8.9
    ],
    [
     "2023-02",
     38.3,
     21.2,
     88.4,
     8.9
    ],
    [
     "2023-03",
     37.9,
     20.3,
     88.4,
     8.9
    ],
    [
     "2023-04",
     38,
     20.6,
     88.4,
     8.9
    ],
    [
     "2023-05",
     38.1,
     20.7,
     88.4,
     8.9
    ],
    [
     "2023-06",
     37.7,
     20,
     88.4,
     8.9
    ],
    [
     "2023-07",
     38,
     20.5,
     88.4,
     8.9
    ],
    [
     "2023-08",
     38,
     20.5,
     88.4,
     8.9
    ],
    [
     "2023-09",
     37.8,
     20.1,
     88.4,
     8.9
    ],
    [
     "2023-10",
     38.6,
     21.8,
     88.4,
     8.9
    ],
    [
     "2023-11",
     37.5,
     19.5,
     88.4,
     8.9
    ],
    [
     "2023-12",
     37.6,
     19.7,
     88.4,
     8.9
    ],
    [
     "2024-01",
     37.9,
     20.2,
     88.4,
     9
    ],
    [
     "2024-02",
     37.2,
     18.7,
     88.4,
     9
    ],
    [
     "2024-03",
     37.5,
     19.3,
     88.4,
     9
    ],
    [
     "2024-04",
     38.4,
     21.3,
     88.4,
     9
    ],
    [
     "2024-05",
     38,
     20.6,
     88.4,
     9
    ],
    [
     "2024-06",
     38.6,
     21.8,
     88.4,
     9
    ],
    [
     "2024-07",
     39,
     22.7,
     88.4,
     9
    ],
    [
     "2024-08",
     39.8,
     24.6,
     88.4,
     9
    ],
    [
     "2024-09",
     39.1,
     22.9,
     88.4,
     9
    ],
    [
     "2024-10",
     38.4,
     21.5,
     88.4,
     9
    ],
    [
     "2024-11",
     39.4,
     23.7,
     88.4,
     9
    ],
    [
     "2024-12",
     39.2,
     23.2,
     88.4,
     9
    ],
    [
     "2025-01",
     39.3,
     23.7,
     88.4,
     8.5
    ],
    [
     "2025-02",
     38.8,
     22.6,
     88.4,
     8.5
    ],
    [
     "2025-03",
     44.2,
     34.6,
     88.4,
     8.5
    ],
    [
     "2025-04",
     51.7,
     51.3,
     88.4,
     8.5
    ],
    [
     "2025-05",
     56.1,
     61,
     88.4,
     8.5
    ],
    [
     "2025-06",
     58.3,
     65.9,
     88.4,
     8.5
    ],
    [
     "2025-07",
     59.9,
     69.4,
     88.4,
     8.5
    ],
    [
     "2025-08",
     62.7,
     75.6,
     88.4,
     8.5
    ],
    [
     "2025-09",
     64.3,
     79.2,
     88.4,
     8.5
    ],
    [
     "2025-10",
     65.6,
     82.1,
     88.4,
     8.5
    ],
    [
     "2025-11",
     61.7,
     73.4,
     88.4,
     8.5
    ],
    [
     "2025-12",
     61.5,
     73,
     88.4,
     8.5
    ],
    [
     "2026-01",
     62.5,
     75.2,
     88.4,
     8.5
    ],
    [
     "2026-02",
     58.9,
     67.3,
     88.4,
     8.5
    ],
    [
     "2026-03",
     54,
     56.4,
     88.4,
     8.5
    ],
    [
     "2026-04",
     47.7,
     42.3,
     88.4,
     8.5
    ],
    [
     "2026-05",
     45.9,
     38.3,
     88.4,
     8.5
    ],
    [
     "2026-06",
     45.3,
     37,
     88.4,
     8.5
    ]
   ]
  },
  {
   "family": "iron-steel-articles",
   "label": "Iron and steel castings and articles",
   "latest": {
    "period": "2026-06",
    "rri": 45.8,
    "band": "building case",
    "tariffScore": 88.2,
    "levelScore": 100,
    "trendScore": 60.7,
    "dependenceScore": 9.6,
    "concentrationScore": 13.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 47.79,
    "exportRatio": 0.904,
    "hhi": 1310,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 81.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     23.4,
     37,
     9.6,
     15.4
    ],
    [
     "2020-02",
     21.9,
     33.7,
     9.6,
     15.4
    ],
    [
     "2020-03",
     19.1,
     27.5,
     9.6,
     15.4
    ],
    [
     "2020-04",
     22.6,
     35.3,
     9.6,
     15.4
    ],
    [
     "2020-05",
     24.1,
     38.7,
     9.6,
     15.4
    ],
    [
     "2020-06",
     23.9,
     38.1,
     9.6,
     15.4
    ],
    [
     "2020-07",
     23.5,
     37.3,
     9.6,
     15.4
    ],
    [
     "2020-08",
     24,
     38.3,
     9.6,
     15.4
    ],
    [
     "2020-09",
     23.4,
     37,
     9.6,
     15.4
    ],
    [
     "2020-10",
     23.7,
     37.8,
     9.6,
     15.4
    ],
    [
     "2020-11",
     23.6,
     37.4,
     9.6,
     15.4
    ],
    [
     "2020-12",
     23.4,
     37.1,
     9.6,
     15.4
    ],
    [
     "2021-01",
     23.6,
     37.6,
     9.6,
     15.1
    ],
    [
     "2021-02",
     24.3,
     39.2,
     9.6,
     15.1
    ],
    [
     "2021-03",
     25.7,
     42.3,
     9.6,
     15.1
    ],
    [
     "2021-04",
     22.2,
     34.6,
     9.6,
     15.1
    ],
    [
     "2021-05",
     21.7,
     33.4,
     9.6,
     15.1
    ],
    [
     "2021-06",
     22.8,
     35.9,
     9.6,
     15.1
    ],
    [
     "2021-07",
     23.3,
     37.1,
     9.6,
     15.1
    ],
    [
     "2021-08",
     23.4,
     37.3,
     9.6,
     15.1
    ],
    [
     "2021-09",
     23.4,
     37.3,
     9.6,
     15.1
    ],
    [
     "2021-10",
     22.1,
     34.3,
     9.6,
     15.1
    ],
    [
     "2021-11",
     22.4,
     35,
     9.6,
     15.1
    ],
    [
     "2021-12",
     23.2,
     36.8,
     9.6,
     15.1
    ],
    [
     "2022-01",
     24.7,
     39.8,
     9.6,
     15.5
    ],
    [
     "2022-02",
     24.4,
     39.1,
     9.6,
     15.5
    ],
    [
     "2022-03",
     23.7,
     37.7,
     9.6,
     15.5
    ],
    [
     "2022-04",
     22.6,
     35.1,
     9.6,
     15.5
    ],
    [
     "2022-05",
     22.3,
     34.5,
     9.6,
     15.5
    ],
    [
     "2022-06",
     23.4,
     36.9,
     9.6,
     15.5
    ],
    [
     "2022-07",
     23.3,
     36.7,
     9.6,
     15.5
    ],
    [
     "2022-08",
     23.5,
     37.1,
     9.6,
     15.5
    ],
    [
     "2022-09",
     22.6,
     35.2,
     9.6,
     15.5
    ],
    [
     "2022-10",
     22.3,
     34.5,
     9.6,
     15.5
    ],
    [
     "2022-11",
     21.6,
     33,
     9.6,
     15.5
    ],
    [
     "2022-12",
     22,
     33.9,
     9.6,
     15.5
    ],
    [
     "2023-01",
     20.4,
     31.2,
     9.6,
     14.1
    ],
    [
     "2023-02",
     19.7,
     29.6,
     9.6,
     14.1
    ],
    [
     "2023-03",
     17.3,
     24.3,
     9.6,
     14.1
    ],
    [
     "2023-04",
     20.5,
     31.4,
     9.6,
     14.1
    ],
    [
     "2023-05",
     20.4,
     31,
     9.6,
     14.1
    ],
    [
     "2023-06",
     20.7,
     31.7,
     9.6,
     14.1
    ],
    [
     "2023-07",
     20.9,
     32.3,
     9.6,
     14.1
    ],
    [
     "2023-08",
     19.4,
     28.8,
     9.6,
     14.1
    ],
    [
     "2023-09",
     19.7,
     29.6,
     9.6,
     14.1
    ],
    [
     "2023-10",
     20.6,
     31.5,
     9.6,
     14.1
    ],
    [
     "2023-11",
     19.5,
     29.1,
     9.6,
     14.1
    ],
    [
     "2023-12",
     21.8,
     34.2,
     9.6,
     14.1
    ],
    [
     "2024-01",
     22.8,
     36.2,
     9.6,
     14.5
    ],
    [
     "2024-02",
     21.8,
     34,
     9.6,
     14.5
    ],
    [
     "2024-03",
     22.2,
     34.8,
     9.6,
     14.5
    ],
    [
     "2024-04",
     20.1,
     30.3,
     9.6,
     14.5
    ],
    [
     "2024-05",
     21.9,
     34.1,
     9.6,
     14.5
    ],
    [
     "2024-06",
     22.7,
     36,
     9.6,
     14.5
    ],
    [
     "2024-07",
     22.8,
     36.1,
     9.6,
     14.5
    ],
    [
     "2024-08",
     23.2,
     37.1,
     9.6,
     14.5
    ],
    [
     "2024-09",
     23.1,
     36.8,
     9.6,
     14.5
    ],
    [
     "2024-10",
     22.3,
     35,
     9.6,
     14.5
    ],
    [
     "2024-11",
     22.2,
     34.8,
     9.6,
     14.5
    ],
    [
     "2024-12",
     22.7,
     36,
     9.6,
     14.5
    ],
    [
     "2025-01",
     22.8,
     37,
     9.6,
     13.1
    ],
    [
     "2025-02",
     22.7,
     36.8,
     9.6,
     13.1
    ],
    [
     "2025-03",
     43,
     81.9,
     9.6,
     13.1
    ],
    [
     "2025-04",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-05",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-06",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-07",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-08",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-09",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-10",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-11",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2025-12",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-01",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-02",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-03",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-04",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-05",
     51.2,
     100,
     9.6,
     13.1
    ],
    [
     "2026-06",
     45.8,
     88.2,
     9.6,
     13.1
    ]
   ]
  },
  {
   "family": "lifting-handling",
   "label": "Lifting and handling equipment",
   "latest": {
    "period": "2026-06",
    "rri": 55.2,
    "band": "building case",
    "tariffScore": 71.4,
    "levelScore": 60.8,
    "trendScore": 96.2,
    "dependenceScore": 69.3,
    "concentrationScore": 9.3,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 11.1,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 18.24,
    "exportRatio": 0.307,
    "hhi": 930,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 86,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     31.8,
     19.4,
     69.3,
     9.1
    ],
    [
     "2023-02",
     31.8,
     19.3,
     69.3,
     9.1
    ],
    [
     "2023-03",
     31.5,
     18.7,
     69.3,
     9.1
    ],
    [
     "2023-04",
     31.8,
     19.4,
     69.3,
     9.1
    ],
    [
     "2023-05",
     32.1,
     20,
     69.3,
     9.1
    ],
    [
     "2023-06",
     32.2,
     20.2,
     69.3,
     9.1
    ],
    [
     "2023-07",
     31.8,
     19.4,
     69.3,
     9.1
    ],
    [
     "2023-08",
     31.6,
     18.9,
     69.3,
     9.1
    ],
    [
     "2023-09",
     31.4,
     18.6,
     69.3,
     9.1
    ],
    [
     "2023-10",
     31.4,
     18.6,
     69.3,
     9.1
    ],
    [
     "2023-11",
     31,
     17.7,
     69.3,
     9.1
    ],
    [
     "2023-12",
     31.3,
     18.2,
     69.3,
     9.1
    ],
    [
     "2024-01",
     31.3,
     18.4,
     69.3,
     8.9
    ],
    [
     "2024-02",
     30.9,
     17.6,
     69.3,
     8.9
    ],
    [
     "2024-03",
     31.3,
     18.4,
     69.3,
     8.9
    ],
    [
     "2024-04",
     31.4,
     18.6,
     69.3,
     8.9
    ],
    [
     "2024-05",
     31.2,
     18.2,
     69.3,
     8.9
    ],
    [
     "2024-06",
     31.6,
     19.1,
     69.3,
     8.9
    ],
    [
     "2024-07",
     31.7,
     19.3,
     69.3,
     8.9
    ],
    [
     "2024-08",
     31.9,
     19.8,
     69.3,
     8.9
    ],
    [
     "2024-09",
     32.4,
     20.8,
     69.3,
     8.9
    ],
    [
     "2024-10",
     31.5,
     18.8,
     69.3,
     8.9
    ],
    [
     "2024-11",
     31.9,
     19.7,
     69.3,
     8.9
    ],
    [
     "2024-12",
     32.9,
     21.9,
     69.3,
     8.9
    ],
    [
     "2025-01",
     33.3,
     22.6,
     69.3,
     9.3
    ],
    [
     "2025-02",
     33.3,
     22.7,
     69.3,
     9.3
    ],
    [
     "2025-03",
     35.3,
     27,
     69.3,
     9.3
    ],
    [
     "2025-04",
     38.3,
     33.8,
     69.3,
     9.3
    ],
    [
     "2025-05",
     45.4,
     49.5,
     69.3,
     9.3
    ],
    [
     "2025-06",
     44.1,
     46.6,
     69.3,
     9.3
    ],
    [
     "2025-07",
     49.1,
     57.7,
     69.3,
     9.3
    ],
    [
     "2025-08",
     53,
     66.5,
     69.3,
     9.3
    ],
    [
     "2025-09",
     58.8,
     79.2,
     69.3,
     9.3
    ],
    [
     "2025-10",
     61.1,
     84.3,
     69.3,
     9.3
    ],
    [
     "2025-11",
     58.1,
     77.8,
     69.3,
     9.3
    ],
    [
     "2025-12",
     55.3,
     71.5,
     69.3,
     9.3
    ],
    [
     "2026-01",
     55.7,
     72.3,
     69.3,
     9.3
    ],
    [
     "2026-02",
     52.7,
     65.7,
     69.3,
     9.3
    ],
    [
     "2026-03",
     50.9,
     61.7,
     69.3,
     9.3
    ],
    [
     "2026-04",
     56.2,
     73.6,
     69.3,
     9.3
    ],
    [
     "2026-05",
     57,
     75.4,
     69.3,
     9.3
    ],
    [
     "2026-06",
     55.2,
     71.4,
     69.3,
     9.3
    ]
   ]
  },
  {
   "family": "machine-tools-cutting",
   "label": "Metal-cutting machine tools",
   "latest": {
    "period": "2026-06",
    "rri": 46.8,
    "band": "building case",
    "tariffScore": 44.8,
    "levelScore": 40.7,
    "trendScore": 54.3,
    "dependenceScore": 76.5,
    "concentrationScore": 14.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.22,
    "exportRatio": 0.235,
    "hhi": 1470,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 89.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     37.9,
     24.4,
     76.5,
     15.7
    ],
    [
     "2020-02",
     37.4,
     23.5,
     76.5,
     15.7
    ],
    [
     "2020-03",
     37,
     22.5,
     76.5,
     15.7
    ],
    [
     "2020-04",
     37.4,
     23.5,
     76.5,
     15.7
    ],
    [
     "2020-05",
     37.5,
     23.7,
     76.5,
     15.7
    ],
    [
     "2020-06",
     37.4,
     23.3,
     76.5,
     15.7
    ],
    [
     "2020-07",
     37.9,
     24.5,
     76.5,
     15.7
    ],
    [
     "2020-08",
     38.1,
     25,
     76.5,
     15.7
    ],
    [
     "2020-09",
     38.3,
     25.3,
     76.5,
     15.7
    ],
    [
     "2020-10",
     37.6,
     23.9,
     76.5,
     15.7
    ],
    [
     "2020-11",
     37.8,
     24.3,
     76.5,
     15.7
    ],
    [
     "2020-12",
     38,
     24.7,
     76.5,
     15.7
    ],
    [
     "2021-01",
     37.9,
     24.4,
     76.5,
     15.8
    ],
    [
     "2021-02",
     37.8,
     24.2,
     76.5,
     15.8
    ],
    [
     "2021-03",
     37.4,
     23.3,
     76.5,
     15.8
    ],
    [
     "2021-04",
     36.5,
     21.4,
     76.5,
     15.8
    ],
    [
     "2021-05",
     37.2,
     22.8,
     76.5,
     15.8
    ],
    [
     "2021-06",
     37.6,
     23.8,
     76.5,
     15.8
    ],
    [
     "2021-07",
     36.4,
     21.1,
     76.5,
     15.8
    ],
    [
     "2021-08",
     36.6,
     21.6,
     76.5,
     15.8
    ],
    [
     "2021-09",
     36.9,
     22.3,
     76.5,
     15.8
    ],
    [
     "2021-10",
     36.6,
     21.6,
     76.5,
     15.8
    ],
    [
     "2021-11",
     36.8,
     22.1,
     76.5,
     15.8
    ],
    [
     "2021-12",
     37.1,
     22.7,
     76.5,
     15.8
    ],
    [
     "2022-01",
     37.2,
     23.1,
     76.5,
     15.5
    ],
    [
     "2022-02",
     37,
     22.7,
     76.5,
     15.5
    ],
    [
     "2022-03",
     37.2,
     23.1,
     76.5,
     15.5
    ],
    [
     "2022-04",
     37.4,
     23.5,
     76.5,
     15.5
    ],
    [
     "2022-05",
     36.8,
     22.1,
     76.5,
     15.5
    ],
    [
     "2022-06",
     37,
     22.7,
     76.5,
     15.5
    ],
    [
     "2022-07",
     37.4,
     23.4,
     76.5,
     15.5
    ],
    [
     "2022-08",
     37.2,
     23.1,
     76.5,
     15.5
    ],
    [
     "2022-09",
     36.7,
     21.9,
     76.5,
     15.5
    ],
    [
     "2022-10",
     37.9,
     24.6,
     76.5,
     15.5
    ],
    [
     "2022-11",
     36.2,
     20.9,
     76.5,
     15.5
    ],
    [
     "2022-12",
     36.2,
     20.9,
     76.5,
     15.5
    ],
    [
     "2023-01",
     36.6,
     22.1,
     76.5,
     14.8
    ],
    [
     "2023-02",
     36.2,
     21.2,
     76.5,
     14.8
    ],
    [
     "2023-03",
     36.3,
     21.4,
     76.5,
     14.8
    ],
    [
     "2023-04",
     36.7,
     22.4,
     76.5,
     14.8
    ],
    [
     "2023-05",
     37.2,
     23.5,
     76.5,
     14.8
    ],
    [
     "2023-06",
     36.8,
     22.6,
     76.5,
     14.8
    ],
    [
     "2023-07",
     36.8,
     22.5,
     76.5,
     14.8
    ],
    [
     "2023-08",
     36.8,
     22.5,
     76.5,
     14.8
    ],
    [
     "2023-09",
     36.6,
     22.2,
     76.5,
     14.8
    ],
    [
     "2023-10",
     36.5,
     21.9,
     76.5,
     14.8
    ],
    [
     "2023-11",
     36.6,
     22.1,
     76.5,
     14.8
    ],
    [
     "2023-12",
     36.9,
     22.8,
     76.5,
     14.8
    ],
    [
     "2024-01",
     36.5,
     22,
     76.5,
     14.4
    ],
    [
     "2024-02",
     37.8,
     25.1,
     76.5,
     14.4
    ],
    [
     "2024-03",
     36.5,
     22.2,
     76.5,
     14.4
    ],
    [
     "2024-04",
     37.5,
     24.3,
     76.5,
     14.4
    ],
    [
     "2024-05",
     36.8,
     22.7,
     76.5,
     14.4
    ],
    [
     "2024-06",
     36.6,
     22.3,
     76.5,
     14.4
    ],
    [
     "2024-07",
     37,
     23.2,
     76.5,
     14.4
    ],
    [
     "2024-08",
     37.5,
     24.3,
     76.5,
     14.4
    ],
    [
     "2024-09",
     37.1,
     23.5,
     76.5,
     14.4
    ],
    [
     "2024-10",
     36.5,
     22.1,
     76.5,
     14.4
    ],
    [
     "2024-11",
     36.8,
     22.8,
     76.5,
     14.4
    ],
    [
     "2024-12",
     37.8,
     25,
     76.5,
     14.4
    ],
    [
     "2025-01",
     38.8,
     27.1,
     76.5,
     14.7
    ],
    [
     "2025-02",
     37.2,
     23.4,
     76.5,
     14.7
    ],
    [
     "2025-03",
     38.6,
     26.7,
     76.5,
     14.7
    ],
    [
     "2025-04",
     39.9,
     29.5,
     76.5,
     14.7
    ],
    [
     "2025-05",
     48.5,
     48.7,
     76.5,
     14.7
    ],
    [
     "2025-06",
     50.8,
     53.7,
     76.5,
     14.7
    ],
    [
     "2025-07",
     52.4,
     57.2,
     76.5,
     14.7
    ],
    [
     "2025-08",
     52,
     56.4,
     76.5,
     14.7
    ],
    [
     "2025-09",
     56.9,
     67.2,
     76.5,
     14.7
    ],
    [
     "2025-10",
     54,
     60.8,
     76.5,
     14.7
    ],
    [
     "2025-11",
     52.1,
     56.7,
     76.5,
     14.7
    ],
    [
     "2025-12",
     50.2,
     52.4,
     76.5,
     14.7
    ],
    [
     "2026-01",
     50.4,
     52.8,
     76.5,
     14.7
    ],
    [
     "2026-02",
     49.2,
     50.1,
     76.5,
     14.7
    ],
    [
     "2026-03",
     47.9,
     47.2,
     76.5,
     14.7
    ],
    [
     "2026-04",
     47.8,
     47,
     76.5,
     14.7
    ],
    [
     "2026-05",
     44.9,
     40.6,
     76.5,
     14.7
    ],
    [
     "2026-06",
     46.8,
     44.8,
     76.5,
     14.7
    ]
   ]
  },
  {
   "family": "machine-tools-forming",
   "label": "Metal-forming machine tools",
   "latest": {
    "period": "2026-06",
    "rri": 44.9,
    "band": "building case",
    "tariffScore": 44.5,
    "levelScore": 41.3,
    "trendScore": 52,
    "dependenceScore": 74.8,
    "concentrationScore": 9.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -4.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.38,
    "exportRatio": 0.252,
    "hhi": 980,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.8,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     36.7,
     26.9,
     74.8,
     8.5
    ],
    [
     "2023-02",
     36.4,
     26.2,
     74.8,
     8.5
    ],
    [
     "2023-03",
     36.5,
     26.5,
     74.8,
     8.5
    ],
    [
     "2023-04",
     36.2,
     25.8,
     74.8,
     8.5
    ],
    [
     "2023-05",
     37,
     27.7,
     74.8,
     8.5
    ],
    [
     "2023-06",
     35.9,
     25.3,
     74.8,
     8.5
    ],
    [
     "2023-07",
     35.9,
     25.3,
     74.8,
     8.5
    ],
    [
     "2023-08",
     35.7,
     24.8,
     74.8,
     8.5
    ],
    [
     "2023-09",
     37.3,
     28.3,
     74.8,
     8.5
    ],
    [
     "2023-10",
     38.3,
     30.6,
     74.8,
     8.5
    ],
    [
     "2023-11",
     35.4,
     24,
     74.8,
     8.5
    ],
    [
     "2023-12",
     35.5,
     24.4,
     74.8,
     8.5
    ],
    [
     "2024-01",
     35.1,
     22.8,
     74.8,
     9.6
    ],
    [
     "2024-02",
     37.6,
     28.4,
     74.8,
     9.6
    ],
    [
     "2024-03",
     35.4,
     23.4,
     74.8,
     9.6
    ],
    [
     "2024-04",
     35.1,
     22.9,
     74.8,
     9.6
    ],
    [
     "2024-05",
     35.2,
     23.1,
     74.8,
     9.6
    ],
    [
     "2024-06",
     36.1,
     25.1,
     74.8,
     9.6
    ],
    [
     "2024-07",
     36.7,
     26.4,
     74.8,
     9.6
    ],
    [
     "2024-08",
     36.7,
     26.3,
     74.8,
     9.6
    ],
    [
     "2024-09",
     35,
     22.5,
     74.8,
     9.6
    ],
    [
     "2024-10",
     34.2,
     20.8,
     74.8,
     9.6
    ],
    [
     "2024-11",
     36.9,
     26.8,
     74.8,
     9.6
    ],
    [
     "2024-12",
     36.3,
     25.4,
     74.8,
     9.6
    ],
    [
     "2025-01",
     37.9,
     29,
     74.8,
     9.8
    ],
    [
     "2025-02",
     35.6,
     23.8,
     74.8,
     9.8
    ],
    [
     "2025-03",
     37,
     26.8,
     74.8,
     9.8
    ],
    [
     "2025-04",
     40.1,
     33.9,
     74.8,
     9.8
    ],
    [
     "2025-05",
     50.5,
     57,
     74.8,
     9.8
    ],
    [
     "2025-06",
     49.4,
     54.4,
     74.8,
     9.8
    ],
    [
     "2025-07",
     53.6,
     63.7,
     74.8,
     9.8
    ],
    [
     "2025-08",
     54.5,
     65.7,
     74.8,
     9.8
    ],
    [
     "2025-09",
     55.3,
     67.5,
     74.8,
     9.8
    ],
    [
     "2025-10",
     54.9,
     66.6,
     74.8,
     9.8
    ],
    [
     "2025-11",
     50,
     55.8,
     74.8,
     9.8
    ],
    [
     "2025-12",
     49.2,
     54.1,
     74.8,
     9.8
    ],
    [
     "2026-01",
     48.2,
     51.8,
     74.8,
     9.8
    ],
    [
     "2026-02",
     46.1,
     47.2,
     74.8,
     9.8
    ],
    [
     "2026-03",
     48.8,
     53.1,
     74.8,
     9.8
    ],
    [
     "2026-04",
     48.5,
     52.5,
     74.8,
     9.8
    ],
    [
     "2026-05",
     44.4,
     43.4,
     74.8,
     9.8
    ],
    [
     "2026-06",
     44.9,
     44.5,
     74.8,
     9.8
    ]
   ]
  },
  {
   "family": "measuring-instruments",
   "label": "Measuring and inspection instruments",
   "latest": {
    "period": "2026-06",
    "rri": 32.2,
    "band": "weak case",
    "tariffScore": 31.6,
    "levelScore": 28.7,
    "trendScore": 38.4,
    "dependenceScore": 53.2,
    "concentrationScore": 8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -10.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 8.6,
    "exportRatio": 0.468,
    "hhi": 800,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 74.7,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     26.9,
     19.8,
     53.2,
     8.2
    ],
    [
     "2020-02",
     26.1,
     17.9,
     53.2,
     8.2
    ],
    [
     "2020-03",
     26,
     17.8,
     53.2,
     8.2
    ],
    [
     "2020-04",
     27,
     19.9,
     53.2,
     8.2
    ],
    [
     "2020-05",
     27.2,
     20.5,
     53.2,
     8.2
    ],
    [
     "2020-06",
     27,
     19.9,
     53.2,
     8.2
    ],
    [
     "2020-07",
     26.7,
     19.2,
     53.2,
     8.2
    ],
    [
     "2020-08",
     26.7,
     19.3,
     53.2,
     8.2
    ],
    [
     "2020-09",
     26.8,
     19.5,
     53.2,
     8.2
    ],
    [
     "2020-10",
     26.6,
     19,
     53.2,
     8.2
    ],
    [
     "2020-11",
     26.7,
     19.4,
     53.2,
     8.2
    ],
    [
     "2020-12",
     26.8,
     19.6,
     53.2,
     8.2
    ],
    [
     "2021-01",
     26.8,
     19.9,
     53.2,
     7.7
    ],
    [
     "2021-02",
     27.1,
     20.4,
     53.2,
     7.7
    ],
    [
     "2021-03",
     27.2,
     20.6,
     53.2,
     7.7
    ],
    [
     "2021-04",
     26.4,
     18.9,
     53.2,
     7.7
    ],
    [
     "2021-05",
     26.8,
     19.7,
     53.2,
     7.7
    ],
    [
     "2021-06",
     26.6,
     19.4,
     53.2,
     7.7
    ],
    [
     "2021-07",
     27.1,
     20.4,
     53.2,
     7.7
    ],
    [
     "2021-08",
     26.9,
     20,
     53.2,
     7.7
    ],
    [
     "2021-09",
     26.8,
     19.7,
     53.2,
     7.7
    ],
    [
     "2021-10",
     26.6,
     19.4,
     53.2,
     7.7
    ],
    [
     "2021-11",
     26.9,
     20,
     53.2,
     7.7
    ],
    [
     "2021-12",
     26.8,
     19.7,
     53.2,
     7.7
    ],
    [
     "2022-01",
     27,
     20.3,
     53.2,
     7.5
    ],
    [
     "2022-02",
     26.9,
     20.2,
     53.2,
     7.5
    ],
    [
     "2022-03",
     26.7,
     19.8,
     53.2,
     7.5
    ],
    [
     "2022-04",
     26.4,
     19.1,
     53.2,
     7.5
    ],
    [
     "2022-05",
     26.5,
     19.3,
     53.2,
     7.5
    ],
    [
     "2022-06",
     27,
     20.4,
     53.2,
     7.5
    ],
    [
     "2022-07",
     27.1,
     20.6,
     53.2,
     7.5
    ],
    [
     "2022-08",
     27.4,
     21.3,
     53.2,
     7.5
    ],
    [
     "2022-09",
     27.2,
     20.7,
     53.2,
     7.5
    ],
    [
     "2022-10",
     26.8,
     19.9,
     53.2,
     7.5
    ],
    [
     "2022-11",
     26.7,
     19.6,
     53.2,
     7.5
    ],
    [
     "2022-12",
     26.3,
     18.9,
     53.2,
     7.5
    ],
    [
     "2023-01",
     26.3,
     18.9,
     53.2,
     7.3
    ],
    [
     "2023-02",
     25.7,
     17.6,
     53.2,
     7.3
    ],
    [
     "2023-03",
     26,
     18.2,
     53.2,
     7.3
    ],
    [
     "2023-04",
     26.3,
     18.9,
     53.2,
     7.3
    ],
    [
     "2023-05",
     26,
     18.2,
     53.2,
     7.3
    ],
    [
     "2023-06",
     25.7,
     17.6,
     53.2,
     7.3
    ],
    [
     "2023-07",
     25.8,
     17.9,
     53.2,
     7.3
    ],
    [
     "2023-08",
     25.9,
     18.1,
     53.2,
     7.3
    ],
    [
     "2023-09",
     25.8,
     17.8,
     53.2,
     7.3
    ],
    [
     "2023-10",
     26,
     18.3,
     53.2,
     7.3
    ],
    [
     "2023-11",
     25.6,
     17.4,
     53.2,
     7.3
    ],
    [
     "2023-12",
     26.2,
     18.8,
     53.2,
     7.3
    ],
    [
     "2024-01",
     26.2,
     18.8,
     53.2,
     7.3
    ],
    [
     "2024-02",
     26.2,
     18.7,
     53.2,
     7.3
    ],
    [
     "2024-03",
     25.8,
     17.7,
     53.2,
     7.3
    ],
    [
     "2024-04",
     25.8,
     17.9,
     53.2,
     7.3
    ],
    [
     "2024-05",
     26.2,
     18.8,
     53.2,
     7.3
    ],
    [
     "2024-06",
     26,
     18.3,
     53.2,
     7.3
    ],
    [
     "2024-07",
     26.2,
     18.6,
     53.2,
     7.3
    ],
    [
     "2024-08",
     25.8,
     17.8,
     53.2,
     7.3
    ],
    [
     "2024-09",
     25.9,
     18,
     53.2,
     7.3
    ],
    [
     "2024-10",
     25.7,
     17.5,
     53.2,
     7.3
    ],
    [
     "2024-11",
     26.1,
     18.4,
     53.2,
     7.3
    ],
    [
     "2024-12",
     26.1,
     18.4,
     53.2,
     7.3
    ],
    [
     "2025-01",
     26.6,
     19.3,
     53.2,
     8
    ],
    [
     "2025-02",
     26.2,
     18.4,
     53.2,
     8
    ],
    [
     "2025-03",
     30,
     26.8,
     53.2,
     8
    ],
    [
     "2025-04",
     39.7,
     48.3,
     53.2,
     8
    ],
    [
     "2025-05",
     44,
     57.8,
     53.2,
     8
    ],
    [
     "2025-06",
     42.6,
     54.7,
     53.2,
     8
    ],
    [
     "2025-07",
     43.3,
     56.4,
     53.2,
     8
    ],
    [
     "2025-08",
     46.3,
     62.9,
     53.2,
     8
    ],
    [
     "2025-09",
     47.2,
     65,
     53.2,
     8
    ],
    [
     "2025-10",
     47.8,
     66.2,
     53.2,
     8
    ],
    [
     "2025-11",
     47.3,
     65.3,
     53.2,
     8
    ],
    [
     "2025-12",
     46.4,
     63.3,
     53.2,
     8
    ],
    [
     "2026-01",
     46.6,
     63.7,
     53.2,
     8
    ],
    [
     "2026-02",
     45.1,
     60.4,
     53.2,
     8
    ],
    [
     "2026-03",
     37.3,
     42.9,
     53.2,
     8
    ],
    [
     "2026-04",
     33.1,
     33.6,
     53.2,
     8
    ],
    [
     "2026-05",
     30.9,
     28.8,
     53.2,
     8
    ],
    [
     "2026-06",
     32.2,
     31.6,
     53.2,
     8
    ]
   ]
  },
  {
   "family": "molds-dies",
   "label": "Molds and die sets",
   "latest": {
    "period": "2026-06",
    "rri": 47.1,
    "band": "building case",
    "tariffScore": 45.7,
    "levelScore": 44.1,
    "trendScore": 49.6,
    "dependenceScore": 73.6,
    "concentrationScore": 17.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 13.22,
    "exportRatio": 0.264,
    "hhi": 1790,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 85.8,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     35.5,
     18.6,
     73.6,
     20.1
    ],
    [
     "2014-02",
     35.5,
     18.7,
     73.6,
     20.1
    ],
    [
     "2014-03",
     35.4,
     18.4,
     73.6,
     20.1
    ],
    [
     "2014-04",
     35.4,
     18.4,
     73.6,
     20.1
    ],
    [
     "2014-05",
     35.3,
     18.2,
     73.6,
     20.1
    ],
    [
     "2014-06",
     35.3,
     18.3,
     73.6,
     20.1
    ],
    [
     "2014-07",
     35.3,
     18.3,
     73.6,
     20.1
    ],
    [
     "2014-08",
     35.4,
     18.5,
     73.6,
     20.1
    ],
    [
     "2014-09",
     35.3,
     18.2,
     73.6,
     20.1
    ],
    [
     "2014-10",
     35.2,
     18,
     73.6,
     20.1
    ],
    [
     "2014-11",
     35.4,
     18.5,
     73.6,
     20.1
    ],
    [
     "2014-12",
     35.3,
     18.3,
     73.6,
     20.1
    ],
    [
     "2015-01",
     36,
     18.2,
     73.6,
     22.8
    ],
    [
     "2015-02",
     36,
     18.2,
     73.6,
     22.8
    ],
    [
     "2015-03",
     36.1,
     18.4,
     73.6,
     22.8
    ],
    [
     "2015-04",
     36.1,
     18.4,
     73.6,
     22.8
    ],
    [
     "2015-05",
     35.9,
     18.1,
     73.6,
     22.8
    ],
    [
     "2015-06",
     36,
     18.3,
     73.6,
     22.8
    ],
    [
     "2015-07",
     36,
     18.3,
     73.6,
     22.8
    ],
    [
     "2015-08",
     35.5,
     17.2,
     73.6,
     22.8
    ],
    [
     "2015-09",
     35.8,
     17.8,
     73.6,
     22.8
    ],
    [
     "2015-10",
     35.6,
     17.4,
     73.6,
     22.8
    ],
    [
     "2015-11",
     35.8,
     17.9,
     73.6,
     22.8
    ],
    [
     "2015-12",
     36.1,
     18.4,
     73.6,
     22.8
    ],
    [
     "2016-01",
     36.3,
     18.9,
     73.6,
     22.8
    ],
    [
     "2016-02",
     35.9,
     18,
     73.6,
     22.8
    ],
    [
     "2016-03",
     35.8,
     17.9,
     73.6,
     22.8
    ],
    [
     "2016-04",
     36,
     18.3,
     73.6,
     22.8
    ],
    [
     "2016-05",
     36,
     18.2,
     73.6,
     22.8
    ],
    [
     "2016-06",
     35.9,
     18.1,
     73.6,
     22.8
    ],
    [
     "2016-07",
     36.1,
     18.4,
     73.6,
     22.8
    ],
    [
     "2016-08",
     36.6,
     19.5,
     73.6,
     22.8
    ],
    [
     "2016-09",
     36.1,
     18.5,
     73.6,
     22.8
    ],
    [
     "2016-10",
     36.2,
     18.6,
     73.6,
     22.8
    ],
    [
     "2016-11",
     36.3,
     18.9,
     73.6,
     22.8
    ],
    [
     "2016-12",
     36.4,
     19.2,
     73.6,
     22.8
    ],
    [
     "2017-01",
     36.1,
     18.2,
     73.6,
     23.5
    ],
    [
     "2017-02",
     36.1,
     18.1,
     73.6,
     23.5
    ],
    [
     "2017-03",
     36,
     17.8,
     73.6,
     23.5
    ],
    [
     "2017-04",
     35.9,
     17.7,
     73.6,
     23.5
    ],
    [
     "2017-05",
     36,
     17.8,
     73.6,
     23.5
    ],
    [
     "2017-06",
     36.1,
     18.1,
     73.6,
     23.5
    ],
    [
     "2017-07",
     36.3,
     18.5,
     73.6,
     23.5
    ],
    [
     "2017-08",
     36,
     17.9,
     73.6,
     23.5
    ],
    [
     "2017-09",
     36.4,
     18.7,
     73.6,
     23.5
    ],
    [
     "2017-10",
     36.4,
     18.7,
     73.6,
     23.5
    ],
    [
     "2017-11",
     36.3,
     18.5,
     73.6,
     23.5
    ],
    [
     "2017-12",
     36.4,
     18.7,
     73.6,
     23.5
    ],
    [
     "2018-01",
     36.2,
     18.6,
     73.6,
     23.1
    ],
    [
     "2018-02",
     36.4,
     18.9,
     73.6,
     23.1
    ],
    [
     "2018-03",
     36.4,
     19.1,
     73.6,
     23.1
    ],
    [
     "2018-04",
     36.4,
     19.1,
     73.6,
     23.1
    ],
    [
     "2018-05",
     36.1,
     18.4,
     73.6,
     23.1
    ],
    [
     "2018-06",
     36.2,
     18.5,
     73.6,
     23.1
    ],
    [
     "2018-07",
     37.7,
     21.9,
     73.6,
     23.1
    ],
    [
     "2018-08",
     38.6,
     23.9,
     73.6,
     23.1
    ],
    [
     "2018-09",
     37.8,
     22.2,
     73.6,
     23.1
    ],
    [
     "2018-10",
     37.9,
     22.3,
     73.6,
     23.1
    ],
    [
     "2018-11",
     38.2,
     22.9,
     73.6,
     23.1
    ],
    [
     "2018-12",
     38.3,
     23.2,
     73.6,
     23.1
    ],
    [
     "2019-01",
     38.2,
     22.9,
     73.6,
     23.4
    ],
    [
     "2019-02",
     37.5,
     21.2,
     73.6,
     23.4
    ],
    [
     "2019-03",
     37.2,
     20.5,
     73.6,
     23.4
    ],
    [
     "2019-04",
     37,
     20.1,
     73.6,
     23.4
    ],
    [
     "2019-05",
     37.7,
     21.8,
     73.6,
     23.4
    ],
    [
     "2019-06",
     37.9,
     22.1,
     73.6,
     23.4
    ],
    [
     "2019-07",
     37.4,
     21,
     73.6,
     23.4
    ],
    [
     "2019-08",
     36.7,
     19.4,
     73.6,
     23.4
    ],
    [
     "2019-09",
     37.7,
     21.6,
     73.6,
     23.4
    ],
    [
     "2019-10",
     37.5,
     21.3,
     73.6,
     23.4
    ],
    [
     "2019-11",
     37.4,
     21.1,
     73.6,
     23.4
    ],
    [
     "2019-12",
     37.6,
     21.4,
     73.6,
     23.4
    ],
    [
     "2020-01",
     43.5,
     36.3,
     73.6,
     20.3
    ],
    [
     "2020-02",
     40.8,
     30.4,
     73.6,
     20.3
    ],
    [
     "2020-03",
     39.5,
     27.4,
     73.6,
     20.3
    ],
    [
     "2020-04",
     41,
     30.8,
     73.6,
     20.3
    ],
    [
     "2020-05",
     41.2,
     31.1,
     73.6,
     20.3
    ],
    [
     "2020-06",
     41.6,
     32,
     73.6,
     20.3
    ],
    [
     "2020-07",
     40.9,
     30.6,
     73.6,
     20.3
    ],
    [
     "2020-08",
     41.5,
     31.9,
     73.6,
     20.3
    ],
    [
     "2020-09",
     40.7,
     30,
     73.6,
     20.3
    ],
    [
     "2020-10",
     40.1,
     28.8,
     73.6,
     20.3
    ],
    [
     "2020-11",
     41.9,
     32.7,
     73.6,
     20.3
    ],
    [
     "2020-12",
     43,
     35.3,
     73.6,
     20.3
    ],
    [
     "2021-01",
     38.1,
     23.2,
     73.6,
     22.2
    ],
    [
     "2021-02",
     40.9,
     29.4,
     73.6,
     22.2
    ],
    [
     "2021-03",
     40.1,
     27.8,
     73.6,
     22.2
    ],
    [
     "2021-04",
     39.4,
     26.1,
     73.6,
     22.2
    ],
    [
     "2021-05",
     40,
     27.5,
     73.6,
     22.2
    ],
    [
     "2021-06",
     40.8,
     29.3,
     73.6,
     22.2
    ],
    [
     "2021-07",
     41.1,
     30,
     73.6,
     22.2
    ],
    [
     "2021-08",
     40.3,
     28.1,
     73.6,
     22.2
    ],
    [
     "2021-09",
     42.3,
     32.7,
     73.6,
     22.2
    ],
    [
     "2021-10",
     41.4,
     30.6,
     73.6,
     22.2
    ],
    [
     "2021-11",
     41.3,
     30.3,
     73.6,
     22.2
    ],
    [
     "2021-12",
     38.8,
     24.8,
     73.6,
     22.2
    ],
    [
     "2022-01",
     42.4,
     33.4,
     73.6,
     21.3
    ],
    [
     "2022-02",
     39.1,
     25.9,
     73.6,
     21.3
    ],
    [
     "2022-03",
     40.3,
     28.6,
     73.6,
     21.3
    ],
    [
     "2022-04",
     40.7,
     29.5,
     73.6,
     21.3
    ],
    [
     "2022-05",
     39.1,
     25.9,
     73.6,
     21.3
    ],
    [
     "2022-06",
     37.9,
     23.4,
     73.6,
     21.3
    ],
    [
     "2022-07",
     38.6,
     24.8,
     73.6,
     21.3
    ],
    [
     "2022-08",
     40.1,
     28.1,
     73.6,
     21.3
    ],
    [
     "2022-09",
     38.5,
     24.6,
     73.6,
     21.3
    ],
    [
     "2022-10",
     38.2,
     24,
     73.6,
     21.3
    ],
    [
     "2022-11",
     38.2,
     23.9,
     73.6,
     21.3
    ],
    [
     "2022-12",
     39.4,
     26.7,
     73.6,
     21.3
    ],
    [
     "2023-01",
     39.4,
     24.6,
     73.6,
     24.8
    ],
    [
     "2023-02",
     40.5,
     27.1,
     73.6,
     24.8
    ],
    [
     "2023-03",
     38.4,
     22.4,
     73.6,
     24.8
    ],
    [
     "2023-04",
     39.8,
     25.5,
     73.6,
     24.8
    ],
    [
     "2023-05",
     40.4,
     27,
     73.6,
     24.8
    ],
    [
     "2023-06",
     39.8,
     25.5,
     73.6,
     24.8
    ],
    [
     "2023-07",
     40,
     26.1,
     73.6,
     24.8
    ],
    [
     "2023-08",
     39.9,
     25.9,
     73.6,
     24.8
    ],
    [
     "2023-09",
     40.5,
     27.1,
     73.6,
     24.8
    ],
    [
     "2023-10",
     39.7,
     25.3,
     73.6,
     24.8
    ],
    [
     "2023-11",
     39.6,
     25.1,
     73.6,
     24.8
    ],
    [
     "2023-12",
     40.7,
     27.5,
     73.6,
     24.8
    ],
    [
     "2024-01",
     38.7,
     26.7,
     73.6,
     18.5
    ],
    [
     "2024-02",
     38,
     25.2,
     73.6,
     18.5
    ],
    [
     "2024-03",
     39.2,
     27.7,
     73.6,
     18.5
    ],
    [
     "2024-04",
     38,
     25.2,
     73.6,
     18.5
    ],
    [
     "2024-05",
     38.9,
     27,
     73.6,
     18.5
    ],
    [
     "2024-06",
     38.5,
     26.3,
     73.6,
     18.5
    ],
    [
     "2024-07",
     38.2,
     25.6,
     73.6,
     18.5
    ],
    [
     "2024-08",
     40.1,
     29.8,
     73.6,
     18.5
    ],
    [
     "2024-09",
     38.9,
     27,
     73.6,
     18.5
    ],
    [
     "2024-10",
     39.3,
     28,
     73.6,
     18.5
    ],
    [
     "2024-11",
     39.3,
     27.9,
     73.6,
     18.5
    ],
    [
     "2024-12",
     38.1,
     25.4,
     73.6,
     18.5
    ],
    [
     "2025-01",
     39.6,
     29,
     73.6,
     17.9
    ],
    [
     "2025-02",
     38.8,
     27.1,
     73.6,
     17.9
    ],
    [
     "2025-03",
     43.6,
     37.9,
     73.6,
     17.9
    ],
    [
     "2025-04",
     50.4,
     53,
     73.6,
     17.9
    ],
    [
     "2025-05",
     53.7,
     60.4,
     73.6,
     17.9
    ],
    [
     "2025-06",
     53.1,
     58.9,
     73.6,
     17.9
    ],
    [
     "2025-07",
     55.8,
     65,
     73.6,
     17.9
    ],
    [
     "2025-08",
     59.5,
     73.1,
     73.6,
     17.9
    ],
    [
     "2025-09",
     62.3,
     79.5,
     73.6,
     17.9
    ],
    [
     "2025-10",
     64.1,
     83.5,
     73.6,
     17.9
    ],
    [
     "2025-11",
     60.6,
     75.7,
     73.6,
     17.9
    ],
    [
     "2025-12",
     60.8,
     76.2,
     73.6,
     17.9
    ],
    [
     "2026-01",
     61.5,
     77.7,
     73.6,
     17.9
    ],
    [
     "2026-02",
     58.8,
     71.7,
     73.6,
     17.9
    ],
    [
     "2026-03",
     56.3,
     66,
     73.6,
     17.9
    ],
    [
     "2026-04",
     49.3,
     50.5,
     73.6,
     17.9
    ],
    [
     "2026-05",
     49.1,
     50.2,
     73.6,
     17.9
    ],
    [
     "2026-06",
     47.1,
     45.7,
     73.6,
     17.9
    ]
   ]
  },
  {
   "family": "nickel-alloys",
   "label": "Nickel and nickel alloys",
   "latest": {
    "period": "2026-06",
    "rri": 37.3,
    "band": "building case",
    "tariffScore": 24.1,
    "levelScore": 16.5,
    "trendScore": 41.9,
    "dependenceScore": 74.5,
    "concentrationScore": 16.6,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 4.95,
    "exportRatio": 0.255,
    "hhi": 1660,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 88.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     33,
     15.8,
     74.5,
     14.3
    ],
    [
     "2014-02",
     33.1,
     16,
     74.5,
     14.3
    ],
    [
     "2014-03",
     33,
     15.8,
     74.5,
     14.3
    ],
    [
     "2014-04",
     33.2,
     16.1,
     74.5,
     14.3
    ],
    [
     "2014-05",
     33.2,
     16.1,
     74.5,
     14.3
    ],
    [
     "2014-06",
     33.1,
     16,
     74.5,
     14.3
    ],
    [
     "2014-07",
     33.2,
     16.1,
     74.5,
     14.3
    ],
    [
     "2014-08",
     33.2,
     16.1,
     74.5,
     14.3
    ],
    [
     "2014-09",
     33.1,
     15.9,
     74.5,
     14.3
    ],
    [
     "2014-10",
     33.1,
     16,
     74.5,
     14.3
    ],
    [
     "2014-11",
     33.3,
     16.4,
     74.5,
     14.3
    ],
    [
     "2014-12",
     33.3,
     16.3,
     74.5,
     14.3
    ],
    [
     "2015-01",
     33.2,
     16.5,
     74.5,
     13.8
    ],
    [
     "2015-02",
     33.3,
     16.6,
     74.5,
     13.8
    ],
    [
     "2015-03",
     33.1,
     16.2,
     74.5,
     13.8
    ],
    [
     "2015-04",
     33.3,
     16.7,
     74.5,
     13.8
    ],
    [
     "2015-05",
     33.3,
     16.7,
     74.5,
     13.8
    ],
    [
     "2015-06",
     33.5,
     17,
     74.5,
     13.8
    ],
    [
     "2015-07",
     33.5,
     17,
     74.5,
     13.8
    ],
    [
     "2015-08",
     33.3,
     16.6,
     74.5,
     13.8
    ],
    [
     "2015-09",
     33.2,
     16.4,
     74.5,
     13.8
    ],
    [
     "2015-10",
     33.5,
     17.1,
     74.5,
     13.8
    ],
    [
     "2015-11",
     33.2,
     16.4,
     74.5,
     13.8
    ],
    [
     "2015-12",
     33.4,
     16.8,
     74.5,
     13.8
    ],
    [
     "2016-01",
     34.4,
     16.5,
     74.5,
     18.3
    ],
    [
     "2016-02",
     34.3,
     16.4,
     74.5,
     18.3
    ],
    [
     "2016-03",
     34.6,
     17,
     74.5,
     18.3
    ],
    [
     "2016-04",
     34.3,
     16.3,
     74.5,
     18.3
    ],
    [
     "2016-05",
     34.3,
     16.4,
     74.5,
     18.3
    ],
    [
     "2016-06",
     34.2,
     16.1,
     74.5,
     18.3
    ],
    [
     "2016-07",
     34.4,
     16.5,
     74.5,
     18.3
    ],
    [
     "2016-08",
     34.1,
     15.9,
     74.5,
     18.3
    ],
    [
     "2016-09",
     34.2,
     16.2,
     74.5,
     18.3
    ],
    [
     "2016-10",
     34.1,
     15.9,
     74.5,
     18.3
    ],
    [
     "2016-11",
     34.4,
     16.6,
     74.5,
     18.3
    ],
    [
     "2016-12",
     34.2,
     16.2,
     74.5,
     18.3
    ],
    [
     "2017-01",
     33.3,
     16.3,
     74.5,
     14.6
    ],
    [
     "2017-02",
     33.3,
     16.2,
     74.5,
     14.6
    ],
    [
     "2017-03",
     33.4,
     16.5,
     74.5,
     14.6
    ],
    [
     "2017-04",
     33.6,
     16.8,
     74.5,
     14.6
    ],
    [
     "2017-05",
     33.4,
     16.4,
     74.5,
     14.6
    ],
    [
     "2017-06",
     33.5,
     16.7,
     74.5,
     14.6
    ],
    [
     "2017-07",
     33.5,
     16.6,
     74.5,
     14.6
    ],
    [
     "2017-08",
     33.6,
     16.8,
     74.5,
     14.6
    ],
    [
     "2017-09",
     33.2,
     16.1,
     74.5,
     14.6
    ],
    [
     "2017-10",
     33.4,
     16.5,
     74.5,
     14.6
    ],
    [
     "2017-11",
     33.3,
     16.2,
     74.5,
     14.6
    ],
    [
     "2017-12",
     33.3,
     16.3,
     74.5,
     14.6
    ],
    [
     "2018-01",
     33.2,
     16,
     74.5,
     14.4
    ],
    [
     "2018-02",
     33.5,
     16.7,
     74.5,
     14.4
    ],
    [
     "2018-03",
     33.2,
     16,
     74.5,
     14.4
    ],
    [
     "2018-04",
     33,
     15.6,
     74.5,
     14.4
    ],
    [
     "2018-05",
     33.2,
     16.1,
     74.5,
     14.4
    ],
    [
     "2018-06",
     33.2,
     16.1,
     74.5,
     14.4
    ],
    [
     "2018-07",
     33.2,
     16.1,
     74.5,
     14.4
    ],
    [
     "2018-08",
     33.3,
     16.3,
     74.5,
     14.4
    ],
    [
     "2018-09",
     33.4,
     16.5,
     74.5,
     14.4
    ],
    [
     "2018-10",
     33.6,
     17,
     74.5,
     14.4
    ],
    [
     "2018-11",
     33.6,
     17.1,
     74.5,
     14.4
    ],
    [
     "2018-12",
     33.7,
     17.3,
     74.5,
     14.4
    ],
    [
     "2019-01",
     34.1,
     17.2,
     74.5,
     16
    ],
    [
     "2019-02",
     34.3,
     17.7,
     74.5,
     16
    ],
    [
     "2019-03",
     33.9,
     16.8,
     74.5,
     16
    ],
    [
     "2019-04",
     34.2,
     17.5,
     74.5,
     16
    ],
    [
     "2019-05",
     34,
     16.9,
     74.5,
     16
    ],
    [
     "2019-06",
     34.1,
     17.2,
     74.5,
     16
    ],
    [
     "2019-07",
     34.3,
     17.7,
     74.5,
     16
    ],
    [
     "2019-08",
     34.1,
     17.2,
     74.5,
     16
    ],
    [
     "2019-09",
     33.7,
     16.4,
     74.5,
     16
    ],
    [
     "2019-10",
     33.6,
     16.2,
     74.5,
     16
    ],
    [
     "2019-11",
     33.7,
     16.3,
     74.5,
     16
    ],
    [
     "2019-12",
     33.6,
     16.2,
     74.5,
     16
    ],
    [
     "2020-01",
     35.1,
     16.9,
     74.5,
     20.5
    ],
    [
     "2020-02",
     34.7,
     16.1,
     74.5,
     20.5
    ],
    [
     "2020-03",
     35.3,
     17.3,
     74.5,
     20.5
    ],
    [
     "2020-04",
     35.2,
     17.2,
     74.5,
     20.5
    ],
    [
     "2020-05",
     35.2,
     17.1,
     74.5,
     20.5
    ],
    [
     "2020-06",
     35,
     16.8,
     74.5,
     20.5
    ],
    [
     "2020-07",
     35,
     16.8,
     74.5,
     20.5
    ],
    [
     "2020-08",
     34.8,
     16.3,
     74.5,
     20.5
    ],
    [
     "2020-09",
     35,
     16.8,
     74.5,
     20.5
    ],
    [
     "2020-10",
     35.1,
     16.9,
     74.5,
     20.5
    ],
    [
     "2020-11",
     34.8,
     16.2,
     74.5,
     20.5
    ],
    [
     "2020-12",
     35,
     16.7,
     74.5,
     20.5
    ],
    [
     "2021-01",
     34.1,
     15.7,
     74.5,
     18.8
    ],
    [
     "2021-02",
     34.2,
     15.9,
     74.5,
     18.8
    ],
    [
     "2021-03",
     34.3,
     16.1,
     74.5,
     18.8
    ],
    [
     "2021-04",
     34,
     15.4,
     74.5,
     18.8
    ],
    [
     "2021-05",
     34.3,
     16,
     74.5,
     18.8
    ],
    [
     "2021-06",
     34.9,
     17.5,
     74.5,
     18.8
    ],
    [
     "2021-07",
     35.5,
     18.8,
     74.5,
     18.8
    ],
    [
     "2021-08",
     34.7,
     17.1,
     74.5,
     18.8
    ],
    [
     "2021-09",
     34.5,
     16.5,
     74.5,
     18.8
    ],
    [
     "2021-10",
     34.5,
     16.6,
     74.5,
     18.8
    ],
    [
     "2021-11",
     34.7,
     16.9,
     74.5,
     18.8
    ],
    [
     "2021-12",
     34.7,
     17.1,
     74.5,
     18.8
    ],
    [
     "2022-01",
     33.6,
     17.1,
     74.5,
     14.2
    ],
    [
     "2022-02",
     33.7,
     17.4,
     74.5,
     14.2
    ],
    [
     "2022-03",
     33.8,
     17.5,
     74.5,
     14.2
    ],
    [
     "2022-04",
     33.7,
     17.3,
     74.5,
     14.2
    ],
    [
     "2022-05",
     33.2,
     16.2,
     74.5,
     14.2
    ],
    [
     "2022-06",
     33.1,
     15.9,
     74.5,
     14.2
    ],
    [
     "2022-07",
     32.8,
     15.4,
     74.5,
     14.2
    ],
    [
     "2022-08",
     33.5,
     16.8,
     74.5,
     14.2
    ],
    [
     "2022-09",
     33.9,
     17.8,
     74.5,
     14.2
    ],
    [
     "2022-10",
     33.6,
     17,
     74.5,
     14.2
    ],
    [
     "2022-11",
     33.6,
     17.2,
     74.5,
     14.2
    ],
    [
     "2022-12",
     33.7,
     17.3,
     74.5,
     14.2
    ],
    [
     "2023-01",
     34.3,
     17.1,
     74.5,
     17.1
    ],
    [
     "2023-02",
     33.8,
     16,
     74.5,
     17.1
    ],
    [
     "2023-03",
     33.9,
     16.2,
     74.5,
     17.1
    ],
    [
     "2023-04",
     34.1,
     16.7,
     74.5,
     17.1
    ],
    [
     "2023-05",
     34.5,
     17.6,
     74.5,
     17.1
    ],
    [
     "2023-06",
     34.5,
     17.4,
     74.5,
     17.1
    ],
    [
     "2023-07",
     34.2,
     16.9,
     74.5,
     17.1
    ],
    [
     "2023-08",
     34.2,
     16.8,
     74.5,
     17.1
    ],
    [
     "2023-09",
     34.2,
     16.8,
     74.5,
     17.1
    ],
    [
     "2023-10",
     34.2,
     16.9,
     74.5,
     17.1
    ],
    [
     "2023-11",
     34.1,
     16.6,
     74.5,
     17.1
    ],
    [
     "2023-12",
     34.4,
     17.3,
     74.5,
     17.1
    ],
    [
     "2024-01",
     33.7,
     17.4,
     74.5,
     14
    ],
    [
     "2024-02",
     34.2,
     18.6,
     74.5,
     14
    ],
    [
     "2024-03",
     34.3,
     18.7,
     74.5,
     14
    ],
    [
     "2024-04",
     34,
     18.1,
     74.5,
     14
    ],
    [
     "2024-05",
     33.9,
     17.8,
     74.5,
     14
    ],
    [
     "2024-06",
     34.3,
     18.8,
     74.5,
     14
    ],
    [
     "2024-07",
     33.8,
     17.7,
     74.5,
     14
    ],
    [
     "2024-08",
     33.7,
     17.4,
     74.5,
     14
    ],
    [
     "2024-09",
     33.4,
     16.8,
     74.5,
     14
    ],
    [
     "2024-10",
     34.1,
     18.3,
     74.5,
     14
    ],
    [
     "2024-11",
     33.9,
     18,
     74.5,
     14
    ],
    [
     "2024-12",
     33.4,
     16.7,
     74.5,
     14
    ],
    [
     "2025-01",
     34.2,
     17.2,
     74.5,
     16.6
    ],
    [
     "2025-02",
     34.2,
     17.1,
     74.5,
     16.6
    ],
    [
     "2025-03",
     34.2,
     17,
     74.5,
     16.6
    ],
    [
     "2025-04",
     36.4,
     22,
     74.5,
     16.6
    ],
    [
     "2025-05",
     42.9,
     36.5,
     74.5,
     16.6
    ],
    [
     "2025-06",
     43.7,
     38.2,
     74.5,
     16.6
    ],
    [
     "2025-07",
     45.3,
     41.8,
     74.5,
     16.6
    ],
    [
     "2025-08",
     46.1,
     43.6,
     74.5,
     16.6
    ],
    [
     "2025-09",
     41.6,
     33.6,
     74.5,
     16.6
    ],
    [
     "2025-10",
     43.1,
     36.8,
     74.5,
     16.6
    ],
    [
     "2025-11",
     40.9,
     31.9,
     74.5,
     16.6
    ],
    [
     "2025-12",
     42.5,
     35.5,
     74.5,
     16.6
    ],
    [
     "2026-01",
     40.2,
     30.5,
     74.5,
     16.6
    ],
    [
     "2026-02",
     38.2,
     25.9,
     74.5,
     16.6
    ],
    [
     "2026-03",
     38.4,
     26.4,
     74.5,
     16.6
    ],
    [
     "2026-04",
     39.4,
     28.6,
     74.5,
     16.6
    ],
    [
     "2026-05",
     35.9,
     20.8,
     74.5,
     16.6
    ],
    [
     "2026-06",
     37.3,
     24.1,
     74.5,
     16.6
    ]
   ]
  },
  {
   "family": "optical-components",
   "label": "Optical elements and lenses",
   "latest": {
    "period": "2026-06",
    "rri": 38.8,
    "band": "building case",
    "tariffScore": 43.4,
    "levelScore": 42.7,
    "trendScore": 45,
    "dependenceScore": 57.6,
    "concentrationScore": 8.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -8.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.82,
    "exportRatio": 0.424,
    "hhi": 810,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 77.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     28.6,
     19.5,
     57.6,
     10.1
    ],
    [
     "2014-02",
     28.6,
     19.6,
     57.6,
     10.1
    ],
    [
     "2014-03",
     28.6,
     19.5,
     57.6,
     10.1
    ],
    [
     "2014-04",
     28.6,
     19.6,
     57.6,
     10.1
    ],
    [
     "2014-05",
     28.8,
     19.9,
     57.6,
     10.1
    ],
    [
     "2014-06",
     28.6,
     19.6,
     57.6,
     10.1
    ],
    [
     "2014-07",
     28.7,
     19.8,
     57.6,
     10.1
    ],
    [
     "2014-08",
     28.7,
     19.7,
     57.6,
     10.1
    ],
    [
     "2014-09",
     28.7,
     19.8,
     57.6,
     10.1
    ],
    [
     "2014-10",
     28.8,
     19.9,
     57.6,
     10.1
    ],
    [
     "2014-11",
     28.7,
     19.8,
     57.6,
     10.1
    ],
    [
     "2014-12",
     28.7,
     19.7,
     57.6,
     10.1
    ],
    [
     "2015-01",
     28.6,
     19.6,
     57.6,
     9.8
    ],
    [
     "2015-02",
     28.6,
     19.8,
     57.6,
     9.8
    ],
    [
     "2015-03",
     28.8,
     20.1,
     57.6,
     9.8
    ],
    [
     "2015-04",
     28.7,
     20,
     57.6,
     9.8
    ],
    [
     "2015-05",
     28.6,
     19.7,
     57.6,
     9.8
    ],
    [
     "2015-06",
     28.6,
     19.8,
     57.6,
     9.8
    ],
    [
     "2015-07",
     28.6,
     19.8,
     57.6,
     9.8
    ],
    [
     "2015-08",
     28.7,
     20,
     57.6,
     9.8
    ],
    [
     "2015-09",
     28.7,
     19.9,
     57.6,
     9.8
    ],
    [
     "2015-10",
     28.6,
     19.8,
     57.6,
     9.8
    ],
    [
     "2015-11",
     28.7,
     20,
     57.6,
     9.8
    ],
    [
     "2015-12",
     28.7,
     19.9,
     57.6,
     9.8
    ],
    [
     "2016-01",
     28.6,
     19.8,
     57.6,
     9.7
    ],
    [
     "2016-02",
     28.7,
     20,
     57.6,
     9.7
    ],
    [
     "2016-03",
     28.5,
     19.6,
     57.6,
     9.7
    ],
    [
     "2016-04",
     28.6,
     19.8,
     57.6,
     9.7
    ],
    [
     "2016-05",
     28.7,
     19.9,
     57.6,
     9.7
    ],
    [
     "2016-06",
     28.7,
     20,
     57.6,
     9.7
    ],
    [
     "2016-07",
     28,
     18.5,
     57.6,
     9.7
    ],
    [
     "2016-08",
     27.9,
     18.3,
     57.6,
     9.7
    ],
    [
     "2016-09",
     27.7,
     17.7,
     57.6,
     9.7
    ],
    [
     "2016-10",
     27.8,
     18,
     57.6,
     9.7
    ],
    [
     "2016-11",
     27.8,
     17.9,
     57.6,
     9.7
    ],
    [
     "2016-12",
     27.8,
     17.9,
     57.6,
     9.7
    ],
    [
     "2017-01",
     27.6,
     17.7,
     57.6,
     9.6
    ],
    [
     "2017-02",
     27.7,
     17.9,
     57.6,
     9.6
    ],
    [
     "2017-03",
     27.8,
     18.1,
     57.6,
     9.6
    ],
    [
     "2017-04",
     27.8,
     18,
     57.6,
     9.6
    ],
    [
     "2017-05",
     27.9,
     18.3,
     57.6,
     9.6
    ],
    [
     "2017-06",
     27.7,
     17.9,
     57.6,
     9.6
    ],
    [
     "2017-07",
     27.9,
     18.3,
     57.6,
     9.6
    ],
    [
     "2017-08",
     27.9,
     18.2,
     57.6,
     9.6
    ],
    [
     "2017-09",
     28,
     18.5,
     57.6,
     9.6
    ],
    [
     "2017-10",
     28,
     18.5,
     57.6,
     9.6
    ],
    [
     "2017-11",
     28.1,
     18.6,
     57.6,
     9.6
    ],
    [
     "2017-12",
     28,
     18.5,
     57.6,
     9.6
    ],
    [
     "2018-01",
     28,
     18.6,
     57.6,
     9.5
    ],
    [
     "2018-02",
     28,
     18.6,
     57.6,
     9.5
    ],
    [
     "2018-03",
     28,
     18.5,
     57.6,
     9.5
    ],
    [
     "2018-04",
     28.2,
     18.9,
     57.6,
     9.5
    ],
    [
     "2018-05",
     27.9,
     18.4,
     57.6,
     9.5
    ],
    [
     "2018-06",
     27.9,
     18.3,
     57.6,
     9.5
    ],
    [
     "2018-07",
     28.3,
     19.1,
     57.6,
     9.5
    ],
    [
     "2018-08",
     28.3,
     19.3,
     57.6,
     9.5
    ],
    [
     "2018-09",
     28.7,
     20.1,
     57.6,
     9.5
    ],
    [
     "2018-10",
     30.1,
     23.2,
     57.6,
     9.5
    ],
    [
     "2018-11",
     30.3,
     23.7,
     57.6,
     9.5
    ],
    [
     "2018-12",
     30.4,
     23.8,
     57.6,
     9.5
    ],
    [
     "2019-01",
     29.6,
     22.5,
     57.6,
     8.8
    ],
    [
     "2019-02",
     29.6,
     22.5,
     57.6,
     8.8
    ],
    [
     "2019-03",
     29.6,
     22.4,
     57.6,
     8.8
    ],
    [
     "2019-04",
     29.8,
     22.9,
     57.6,
     8.8
    ],
    [
     "2019-05",
     30.9,
     25.3,
     57.6,
     8.8
    ],
    [
     "2019-06",
     31.9,
     27.7,
     57.6,
     8.8
    ],
    [
     "2019-07",
     31.7,
     27.1,
     57.6,
     8.8
    ],
    [
     "2019-08",
     31.7,
     27.2,
     57.6,
     8.8
    ],
    [
     "2019-09",
     32.4,
     28.7,
     57.6,
     8.8
    ],
    [
     "2019-10",
     32.2,
     28.3,
     57.6,
     8.8
    ],
    [
     "2019-11",
     32.2,
     28.2,
     57.6,
     8.8
    ],
    [
     "2019-12",
     31.9,
     27.5,
     57.6,
     8.8
    ],
    [
     "2020-01",
     32.2,
     28.6,
     57.6,
     8
    ],
    [
     "2020-02",
     29.9,
     23.6,
     57.6,
     8
    ],
    [
     "2020-03",
     31,
     26.1,
     57.6,
     8
    ],
    [
     "2020-04",
     30.7,
     25.3,
     57.6,
     8
    ],
    [
     "2020-05",
     30.3,
     24.5,
     57.6,
     8
    ],
    [
     "2020-06",
     30.3,
     24.4,
     57.6,
     8
    ],
    [
     "2020-07",
     30.4,
     24.8,
     57.6,
     8
    ],
    [
     "2020-08",
     30.5,
     24.9,
     57.6,
     8
    ],
    [
     "2020-09",
     30,
     23.8,
     57.6,
     8
    ],
    [
     "2020-10",
     29.8,
     23.3,
     57.6,
     8
    ],
    [
     "2020-11",
     29.2,
     22,
     57.6,
     8
    ],
    [
     "2020-12",
     29.3,
     22.2,
     57.6,
     8
    ],
    [
     "2021-01",
     29.8,
     22.8,
     57.6,
     9
    ],
    [
     "2021-02",
     30.8,
     25,
     57.6,
     9
    ],
    [
     "2021-03",
     29.8,
     22.8,
     57.6,
     9
    ],
    [
     "2021-04",
     30.8,
     25,
     57.6,
     9
    ],
    [
     "2021-05",
     30.4,
     24.1,
     57.6,
     9
    ],
    [
     "2021-06",
     29.5,
     22.2,
     57.6,
     9
    ],
    [
     "2021-07",
     29.4,
     22,
     57.6,
     9
    ],
    [
     "2021-08",
     29.7,
     22.5,
     57.6,
     9
    ],
    [
     "2021-09",
     30.1,
     23.5,
     57.6,
     9
    ],
    [
     "2021-10",
     29.9,
     23,
     57.6,
     9
    ],
    [
     "2021-11",
     29.7,
     22.7,
     57.6,
     9
    ],
    [
     "2021-12",
     29.4,
     21.9,
     57.6,
     9
    ],
    [
     "2022-01",
     29.6,
     22.3,
     57.6,
     9.1
    ],
    [
     "2022-02",
     29.2,
     21.4,
     57.6,
     9.1
    ],
    [
     "2022-03",
     29.7,
     22.5,
     57.6,
     9.1
    ],
    [
     "2022-04",
     29.1,
     21.2,
     57.6,
     9.1
    ],
    [
     "2022-05",
     29.7,
     22.6,
     57.6,
     9.1
    ],
    [
     "2022-06",
     30,
     23.2,
     57.6,
     9.1
    ],
    [
     "2022-07",
     30,
     23.3,
     57.6,
     9.1
    ],
    [
     "2022-08",
     29.8,
     22.7,
     57.6,
     9.1
    ],
    [
     "2022-09",
     29.8,
     22.8,
     57.6,
     9.1
    ],
    [
     "2022-10",
     29.6,
     22.4,
     57.6,
     9.1
    ],
    [
     "2022-11",
     29.8,
     22.7,
     57.6,
     9.1
    ],
    [
     "2022-12",
     30,
     23.3,
     57.6,
     9.1
    ],
    [
     "2023-01",
     29.7,
     22.7,
     57.6,
     8.7
    ],
    [
     "2023-02",
     29.4,
     22.1,
     57.6,
     8.7
    ],
    [
     "2023-03",
     29.8,
     23,
     57.6,
     8.7
    ],
    [
     "2023-04",
     30.3,
     24.2,
     57.6,
     8.7
    ],
    [
     "2023-05",
     29.9,
     23.2,
     57.6,
     8.7
    ],
    [
     "2023-06",
     30,
     23.4,
     57.6,
     8.7
    ],
    [
     "2023-07",
     29.9,
     23.2,
     57.6,
     8.7
    ],
    [
     "2023-08",
     29.9,
     23.1,
     57.6,
     8.7
    ],
    [
     "2023-09",
     30.2,
     23.9,
     57.6,
     8.7
    ],
    [
     "2023-10",
     30.3,
     24.2,
     57.6,
     8.7
    ],
    [
     "2023-11",
     30.1,
     23.6,
     57.6,
     8.7
    ],
    [
     "2023-12",
     29.9,
     23.1,
     57.6,
     8.7
    ],
    [
     "2024-01",
     30.4,
     24.3,
     57.6,
     8.8
    ],
    [
     "2024-02",
     29.5,
     22.3,
     57.6,
     8.8
    ],
    [
     "2024-03",
     29.4,
     22,
     57.6,
     8.8
    ],
    [
     "2024-04",
     29.6,
     22.4,
     57.6,
     8.8
    ],
    [
     "2024-05",
     29.5,
     22.2,
     57.6,
     8.8
    ],
    [
     "2024-06",
     29.7,
     22.6,
     57.6,
     8.8
    ],
    [
     "2024-07",
     30.1,
     23.7,
     57.6,
     8.8
    ],
    [
     "2024-08",
     29.7,
     22.7,
     57.6,
     8.8
    ],
    [
     "2024-09",
     29.5,
     22.3,
     57.6,
     8.8
    ],
    [
     "2024-10",
     29.5,
     22.2,
     57.6,
     8.8
    ],
    [
     "2024-11",
     29.2,
     21.7,
     57.6,
     8.8
    ],
    [
     "2024-12",
     29.4,
     22,
     57.6,
     8.8
    ],
    [
     "2025-01",
     30.1,
     23.9,
     57.6,
     8.1
    ],
    [
     "2025-02",
     29.9,
     23.5,
     57.6,
     8.1
    ],
    [
     "2025-03",
     32.8,
     30,
     57.6,
     8.1
    ],
    [
     "2025-04",
     47.2,
     62,
     57.6,
     8.1
    ],
    [
     "2025-05",
     48.2,
     64.2,
     57.6,
     8.1
    ],
    [
     "2025-06",
     47.3,
     62.3,
     57.6,
     8.1
    ],
    [
     "2025-07",
     47.6,
     62.9,
     57.6,
     8.1
    ],
    [
     "2025-08",
     50.1,
     68.4,
     57.6,
     8.1
    ],
    [
     "2025-09",
     51.8,
     72.1,
     57.6,
     8.1
    ],
    [
     "2025-10",
     52.2,
     73.1,
     57.6,
     8.1
    ],
    [
     "2025-11",
     50.8,
     69.9,
     57.6,
     8.1
    ],
    [
     "2025-12",
     50.6,
     69.6,
     57.6,
     8.1
    ],
    [
     "2026-01",
     51.5,
     71.6,
     57.6,
     8.1
    ],
    [
     "2026-02",
     49.9,
     67.9,
     57.6,
     8.1
    ],
    [
     "2026-03",
     43.4,
     53.5,
     57.6,
     8.1
    ],
    [
     "2026-04",
     37.7,
     40.8,
     57.6,
     8.1
    ],
    [
     "2026-05",
     38.8,
     43.4,
     57.6,
     8.1
    ],
    [
     "2026-06",
     38.8,
     43.4,
     57.6,
     8.1
    ]
   ]
  },
  {
   "family": "packaging-machinery",
   "label": "Packaging and filling machinery",
   "latest": {
    "period": "2026-06",
    "rri": 46,
    "band": "building case",
    "tariffScore": 35.3,
    "levelScore": 30,
    "trendScore": 47.6,
    "dependenceScore": 90.2,
    "concentrationScore": 12.3,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9,
    "exportRatio": 0.098,
    "hhi": 1230,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 83.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     37.3,
     15.3,
     90.2,
     13.6
    ],
    [
     "2014-02",
     37.4,
     15.5,
     90.2,
     13.6
    ],
    [
     "2014-03",
     37.4,
     15.5,
     90.2,
     13.6
    ],
    [
     "2014-04",
     37.5,
     15.6,
     90.2,
     13.6
    ],
    [
     "2014-05",
     37.6,
     15.8,
     90.2,
     13.6
    ],
    [
     "2014-06",
     37.5,
     15.6,
     90.2,
     13.6
    ],
    [
     "2014-07",
     37.5,
     15.7,
     90.2,
     13.6
    ],
    [
     "2014-08",
     37.4,
     15.5,
     90.2,
     13.6
    ],
    [
     "2014-09",
     37.5,
     15.6,
     90.2,
     13.6
    ],
    [
     "2014-10",
     37.5,
     15.6,
     90.2,
     13.6
    ],
    [
     "2014-11",
     37.4,
     15.4,
     90.2,
     13.6
    ],
    [
     "2014-12",
     37.4,
     15.5,
     90.2,
     13.6
    ],
    [
     "2015-01",
     37.2,
     15.6,
     90.2,
     12.4
    ],
    [
     "2015-02",
     37,
     15.3,
     90.2,
     12.4
    ],
    [
     "2015-03",
     37.2,
     15.7,
     90.2,
     12.4
    ],
    [
     "2015-04",
     37.2,
     15.6,
     90.2,
     12.4
    ],
    [
     "2015-05",
     37.1,
     15.5,
     90.2,
     12.4
    ],
    [
     "2015-06",
     37.2,
     15.6,
     90.2,
     12.4
    ],
    [
     "2015-07",
     37.1,
     15.4,
     90.2,
     12.4
    ],
    [
     "2015-08",
     37,
     15.3,
     90.2,
     12.4
    ],
    [
     "2015-09",
     37.1,
     15.4,
     90.2,
     12.4
    ],
    [
     "2015-10",
     37.2,
     15.6,
     90.2,
     12.4
    ],
    [
     "2015-11",
     37.1,
     15.5,
     90.2,
     12.4
    ],
    [
     "2015-12",
     37.1,
     15.5,
     90.2,
     12.4
    ],
    [
     "2016-01",
     37.3,
     15.3,
     90.2,
     13.5
    ],
    [
     "2016-02",
     37.5,
     15.6,
     90.2,
     13.5
    ],
    [
     "2016-03",
     37.4,
     15.4,
     90.2,
     13.5
    ],
    [
     "2016-04",
     37.3,
     15.3,
     90.2,
     13.5
    ],
    [
     "2016-05",
     37.4,
     15.5,
     90.2,
     13.5
    ],
    [
     "2016-06",
     37.4,
     15.5,
     90.2,
     13.5
    ],
    [
     "2016-07",
     37.4,
     15.5,
     90.2,
     13.5
    ],
    [
     "2016-08",
     37.4,
     15.5,
     90.2,
     13.5
    ],
    [
     "2016-09",
     37.5,
     15.6,
     90.2,
     13.5
    ],
    [
     "2016-10",
     37.4,
     15.5,
     90.2,
     13.5
    ],
    [
     "2016-11",
     37.5,
     15.6,
     90.2,
     13.5
    ],
    [
     "2016-12",
     37.4,
     15.4,
     90.2,
     13.5
    ],
    [
     "2017-01",
     37.2,
     15.5,
     90.2,
     12.6
    ],
    [
     "2017-02",
     37.2,
     15.5,
     90.2,
     12.6
    ],
    [
     "2017-03",
     37.3,
     15.7,
     90.2,
     12.6
    ],
    [
     "2017-04",
     37.3,
     15.7,
     90.2,
     12.6
    ],
    [
     "2017-05",
     37.3,
     15.8,
     90.2,
     12.6
    ],
    [
     "2017-06",
     37.2,
     15.5,
     90.2,
     12.6
    ],
    [
     "2017-07",
     37.2,
     15.6,
     90.2,
     12.6
    ],
    [
     "2017-08",
     37.2,
     15.5,
     90.2,
     12.6
    ],
    [
     "2017-09",
     37.1,
     15.4,
     90.2,
     12.6
    ],
    [
     "2017-10",
     37.2,
     15.6,
     90.2,
     12.6
    ],
    [
     "2017-11",
     37.2,
     15.5,
     90.2,
     12.6
    ],
    [
     "2017-12",
     37.1,
     15.3,
     90.2,
     12.6
    ],
    [
     "2018-01",
     37.3,
     15.5,
     90.2,
     13.1
    ],
    [
     "2018-02",
     37.3,
     15.4,
     90.2,
     13.1
    ],
    [
     "2018-03",
     37.2,
     15.2,
     90.2,
     13.1
    ],
    [
     "2018-04",
     37.3,
     15.5,
     90.2,
     13.1
    ],
    [
     "2018-05",
     37.3,
     15.4,
     90.2,
     13.1
    ],
    [
     "2018-06",
     37.3,
     15.4,
     90.2,
     13.1
    ],
    [
     "2018-07",
     38.5,
     18.2,
     90.2,
     13.1
    ],
    [
     "2018-08",
     39.2,
     19.6,
     90.2,
     13.1
    ],
    [
     "2018-09",
     39,
     19.3,
     90.2,
     13.1
    ],
    [
     "2018-10",
     39.2,
     19.7,
     90.2,
     13.1
    ],
    [
     "2018-11",
     39.2,
     19.6,
     90.2,
     13.1
    ],
    [
     "2018-12",
     39.1,
     19.4,
     90.2,
     13.1
    ],
    [
     "2019-01",
     39.1,
     19.8,
     90.2,
     12.5
    ],
    [
     "2019-02",
     39.5,
     20.6,
     90.2,
     12.5
    ],
    [
     "2019-03",
     38.4,
     18.3,
     90.2,
     12.5
    ],
    [
     "2019-04",
     38.6,
     18.8,
     90.2,
     12.5
    ],
    [
     "2019-05",
     38.6,
     18.6,
     90.2,
     12.5
    ],
    [
     "2019-06",
     39.1,
     19.9,
     90.2,
     12.5
    ],
    [
     "2019-07",
     38.4,
     18.3,
     90.2,
     12.5
    ],
    [
     "2019-08",
     37.7,
     16.8,
     90.2,
     12.5
    ],
    [
     "2019-09",
     38.8,
     19.1,
     90.2,
     12.5
    ],
    [
     "2019-10",
     40.2,
     22.3,
     90.2,
     12.5
    ],
    [
     "2019-11",
     38.9,
     19.4,
     90.2,
     12.5
    ],
    [
     "2019-12",
     38.9,
     19.3,
     90.2,
     12.5
    ],
    [
     "2020-01",
     39,
     19.6,
     90.2,
     12.3
    ],
    [
     "2020-02",
     38.6,
     18.8,
     90.2,
     12.3
    ],
    [
     "2020-03",
     38,
     17.4,
     90.2,
     12.3
    ],
    [
     "2020-04",
     38.7,
     19.1,
     90.2,
     12.3
    ],
    [
     "2020-05",
     39.1,
     20,
     90.2,
     12.3
    ],
    [
     "2020-06",
     38.7,
     19.1,
     90.2,
     12.3
    ],
    [
     "2020-07",
     39.2,
     20.1,
     90.2,
     12.3
    ],
    [
     "2020-08",
     38.8,
     19.2,
     90.2,
     12.3
    ],
    [
     "2020-09",
     39.3,
     20.3,
     90.2,
     12.3
    ],
    [
     "2020-10",
     39,
     19.7,
     90.2,
     12.3
    ],
    [
     "2020-11",
     38.9,
     19.5,
     90.2,
     12.3
    ],
    [
     "2020-12",
     39,
     19.8,
     90.2,
     12.3
    ],
    [
     "2021-01",
     38.3,
     18.5,
     90.2,
     11.8
    ],
    [
     "2021-02",
     38.7,
     19.2,
     90.2,
     11.8
    ],
    [
     "2021-03",
     39.6,
     21.4,
     90.2,
     11.8
    ],
    [
     "2021-04",
     38.9,
     19.8,
     90.2,
     11.8
    ],
    [
     "2021-05",
     38.7,
     19.4,
     90.2,
     11.8
    ],
    [
     "2021-06",
     38.7,
     19.2,
     90.2,
     11.8
    ],
    [
     "2021-07",
     38.5,
     18.9,
     90.2,
     11.8
    ],
    [
     "2021-08",
     38.9,
     19.7,
     90.2,
     11.8
    ],
    [
     "2021-09",
     39.2,
     20.5,
     90.2,
     11.8
    ],
    [
     "2021-10",
     39.2,
     20.4,
     90.2,
     11.8
    ],
    [
     "2021-11",
     38.4,
     18.6,
     90.2,
     11.8
    ],
    [
     "2021-12",
     38.5,
     18.9,
     90.2,
     11.8
    ],
    [
     "2022-01",
     38,
     18.6,
     90.2,
     10.1
    ],
    [
     "2022-02",
     38.5,
     19.9,
     90.2,
     10.1
    ],
    [
     "2022-03",
     37.8,
     18.3,
     90.2,
     10.1
    ],
    [
     "2022-04",
     38.2,
     19.2,
     90.2,
     10.1
    ],
    [
     "2022-05",
     38,
     18.7,
     90.2,
     10.1
    ],
    [
     "2022-06",
     37.9,
     18.5,
     90.2,
     10.1
    ],
    [
     "2022-07",
     38.1,
     19,
     90.2,
     10.1
    ],
    [
     "2022-08",
     39.4,
     21.9,
     90.2,
     10.1
    ],
    [
     "2022-09",
     38,
     18.7,
     90.2,
     10.1
    ],
    [
     "2022-10",
     38,
     18.7,
     90.2,
     10.1
    ],
    [
     "2022-11",
     38.2,
     19.2,
     90.2,
     10.1
    ],
    [
     "2022-12",
     37.7,
     18.1,
     90.2,
     10.1
    ],
    [
     "2023-01",
     38.1,
     17.9,
     90.2,
     11.9
    ],
    [
     "2023-02",
     38.5,
     18.8,
     90.2,
     11.9
    ],
    [
     "2023-03",
     38.4,
     18.5,
     90.2,
     11.9
    ],
    [
     "2023-04",
     38.2,
     18.2,
     90.2,
     11.9
    ],
    [
     "2023-05",
     38.3,
     18.3,
     90.2,
     11.9
    ],
    [
     "2023-06",
     38.4,
     18.6,
     90.2,
     11.9
    ],
    [
     "2023-07",
     38.3,
     18.3,
     90.2,
     11.9
    ],
    [
     "2023-08",
     38,
     17.8,
     90.2,
     11.9
    ],
    [
     "2023-09",
     38.5,
     18.9,
     90.2,
     11.9
    ],
    [
     "2023-10",
     38.1,
     18,
     90.2,
     11.9
    ],
    [
     "2023-11",
     37.8,
     17.2,
     90.2,
     11.9
    ],
    [
     "2023-12",
     37.6,
     16.9,
     90.2,
     11.9
    ],
    [
     "2024-01",
     38.2,
     18.2,
     90.2,
     11.7
    ],
    [
     "2024-02",
     38.6,
     19.2,
     90.2,
     11.7
    ],
    [
     "2024-03",
     38.5,
     18.9,
     90.2,
     11.7
    ],
    [
     "2024-04",
     38.1,
     18,
     90.2,
     11.7
    ],
    [
     "2024-05",
     38,
     17.8,
     90.2,
     11.7
    ],
    [
     "2024-06",
     38.4,
     18.6,
     90.2,
     11.7
    ],
    [
     "2024-07",
     38,
     17.8,
     90.2,
     11.7
    ],
    [
     "2024-08",
     38.4,
     18.7,
     90.2,
     11.7
    ],
    [
     "2024-09",
     38.3,
     18.4,
     90.2,
     11.7
    ],
    [
     "2024-10",
     38.2,
     18.2,
     90.2,
     11.7
    ],
    [
     "2024-11",
     38.6,
     19.1,
     90.2,
     11.7
    ],
    [
     "2024-12",
     38.3,
     18.4,
     90.2,
     11.7
    ],
    [
     "2025-01",
     38.1,
     17.7,
     90.2,
     12.3
    ],
    [
     "2025-02",
     38.8,
     19.2,
     90.2,
     12.3
    ],
    [
     "2025-03",
     40,
     22,
     90.2,
     12.3
    ],
    [
     "2025-04",
     47.1,
     37.6,
     90.2,
     12.3
    ],
    [
     "2025-05",
     53.2,
     51.2,
     90.2,
     12.3
    ],
    [
     "2025-06",
     52.2,
     49,
     90.2,
     12.3
    ],
    [
     "2025-07",
     55.6,
     56.5,
     90.2,
     12.3
    ],
    [
     "2025-08",
     56.6,
     58.9,
     90.2,
     12.3
    ],
    [
     "2025-09",
     59.9,
     66.1,
     90.2,
     12.3
    ],
    [
     "2025-10",
     60.3,
     67.1,
     90.2,
     12.3
    ],
    [
     "2025-11",
     56.5,
     58.5,
     90.2,
     12.3
    ],
    [
     "2025-12",
     57.5,
     60.8,
     90.2,
     12.3
    ],
    [
     "2026-01",
     57.4,
     60.6,
     90.2,
     12.3
    ],
    [
     "2026-02",
     57,
     59.7,
     90.2,
     12.3
    ],
    [
     "2026-03",
     51,
     46.4,
     90.2,
     12.3
    ],
    [
     "2026-04",
     50.1,
     44.4,
     90.2,
     12.3
    ],
    [
     "2026-05",
     45.3,
     33.7,
     90.2,
     12.3
    ],
    [
     "2026-06",
     46,
     35.3,
     90.2,
     12.3
    ]
   ]
  },
  {
   "family": "passive-components",
   "label": "Capacitors, resistors, and circuit boards",
   "latest": {
    "period": "2026-06",
    "rri": 40.7,
    "band": "building case",
    "tariffScore": 38.4,
    "levelScore": 41,
    "trendScore": 32.3,
    "dependenceScore": 68.5,
    "concentrationScore": 11.5,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -12.9,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.3,
    "exportRatio": 0.315,
    "hhi": 1150,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-02",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-03",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-04",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-05",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-06",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-07",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-08",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-09",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-10",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-11",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2014-12",
     31.2,
     15,
     68.5,
     15.5
    ],
    [
     "2015-01",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-02",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-03",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-04",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-05",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-06",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-07",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-08",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-09",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-10",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-11",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2015-12",
     31.1,
     15,
     68.5,
     15.1
    ],
    [
     "2016-01",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-02",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-03",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-04",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-05",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-06",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-07",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-08",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-09",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-10",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-11",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2016-12",
     31,
     15,
     68.5,
     14.9
    ],
    [
     "2017-01",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-02",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-03",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-04",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-05",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-06",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-07",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-08",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-09",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-10",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-11",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2017-12",
     31.1,
     15,
     68.5,
     15.3
    ],
    [
     "2018-01",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-02",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-03",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-04",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-05",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-06",
     30.9,
     15,
     68.5,
     14.5
    ],
    [
     "2018-07",
     33.6,
     21,
     68.5,
     14.5
    ],
    [
     "2018-08",
     34.3,
     22.4,
     68.5,
     14.5
    ],
    [
     "2018-09",
     33.8,
     21.4,
     68.5,
     14.5
    ],
    [
     "2018-10",
     36.4,
     27.1,
     68.5,
     14.5
    ],
    [
     "2018-11",
     36.2,
     26.7,
     68.5,
     14.5
    ],
    [
     "2018-12",
     36.8,
     28,
     68.5,
     14.5
    ],
    [
     "2019-01",
     35.6,
     26.5,
     68.5,
     12.5
    ],
    [
     "2019-02",
     34.3,
     23.6,
     68.5,
     12.5
    ],
    [
     "2019-03",
     34.3,
     23.7,
     68.5,
     12.5
    ],
    [
     "2019-04",
     34.7,
     24.4,
     68.5,
     12.5
    ],
    [
     "2019-05",
     36,
     27.3,
     68.5,
     12.5
    ],
    [
     "2019-06",
     37.8,
     31.3,
     68.5,
     12.5
    ],
    [
     "2019-07",
     36.2,
     27.8,
     68.5,
     12.5
    ],
    [
     "2019-08",
     36.6,
     28.8,
     68.5,
     12.5
    ],
    [
     "2019-09",
     37.2,
     30.1,
     68.5,
     12.5
    ],
    [
     "2019-10",
     35.6,
     26.5,
     68.5,
     12.5
    ],
    [
     "2019-11",
     36.2,
     27.8,
     68.5,
     12.5
    ],
    [
     "2019-12",
     35.7,
     26.8,
     68.5,
     12.5
    ],
    [
     "2020-01",
     35.9,
     27.1,
     68.5,
     12.5
    ],
    [
     "2020-02",
     34.1,
     23.1,
     68.5,
     12.5
    ],
    [
     "2020-03",
     35,
     25.2,
     68.5,
     12.5
    ],
    [
     "2020-04",
     36.2,
     27.9,
     68.5,
     12.5
    ],
    [
     "2020-05",
     35.7,
     26.8,
     68.5,
     12.5
    ],
    [
     "2020-06",
     34.7,
     24.6,
     68.5,
     12.5
    ],
    [
     "2020-07",
     34.3,
     23.5,
     68.5,
     12.5
    ],
    [
     "2020-08",
     34.6,
     24.3,
     68.5,
     12.5
    ],
    [
     "2020-09",
     33.8,
     22.4,
     68.5,
     12.5
    ],
    [
     "2020-10",
     34,
     23,
     68.5,
     12.5
    ],
    [
     "2020-11",
     34.7,
     24.4,
     68.5,
     12.5
    ],
    [
     "2020-12",
     34.7,
     24.5,
     68.5,
     12.5
    ],
    [
     "2021-01",
     36.9,
     29.1,
     68.5,
     12.9
    ],
    [
     "2021-02",
     36.9,
     29.1,
     68.5,
     12.9
    ],
    [
     "2021-03",
     37.2,
     29.9,
     68.5,
     12.9
    ],
    [
     "2021-04",
     36.6,
     28.4,
     68.5,
     12.9
    ],
    [
     "2021-05",
     36.9,
     29.2,
     68.5,
     12.9
    ],
    [
     "2021-06",
     36.6,
     28.6,
     68.5,
     12.9
    ],
    [
     "2021-07",
     37.6,
     30.7,
     68.5,
     12.9
    ],
    [
     "2021-08",
     37.7,
     30.9,
     68.5,
     12.9
    ],
    [
     "2021-09",
     37.9,
     31.4,
     68.5,
     12.9
    ],
    [
     "2021-10",
     36.3,
     27.9,
     68.5,
     12.9
    ],
    [
     "2021-11",
     36,
     27.2,
     68.5,
     12.9
    ],
    [
     "2021-12",
     36.2,
     27.7,
     68.5,
     12.9
    ],
    [
     "2022-01",
     36,
     27.5,
     68.5,
     12.3
    ],
    [
     "2022-02",
     34.4,
     23.9,
     68.5,
     12.3
    ],
    [
     "2022-03",
     34.5,
     24.1,
     68.5,
     12.3
    ],
    [
     "2022-04",
     34.3,
     23.7,
     68.5,
     12.3
    ],
    [
     "2022-05",
     33.9,
     22.8,
     68.5,
     12.3
    ],
    [
     "2022-06",
     34.9,
     25,
     68.5,
     12.3
    ],
    [
     "2022-07",
     33.6,
     22.1,
     68.5,
     12.3
    ],
    [
     "2022-08",
     33.3,
     21.6,
     68.5,
     12.3
    ],
    [
     "2022-09",
     33.9,
     22.8,
     68.5,
     12.3
    ],
    [
     "2022-10",
     34.2,
     23.6,
     68.5,
     12.3
    ],
    [
     "2022-11",
     34.2,
     23.6,
     68.5,
     12.3
    ],
    [
     "2022-12",
     33.7,
     22.4,
     68.5,
     12.3
    ],
    [
     "2023-01",
     33.7,
     22.8,
     68.5,
     11.4
    ],
    [
     "2023-02",
     33.6,
     22.6,
     68.5,
     11.4
    ],
    [
     "2023-03",
     34.4,
     24.4,
     68.5,
     11.4
    ],
    [
     "2023-04",
     34.6,
     24.9,
     68.5,
     11.4
    ],
    [
     "2023-05",
     34.1,
     23.7,
     68.5,
     11.4
    ],
    [
     "2023-06",
     33.7,
     22.9,
     68.5,
     11.4
    ],
    [
     "2023-07",
     34.2,
     24,
     68.5,
     11.4
    ],
    [
     "2023-08",
     34.1,
     23.8,
     68.5,
     11.4
    ],
    [
     "2023-09",
     33.9,
     23.4,
     68.5,
     11.4
    ],
    [
     "2023-10",
     33.3,
     22,
     68.5,
     11.4
    ],
    [
     "2023-11",
     33.8,
     23.2,
     68.5,
     11.4
    ],
    [
     "2023-12",
     34.1,
     23.8,
     68.5,
     11.4
    ],
    [
     "2024-01",
     34.5,
     24.4,
     68.5,
     11.7
    ],
    [
     "2024-02",
     34.2,
     23.9,
     68.5,
     11.7
    ],
    [
     "2024-03",
     34.4,
     24.2,
     68.5,
     11.7
    ],
    [
     "2024-04",
     34.4,
     24.2,
     68.5,
     11.7
    ],
    [
     "2024-05",
     34.9,
     25.4,
     68.5,
     11.7
    ],
    [
     "2024-06",
     35.3,
     26.2,
     68.5,
     11.7
    ],
    [
     "2024-07",
     35.4,
     26.5,
     68.5,
     11.7
    ],
    [
     "2024-08",
     34.5,
     24.6,
     68.5,
     11.7
    ],
    [
     "2024-09",
     34.2,
     23.8,
     68.5,
     11.7
    ],
    [
     "2024-10",
     34.3,
     24,
     68.5,
     11.7
    ],
    [
     "2024-11",
     33.8,
     22.9,
     68.5,
     11.7
    ],
    [
     "2024-12",
     34.2,
     23.8,
     68.5,
     11.7
    ],
    [
     "2025-01",
     35.5,
     26.8,
     68.5,
     11.5
    ],
    [
     "2025-02",
     33.8,
     23.1,
     68.5,
     11.5
    ],
    [
     "2025-03",
     37.5,
     31.3,
     68.5,
     11.5
    ],
    [
     "2025-04",
     53.9,
     67.8,
     68.5,
     11.5
    ],
    [
     "2025-05",
     57.4,
     75.4,
     68.5,
     11.5
    ],
    [
     "2025-06",
     53.6,
     67,
     68.5,
     11.5
    ],
    [
     "2025-07",
     54.2,
     68.4,
     68.5,
     11.5
    ],
    [
     "2025-08",
     58.4,
     77.8,
     68.5,
     11.5
    ],
    [
     "2025-09",
     60.5,
     82.4,
     68.5,
     11.5
    ],
    [
     "2025-10",
     60.5,
     82.3,
     68.5,
     11.5
    ],
    [
     "2025-11",
     59.1,
     79.2,
     68.5,
     11.5
    ],
    [
     "2025-12",
     58.5,
     77.9,
     68.5,
     11.5
    ],
    [
     "2026-01",
     57.9,
     76.6,
     68.5,
     11.5
    ],
    [
     "2026-02",
     55.7,
     71.7,
     68.5,
     11.5
    ],
    [
     "2026-03",
     47.4,
     53.3,
     68.5,
     11.5
    ],
    [
     "2026-04",
     42.6,
     42.5,
     68.5,
     11.5
    ],
    [
     "2026-05",
     40.5,
     37.9,
     68.5,
     11.5
    ],
    [
     "2026-06",
     40.7,
     38.4,
     68.5,
     11.5
    ]
   ]
  },
  {
   "family": "plastic-semis",
   "label": "Plastic semi-finished products",
   "latest": {
    "period": "2026-06",
    "rri": 26.8,
    "band": "weak case",
    "tariffScore": 36.6,
    "levelScore": 32.4,
    "trendScore": 46.3,
    "dependenceScore": 26.9,
    "concentrationScore": 9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.72,
    "exportRatio": 0.731,
    "hhi": 900,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 73.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     20.2,
     20.4,
     26.9,
     11.6
    ],
    [
     "2014-02",
     20,
     20.1,
     26.9,
     11.6
    ],
    [
     "2014-03",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2014-04",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2014-05",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2014-06",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2014-07",
     20.1,
     20.2,
     26.9,
     11.6
    ],
    [
     "2014-08",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2014-09",
     20,
     20,
     26.9,
     11.6
    ],
    [
     "2014-10",
     20,
     20.1,
     26.9,
     11.6
    ],
    [
     "2014-11",
     20,
     20.1,
     26.9,
     11.6
    ],
    [
     "2014-12",
     20.2,
     20.4,
     26.9,
     11.6
    ],
    [
     "2015-01",
     19.9,
     20.1,
     26.9,
     11.3
    ],
    [
     "2015-02",
     19.9,
     20,
     26.9,
     11.3
    ],
    [
     "2015-03",
     20.1,
     20.5,
     26.9,
     11.3
    ],
    [
     "2015-04",
     20.1,
     20.4,
     26.9,
     11.3
    ],
    [
     "2015-05",
     20.1,
     20.4,
     26.9,
     11.3
    ],
    [
     "2015-06",
     19.8,
     19.8,
     26.9,
     11.3
    ],
    [
     "2015-07",
     20,
     20.3,
     26.9,
     11.3
    ],
    [
     "2015-08",
     19.9,
     20.1,
     26.9,
     11.3
    ],
    [
     "2015-09",
     19.7,
     19.5,
     26.9,
     11.3
    ],
    [
     "2015-10",
     20,
     20.3,
     26.9,
     11.3
    ],
    [
     "2015-11",
     20,
     20.3,
     26.9,
     11.3
    ],
    [
     "2015-12",
     20.1,
     20.4,
     26.9,
     11.3
    ],
    [
     "2016-01",
     20,
     20.1,
     26.9,
     11.4
    ],
    [
     "2016-02",
     20.2,
     20.6,
     26.9,
     11.4
    ],
    [
     "2016-03",
     19.8,
     19.8,
     26.9,
     11.4
    ],
    [
     "2016-04",
     20,
     20.1,
     26.9,
     11.4
    ],
    [
     "2016-05",
     19.9,
     20,
     26.9,
     11.4
    ],
    [
     "2016-06",
     20.1,
     20.3,
     26.9,
     11.4
    ],
    [
     "2016-07",
     20.1,
     20.4,
     26.9,
     11.4
    ],
    [
     "2016-08",
     20.1,
     20.5,
     26.9,
     11.4
    ],
    [
     "2016-09",
     20.1,
     20.3,
     26.9,
     11.4
    ],
    [
     "2016-10",
     20.1,
     20.3,
     26.9,
     11.4
    ],
    [
     "2016-11",
     20,
     20.2,
     26.9,
     11.4
    ],
    [
     "2016-12",
     20.1,
     20.5,
     26.9,
     11.4
    ],
    [
     "2017-01",
     20.2,
     20.4,
     26.9,
     11.6
    ],
    [
     "2017-02",
     20,
     20.1,
     26.9,
     11.6
    ],
    [
     "2017-03",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2017-04",
     20.1,
     20.3,
     26.9,
     11.6
    ],
    [
     "2017-05",
     20,
     20,
     26.9,
     11.6
    ],
    [
     "2017-06",
     20.1,
     20.2,
     26.9,
     11.6
    ],
    [
     "2017-07",
     20,
     20,
     26.9,
     11.6
    ],
    [
     "2017-08",
     19.9,
     19.9,
     26.9,
     11.6
    ],
    [
     "2017-09",
     19.9,
     19.9,
     26.9,
     11.6
    ],
    [
     "2017-10",
     19.9,
     19.9,
     26.9,
     11.6
    ],
    [
     "2017-11",
     19.9,
     19.9,
     26.9,
     11.6
    ],
    [
     "2017-12",
     20.3,
     20.7,
     26.9,
     11.6
    ],
    [
     "2018-01",
     20,
     20.2,
     26.9,
     11.4
    ],
    [
     "2018-02",
     20,
     20.1,
     26.9,
     11.4
    ],
    [
     "2018-03",
     19.9,
     20,
     26.9,
     11.4
    ],
    [
     "2018-04",
     19.8,
     19.8,
     26.9,
     11.4
    ],
    [
     "2018-05",
     20,
     20.1,
     26.9,
     11.4
    ],
    [
     "2018-06",
     20.1,
     20.3,
     26.9,
     11.4
    ],
    [
     "2018-07",
     20,
     20.2,
     26.9,
     11.4
    ],
    [
     "2018-08",
     20.7,
     21.8,
     26.9,
     11.4
    ],
    [
     "2018-09",
     23.4,
     27.8,
     26.9,
     11.4
    ],
    [
     "2018-10",
     23.5,
     27.9,
     26.9,
     11.4
    ],
    [
     "2018-11",
     23.5,
     27.9,
     26.9,
     11.4
    ],
    [
     "2018-12",
     24.5,
     30.1,
     26.9,
     11.4
    ],
    [
     "2019-01",
     23.7,
     28.8,
     26.9,
     10.5
    ],
    [
     "2019-02",
     22.9,
     27.1,
     26.9,
     10.5
    ],
    [
     "2019-03",
     21.9,
     25,
     26.9,
     10.5
    ],
    [
     "2019-04",
     22.8,
     26.9,
     26.9,
     10.5
    ],
    [
     "2019-05",
     22.8,
     27,
     26.9,
     10.5
    ],
    [
     "2019-06",
     23.3,
     27.9,
     26.9,
     10.5
    ],
    [
     "2019-07",
     23.4,
     28.2,
     26.9,
     10.5
    ],
    [
     "2019-08",
     23.2,
     27.8,
     26.9,
     10.5
    ],
    [
     "2019-09",
     21.8,
     24.7,
     26.9,
     10.5
    ],
    [
     "2019-10",
     21.4,
     23.7,
     26.9,
     10.5
    ],
    [
     "2019-11",
     21.9,
     24.9,
     26.9,
     10.5
    ],
    [
     "2019-12",
     21.8,
     24.6,
     26.9,
     10.5
    ],
    [
     "2020-01",
     22.2,
     25.7,
     26.9,
     10.4
    ],
    [
     "2020-02",
     21.2,
     23.3,
     26.9,
     10.4
    ],
    [
     "2020-03",
     20.3,
     21.5,
     26.9,
     10.4
    ],
    [
     "2020-04",
     22.1,
     25.4,
     26.9,
     10.4
    ],
    [
     "2020-05",
     22,
     25.2,
     26.9,
     10.4
    ],
    [
     "2020-06",
     21.7,
     24.6,
     26.9,
     10.4
    ],
    [
     "2020-07",
     22.5,
     26.3,
     26.9,
     10.4
    ],
    [
     "2020-08",
     22.1,
     25.5,
     26.9,
     10.4
    ],
    [
     "2020-09",
     22,
     25.1,
     26.9,
     10.4
    ],
    [
     "2020-10",
     22.2,
     25.7,
     26.9,
     10.4
    ],
    [
     "2020-11",
     22.1,
     25.4,
     26.9,
     10.4
    ],
    [
     "2020-12",
     22.5,
     26.2,
     26.9,
     10.4
    ],
    [
     "2021-01",
     22.4,
     25.9,
     26.9,
     10.8
    ],
    [
     "2021-02",
     22.9,
     27,
     26.9,
     10.8
    ],
    [
     "2021-03",
     22.9,
     27,
     26.9,
     10.8
    ],
    [
     "2021-04",
     21.8,
     24.6,
     26.9,
     10.8
    ],
    [
     "2021-05",
     22.1,
     25.1,
     26.9,
     10.8
    ],
    [
     "2021-06",
     21.9,
     24.7,
     26.9,
     10.8
    ],
    [
     "2021-07",
     22,
     25,
     26.9,
     10.8
    ],
    [
     "2021-08",
     22.2,
     25.4,
     26.9,
     10.8
    ],
    [
     "2021-09",
     22.2,
     25.5,
     26.9,
     10.8
    ],
    [
     "2021-10",
     22,
     25,
     26.9,
     10.8
    ],
    [
     "2021-11",
     21.8,
     24.6,
     26.9,
     10.8
    ],
    [
     "2021-12",
     22,
     25,
     26.9,
     10.8
    ],
    [
     "2022-01",
     22.1,
     25.4,
     26.9,
     10.5
    ],
    [
     "2022-02",
     21.9,
     24.8,
     26.9,
     10.5
    ],
    [
     "2022-03",
     21.4,
     23.8,
     26.9,
     10.5
    ],
    [
     "2022-04",
     21.7,
     24.5,
     26.9,
     10.5
    ],
    [
     "2022-05",
     21.4,
     23.7,
     26.9,
     10.5
    ],
    [
     "2022-06",
     21.8,
     24.7,
     26.9,
     10.5
    ],
    [
     "2022-07",
     21.5,
     24,
     26.9,
     10.5
    ],
    [
     "2022-08",
     21.5,
     24.1,
     26.9,
     10.5
    ],
    [
     "2022-09",
     21.2,
     23.4,
     26.9,
     10.5
    ],
    [
     "2022-10",
     21.5,
     24.1,
     26.9,
     10.5
    ],
    [
     "2022-11",
     21.4,
     23.8,
     26.9,
     10.5
    ],
    [
     "2022-12",
     21.9,
     24.9,
     26.9,
     10.5
    ],
    [
     "2023-01",
     21.7,
     24.2,
     26.9,
     11.1
    ],
    [
     "2023-02",
     21.5,
     23.6,
     26.9,
     11.1
    ],
    [
     "2023-03",
     21.1,
     22.7,
     26.9,
     11.1
    ],
    [
     "2023-04",
     21.7,
     24.2,
     26.9,
     11.1
    ],
    [
     "2023-05",
     21.9,
     24.5,
     26.9,
     11.1
    ],
    [
     "2023-06",
     21.8,
     24.4,
     26.9,
     11.1
    ],
    [
     "2023-07",
     21.6,
     24,
     26.9,
     11.1
    ],
    [
     "2023-08",
     21.5,
     23.6,
     26.9,
     11.1
    ],
    [
     "2023-09",
     22,
     24.8,
     26.9,
     11.1
    ],
    [
     "2023-10",
     21.9,
     24.5,
     26.9,
     11.1
    ],
    [
     "2023-11",
     21.8,
     24.3,
     26.9,
     11.1
    ],
    [
     "2023-12",
     22.4,
     25.7,
     26.9,
     11.1
    ],
    [
     "2024-01",
     22.7,
     26.6,
     26.9,
     10.5
    ],
    [
     "2024-02",
     22.3,
     25.9,
     26.9,
     10.5
    ],
    [
     "2024-03",
     21.6,
     24.2,
     26.9,
     10.5
    ],
    [
     "2024-04",
     21.2,
     23.4,
     26.9,
     10.5
    ],
    [
     "2024-05",
     21.7,
     24.5,
     26.9,
     10.5
    ],
    [
     "2024-06",
     21.6,
     24.2,
     26.9,
     10.5
    ],
    [
     "2024-07",
     21.9,
     25,
     26.9,
     10.5
    ],
    [
     "2024-08",
     22.1,
     25.3,
     26.9,
     10.5
    ],
    [
     "2024-09",
     21.7,
     24.4,
     26.9,
     10.5
    ],
    [
     "2024-10",
     21.4,
     23.8,
     26.9,
     10.5
    ],
    [
     "2024-11",
     21.9,
     24.9,
     26.9,
     10.5
    ],
    [
     "2024-12",
     22,
     25.1,
     26.9,
     10.5
    ],
    [
     "2025-01",
     21.5,
     24.8,
     26.9,
     9
    ],
    [
     "2025-02",
     21.3,
     24.5,
     26.9,
     9
    ],
    [
     "2025-03",
     24,
     30.5,
     26.9,
     9
    ],
    [
     "2025-04",
     28.7,
     40.8,
     26.9,
     9
    ],
    [
     "2025-05",
     33.9,
     52.3,
     26.9,
     9
    ],
    [
     "2025-06",
     32.4,
     49.1,
     26.9,
     9
    ],
    [
     "2025-07",
     34.6,
     53.9,
     26.9,
     9
    ],
    [
     "2025-08",
     34.6,
     54,
     26.9,
     9
    ],
    [
     "2025-09",
     36.7,
     58.7,
     26.9,
     9
    ],
    [
     "2025-10",
     37.5,
     60.3,
     26.9,
     9
    ],
    [
     "2025-11",
     36.1,
     57.2,
     26.9,
     9
    ],
    [
     "2025-12",
     36.5,
     58.2,
     26.9,
     9
    ],
    [
     "2026-01",
     36.6,
     58.3,
     26.9,
     9
    ],
    [
     "2026-02",
     33.2,
     50.8,
     26.9,
     9
    ],
    [
     "2026-03",
     29.3,
     42.2,
     26.9,
     9
    ],
    [
     "2026-04",
     27.6,
     38.4,
     26.9,
     9
    ],
    [
     "2026-05",
     25.8,
     34.3,
     26.9,
     9
    ],
    [
     "2026-06",
     26.8,
     36.6,
     26.9,
     9
    ]
   ]
  },
  {
   "family": "plastics-resins",
   "label": "Plastics in primary forms",
   "latest": {
    "period": "2026-06",
    "rri": 19.2,
    "band": "weak case",
    "tariffScore": 34.4,
    "levelScore": 24.1,
    "trendScore": 58.4,
    "dependenceScore": 0,
    "concentrationScore": 14.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 1.2,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 7.23,
    "exportRatio": 1.821,
    "hhi": 1480,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     13.8,
     21.7,
     0,
     16.3
    ],
    [
     "2023-02",
     13.6,
     21.1,
     0,
     16.3
    ],
    [
     "2023-03",
     13.8,
     21.7,
     0,
     16.3
    ],
    [
     "2023-04",
     14.2,
     22.6,
     0,
     16.3
    ],
    [
     "2023-05",
     14.1,
     22.2,
     0,
     16.3
    ],
    [
     "2023-06",
     14.1,
     22.3,
     0,
     16.3
    ],
    [
     "2023-07",
     13.7,
     21.3,
     0,
     16.3
    ],
    [
     "2023-08",
     13.7,
     21.3,
     0,
     16.3
    ],
    [
     "2023-09",
     13.9,
     21.8,
     0,
     16.3
    ],
    [
     "2023-10",
     14.1,
     22.2,
     0,
     16.3
    ],
    [
     "2023-11",
     13.6,
     21.2,
     0,
     16.3
    ],
    [
     "2023-12",
     13.7,
     21.4,
     0,
     16.3
    ],
    [
     "2024-01",
     13.6,
     21.3,
     0,
     16.1
    ],
    [
     "2024-02",
     13.6,
     21.3,
     0,
     16.1
    ],
    [
     "2024-03",
     13.2,
     20.4,
     0,
     16.1
    ],
    [
     "2024-04",
     13.7,
     21.6,
     0,
     16.1
    ],
    [
     "2024-05",
     13.6,
     21.2,
     0,
     16.1
    ],
    [
     "2024-06",
     13.8,
     21.8,
     0,
     16.1
    ],
    [
     "2024-07",
     14.2,
     22.7,
     0,
     16.1
    ],
    [
     "2024-08",
     13.8,
     21.8,
     0,
     16.1
    ],
    [
     "2024-09",
     14,
     22.1,
     0,
     16.1
    ],
    [
     "2024-10",
     13.7,
     21.4,
     0,
     16.1
    ],
    [
     "2024-11",
     14.1,
     22.3,
     0,
     16.1
    ],
    [
     "2024-12",
     13.9,
     21.9,
     0,
     16.1
    ],
    [
     "2025-01",
     13.8,
     22.4,
     0,
     14.8
    ],
    [
     "2025-02",
     13.9,
     22.7,
     0,
     14.8
    ],
    [
     "2025-03",
     16.4,
     28.2,
     0,
     14.8
    ],
    [
     "2025-04",
     15.5,
     26.2,
     0,
     14.8
    ],
    [
     "2025-05",
     18.1,
     31.9,
     0,
     14.8
    ],
    [
     "2025-06",
     18,
     31.8,
     0,
     14.8
    ],
    [
     "2025-07",
     16.9,
     29.3,
     0,
     14.8
    ],
    [
     "2025-08",
     15.9,
     27.2,
     0,
     14.8
    ],
    [
     "2025-09",
     21.4,
     39.3,
     0,
     14.8
    ],
    [
     "2025-10",
     22.7,
     42.2,
     0,
     14.8
    ],
    [
     "2025-11",
     21.9,
     40.4,
     0,
     14.8
    ],
    [
     "2025-12",
     22.9,
     42.7,
     0,
     14.8
    ],
    [
     "2026-01",
     22.7,
     42.2,
     0,
     14.8
    ],
    [
     "2026-02",
     22.2,
     41.1,
     0,
     14.8
    ],
    [
     "2026-03",
     19.6,
     35.3,
     0,
     14.8
    ],
    [
     "2026-04",
     20.4,
     37.1,
     0,
     14.8
    ],
    [
     "2026-05",
     18.9,
     33.7,
     0,
     14.8
    ],
    [
     "2026-06",
     19.2,
     34.4,
     0,
     14.8
    ]
   ]
  },
  {
   "family": "plastics-rubber-machinery",
   "label": "Plastics and rubber machinery",
   "latest": {
    "period": "2026-06",
    "rri": 49.6,
    "band": "building case",
    "tariffScore": 46.5,
    "levelScore": 42.8,
    "trendScore": 55,
    "dependenceScore": 84.5,
    "concentrationScore": 13.2,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -3.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.85,
    "exportRatio": 0.155,
    "hhi": 1320,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 87.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     39.1,
     23,
     84.5,
     13.5
    ],
    [
     "2023-02",
     39.4,
     23.7,
     84.5,
     13.5
    ],
    [
     "2023-03",
     39,
     22.9,
     84.5,
     13.5
    ],
    [
     "2023-04",
     39.7,
     24.4,
     84.5,
     13.5
    ],
    [
     "2023-05",
     39.4,
     23.8,
     84.5,
     13.5
    ],
    [
     "2023-06",
     39.4,
     23.8,
     84.5,
     13.5
    ],
    [
     "2023-07",
     39.3,
     23.4,
     84.5,
     13.5
    ],
    [
     "2023-08",
     39.5,
     24,
     84.5,
     13.5
    ],
    [
     "2023-09",
     39.8,
     24.6,
     84.5,
     13.5
    ],
    [
     "2023-10",
     39.8,
     24.5,
     84.5,
     13.5
    ],
    [
     "2023-11",
     39.1,
     23.1,
     84.5,
     13.5
    ],
    [
     "2023-12",
     39.6,
     24.2,
     84.5,
     13.5
    ],
    [
     "2024-01",
     39.8,
     24.6,
     84.5,
     13.4
    ],
    [
     "2024-02",
     39.8,
     24.7,
     84.5,
     13.4
    ],
    [
     "2024-03",
     39.1,
     23.1,
     84.5,
     13.4
    ],
    [
     "2024-04",
     39.1,
     23.2,
     84.5,
     13.4
    ],
    [
     "2024-05",
     39.1,
     23.1,
     84.5,
     13.4
    ],
    [
     "2024-06",
     39.5,
     24.1,
     84.5,
     13.4
    ],
    [
     "2024-07",
     40.4,
     25.9,
     84.5,
     13.4
    ],
    [
     "2024-08",
     38.9,
     22.7,
     84.5,
     13.4
    ],
    [
     "2024-09",
     39.5,
     24.1,
     84.5,
     13.4
    ],
    [
     "2024-10",
     39.9,
     24.8,
     84.5,
     13.4
    ],
    [
     "2024-11",
     39.8,
     24.6,
     84.5,
     13.4
    ],
    [
     "2024-12",
     39.4,
     23.7,
     84.5,
     13.4
    ],
    [
     "2025-01",
     40.2,
     25.6,
     84.5,
     13.2
    ],
    [
     "2025-02",
     39.5,
     24.1,
     84.5,
     13.2
    ],
    [
     "2025-03",
     39.9,
     25,
     84.5,
     13.2
    ],
    [
     "2025-04",
     43.5,
     33,
     84.5,
     13.2
    ],
    [
     "2025-05",
     54.8,
     58,
     84.5,
     13.2
    ],
    [
     "2025-06",
     53.3,
     54.7,
     84.5,
     13.2
    ],
    [
     "2025-07",
     55.2,
     59.1,
     84.5,
     13.2
    ],
    [
     "2025-08",
     57,
     63.1,
     84.5,
     13.2
    ],
    [
     "2025-09",
     58.8,
     66.9,
     84.5,
     13.2
    ],
    [
     "2025-10",
     60.5,
     70.8,
     84.5,
     13.2
    ],
    [
     "2025-11",
     57.5,
     64.2,
     84.5,
     13.2
    ],
    [
     "2025-12",
     54.9,
     58.4,
     84.5,
     13.2
    ],
    [
     "2026-01",
     53.9,
     56.1,
     84.5,
     13.2
    ],
    [
     "2026-02",
     58.1,
     65.4,
     84.5,
     13.2
    ],
    [
     "2026-03",
     52.4,
     52.7,
     84.5,
     13.2
    ],
    [
     "2026-04",
     52.1,
     52.2,
     84.5,
     13.2
    ],
    [
     "2026-05",
     47.6,
     42.1,
     84.5,
     13.2
    ],
    [
     "2026-06",
     49.6,
     46.5,
     84.5,
     13.2
    ]
   ]
  },
  {
   "family": "power-transmission",
   "label": "Gears and power transmission",
   "latest": {
    "period": "2026-06",
    "rri": 44.8,
    "band": "building case",
    "tariffScore": 54.8,
    "levelScore": 53.5,
    "trendScore": 58.1,
    "dependenceScore": 60.4,
    "concentrationScore": 7.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -3.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 16.04,
    "exportRatio": 0.396,
    "hhi": 790,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.6,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-02",
     29.5,
     19.7,
     60.4,
     9.9
    ],
    [
     "2014-03",
     29.5,
     19.7,
     60.4,
     9.9
    ],
    [
     "2014-04",
     29.5,
     19.7,
     60.4,
     9.9
    ],
    [
     "2014-05",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-06",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-07",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-08",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-09",
     29.5,
     19.7,
     60.4,
     9.9
    ],
    [
     "2014-10",
     29.5,
     19.7,
     60.4,
     9.9
    ],
    [
     "2014-11",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2014-12",
     29.4,
     19.6,
     60.4,
     9.9
    ],
    [
     "2015-01",
     29.5,
     19.6,
     60.4,
     10.2
    ],
    [
     "2015-02",
     29.4,
     19.5,
     60.4,
     10.2
    ],
    [
     "2015-03",
     29.5,
     19.7,
     60.4,
     10.2
    ],
    [
     "2015-04",
     29.4,
     19.5,
     60.4,
     10.2
    ],
    [
     "2015-05",
     29.4,
     19.4,
     60.4,
     10.2
    ],
    [
     "2015-06",
     29.3,
     19.2,
     60.4,
     10.2
    ],
    [
     "2015-07",
     29.4,
     19.4,
     60.4,
     10.2
    ],
    [
     "2015-08",
     29.4,
     19.4,
     60.4,
     10.2
    ],
    [
     "2015-09",
     29.4,
     19.3,
     60.4,
     10.2
    ],
    [
     "2015-10",
     29.4,
     19.4,
     60.4,
     10.2
    ],
    [
     "2015-11",
     29.4,
     19.5,
     60.4,
     10.2
    ],
    [
     "2015-12",
     29.4,
     19.3,
     60.4,
     10.2
    ],
    [
     "2016-01",
     29.3,
     19.3,
     60.4,
     9.9
    ],
    [
     "2016-02",
     29.3,
     19.4,
     60.4,
     9.9
    ],
    [
     "2016-03",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-04",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-05",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-06",
     29.3,
     19.3,
     60.4,
     9.9
    ],
    [
     "2016-07",
     29.4,
     19.5,
     60.4,
     9.9
    ],
    [
     "2016-08",
     29.3,
     19.3,
     60.4,
     9.9
    ],
    [
     "2016-09",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-10",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-11",
     29.2,
     19.1,
     60.4,
     9.9
    ],
    [
     "2016-12",
     29.3,
     19.3,
     60.4,
     9.9
    ],
    [
     "2017-01",
     29.2,
     19.3,
     60.4,
     9.5
    ],
    [
     "2017-02",
     29.1,
     19.2,
     60.4,
     9.5
    ],
    [
     "2017-03",
     29.1,
     19.1,
     60.4,
     9.5
    ],
    [
     "2017-04",
     29.1,
     19.2,
     60.4,
     9.5
    ],
    [
     "2017-05",
     29.1,
     19.2,
     60.4,
     9.5
    ],
    [
     "2017-06",
     29,
     18.9,
     60.4,
     9.5
    ],
    [
     "2017-07",
     29.1,
     19.1,
     60.4,
     9.5
    ],
    [
     "2017-08",
     29,
     19,
     60.4,
     9.5
    ],
    [
     "2017-09",
     29,
     19,
     60.4,
     9.5
    ],
    [
     "2017-10",
     29.2,
     19.3,
     60.4,
     9.5
    ],
    [
     "2017-11",
     29.1,
     19.1,
     60.4,
     9.5
    ],
    [
     "2017-12",
     29.1,
     19.2,
     60.4,
     9.5
    ],
    [
     "2018-01",
     29,
     18.9,
     60.4,
     9.6
    ],
    [
     "2018-02",
     29.2,
     19.2,
     60.4,
     9.6
    ],
    [
     "2018-03",
     29.1,
     19.1,
     60.4,
     9.6
    ],
    [
     "2018-04",
     29.1,
     19.1,
     60.4,
     9.6
    ],
    [
     "2018-05",
     29.1,
     19.1,
     60.4,
     9.6
    ],
    [
     "2018-06",
     29.2,
     19.2,
     60.4,
     9.6
    ],
    [
     "2018-07",
     30.3,
     21.7,
     60.4,
     9.6
    ],
    [
     "2018-08",
     30.8,
     22.9,
     60.4,
     9.6
    ],
    [
     "2018-09",
     31.5,
     24.4,
     60.4,
     9.6
    ],
    [
     "2018-10",
     33.3,
     28.5,
     60.4,
     9.6
    ],
    [
     "2018-11",
     33.8,
     29.5,
     60.4,
     9.6
    ],
    [
     "2018-12",
     34.1,
     30.2,
     60.4,
     9.6
    ],
    [
     "2019-01",
     34.2,
     30.6,
     60.4,
     9.4
    ],
    [
     "2019-02",
     33.4,
     28.7,
     60.4,
     9.4
    ],
    [
     "2019-03",
     32.9,
     27.6,
     60.4,
     9.4
    ],
    [
     "2019-04",
     33,
     27.9,
     60.4,
     9.4
    ],
    [
     "2019-05",
     33.4,
     28.7,
     60.4,
     9.4
    ],
    [
     "2019-06",
     34.8,
     31.9,
     60.4,
     9.4
    ],
    [
     "2019-07",
     35.8,
     34,
     60.4,
     9.4
    ],
    [
     "2019-08",
     36.3,
     35.1,
     60.4,
     9.4
    ],
    [
     "2019-09",
     35.3,
     32.9,
     60.4,
     9.4
    ],
    [
     "2019-10",
     34.8,
     31.8,
     60.4,
     9.4
    ],
    [
     "2019-11",
     33,
     27.8,
     60.4,
     9.4
    ],
    [
     "2019-12",
     36.1,
     34.7,
     60.4,
     9.4
    ],
    [
     "2020-01",
     34.1,
     30.5,
     60.4,
     9.1
    ],
    [
     "2020-02",
     33.4,
     28.8,
     60.4,
     9.1
    ],
    [
     "2020-03",
     32,
     25.8,
     60.4,
     9.1
    ],
    [
     "2020-04",
     33.8,
     29.7,
     60.4,
     9.1
    ],
    [
     "2020-05",
     35.7,
     34,
     60.4,
     9.1
    ],
    [
     "2020-06",
     33.9,
     30,
     60.4,
     9.1
    ],
    [
     "2020-07",
     32.8,
     27.6,
     60.4,
     9.1
    ],
    [
     "2020-08",
     32.6,
     27.2,
     60.4,
     9.1
    ],
    [
     "2020-09",
     32.5,
     26.8,
     60.4,
     9.1
    ],
    [
     "2020-10",
     33.1,
     28.2,
     60.4,
     9.1
    ],
    [
     "2020-11",
     34,
     30.2,
     60.4,
     9.1
    ],
    [
     "2020-12",
     31.6,
     24.8,
     60.4,
     9.1
    ],
    [
     "2021-01",
     34.6,
     31.6,
     60.4,
     9
    ],
    [
     "2021-02",
     33.8,
     29.9,
     60.4,
     9
    ],
    [
     "2021-03",
     34.9,
     32.4,
     60.4,
     9
    ],
    [
     "2021-04",
     33.7,
     29.6,
     60.4,
     9
    ],
    [
     "2021-05",
     33,
     28,
     60.4,
     9
    ],
    [
     "2021-06",
     33.7,
     29.6,
     60.4,
     9
    ],
    [
     "2021-07",
     33.8,
     29.9,
     60.4,
     9
    ],
    [
     "2021-08",
     34.6,
     31.7,
     60.4,
     9
    ],
    [
     "2021-09",
     33.9,
     30,
     60.4,
     9
    ],
    [
     "2021-10",
     34.9,
     32.2,
     60.4,
     9
    ],
    [
     "2021-11",
     34.7,
     31.8,
     60.4,
     9
    ],
    [
     "2021-12",
     33.9,
     30.1,
     60.4,
     9
    ],
    [
     "2022-01",
     34.6,
     31.9,
     60.4,
     8.6
    ],
    [
     "2022-02",
     34.4,
     31.3,
     60.4,
     8.6
    ],
    [
     "2022-03",
     33.1,
     28.5,
     60.4,
     8.6
    ],
    [
     "2022-04",
     33.8,
     30,
     60.4,
     8.6
    ],
    [
     "2022-05",
     33.1,
     28.4,
     60.4,
     8.6
    ],
    [
     "2022-06",
     32.6,
     27.3,
     60.4,
     8.6
    ],
    [
     "2022-07",
     32.5,
     27.2,
     60.4,
     8.6
    ],
    [
     "2022-08",
     33.6,
     29.7,
     60.4,
     8.6
    ],
    [
     "2022-09",
     33.2,
     28.8,
     60.4,
     8.6
    ],
    [
     "2022-10",
     32.5,
     27.1,
     60.4,
     8.6
    ],
    [
     "2022-11",
     31.9,
     25.9,
     60.4,
     8.6
    ],
    [
     "2022-12",
     31.9,
     25.9,
     60.4,
     8.6
    ],
    [
     "2023-01",
     31,
     24.3,
     60.4,
     7.7
    ],
    [
     "2023-02",
     31.4,
     25.2,
     60.4,
     7.7
    ],
    [
     "2023-03",
     31.2,
     24.8,
     60.4,
     7.7
    ],
    [
     "2023-04",
     31.9,
     26.3,
     60.4,
     7.7
    ],
    [
     "2023-05",
     31.5,
     25.4,
     60.4,
     7.7
    ],
    [
     "2023-06",
     32.4,
     27.5,
     60.4,
     7.7
    ],
    [
     "2023-07",
     31.7,
     25.8,
     60.4,
     7.7
    ],
    [
     "2023-08",
     31.3,
     25,
     60.4,
     7.7
    ],
    [
     "2023-09",
     31.1,
     24.6,
     60.4,
     7.7
    ],
    [
     "2023-10",
     31.4,
     25.2,
     60.4,
     7.7
    ],
    [
     "2023-11",
     30.5,
     23.2,
     60.4,
     7.7
    ],
    [
     "2023-12",
     31.2,
     24.8,
     60.4,
     7.7
    ],
    [
     "2024-01",
     31.6,
     25.7,
     60.4,
     7.7
    ],
    [
     "2024-02",
     31.5,
     25.5,
     60.4,
     7.7
    ],
    [
     "2024-03",
     31.2,
     24.7,
     60.4,
     7.7
    ],
    [
     "2024-04",
     31,
     24.4,
     60.4,
     7.7
    ],
    [
     "2024-05",
     31.5,
     25.5,
     60.4,
     7.7
    ],
    [
     "2024-06",
     31.3,
     25,
     60.4,
     7.7
    ],
    [
     "2024-07",
     31.8,
     26.2,
     60.4,
     7.7
    ],
    [
     "2024-08",
     32.2,
     27.1,
     60.4,
     7.7
    ],
    [
     "2024-09",
     32.1,
     26.8,
     60.4,
     7.7
    ],
    [
     "2024-10",
     31.6,
     25.7,
     60.4,
     7.7
    ],
    [
     "2024-11",
     31.3,
     25,
     60.4,
     7.7
    ],
    [
     "2024-12",
     31.7,
     26,
     60.4,
     7.7
    ],
    [
     "2025-01",
     32.1,
     26.6,
     60.4,
     7.9
    ],
    [
     "2025-02",
     32.1,
     26.7,
     60.4,
     7.9
    ],
    [
     "2025-03",
     35.4,
     33.9,
     60.4,
     7.9
    ],
    [
     "2025-04",
     42.6,
     49.9,
     60.4,
     7.9
    ],
    [
     "2025-05",
     49.8,
     66,
     60.4,
     7.9
    ],
    [
     "2025-06",
     48.5,
     63.2,
     60.4,
     7.9
    ],
    [
     "2025-07",
     48.6,
     63.4,
     60.4,
     7.9
    ],
    [
     "2025-08",
     54.2,
     75.8,
     60.4,
     7.9
    ],
    [
     "2025-09",
     63.8,
     97.1,
     60.4,
     7.9
    ],
    [
     "2025-10",
     63.4,
     96.2,
     60.4,
     7.9
    ],
    [
     "2025-11",
     62.8,
     94.9,
     60.4,
     7.9
    ],
    [
     "2025-12",
     61.9,
     92.8,
     60.4,
     7.9
    ],
    [
     "2026-01",
     62.1,
     93.4,
     60.4,
     7.9
    ],
    [
     "2026-02",
     58.8,
     86.1,
     60.4,
     7.9
    ],
    [
     "2026-03",
     54.8,
     77.2,
     60.4,
     7.9
    ],
    [
     "2026-04",
     49.8,
     66,
     60.4,
     7.9
    ],
    [
     "2026-05",
     45.5,
     56.5,
     60.4,
     7.9
    ],
    [
     "2026-06",
     44.8,
     54.8,
     60.4,
     7.9
    ]
   ]
  },
  {
   "family": "powered-hand-tools",
   "label": "Powered hand tools",
   "latest": {
    "period": "2026-06",
    "rri": 49.3,
    "band": "building case",
    "tariffScore": 40.1,
    "levelScore": 40.3,
    "trendScore": 39.6,
    "dependenceScore": 87.5,
    "concentrationScore": 20,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -10.3,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.08,
    "exportRatio": 0.125,
    "hhi": 2000,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 94.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     42.2,
     15.6,
     87.5,
     35.9
    ],
    [
     "2014-02",
     42.2,
     15.4,
     87.5,
     35.9
    ],
    [
     "2014-03",
     42.2,
     15.5,
     87.5,
     35.9
    ],
    [
     "2014-04",
     42.2,
     15.5,
     87.5,
     35.9
    ],
    [
     "2014-05",
     42.2,
     15.5,
     87.5,
     35.9
    ],
    [
     "2014-06",
     42.2,
     15.6,
     87.5,
     35.9
    ],
    [
     "2014-07",
     42.3,
     15.7,
     87.5,
     35.9
    ],
    [
     "2014-08",
     42.3,
     15.7,
     87.5,
     35.9
    ],
    [
     "2014-09",
     42.3,
     15.8,
     87.5,
     35.9
    ],
    [
     "2014-10",
     42.3,
     15.8,
     87.5,
     35.9
    ],
    [
     "2014-11",
     42.2,
     15.6,
     87.5,
     35.9
    ],
    [
     "2014-12",
     42.2,
     15.6,
     87.5,
     35.9
    ],
    [
     "2015-01",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2015-02",
     42.4,
     15.8,
     87.5,
     36.2
    ],
    [
     "2015-03",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2015-04",
     42.3,
     15.5,
     87.5,
     36.2
    ],
    [
     "2015-05",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2015-06",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2015-07",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2015-08",
     42.3,
     15.5,
     87.5,
     36.2
    ],
    [
     "2015-09",
     42.3,
     15.5,
     87.5,
     36.2
    ],
    [
     "2015-10",
     42.4,
     15.7,
     87.5,
     36.2
    ],
    [
     "2015-11",
     42.4,
     15.7,
     87.5,
     36.2
    ],
    [
     "2015-12",
     42.3,
     15.6,
     87.5,
     36.2
    ],
    [
     "2016-01",
     42.5,
     15.5,
     87.5,
     37.1
    ],
    [
     "2016-02",
     42.5,
     15.4,
     87.5,
     37.1
    ],
    [
     "2016-03",
     42.5,
     15.4,
     87.5,
     37.1
    ],
    [
     "2016-04",
     42.5,
     15.5,
     87.5,
     37.1
    ],
    [
     "2016-05",
     42.5,
     15.4,
     87.5,
     37.1
    ],
    [
     "2016-06",
     42.4,
     15.3,
     87.5,
     37.1
    ],
    [
     "2016-07",
     42.5,
     15.5,
     87.5,
     37.1
    ],
    [
     "2016-08",
     42.5,
     15.5,
     87.5,
     37.1
    ],
    [
     "2016-09",
     42.5,
     15.6,
     87.5,
     37.1
    ],
    [
     "2016-10",
     42.6,
     15.8,
     87.5,
     37.1
    ],
    [
     "2016-11",
     42.5,
     15.4,
     87.5,
     37.1
    ],
    [
     "2016-12",
     42.5,
     15.5,
     87.5,
     37.1
    ],
    [
     "2017-01",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-02",
     42.8,
     15.4,
     87.5,
     38.3
    ],
    [
     "2017-03",
     42.8,
     15.5,
     87.5,
     38.3
    ],
    [
     "2017-04",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-05",
     42.8,
     15.5,
     87.5,
     38.3
    ],
    [
     "2017-06",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-07",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-08",
     42.8,
     15.5,
     87.5,
     38.3
    ],
    [
     "2017-09",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-10",
     42.8,
     15.5,
     87.5,
     38.3
    ],
    [
     "2017-11",
     42.8,
     15.6,
     87.5,
     38.3
    ],
    [
     "2017-12",
     42.8,
     15.5,
     87.5,
     38.3
    ],
    [
     "2018-01",
     43.6,
     15.5,
     87.5,
     41.3
    ],
    [
     "2018-02",
     43.5,
     15.4,
     87.5,
     41.3
    ],
    [
     "2018-03",
     43.6,
     15.5,
     87.5,
     41.3
    ],
    [
     "2018-04",
     43.5,
     15.4,
     87.5,
     41.3
    ],
    [
     "2018-05",
     43.6,
     15.5,
     87.5,
     41.3
    ],
    [
     "2018-06",
     43.6,
     15.6,
     87.5,
     41.3
    ],
    [
     "2018-07",
     44,
     16.4,
     87.5,
     41.3
    ],
    [
     "2018-08",
     44,
     16.6,
     87.5,
     41.3
    ],
    [
     "2018-09",
     44,
     16.4,
     87.5,
     41.3
    ],
    [
     "2018-10",
     44.4,
     17.3,
     87.5,
     41.3
    ],
    [
     "2018-11",
     44.5,
     17.7,
     87.5,
     41.3
    ],
    [
     "2018-12",
     44.7,
     18,
     87.5,
     41.3
    ],
    [
     "2019-01",
     45,
     17.9,
     87.5,
     42.9
    ],
    [
     "2019-02",
     44.8,
     17.4,
     87.5,
     42.9
    ],
    [
     "2019-03",
     44.8,
     17.4,
     87.5,
     42.9
    ],
    [
     "2019-04",
     44.8,
     17.3,
     87.5,
     42.9
    ],
    [
     "2019-05",
     45,
     17.8,
     87.5,
     42.9
    ],
    [
     "2019-06",
     45.5,
     18.9,
     87.5,
     42.9
    ],
    [
     "2019-07",
     45.2,
     18.2,
     87.5,
     42.9
    ],
    [
     "2019-08",
     45.3,
     18.5,
     87.5,
     42.9
    ],
    [
     "2019-09",
     52,
     33.4,
     87.5,
     42.9
    ],
    [
     "2019-10",
     53.3,
     36.2,
     87.5,
     42.9
    ],
    [
     "2019-11",
     53.5,
     36.8,
     87.5,
     42.9
    ],
    [
     "2019-12",
     54.8,
     39.6,
     87.5,
     42.9
    ],
    [
     "2020-01",
     52.4,
     40.6,
     87.5,
     31.5
    ],
    [
     "2020-02",
     50,
     35.2,
     87.5,
     31.5
    ],
    [
     "2020-03",
     44.9,
     23.9,
     87.5,
     31.5
    ],
    [
     "2020-04",
     46.9,
     28.3,
     87.5,
     31.5
    ],
    [
     "2020-05",
     46.7,
     27.9,
     87.5,
     31.5
    ],
    [
     "2020-06",
     46.2,
     26.8,
     87.5,
     31.5
    ],
    [
     "2020-07",
     45.6,
     25.5,
     87.5,
     31.5
    ],
    [
     "2020-08",
     45.8,
     26,
     87.5,
     31.5
    ],
    [
     "2020-09",
     42.9,
     19.5,
     87.5,
     31.5
    ],
    [
     "2020-10",
     41.7,
     16.9,
     87.5,
     31.5
    ],
    [
     "2020-11",
     41.6,
     16.7,
     87.5,
     31.5
    ],
    [
     "2020-12",
     41.2,
     15.7,
     87.5,
     31.5
    ],
    [
     "2021-01",
     39.8,
     15.4,
     87.5,
     26.4
    ],
    [
     "2021-02",
     41.2,
     18.6,
     87.5,
     26.4
    ],
    [
     "2021-03",
     42.5,
     21.5,
     87.5,
     26.4
    ],
    [
     "2021-04",
     41.3,
     18.7,
     87.5,
     26.4
    ],
    [
     "2021-05",
     41.2,
     18.5,
     87.5,
     26.4
    ],
    [
     "2021-06",
     41.8,
     19.9,
     87.5,
     26.4
    ],
    [
     "2021-07",
     41.6,
     19.5,
     87.5,
     26.4
    ],
    [
     "2021-08",
     42.2,
     20.7,
     87.5,
     26.4
    ],
    [
     "2021-09",
     41.9,
     20,
     87.5,
     26.4
    ],
    [
     "2021-10",
     42.2,
     20.8,
     87.5,
     26.4
    ],
    [
     "2021-11",
     41.9,
     20.1,
     87.5,
     26.4
    ],
    [
     "2021-12",
     42.9,
     22.3,
     87.5,
     26.4
    ],
    [
     "2022-01",
     42,
     21.6,
     87.5,
     24.2
    ],
    [
     "2022-02",
     41.8,
     21.2,
     87.5,
     24.2
    ],
    [
     "2022-03",
     41.7,
     20.8,
     87.5,
     24.2
    ],
    [
     "2022-04",
     42,
     21.5,
     87.5,
     24.2
    ],
    [
     "2022-05",
     41.5,
     20.4,
     87.5,
     24.2
    ],
    [
     "2022-06",
     41.4,
     20.3,
     87.5,
     24.2
    ],
    [
     "2022-07",
     42,
     21.5,
     87.5,
     24.2
    ],
    [
     "2022-08",
     41.3,
     20,
     87.5,
     24.2
    ],
    [
     "2022-09",
     41.8,
     21,
     87.5,
     24.2
    ],
    [
     "2022-10",
     41.6,
     20.6,
     87.5,
     24.2
    ],
    [
     "2022-11",
     41.8,
     21,
     87.5,
     24.2
    ],
    [
     "2022-12",
     41.2,
     19.8,
     87.5,
     24.2
    ],
    [
     "2023-01",
     39.9,
     18.8,
     87.5,
     20.6
    ],
    [
     "2023-02",
     40.1,
     19.3,
     87.5,
     20.6
    ],
    [
     "2023-03",
     39.5,
     18.1,
     87.5,
     20.6
    ],
    [
     "2023-04",
     40.3,
     19.8,
     87.5,
     20.6
    ],
    [
     "2023-05",
     40.2,
     19.5,
     87.5,
     20.6
    ],
    [
     "2023-06",
     40.1,
     19.3,
     87.5,
     20.6
    ],
    [
     "2023-07",
     39.7,
     18.5,
     87.5,
     20.6
    ],
    [
     "2023-08",
     39.7,
     18.4,
     87.5,
     20.6
    ],
    [
     "2023-09",
     39.9,
     18.9,
     87.5,
     20.6
    ],
    [
     "2023-10",
     40,
     19.2,
     87.5,
     20.6
    ],
    [
     "2023-11",
     40,
     19.1,
     87.5,
     20.6
    ],
    [
     "2023-12",
     40.5,
     20.2,
     87.5,
     20.6
    ],
    [
     "2024-01",
     40.8,
     20,
     87.5,
     22
    ],
    [
     "2024-02",
     40.4,
     19.2,
     87.5,
     22
    ],
    [
     "2024-03",
     40.9,
     20.4,
     87.5,
     22
    ],
    [
     "2024-04",
     40.5,
     19.4,
     87.5,
     22
    ],
    [
     "2024-05",
     40.8,
     20.1,
     87.5,
     22
    ],
    [
     "2024-06",
     41,
     20.6,
     87.5,
     22
    ],
    [
     "2024-07",
     40.8,
     20,
     87.5,
     22
    ],
    [
     "2024-08",
     41.2,
     20.9,
     87.5,
     22
    ],
    [
     "2024-09",
     40.6,
     19.7,
     87.5,
     22
    ],
    [
     "2024-10",
     40.7,
     19.9,
     87.5,
     22
    ],
    [
     "2024-11",
     40.9,
     20.4,
     87.5,
     22
    ],
    [
     "2024-12",
     41.2,
     21.1,
     87.5,
     22
    ],
    [
     "2025-01",
     41.2,
     22.1,
     87.5,
     20
    ],
    [
     "2025-02",
     41.1,
     21.8,
     87.5,
     20
    ],
    [
     "2025-03",
     51.7,
     45.5,
     87.5,
     20
    ],
    [
     "2025-04",
     57.8,
     58.9,
     87.5,
     20
    ],
    [
     "2025-05",
     62.7,
     69.8,
     87.5,
     20
    ],
    [
     "2025-06",
     59.6,
     63,
     87.5,
     20
    ],
    [
     "2025-07",
     60.7,
     65.4,
     87.5,
     20
    ],
    [
     "2025-08",
     66.6,
     78.5,
     87.5,
     20
    ],
    [
     "2025-09",
     67.9,
     81.4,
     87.5,
     20
    ],
    [
     "2025-10",
     68.9,
     83.7,
     87.5,
     20
    ],
    [
     "2025-11",
     67.4,
     80.4,
     87.5,
     20
    ],
    [
     "2025-12",
     66.1,
     77.4,
     87.5,
     20
    ],
    [
     "2026-01",
     66.4,
     78.1,
     87.5,
     20
    ],
    [
     "2026-02",
     64,
     72.8,
     87.5,
     20
    ],
    [
     "2026-03",
     53.1,
     48.6,
     87.5,
     20
    ],
    [
     "2026-04",
     52.1,
     46.4,
     87.5,
     20
    ],
    [
     "2026-05",
     50.3,
     42.3,
     87.5,
     20
    ],
    [
     "2026-06",
     49.3,
     40.1,
     87.5,
     20
    ]
   ]
  },
  {
   "family": "pumps",
   "label": "Pumps for liquids",
   "latest": {
    "period": "2026-06",
    "rri": 33.6,
    "band": "weak case",
    "tariffScore": 37.8,
    "levelScore": 40.3,
    "trendScore": 32.2,
    "dependenceScore": 47,
    "concentrationScore": 10,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -12.9,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.08,
    "exportRatio": 0.53,
    "hhi": 1000,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 81.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     24.3,
     16,
     47,
     12.1
    ],
    [
     "2014-02",
     24.3,
     16,
     47,
     12.1
    ],
    [
     "2014-03",
     24.3,
     15.9,
     47,
     12.1
    ],
    [
     "2014-04",
     24.3,
     15.9,
     47,
     12.1
    ],
    [
     "2014-05",
     24.3,
     15.9,
     47,
     12.1
    ],
    [
     "2014-06",
     24.3,
     15.9,
     47,
     12.1
    ],
    [
     "2014-07",
     24.2,
     15.8,
     47,
     12.1
    ],
    [
     "2014-08",
     24.2,
     15.8,
     47,
     12.1
    ],
    [
     "2014-09",
     24.2,
     15.8,
     47,
     12.1
    ],
    [
     "2014-10",
     24.3,
     15.9,
     47,
     12.1
    ],
    [
     "2014-11",
     24.2,
     15.8,
     47,
     12.1
    ],
    [
     "2014-12",
     24.2,
     15.8,
     47,
     12.1
    ],
    [
     "2015-01",
     24.1,
     15.9,
     47,
     11.5
    ],
    [
     "2015-02",
     24,
     15.7,
     47,
     11.5
    ],
    [
     "2015-03",
     24.1,
     15.8,
     47,
     11.5
    ],
    [
     "2015-04",
     24.1,
     15.8,
     47,
     11.5
    ],
    [
     "2015-05",
     24.1,
     15.9,
     47,
     11.5
    ],
    [
     "2015-06",
     24.1,
     15.9,
     47,
     11.5
    ],
    [
     "2015-07",
     24.1,
     15.8,
     47,
     11.5
    ],
    [
     "2015-08",
     24.1,
     15.9,
     47,
     11.5
    ],
    [
     "2015-09",
     24.2,
     16,
     47,
     11.5
    ],
    [
     "2015-10",
     24,
     15.7,
     47,
     11.5
    ],
    [
     "2015-11",
     24.1,
     15.8,
     47,
     11.5
    ],
    [
     "2015-12",
     24.1,
     15.9,
     47,
     11.5
    ],
    [
     "2016-01",
     24.3,
     16,
     47,
     11.8
    ],
    [
     "2016-02",
     24.3,
     16.2,
     47,
     11.8
    ],
    [
     "2016-03",
     24.3,
     16,
     47,
     11.8
    ],
    [
     "2016-04",
     24.2,
     15.9,
     47,
     11.8
    ],
    [
     "2016-05",
     24.2,
     15.9,
     47,
     11.8
    ],
    [
     "2016-06",
     24.2,
     15.8,
     47,
     11.8
    ],
    [
     "2016-07",
     24.2,
     15.8,
     47,
     11.8
    ],
    [
     "2016-08",
     24.3,
     16,
     47,
     11.8
    ],
    [
     "2016-09",
     24.3,
     16,
     47,
     11.8
    ],
    [
     "2016-10",
     24.3,
     16,
     47,
     11.8
    ],
    [
     "2016-11",
     24.2,
     15.9,
     47,
     11.8
    ],
    [
     "2016-12",
     24.2,
     15.9,
     47,
     11.8
    ],
    [
     "2017-01",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-02",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-03",
     24.1,
     15.9,
     47,
     11.4
    ],
    [
     "2017-04",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-05",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-06",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-07",
     24.2,
     16.1,
     47,
     11.4
    ],
    [
     "2017-08",
     24.1,
     15.9,
     47,
     11.4
    ],
    [
     "2017-09",
     24.1,
     15.9,
     47,
     11.4
    ],
    [
     "2017-10",
     24.2,
     16,
     47,
     11.4
    ],
    [
     "2017-11",
     24.1,
     15.9,
     47,
     11.4
    ],
    [
     "2017-12",
     24.1,
     15.9,
     47,
     11.4
    ],
    [
     "2018-01",
     24,
     15.9,
     47,
     11.1
    ],
    [
     "2018-02",
     24,
     15.9,
     47,
     11.1
    ],
    [
     "2018-03",
     24,
     15.8,
     47,
     11.1
    ],
    [
     "2018-04",
     24,
     15.9,
     47,
     11.1
    ],
    [
     "2018-05",
     24,
     15.9,
     47,
     11.1
    ],
    [
     "2018-06",
     24,
     15.9,
     47,
     11.1
    ],
    [
     "2018-07",
     27.3,
     23.1,
     47,
     11.1
    ],
    [
     "2018-08",
     28.4,
     25.5,
     47,
     11.1
    ],
    [
     "2018-09",
     28.4,
     25.7,
     47,
     11.1
    ],
    [
     "2018-10",
     29,
     27,
     47,
     11.1
    ],
    [
     "2018-11",
     28.9,
     26.8,
     47,
     11.1
    ],
    [
     "2018-12",
     29.1,
     27.2,
     47,
     11.1
    ],
    [
     "2019-01",
     27.9,
     24.7,
     47,
     10.8
    ],
    [
     "2019-02",
     27.3,
     23.3,
     47,
     10.8
    ],
    [
     "2019-03",
     27.6,
     23.9,
     47,
     10.8
    ],
    [
     "2019-04",
     27.9,
     24.6,
     47,
     10.8
    ],
    [
     "2019-05",
     27.7,
     24.3,
     47,
     10.8
    ],
    [
     "2019-06",
     27.7,
     24.3,
     47,
     10.8
    ],
    [
     "2019-07",
     26.4,
     21.3,
     47,
     10.8
    ],
    [
     "2019-08",
     25.9,
     20.3,
     47,
     10.8
    ],
    [
     "2019-09",
     25.9,
     20.2,
     47,
     10.8
    ],
    [
     "2019-10",
     25.1,
     18.4,
     47,
     10.8
    ],
    [
     "2019-11",
     25,
     18.2,
     47,
     10.8
    ],
    [
     "2019-12",
     25.5,
     19.4,
     47,
     10.8
    ],
    [
     "2020-01",
     26.3,
     20.9,
     47,
     11.3
    ],
    [
     "2020-02",
     25.9,
     19.9,
     47,
     11.3
    ],
    [
     "2020-03",
     25.1,
     18.2,
     47,
     11.3
    ],
    [
     "2020-04",
     26,
     20.2,
     47,
     11.3
    ],
    [
     "2020-05",
     26.6,
     21.4,
     47,
     11.3
    ],
    [
     "2020-06",
     26.6,
     21.6,
     47,
     11.3
    ],
    [
     "2020-07",
     26.3,
     20.9,
     47,
     11.3
    ],
    [
     "2020-08",
     26.9,
     22.2,
     47,
     11.3
    ],
    [
     "2020-09",
     27.2,
     22.9,
     47,
     11.3
    ],
    [
     "2020-10",
     27.6,
     23.8,
     47,
     11.3
    ],
    [
     "2020-11",
     27.5,
     23.6,
     47,
     11.3
    ],
    [
     "2020-12",
     27.7,
     24,
     47,
     11.3
    ],
    [
     "2021-01",
     29.6,
     28.7,
     47,
     10.4
    ],
    [
     "2021-02",
     29.5,
     28.5,
     47,
     10.4
    ],
    [
     "2021-03",
     29.5,
     28.5,
     47,
     10.4
    ],
    [
     "2021-04",
     28.6,
     26.4,
     47,
     10.4
    ],
    [
     "2021-05",
     28.7,
     26.6,
     47,
     10.4
    ],
    [
     "2021-06",
     29.3,
     27.9,
     47,
     10.4
    ],
    [
     "2021-07",
     29.1,
     27.5,
     47,
     10.4
    ],
    [
     "2021-08",
     29.3,
     28.1,
     47,
     10.4
    ],
    [
     "2021-09",
     29,
     27.4,
     47,
     10.4
    ],
    [
     "2021-10",
     27.8,
     24.7,
     47,
     10.4
    ],
    [
     "2021-11",
     28,
     25,
     47,
     10.4
    ],
    [
     "2021-12",
     27.9,
     24.8,
     47,
     10.4
    ],
    [
     "2022-01",
     27.5,
     24.1,
     47,
     10.2
    ],
    [
     "2022-02",
     27,
     23,
     47,
     10.2
    ],
    [
     "2022-03",
     27.1,
     23.3,
     47,
     10.2
    ],
    [
     "2022-04",
     26.9,
     22.8,
     47,
     10.2
    ],
    [
     "2022-05",
     26.6,
     22.2,
     47,
     10.2
    ],
    [
     "2022-06",
     26.4,
     21.7,
     47,
     10.2
    ],
    [
     "2022-07",
     26.8,
     22.6,
     47,
     10.2
    ],
    [
     "2022-08",
     26.4,
     21.7,
     47,
     10.2
    ],
    [
     "2022-09",
     26.3,
     21.5,
     47,
     10.2
    ],
    [
     "2022-10",
     26.8,
     22.6,
     47,
     10.2
    ],
    [
     "2022-11",
     26.5,
     21.8,
     47,
     10.2
    ],
    [
     "2022-12",
     26.6,
     22.1,
     47,
     10.2
    ],
    [
     "2023-01",
     26.6,
     22.1,
     47,
     10.4
    ],
    [
     "2023-02",
     26.4,
     21.6,
     47,
     10.4
    ],
    [
     "2023-03",
     26,
     20.6,
     47,
     10.4
    ],
    [
     "2023-04",
     26.7,
     22.3,
     47,
     10.4
    ],
    [
     "2023-05",
     26.6,
     22.1,
     47,
     10.4
    ],
    [
     "2023-06",
     26.8,
     22.4,
     47,
     10.4
    ],
    [
     "2023-07",
     26.6,
     22,
     47,
     10.4
    ],
    [
     "2023-08",
     26.6,
     22.1,
     47,
     10.4
    ],
    [
     "2023-09",
     27.5,
     23.9,
     47,
     10.4
    ],
    [
     "2023-10",
     26.6,
     22.1,
     47,
     10.4
    ],
    [
     "2023-11",
     26.2,
     21.2,
     47,
     10.4
    ],
    [
     "2023-12",
     26.5,
     21.8,
     47,
     10.4
    ],
    [
     "2024-01",
     27.1,
     23.1,
     47,
     10.4
    ],
    [
     "2024-02",
     26.7,
     22.3,
     47,
     10.4
    ],
    [
     "2024-03",
     26.5,
     21.7,
     47,
     10.4
    ],
    [
     "2024-04",
     26,
     20.6,
     47,
     10.4
    ],
    [
     "2024-05",
     26.6,
     21.9,
     47,
     10.4
    ],
    [
     "2024-06",
     26.8,
     22.5,
     47,
     10.4
    ],
    [
     "2024-07",
     28,
     25,
     47,
     10.4
    ],
    [
     "2024-08",
     27.5,
     24,
     47,
     10.4
    ],
    [
     "2024-09",
     27.3,
     23.6,
     47,
     10.4
    ],
    [
     "2024-10",
     27.3,
     23.6,
     47,
     10.4
    ],
    [
     "2024-11",
     27.3,
     23.5,
     47,
     10.4
    ],
    [
     "2024-12",
     28,
     25,
     47,
     10.4
    ],
    [
     "2025-01",
     28.4,
     26.2,
     47,
     10
    ],
    [
     "2025-02",
     27.5,
     24.2,
     47,
     10
    ],
    [
     "2025-03",
     34.4,
     39.6,
     47,
     10
    ],
    [
     "2025-04",
     40.9,
     53.9,
     47,
     10
    ],
    [
     "2025-05",
     48,
     69.7,
     47,
     10
    ],
    [
     "2025-06",
     46.5,
     66.5,
     47,
     10
    ],
    [
     "2025-07",
     47.1,
     67.7,
     47,
     10
    ],
    [
     "2025-08",
     48.2,
     70.3,
     47,
     10
    ],
    [
     "2025-09",
     51.3,
     77.2,
     47,
     10
    ],
    [
     "2025-10",
     51.3,
     77.2,
     47,
     10
    ],
    [
     "2025-11",
     50.9,
     76.3,
     47,
     10
    ],
    [
     "2025-12",
     50.2,
     74.7,
     47,
     10
    ],
    [
     "2026-01",
     52.2,
     79.2,
     47,
     10
    ],
    [
     "2026-02",
     47.6,
     68.8,
     47,
     10
    ],
    [
     "2026-03",
     40.7,
     53.6,
     47,
     10
    ],
    [
     "2026-04",
     37.8,
     47.2,
     47,
     10
    ],
    [
     "2026-05",
     33,
     36.5,
     47,
     10
    ],
    [
     "2026-06",
     33.6,
     37.8,
     47,
     10
    ]
   ]
  },
  {
   "family": "rubber-products",
   "label": "Rubber materials and products",
   "latest": {
    "period": "2026-06",
    "rri": 33.4,
    "band": "weak case",
    "tariffScore": 32.8,
    "levelScore": 30.8,
    "trendScore": 37.3,
    "dependenceScore": 53.5,
    "concentrationScore": 10.3,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -9.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.25,
    "exportRatio": 0.465,
    "hhi": 1030,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 80,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     26.3,
     17.8,
     53.5,
     9
    ],
    [
     "2014-02",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-03",
     26.2,
     17.6,
     53.5,
     9
    ],
    [
     "2014-04",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-05",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-06",
     26.2,
     17.6,
     53.5,
     9
    ],
    [
     "2014-07",
     26.3,
     17.8,
     53.5,
     9
    ],
    [
     "2014-08",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-09",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-10",
     26.3,
     17.8,
     53.5,
     9
    ],
    [
     "2014-11",
     26.3,
     17.7,
     53.5,
     9
    ],
    [
     "2014-12",
     26.3,
     17.8,
     53.5,
     9
    ],
    [
     "2015-01",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2015-02",
     26.4,
     17.7,
     53.5,
     9.4
    ],
    [
     "2015-03",
     26.5,
     18.1,
     53.5,
     9.4
    ],
    [
     "2015-04",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2015-05",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2015-06",
     26.5,
     17.9,
     53.5,
     9.4
    ],
    [
     "2015-07",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2015-08",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2015-09",
     26.4,
     17.7,
     53.5,
     9.4
    ],
    [
     "2015-10",
     26.4,
     17.7,
     53.5,
     9.4
    ],
    [
     "2015-11",
     26.4,
     17.7,
     53.5,
     9.4
    ],
    [
     "2015-12",
     26.4,
     17.8,
     53.5,
     9.4
    ],
    [
     "2016-01",
     26.5,
     17.9,
     53.5,
     9.6
    ],
    [
     "2016-02",
     26.5,
     17.8,
     53.5,
     9.6
    ],
    [
     "2016-03",
     26.3,
     17.5,
     53.5,
     9.6
    ],
    [
     "2016-04",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2016-05",
     26.5,
     17.8,
     53.5,
     9.6
    ],
    [
     "2016-06",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2016-07",
     26.5,
     17.9,
     53.5,
     9.6
    ],
    [
     "2016-08",
     26.5,
     17.8,
     53.5,
     9.6
    ],
    [
     "2016-09",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2016-10",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2016-11",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2016-12",
     26.5,
     17.9,
     53.5,
     9.6
    ],
    [
     "2017-01",
     26.5,
     17.9,
     53.5,
     9.6
    ],
    [
     "2017-02",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2017-03",
     26.3,
     17.4,
     53.5,
     9.6
    ],
    [
     "2017-04",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2017-05",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2017-06",
     26.3,
     17.5,
     53.5,
     9.6
    ],
    [
     "2017-07",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2017-08",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2017-09",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2017-10",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2017-11",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2017-12",
     26.6,
     18,
     53.5,
     9.6
    ],
    [
     "2018-01",
     26.5,
     17.8,
     53.5,
     9.6
    ],
    [
     "2018-02",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2018-03",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2018-04",
     26.3,
     17.5,
     53.5,
     9.6
    ],
    [
     "2018-05",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2018-06",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2018-07",
     26.4,
     17.7,
     53.5,
     9.6
    ],
    [
     "2018-08",
     26.4,
     17.6,
     53.5,
     9.6
    ],
    [
     "2018-09",
     26.6,
     18.1,
     53.5,
     9.6
    ],
    [
     "2018-10",
     28.5,
     22.4,
     53.5,
     9.6
    ],
    [
     "2018-11",
     28.8,
     22.9,
     53.5,
     9.6
    ],
    [
     "2018-12",
     29.4,
     24.3,
     53.5,
     9.6
    ],
    [
     "2019-01",
     28.4,
     22.4,
     53.5,
     9.1
    ],
    [
     "2019-02",
     28,
     21.5,
     53.5,
     9.1
    ],
    [
     "2019-03",
     27.6,
     20.7,
     53.5,
     9.1
    ],
    [
     "2019-04",
     28.1,
     21.7,
     53.5,
     9.1
    ],
    [
     "2019-05",
     28.3,
     22.1,
     53.5,
     9.1
    ],
    [
     "2019-06",
     30,
     26,
     53.5,
     9.1
    ],
    [
     "2019-07",
     30.7,
     27.4,
     53.5,
     9.1
    ],
    [
     "2019-08",
     30.5,
     27,
     53.5,
     9.1
    ],
    [
     "2019-09",
     30.9,
     27.9,
     53.5,
     9.1
    ],
    [
     "2019-10",
     29.9,
     25.7,
     53.5,
     9.1
    ],
    [
     "2019-11",
     29.7,
     25.2,
     53.5,
     9.1
    ],
    [
     "2019-12",
     29.6,
     25,
     53.5,
     9.1
    ],
    [
     "2020-01",
     30,
     25.8,
     53.5,
     9.5
    ],
    [
     "2020-02",
     29.5,
     24.7,
     53.5,
     9.5
    ],
    [
     "2020-03",
     28.6,
     22.6,
     53.5,
     9.5
    ],
    [
     "2020-04",
     30.5,
     26.8,
     53.5,
     9.5
    ],
    [
     "2020-05",
     30.8,
     27.5,
     53.5,
     9.5
    ],
    [
     "2020-06",
     29.8,
     25.3,
     53.5,
     9.5
    ],
    [
     "2020-07",
     29.3,
     24.1,
     53.5,
     9.5
    ],
    [
     "2020-08",
     29.3,
     24.1,
     53.5,
     9.5
    ],
    [
     "2020-09",
     29.4,
     24.4,
     53.5,
     9.5
    ],
    [
     "2020-10",
     29.6,
     24.8,
     53.5,
     9.5
    ],
    [
     "2020-11",
     29.9,
     25.4,
     53.5,
     9.5
    ],
    [
     "2020-12",
     30.2,
     26.1,
     53.5,
     9.5
    ],
    [
     "2021-01",
     29.9,
     25.8,
     53.5,
     9.1
    ],
    [
     "2021-02",
     30.3,
     26.7,
     53.5,
     9.1
    ],
    [
     "2021-03",
     30.8,
     27.7,
     53.5,
     9.1
    ],
    [
     "2021-04",
     29.5,
     24.8,
     53.5,
     9.1
    ],
    [
     "2021-05",
     29.2,
     24.1,
     53.5,
     9.1
    ],
    [
     "2021-06",
     29.9,
     25.8,
     53.5,
     9.1
    ],
    [
     "2021-07",
     29.5,
     24.8,
     53.5,
     9.1
    ],
    [
     "2021-08",
     29.9,
     25.7,
     53.5,
     9.1
    ],
    [
     "2021-09",
     29.4,
     24.7,
     53.5,
     9.1
    ],
    [
     "2021-10",
     29.6,
     25,
     53.5,
     9.1
    ],
    [
     "2021-11",
     29.1,
     24,
     53.5,
     9.1
    ],
    [
     "2021-12",
     29.7,
     25.3,
     53.5,
     9.1
    ],
    [
     "2022-01",
     29.5,
     24.9,
     53.5,
     8.9
    ],
    [
     "2022-02",
     29.6,
     25.1,
     53.5,
     8.9
    ],
    [
     "2022-03",
     28.9,
     23.7,
     53.5,
     8.9
    ],
    [
     "2022-04",
     28.9,
     23.7,
     53.5,
     8.9
    ],
    [
     "2022-05",
     28.9,
     23.6,
     53.5,
     8.9
    ],
    [
     "2022-06",
     28.8,
     23.3,
     53.5,
     8.9
    ],
    [
     "2022-07",
     29.3,
     24.4,
     53.5,
     8.9
    ],
    [
     "2022-08",
     29.4,
     24.8,
     53.5,
     8.9
    ],
    [
     "2022-09",
     29,
     23.8,
     53.5,
     8.9
    ],
    [
     "2022-10",
     28.8,
     23.4,
     53.5,
     8.9
    ],
    [
     "2022-11",
     29.1,
     24.1,
     53.5,
     8.9
    ],
    [
     "2022-12",
     29,
     23.9,
     53.5,
     8.9
    ],
    [
     "2023-01",
     29.7,
     24.6,
     53.5,
     10.2
    ],
    [
     "2023-02",
     29,
     23.2,
     53.5,
     10.2
    ],
    [
     "2023-03",
     28.5,
     22,
     53.5,
     10.2
    ],
    [
     "2023-04",
     29.3,
     23.8,
     53.5,
     10.2
    ],
    [
     "2023-05",
     29.2,
     23.6,
     53.5,
     10.2
    ],
    [
     "2023-06",
     29,
     23.2,
     53.5,
     10.2
    ],
    [
     "2023-07",
     29.2,
     23.6,
     53.5,
     10.2
    ],
    [
     "2023-08",
     29.2,
     23.6,
     53.5,
     10.2
    ],
    [
     "2023-09",
     29.4,
     23.9,
     53.5,
     10.2
    ],
    [
     "2023-10",
     29.5,
     24.2,
     53.5,
     10.2
    ],
    [
     "2023-11",
     28.9,
     22.9,
     53.5,
     10.2
    ],
    [
     "2023-12",
     29.7,
     24.6,
     53.5,
     10.2
    ],
    [
     "2024-01",
     29.7,
     24.8,
     53.5,
     10
    ],
    [
     "2024-02",
     28.9,
     22.9,
     53.5,
     10
    ],
    [
     "2024-03",
     28.9,
     23,
     53.5,
     10
    ],
    [
     "2024-04",
     28.4,
     21.9,
     53.5,
     10
    ],
    [
     "2024-05",
     28.9,
     22.9,
     53.5,
     10
    ],
    [
     "2024-06",
     29.5,
     24.3,
     53.5,
     10
    ],
    [
     "2024-07",
     29.5,
     24.3,
     53.5,
     10
    ],
    [
     "2024-08",
     29.1,
     23.4,
     53.5,
     10
    ],
    [
     "2024-09",
     29,
     23.2,
     53.5,
     10
    ],
    [
     "2024-10",
     28.6,
     22.4,
     53.5,
     10
    ],
    [
     "2024-11",
     29.3,
     23.8,
     53.5,
     10
    ],
    [
     "2024-12",
     30.1,
     25.6,
     53.5,
     10
    ],
    [
     "2025-01",
     29.9,
     25.1,
     53.5,
     10.3
    ],
    [
     "2025-02",
     29.9,
     25,
     53.5,
     10.3
    ],
    [
     "2025-03",
     33.7,
     33.5,
     53.5,
     10.3
    ],
    [
     "2025-04",
     37.8,
     42.5,
     53.5,
     10.3
    ],
    [
     "2025-05",
     45.5,
     59.8,
     53.5,
     10.3
    ],
    [
     "2025-06",
     43.1,
     54.4,
     53.5,
     10.3
    ],
    [
     "2025-07",
     45,
     58.7,
     53.5,
     10.3
    ],
    [
     "2025-08",
     45.1,
     58.9,
     53.5,
     10.3
    ],
    [
     "2025-09",
     48.1,
     65.5,
     53.5,
     10.3
    ],
    [
     "2025-10",
     48.7,
     66.8,
     53.5,
     10.3
    ],
    [
     "2025-11",
     48,
     65.3,
     53.5,
     10.3
    ],
    [
     "2025-12",
     48.2,
     65.7,
     53.5,
     10.3
    ],
    [
     "2026-01",
     48.4,
     66.1,
     53.5,
     10.3
    ],
    [
     "2026-02",
     44.4,
     57.2,
     53.5,
     10.3
    ],
    [
     "2026-03",
     37.8,
     42.7,
     53.5,
     10.3
    ],
    [
     "2026-04",
     35.5,
     37.6,
     53.5,
     10.3
    ],
    [
     "2026-05",
     32.5,
     30.8,
     53.5,
     10.3
    ],
    [
     "2026-06",
     33.4,
     32.8,
     53.5,
     10.3
    ]
   ]
  },
  {
   "family": "semiconductor-equipment",
   "label": "Semiconductor and display equipment",
   "latest": {
    "period": "2026-06",
    "rri": 8.9,
    "band": "weak case",
    "tariffScore": 11.9,
    "levelScore": 3.3,
    "trendScore": 32,
    "dependenceScore": 0,
    "concentrationScore": 14.3,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -8.1,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 1,
    "exportRatio": 1.425,
    "hhi": 1430,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 93,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-02",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-03",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-04",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-05",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-06",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-07",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-08",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-09",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-10",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-11",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2014-12",
     12.6,
     15,
     0,
     23.3
    ],
    [
     "2015-01",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-02",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-03",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-04",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-05",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-06",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-07",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-08",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-09",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-10",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-11",
     11.8,
     15,
     0,
     20
    ],
    [
     "2015-12",
     11.8,
     15,
     0,
     20
    ],
    [
     "2016-01",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-02",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-03",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-04",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-05",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-06",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-07",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-08",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-09",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-10",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-11",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2016-12",
     12.4,
     15,
     0,
     22.6
    ],
    [
     "2017-01",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-02",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-03",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-04",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-05",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-06",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-07",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-08",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-09",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-10",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-11",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2017-12",
     11.7,
     15,
     0,
     19.9
    ],
    [
     "2018-01",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-02",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-03",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-04",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-05",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-06",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-07",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-08",
     11.5,
     15,
     0,
     19
    ],
    [
     "2018-09",
     13.4,
     19.2,
     0,
     19
    ],
    [
     "2018-10",
     13.8,
     20,
     0,
     19
    ],
    [
     "2018-11",
     14.9,
     22.5,
     0,
     19
    ],
    [
     "2018-12",
     13.6,
     19.7,
     0,
     19
    ],
    [
     "2019-01",
     15.7,
     19.9,
     0,
     27
    ],
    [
     "2019-02",
     15,
     18.3,
     0,
     27
    ],
    [
     "2019-03",
     15.6,
     19.7,
     0,
     27
    ],
    [
     "2019-04",
     15.1,
     18.5,
     0,
     27
    ],
    [
     "2019-05",
     15.4,
     19.3,
     0,
     27
    ],
    [
     "2019-06",
     15,
     18.3,
     0,
     27
    ],
    [
     "2019-07",
     15,
     18.4,
     0,
     27
    ],
    [
     "2019-08",
     14.9,
     18,
     0,
     27
    ],
    [
     "2019-09",
     14.3,
     16.8,
     0,
     27
    ],
    [
     "2019-10",
     14.8,
     17.8,
     0,
     27
    ],
    [
     "2019-11",
     14.8,
     17.9,
     0,
     27
    ],
    [
     "2019-12",
     14.9,
     18.1,
     0,
     27
    ],
    [
     "2020-01",
     13.3,
     18.1,
     0,
     20.7
    ],
    [
     "2020-02",
     13.3,
     18,
     0,
     20.7
    ],
    [
     "2020-03",
     13.3,
     18.1,
     0,
     20.7
    ],
    [
     "2020-04",
     13.3,
     18.1,
     0,
     20.7
    ],
    [
     "2020-05",
     13.6,
     18.7,
     0,
     20.7
    ],
    [
     "2020-06",
     13.6,
     18.7,
     0,
     20.7
    ],
    [
     "2020-07",
     14.7,
     21.2,
     0,
     20.7
    ],
    [
     "2020-08",
     14,
     19.7,
     0,
     20.7
    ],
    [
     "2020-09",
     15.4,
     22.7,
     0,
     20.7
    ],
    [
     "2020-10",
     14.9,
     21.7,
     0,
     20.7
    ],
    [
     "2020-11",
     14.7,
     21.1,
     0,
     20.7
    ],
    [
     "2020-12",
     15,
     21.8,
     0,
     20.7
    ],
    [
     "2021-01",
     14.6,
     22,
     0,
     18.9
    ],
    [
     "2021-02",
     14.4,
     21.6,
     0,
     18.9
    ],
    [
     "2021-03",
     14.2,
     21.1,
     0,
     18.9
    ],
    [
     "2021-04",
     13.6,
     19.8,
     0,
     18.9
    ],
    [
     "2021-05",
     14,
     20.6,
     0,
     18.9
    ],
    [
     "2021-06",
     13.9,
     20.3,
     0,
     18.9
    ],
    [
     "2021-07",
     14,
     20.5,
     0,
     18.9
    ],
    [
     "2021-08",
     14.1,
     20.9,
     0,
     18.9
    ],
    [
     "2021-09",
     13.4,
     19.2,
     0,
     18.9
    ],
    [
     "2021-10",
     12.7,
     17.7,
     0,
     18.9
    ],
    [
     "2021-11",
     13.2,
     18.8,
     0,
     18.9
    ],
    [
     "2021-12",
     13.1,
     18.7,
     0,
     18.9
    ],
    [
     "2022-01",
     12.5,
     16.9,
     0,
     19.4
    ],
    [
     "2022-02",
     12.4,
     16.7,
     0,
     19.4
    ],
    [
     "2022-03",
     12.6,
     17.2,
     0,
     19.4
    ],
    [
     "2022-04",
     13,
     18.1,
     0,
     19.4
    ],
    [
     "2022-05",
     12.8,
     17.7,
     0,
     19.4
    ],
    [
     "2022-06",
     13.2,
     18.5,
     0,
     19.4
    ],
    [
     "2022-07",
     12.8,
     17.7,
     0,
     19.4
    ],
    [
     "2022-08",
     13.3,
     18.8,
     0,
     19.4
    ],
    [
     "2022-09",
     13.4,
     18.9,
     0,
     19.4
    ],
    [
     "2022-10",
     13.4,
     19,
     0,
     19.4
    ],
    [
     "2022-11",
     13.6,
     19.4,
     0,
     19.4
    ],
    [
     "2022-12",
     12.9,
     17.9,
     0,
     19.4
    ],
    [
     "2023-01",
     12.4,
     18.8,
     0,
     15.9
    ],
    [
     "2023-02",
     11.4,
     16.5,
     0,
     15.9
    ],
    [
     "2023-03",
     11.8,
     17.4,
     0,
     15.9
    ],
    [
     "2023-04",
     11.5,
     16.8,
     0,
     15.9
    ],
    [
     "2023-05",
     11.9,
     17.5,
     0,
     15.9
    ],
    [
     "2023-06",
     11.9,
     17.6,
     0,
     15.9
    ],
    [
     "2023-07",
     12.3,
     18.6,
     0,
     15.9
    ],
    [
     "2023-08",
     11.9,
     17.6,
     0,
     15.9
    ],
    [
     "2023-09",
     11.9,
     17.6,
     0,
     15.9
    ],
    [
     "2023-10",
     12.3,
     18.5,
     0,
     15.9
    ],
    [
     "2023-11",
     12.3,
     18.6,
     0,
     15.9
    ],
    [
     "2023-12",
     13.9,
     22,
     0,
     15.9
    ],
    [
     "2024-01",
     11.8,
     18.3,
     0,
     14.2
    ],
    [
     "2024-02",
     11.9,
     18.6,
     0,
     14.2
    ],
    [
     "2024-03",
     11.9,
     18.6,
     0,
     14.2
    ],
    [
     "2024-04",
     12.2,
     19.2,
     0,
     14.2
    ],
    [
     "2024-05",
     11.7,
     18.1,
     0,
     14.2
    ],
    [
     "2024-06",
     12.6,
     20,
     0,
     14.2
    ],
    [
     "2024-07",
     11.6,
     18,
     0,
     14.2
    ],
    [
     "2024-08",
     11.7,
     18.2,
     0,
     14.2
    ],
    [
     "2024-09",
     11.4,
     17.4,
     0,
     14.2
    ],
    [
     "2024-10",
     11.4,
     17.4,
     0,
     14.2
    ],
    [
     "2024-11",
     11.7,
     18.2,
     0,
     14.2
    ],
    [
     "2024-12",
     11.3,
     17.3,
     0,
     14.2
    ],
    [
     "2025-01",
     11.1,
     16.8,
     0,
     14.3
    ],
    [
     "2025-02",
     12.2,
     19.1,
     0,
     14.3
    ],
    [
     "2025-03",
     14.6,
     24.5,
     0,
     14.3
    ],
    [
     "2025-04",
     20,
     36.6,
     0,
     14.3
    ],
    [
     "2025-05",
     20.7,
     38,
     0,
     14.3
    ],
    [
     "2025-06",
     17,
     29.9,
     0,
     14.3
    ],
    [
     "2025-07",
     17,
     29.9,
     0,
     14.3
    ],
    [
     "2025-08",
     16.1,
     27.8,
     0,
     14.3
    ],
    [
     "2025-09",
     17,
     29.9,
     0,
     14.3
    ],
    [
     "2025-10",
     19.5,
     35.4,
     0,
     14.3
    ],
    [
     "2025-11",
     17.8,
     31.6,
     0,
     14.3
    ],
    [
     "2025-12",
     16.5,
     28.8,
     0,
     14.3
    ],
    [
     "2026-01",
     17.9,
     31.9,
     0,
     14.3
    ],
    [
     "2026-02",
     14.8,
     24.9,
     0,
     14.3
    ],
    [
     "2026-03",
     12,
     18.8,
     0,
     14.3
    ],
    [
     "2026-04",
     7.9,
     9.6,
     0,
     14.3
    ],
    [
     "2026-05",
     7.4,
     8.4,
     0,
     14.3
    ],
    [
     "2026-06",
     8.9,
     11.9,
     0,
     14.3
    ]
   ]
  },
  {
   "family": "semiconductors",
   "label": "Semiconductors and integrated circuits",
   "latest": {
    "period": "2026-06",
    "rri": 22.1,
    "band": "weak case",
    "tariffScore": 14.9,
    "levelScore": 5.9,
    "trendScore": 36.1,
    "dependenceScore": 41,
    "concentrationScore": 12.2,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -6.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 1.76,
    "exportRatio": 0.59,
    "hhi": 1220,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2023-01",
     22.8,
     17.9,
     41,
     9.8
    ],
    [
     "2023-02",
     22.6,
     17.4,
     41,
     9.8
    ],
    [
     "2023-03",
     23,
     18.4,
     41,
     9.8
    ],
    [
     "2023-04",
     22.9,
     18.1,
     41,
     9.8
    ],
    [
     "2023-05",
     22.4,
     17.1,
     41,
     9.8
    ],
    [
     "2023-06",
     22.5,
     17.2,
     41,
     9.8
    ],
    [
     "2023-07",
     22.4,
     16.9,
     41,
     9.8
    ],
    [
     "2023-08",
     22.3,
     16.8,
     41,
     9.8
    ],
    [
     "2023-09",
     22.4,
     17,
     41,
     9.8
    ],
    [
     "2023-10",
     22.3,
     16.7,
     41,
     9.8
    ],
    [
     "2023-11",
     22.2,
     16.5,
     41,
     9.8
    ],
    [
     "2023-12",
     22.3,
     16.7,
     41,
     9.8
    ],
    [
     "2024-01",
     22.3,
     16.3,
     41,
     10.8
    ],
    [
     "2024-02",
     22.2,
     16.1,
     41,
     10.8
    ],
    [
     "2024-03",
     22.1,
     15.8,
     41,
     10.8
    ],
    [
     "2024-04",
     22.2,
     16.1,
     41,
     10.8
    ],
    [
     "2024-05",
     22.2,
     15.9,
     41,
     10.8
    ],
    [
     "2024-06",
     24,
     20.1,
     41,
     10.8
    ],
    [
     "2024-07",
     23.7,
     19.4,
     41,
     10.8
    ],
    [
     "2024-08",
     23.3,
     18.4,
     41,
     10.8
    ],
    [
     "2024-09",
     23.3,
     18.5,
     41,
     10.8
    ],
    [
     "2024-10",
     23.9,
     19.8,
     41,
     10.8
    ],
    [
     "2024-11",
     24,
     20.1,
     41,
     10.8
    ],
    [
     "2024-12",
     23,
     17.7,
     41,
     10.8
    ],
    [
     "2025-01",
     23,
     17.1,
     41,
     12.2
    ],
    [
     "2025-02",
     23.1,
     17.3,
     41,
     12.2
    ],
    [
     "2025-03",
     23.6,
     18.4,
     41,
     12.2
    ],
    [
     "2025-04",
     24.8,
     20.9,
     41,
     12.2
    ],
    [
     "2025-05",
     28.8,
     29.9,
     41,
     12.2
    ],
    [
     "2025-06",
     28.8,
     29.9,
     41,
     12.2
    ],
    [
     "2025-07",
     27.9,
     27.8,
     41,
     12.2
    ],
    [
     "2025-08",
     28,
     28,
     41,
     12.2
    ],
    [
     "2025-09",
     28.3,
     28.7,
     41,
     12.2
    ],
    [
     "2025-10",
     29,
     30.4,
     41,
     12.2
    ],
    [
     "2025-11",
     29.7,
     31.9,
     41,
     12.2
    ],
    [
     "2025-12",
     27.4,
     26.8,
     41,
     12.2
    ],
    [
     "2026-01",
     27.2,
     26.3,
     41,
     12.2
    ],
    [
     "2026-02",
     25.7,
     23.1,
     41,
     12.2
    ],
    [
     "2026-03",
     24.5,
     20.3,
     41,
     12.2
    ],
    [
     "2026-04",
     24.8,
     21,
     41,
     12.2
    ],
    [
     "2026-05",
     22.4,
     15.7,
     41,
     12.2
    ],
    [
     "2026-06",
     22.1,
     14.9,
     41,
     12.2
    ]
   ]
  },
  {
   "family": "specialty-metals",
   "label": "Titanium and tungsten",
   "latest": {
    "period": "2026-06",
    "rri": 29.4,
    "band": "weak case",
    "tariffScore": 40.5,
    "levelScore": 35.6,
    "trendScore": 51.9,
    "dependenceScore": 27.4,
    "concentrationScore": 11.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -0.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 10.67,
    "exportRatio": 0.726,
    "hhi": 1180,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     28.6,
     38.4,
     27.4,
     12.2
    ],
    [
     "2014-02",
     27.7,
     36.4,
     27.4,
     12.2
    ],
    [
     "2014-03",
     28.3,
     37.9,
     27.4,
     12.2
    ],
    [
     "2014-04",
     26.6,
     34,
     27.4,
     12.2
    ],
    [
     "2014-05",
     26.8,
     34.4,
     27.4,
     12.2
    ],
    [
     "2014-06",
     27.7,
     36.6,
     27.4,
     12.2
    ],
    [
     "2014-07",
     26.6,
     34.1,
     27.4,
     12.2
    ],
    [
     "2014-08",
     27.8,
     36.7,
     27.4,
     12.2
    ],
    [
     "2014-09",
     27.3,
     35.7,
     27.4,
     12.2
    ],
    [
     "2014-10",
     28,
     37.2,
     27.4,
     12.2
    ],
    [
     "2014-11",
     27.6,
     36.2,
     27.4,
     12.2
    ],
    [
     "2014-12",
     26.7,
     34.3,
     27.4,
     12.2
    ],
    [
     "2015-01",
     26,
     32.6,
     27.4,
     12.4
    ],
    [
     "2015-02",
     27.7,
     36.3,
     27.4,
     12.4
    ],
    [
     "2015-03",
     26.5,
     33.7,
     27.4,
     12.4
    ],
    [
     "2015-04",
     28.8,
     38.8,
     27.4,
     12.4
    ],
    [
     "2015-05",
     29.2,
     39.7,
     27.4,
     12.4
    ],
    [
     "2015-06",
     25.4,
     31.3,
     27.4,
     12.4
    ],
    [
     "2015-07",
     28.1,
     37.3,
     27.4,
     12.4
    ],
    [
     "2015-08",
     26.3,
     33.2,
     27.4,
     12.4
    ],
    [
     "2015-09",
     28,
     37,
     27.4,
     12.4
    ],
    [
     "2015-10",
     28.5,
     38.2,
     27.4,
     12.4
    ],
    [
     "2015-11",
     27.4,
     35.7,
     27.4,
     12.4
    ],
    [
     "2015-12",
     27.5,
     36,
     27.4,
     12.4
    ],
    [
     "2016-01",
     28.7,
     37.5,
     27.4,
     14.4
    ],
    [
     "2016-02",
     28.7,
     37.5,
     27.4,
     14.4
    ],
    [
     "2016-03",
     27.8,
     35.4,
     27.4,
     14.4
    ],
    [
     "2016-04",
     27.7,
     35.2,
     27.4,
     14.4
    ],
    [
     "2016-05",
     28.2,
     36.4,
     27.4,
     14.4
    ],
    [
     "2016-06",
     28.3,
     36.7,
     27.4,
     14.4
    ],
    [
     "2016-07",
     29.3,
     38.8,
     27.4,
     14.4
    ],
    [
     "2016-08",
     27,
     33.8,
     27.4,
     14.4
    ],
    [
     "2016-09",
     28.7,
     37.4,
     27.4,
     14.4
    ],
    [
     "2016-10",
     28,
     36,
     27.4,
     14.4
    ],
    [
     "2016-11",
     27.7,
     35.3,
     27.4,
     14.4
    ],
    [
     "2016-12",
     26.1,
     31.7,
     27.4,
     14.4
    ],
    [
     "2017-01",
     28.5,
     37.5,
     27.4,
     13.5
    ],
    [
     "2017-02",
     27.6,
     35.5,
     27.4,
     13.5
    ],
    [
     "2017-03",
     28.7,
     38.1,
     27.4,
     13.5
    ],
    [
     "2017-04",
     28.7,
     38.1,
     27.4,
     13.5
    ],
    [
     "2017-05",
     27.1,
     34.4,
     27.4,
     13.5
    ],
    [
     "2017-06",
     27.1,
     34.4,
     27.4,
     13.5
    ],
    [
     "2017-07",
     28.7,
     37.9,
     27.4,
     13.5
    ],
    [
     "2017-08",
     29.8,
     40.5,
     27.4,
     13.5
    ],
    [
     "2017-09",
     29.9,
     40.6,
     27.4,
     13.5
    ],
    [
     "2017-10",
     28.2,
     36.9,
     27.4,
     13.5
    ],
    [
     "2017-11",
     28.4,
     37.4,
     27.4,
     13.5
    ],
    [
     "2017-12",
     27.1,
     34.4,
     27.4,
     13.5
    ],
    [
     "2018-01",
     26.6,
     33.2,
     27.4,
     13.8
    ],
    [
     "2018-02",
     27.7,
     35.7,
     27.4,
     13.8
    ],
    [
     "2018-03",
     27.6,
     35.4,
     27.4,
     13.8
    ],
    [
     "2018-04",
     29.4,
     39.3,
     27.4,
     13.8
    ],
    [
     "2018-05",
     27.4,
     34.9,
     27.4,
     13.8
    ],
    [
     "2018-06",
     27.6,
     35.4,
     27.4,
     13.8
    ],
    [
     "2018-07",
     27.9,
     36.1,
     27.4,
     13.8
    ],
    [
     "2018-08",
     28.6,
     37.6,
     27.4,
     13.8
    ],
    [
     "2018-09",
     26.9,
     33.9,
     27.4,
     13.8
    ],
    [
     "2018-10",
     28.6,
     37.6,
     27.4,
     13.8
    ],
    [
     "2018-11",
     29.8,
     40.3,
     27.4,
     13.8
    ],
    [
     "2018-12",
     28.5,
     37.3,
     27.4,
     13.8
    ],
    [
     "2019-01",
     30.2,
     41.4,
     27.4,
     13.3
    ],
    [
     "2019-02",
     29.2,
     39.2,
     27.4,
     13.3
    ],
    [
     "2019-03",
     28.3,
     37.2,
     27.4,
     13.3
    ],
    [
     "2019-04",
     28.3,
     37.2,
     27.4,
     13.3
    ],
    [
     "2019-05",
     29.1,
     39,
     27.4,
     13.3
    ],
    [
     "2019-06",
     29.2,
     39.2,
     27.4,
     13.3
    ],
    [
     "2019-07",
     29.6,
     40.2,
     27.4,
     13.3
    ],
    [
     "2019-08",
     30.2,
     41.4,
     27.4,
     13.3
    ],
    [
     "2019-09",
     30.8,
     42.8,
     27.4,
     13.3
    ],
    [
     "2019-10",
     29,
     38.8,
     27.4,
     13.3
    ],
    [
     "2019-11",
     28.3,
     37.3,
     27.4,
     13.3
    ],
    [
     "2019-12",
     29.2,
     39.2,
     27.4,
     13.3
    ],
    [
     "2020-01",
     28.6,
     38.1,
     27.4,
     13
    ],
    [
     "2020-02",
     28.8,
     38.4,
     27.4,
     13
    ],
    [
     "2020-03",
     30.5,
     42.3,
     27.4,
     13
    ],
    [
     "2020-04",
     29.1,
     39.2,
     27.4,
     13
    ],
    [
     "2020-05",
     31.1,
     43.7,
     27.4,
     13
    ],
    [
     "2020-06",
     30.9,
     43.2,
     27.4,
     13
    ],
    [
     "2020-07",
     31,
     43.3,
     27.4,
     13
    ],
    [
     "2020-08",
     31.3,
     44.1,
     27.4,
     13
    ],
    [
     "2020-09",
     31.5,
     44.4,
     27.4,
     13
    ],
    [
     "2020-10",
     30.7,
     42.8,
     27.4,
     13
    ],
    [
     "2020-11",
     27.8,
     36.2,
     27.4,
     13
    ],
    [
     "2020-12",
     28.8,
     38.6,
     27.4,
     13
    ],
    [
     "2021-01",
     29.6,
     40.6,
     27.4,
     12.3
    ],
    [
     "2021-02",
     28.3,
     37.8,
     27.4,
     12.3
    ],
    [
     "2021-03",
     31.4,
     44.7,
     27.4,
     12.3
    ],
    [
     "2021-04",
     28.3,
     37.8,
     27.4,
     12.3
    ],
    [
     "2021-05",
     31.2,
     44.2,
     27.4,
     12.3
    ],
    [
     "2021-06",
     29,
     39.3,
     27.4,
     12.3
    ],
    [
     "2021-07",
     27.3,
     35.5,
     27.4,
     12.3
    ],
    [
     "2021-08",
     30.2,
     41.9,
     27.4,
     12.3
    ],
    [
     "2021-09",
     26.4,
     33.6,
     27.4,
     12.3
    ],
    [
     "2021-10",
     26.3,
     33.4,
     27.4,
     12.3
    ],
    [
     "2021-11",
     28.8,
     38.8,
     27.4,
     12.3
    ],
    [
     "2021-12",
     28.7,
     38.7,
     27.4,
     12.3
    ],
    [
     "2022-01",
     27.2,
     35.3,
     27.4,
     12.2
    ],
    [
     "2022-02",
     29.1,
     39.7,
     27.4,
     12.2
    ],
    [
     "2022-03",
     28.2,
     37.7,
     27.4,
     12.2
    ],
    [
     "2022-04",
     28,
     37.1,
     27.4,
     12.2
    ],
    [
     "2022-05",
     24.2,
     28.7,
     27.4,
     12.2
    ],
    [
     "2022-06",
     24.2,
     28.7,
     27.4,
     12.2
    ],
    [
     "2022-07",
     27.5,
     36,
     27.4,
     12.2
    ],
    [
     "2022-08",
     25.1,
     30.8,
     27.4,
     12.2
    ],
    [
     "2022-09",
     26.6,
     34,
     27.4,
     12.2
    ],
    [
     "2022-10",
     27,
     35,
     27.4,
     12.2
    ],
    [
     "2022-11",
     26.5,
     33.8,
     27.4,
     12.2
    ],
    [
     "2022-12",
     25.2,
     31,
     27.4,
     12.2
    ],
    [
     "2023-01",
     26.8,
     34.2,
     27.4,
     12.7
    ],
    [
     "2023-02",
     26.7,
     33.9,
     27.4,
     12.7
    ],
    [
     "2023-03",
     28.3,
     37.5,
     27.4,
     12.7
    ],
    [
     "2023-04",
     28.3,
     37.5,
     27.4,
     12.7
    ],
    [
     "2023-05",
     27.8,
     36.4,
     27.4,
     12.7
    ],
    [
     "2023-06",
     27.9,
     36.7,
     27.4,
     12.7
    ],
    [
     "2023-07",
     27,
     34.6,
     27.4,
     12.7
    ],
    [
     "2023-08",
     27.1,
     34.8,
     27.4,
     12.7
    ],
    [
     "2023-09",
     27.5,
     35.8,
     27.4,
     12.7
    ],
    [
     "2023-10",
     27.5,
     35.8,
     27.4,
     12.7
    ],
    [
     "2023-11",
     27.6,
     35.9,
     27.4,
     12.7
    ],
    [
     "2023-12",
     27.5,
     35.8,
     27.4,
     12.7
    ],
    [
     "2024-01",
     28.3,
     37.9,
     27.4,
     12.1
    ],
    [
     "2024-02",
     29.7,
     41.1,
     27.4,
     12.1
    ],
    [
     "2024-03",
     27.9,
     37,
     27.4,
     12.1
    ],
    [
     "2024-04",
     27.1,
     35.2,
     27.4,
     12.1
    ],
    [
     "2024-05",
     28.2,
     37.7,
     27.4,
     12.1
    ],
    [
     "2024-06",
     26.6,
     34.1,
     27.4,
     12.1
    ],
    [
     "2024-07",
     28.1,
     37.4,
     27.4,
     12.1
    ],
    [
     "2024-08",
     27.4,
     36,
     27.4,
     12.1
    ],
    [
     "2024-09",
     28.9,
     39.3,
     27.4,
     12.1
    ],
    [
     "2024-10",
     26.3,
     33.5,
     27.4,
     12.1
    ],
    [
     "2024-11",
     27.3,
     35.6,
     27.4,
     12.1
    ],
    [
     "2024-12",
     29.6,
     40.7,
     27.4,
     12.1
    ],
    [
     "2025-01",
     29.5,
     40.8,
     27.4,
     11.8
    ],
    [
     "2025-02",
     28.6,
     38.8,
     27.4,
     11.8
    ],
    [
     "2025-03",
     29.8,
     41.4,
     27.4,
     11.8
    ],
    [
     "2025-04",
     33.9,
     50.5,
     27.4,
     11.8
    ],
    [
     "2025-05",
     31.8,
     45.8,
     27.4,
     11.8
    ],
    [
     "2025-06",
     30,
     41.8,
     27.4,
     11.8
    ],
    [
     "2025-07",
     23.7,
     27.9,
     27.4,
     11.8
    ],
    [
     "2025-08",
     20.7,
     21.1,
     27.4,
     11.8
    ],
    [
     "2025-09",
     19.9,
     19.4,
     27.4,
     11.8
    ],
    [
     "2025-10",
     21.7,
     23.3,
     27.4,
     11.8
    ],
    [
     "2025-11",
     20.6,
     21,
     27.4,
     11.8
    ],
    [
     "2025-12",
     19.6,
     18.7,
     27.4,
     11.8
    ],
    [
     "2026-01",
     19.9,
     19.3,
     27.4,
     11.8
    ],
    [
     "2026-02",
     28.4,
     38.3,
     27.4,
     11.8
    ],
    [
     "2026-03",
     26,
     33,
     27.4,
     11.8
    ],
    [
     "2026-04",
     21.7,
     23.5,
     27.4,
     11.8
    ],
    [
     "2026-05",
     26.6,
     34.2,
     27.4,
     11.8
    ],
    [
     "2026-06",
     29.4,
     40.5,
     27.4,
     11.8
    ]
   ]
  },
  {
   "family": "stainless-steel",
   "label": "Stainless steel mill products",
   "latest": {
    "period": "2026-06",
    "rri": 53,
    "band": "building case",
    "tariffScore": 100,
    "levelScore": 100,
    "trendScore": 100,
    "dependenceScore": 20.5,
    "concentrationScore": 7.2,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 0,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 44.2,
    "exportRatio": 0.795,
    "hhi": 720,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 74.8,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-02",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-03",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-04",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-05",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-06",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-07",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-08",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-09",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-10",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-11",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2014-12",
     14.7,
     15,
     20.5,
     7.3
    ],
    [
     "2015-01",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-02",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-03",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-04",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-05",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-06",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-07",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-08",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-09",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-10",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-11",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2015-12",
     14.8,
     15,
     20.5,
     7.6
    ],
    [
     "2016-01",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-02",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-03",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-04",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-05",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-06",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-07",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-08",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-09",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-10",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-11",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2016-12",
     14.6,
     15,
     20.5,
     6.6
    ],
    [
     "2017-01",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-02",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-03",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-04",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-05",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-06",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-07",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-08",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-09",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-10",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-11",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2017-12",
     14.5,
     15,
     20.5,
     6.4
    ],
    [
     "2018-01",
     14.7,
     15,
     20.5,
     7
    ],
    [
     "2018-02",
     14.7,
     15,
     20.5,
     7
    ],
    [
     "2018-03",
     15.4,
     16.6,
     20.5,
     7
    ],
    [
     "2018-04",
     16,
     18,
     20.5,
     7
    ],
    [
     "2018-05",
     23,
     33.5,
     20.5,
     7
    ],
    [
     "2018-06",
     43.5,
     79.1,
     20.5,
     7
    ],
    [
     "2018-07",
     44.3,
     80.8,
     20.5,
     7
    ],
    [
     "2018-08",
     43.8,
     79.7,
     20.5,
     7
    ],
    [
     "2018-09",
     44.4,
     81.1,
     20.5,
     7
    ],
    [
     "2018-10",
     43.3,
     78.7,
     20.5,
     7
    ],
    [
     "2018-11",
     43.2,
     78.4,
     20.5,
     7
    ],
    [
     "2018-12",
     43.4,
     78.9,
     20.5,
     7
    ],
    [
     "2019-01",
     39.3,
     70,
     20.5,
     6.7
    ],
    [
     "2019-02",
     41.5,
     74.8,
     20.5,
     6.7
    ],
    [
     "2019-03",
     41.9,
     75.7,
     20.5,
     6.7
    ],
    [
     "2019-04",
     40.2,
     72,
     20.5,
     6.7
    ],
    [
     "2019-05",
     40,
     71.4,
     20.5,
     6.7
    ],
    [
     "2019-06",
     30.5,
     50.4,
     20.5,
     6.7
    ],
    [
     "2019-07",
     28.2,
     45.3,
     20.5,
     6.7
    ],
    [
     "2019-08",
     27.2,
     43,
     20.5,
     6.7
    ],
    [
     "2019-09",
     27.6,
     44,
     20.5,
     6.7
    ],
    [
     "2019-10",
     28.6,
     46.1,
     20.5,
     6.7
    ],
    [
     "2019-11",
     29.7,
     48.5,
     20.5,
     6.7
    ],
    [
     "2019-12",
     29.2,
     47.6,
     20.5,
     6.7
    ],
    [
     "2020-01",
     26.2,
     41,
     20.5,
     6.5
    ],
    [
     "2020-02",
     26.7,
     42.1,
     20.5,
     6.5
    ],
    [
     "2020-03",
     28.1,
     45.1,
     20.5,
     6.5
    ],
    [
     "2020-04",
     26.6,
     41.9,
     20.5,
     6.5
    ],
    [
     "2020-05",
     27.4,
     43.7,
     20.5,
     6.5
    ],
    [
     "2020-06",
     28.4,
     45.8,
     20.5,
     6.5
    ],
    [
     "2020-07",
     28.9,
     47,
     20.5,
     6.5
    ],
    [
     "2020-08",
     29.6,
     48.4,
     20.5,
     6.5
    ],
    [
     "2020-09",
     29.8,
     49,
     20.5,
     6.5
    ],
    [
     "2020-10",
     27.4,
     43.7,
     20.5,
     6.5
    ],
    [
     "2020-11",
     28.6,
     46.3,
     20.5,
     6.5
    ],
    [
     "2020-12",
     27.5,
     43.9,
     20.5,
     6.5
    ],
    [
     "2021-01",
     29.4,
     47.2,
     20.5,
     8.1
    ],
    [
     "2021-02",
     26,
     39.7,
     20.5,
     8.1
    ],
    [
     "2021-03",
     27.4,
     42.7,
     20.5,
     8.1
    ],
    [
     "2021-04",
     28.5,
     45.2,
     20.5,
     8.1
    ],
    [
     "2021-05",
     29.8,
     48.1,
     20.5,
     8.1
    ],
    [
     "2021-06",
     29,
     46.2,
     20.5,
     8.1
    ],
    [
     "2021-07",
     29.4,
     47.2,
     20.5,
     8.1
    ],
    [
     "2021-08",
     29.9,
     48.3,
     20.5,
     8.1
    ],
    [
     "2021-09",
     29.1,
     46.6,
     20.5,
     8.1
    ],
    [
     "2021-10",
     28.1,
     44.2,
     20.5,
     8.1
    ],
    [
     "2021-11",
     29.1,
     46.4,
     20.5,
     8.1
    ],
    [
     "2021-12",
     28.5,
     45.1,
     20.5,
     8.1
    ],
    [
     "2022-01",
     23.1,
     33.3,
     20.5,
     8
    ],
    [
     "2022-02",
     24.8,
     36.9,
     20.5,
     8
    ],
    [
     "2022-03",
     23.4,
     33.8,
     20.5,
     8
    ],
    [
     "2022-04",
     20.6,
     27.7,
     20.5,
     8
    ],
    [
     "2022-05",
     19.6,
     25.4,
     20.5,
     8
    ],
    [
     "2022-06",
     20.4,
     27.3,
     20.5,
     8
    ],
    [
     "2022-07",
     19.6,
     25.5,
     20.5,
     8
    ],
    [
     "2022-08",
     17.3,
     20.3,
     20.5,
     8
    ],
    [
     "2022-09",
     21.1,
     28.7,
     20.5,
     8
    ],
    [
     "2022-10",
     16.3,
     18.1,
     20.5,
     8
    ],
    [
     "2022-11",
     16.3,
     18.1,
     20.5,
     8
    ],
    [
     "2022-12",
     19,
     24.1,
     20.5,
     8
    ],
    [
     "2023-01",
     16.3,
     18.4,
     20.5,
     7.4
    ],
    [
     "2023-02",
     20.2,
     27.1,
     20.5,
     7.4
    ],
    [
     "2023-03",
     22.7,
     32.6,
     20.5,
     7.4
    ],
    [
     "2023-04",
     17.1,
     20.2,
     20.5,
     7.4
    ],
    [
     "2023-05",
     23.6,
     34.7,
     20.5,
     7.4
    ],
    [
     "2023-06",
     25.1,
     38.1,
     20.5,
     7.4
    ],
    [
     "2023-07",
     18.6,
     23.6,
     20.5,
     7.4
    ],
    [
     "2023-08",
     22.8,
     32.8,
     20.5,
     7.4
    ],
    [
     "2023-09",
     27.2,
     42.7,
     20.5,
     7.4
    ],
    [
     "2023-10",
     20.9,
     28.6,
     20.5,
     7.4
    ],
    [
     "2023-11",
     24,
     35.5,
     20.5,
     7.4
    ],
    [
     "2023-12",
     26.5,
     41.1,
     20.5,
     7.4
    ],
    [
     "2024-01",
     21.1,
     29.1,
     20.5,
     7.3
    ],
    [
     "2024-02",
     22.1,
     31.3,
     20.5,
     7.3
    ],
    [
     "2024-03",
     25.6,
     39.1,
     20.5,
     7.3
    ],
    [
     "2024-04",
     23.9,
     35.3,
     20.5,
     7.3
    ],
    [
     "2024-05",
     22.3,
     31.8,
     20.5,
     7.3
    ],
    [
     "2024-06",
     24.2,
     36,
     20.5,
     7.3
    ],
    [
     "2024-07",
     22.1,
     31.4,
     20.5,
     7.3
    ],
    [
     "2024-08",
     21.7,
     30.6,
     20.5,
     7.3
    ],
    [
     "2024-09",
     25.5,
     38.9,
     20.5,
     7.3
    ],
    [
     "2024-10",
     22.1,
     31.4,
     20.5,
     7.3
    ],
    [
     "2024-11",
     22.5,
     32.2,
     20.5,
     7.3
    ],
    [
     "2024-12",
     25.1,
     38,
     20.5,
     7.3
    ],
    [
     "2025-01",
     22.9,
     33.3,
     20.5,
     7.2
    ],
    [
     "2025-02",
     23.7,
     35.1,
     20.5,
     7.2
    ],
    [
     "2025-03",
     31.6,
     52.6,
     20.5,
     7.2
    ],
    [
     "2025-04",
     39.9,
     70.9,
     20.5,
     7.2
    ],
    [
     "2025-05",
     41.9,
     75.4,
     20.5,
     7.2
    ],
    [
     "2025-06",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-07",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-08",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-09",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-10",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-11",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2025-12",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-01",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-02",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-03",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-04",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-05",
     53,
     100,
     20.5,
     7.2
    ],
    [
     "2026-06",
     53,
     100,
     20.5,
     7.2
    ]
   ]
  },
  {
   "family": "steel-fasteners",
   "label": "Steel fasteners",
   "latest": {
    "period": "2026-06",
    "rri": 57.8,
    "band": "building case",
    "tariffScore": 92.4,
    "levelScore": 100,
    "trendScore": 74.7,
    "dependenceScore": 41.2,
    "concentrationScore": 15.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -3.4,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 52.56,
    "exportRatio": 0.588,
    "hhi": 1540,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 88,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     26.5,
     21.3,
     41.2,
     18.2
    ],
    [
     "2014-02",
     26.4,
     21,
     41.2,
     18.2
    ],
    [
     "2014-03",
     26.4,
     21,
     41.2,
     18.2
    ],
    [
     "2014-04",
     26.4,
     21.1,
     41.2,
     18.2
    ],
    [
     "2014-05",
     26.4,
     21,
     41.2,
     18.2
    ],
    [
     "2014-06",
     26.3,
     20.9,
     41.2,
     18.2
    ],
    [
     "2014-07",
     26.4,
     21.1,
     41.2,
     18.2
    ],
    [
     "2014-08",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2014-09",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2014-10",
     26.4,
     21.1,
     41.2,
     18.2
    ],
    [
     "2014-11",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2014-12",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2015-01",
     26.4,
     20.8,
     41.2,
     18.6
    ],
    [
     "2015-02",
     26.7,
     21.5,
     41.2,
     18.6
    ],
    [
     "2015-03",
     26.8,
     21.8,
     41.2,
     18.6
    ],
    [
     "2015-04",
     26.6,
     21.4,
     41.2,
     18.6
    ],
    [
     "2015-05",
     26.5,
     21.1,
     41.2,
     18.6
    ],
    [
     "2015-06",
     26.5,
     21.1,
     41.2,
     18.6
    ],
    [
     "2015-07",
     26.5,
     21,
     41.2,
     18.6
    ],
    [
     "2015-08",
     26.5,
     21,
     41.2,
     18.6
    ],
    [
     "2015-09",
     26.4,
     20.8,
     41.2,
     18.6
    ],
    [
     "2015-10",
     26.2,
     20.5,
     41.2,
     18.6
    ],
    [
     "2015-11",
     26.2,
     20.5,
     41.2,
     18.6
    ],
    [
     "2015-12",
     26.3,
     20.6,
     41.2,
     18.6
    ],
    [
     "2016-01",
     26.3,
     20.8,
     41.2,
     18.2
    ],
    [
     "2016-02",
     26.2,
     20.7,
     41.2,
     18.2
    ],
    [
     "2016-03",
     26.1,
     20.5,
     41.2,
     18.2
    ],
    [
     "2016-04",
     26.5,
     21.3,
     41.2,
     18.2
    ],
    [
     "2016-05",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2016-06",
     26.6,
     21.5,
     41.2,
     18.2
    ],
    [
     "2016-07",
     26.4,
     21.1,
     41.2,
     18.2
    ],
    [
     "2016-08",
     26.5,
     21.2,
     41.2,
     18.2
    ],
    [
     "2016-09",
     26.6,
     21.6,
     41.2,
     18.2
    ],
    [
     "2016-10",
     26.4,
     21,
     41.2,
     18.2
    ],
    [
     "2016-11",
     26.7,
     21.7,
     41.2,
     18.2
    ],
    [
     "2016-12",
     26.7,
     21.7,
     41.2,
     18.2
    ],
    [
     "2017-01",
     26.7,
     21.4,
     41.2,
     18.9
    ],
    [
     "2017-02",
     26.6,
     21.1,
     41.2,
     18.9
    ],
    [
     "2017-03",
     26.7,
     21.4,
     41.2,
     18.9
    ],
    [
     "2017-04",
     26.6,
     21.1,
     41.2,
     18.9
    ],
    [
     "2017-05",
     26.6,
     21.2,
     41.2,
     18.9
    ],
    [
     "2017-06",
     26.4,
     20.7,
     41.2,
     18.9
    ],
    [
     "2017-07",
     26.7,
     21.4,
     41.2,
     18.9
    ],
    [
     "2017-08",
     26.7,
     21.3,
     41.2,
     18.9
    ],
    [
     "2017-09",
     26.4,
     20.8,
     41.2,
     18.9
    ],
    [
     "2017-10",
     26.7,
     21.4,
     41.2,
     18.9
    ],
    [
     "2017-11",
     26.5,
     20.9,
     41.2,
     18.9
    ],
    [
     "2017-12",
     26.7,
     21.4,
     41.2,
     18.9
    ],
    [
     "2018-01",
     27,
     21.5,
     41.2,
     19.7
    ],
    [
     "2018-02",
     27,
     21.6,
     41.2,
     19.7
    ],
    [
     "2018-03",
     26.9,
     21.3,
     41.2,
     19.7
    ],
    [
     "2018-04",
     26.9,
     21.4,
     41.2,
     19.7
    ],
    [
     "2018-05",
     26.8,
     21.1,
     41.2,
     19.7
    ],
    [
     "2018-06",
     26.9,
     21.4,
     41.2,
     19.7
    ],
    [
     "2018-07",
     26.8,
     21.1,
     41.2,
     19.7
    ],
    [
     "2018-08",
     26.8,
     21.1,
     41.2,
     19.7
    ],
    [
     "2018-09",
     27.1,
     21.7,
     41.2,
     19.7
    ],
    [
     "2018-10",
     30.1,
     28.4,
     41.2,
     19.7
    ],
    [
     "2018-11",
     30.6,
     29.6,
     41.2,
     19.7
    ],
    [
     "2018-12",
     31,
     30.4,
     41.2,
     19.7
    ],
    [
     "2019-01",
     29.7,
     28.3,
     41.2,
     18.5
    ],
    [
     "2019-02",
     29.1,
     27,
     41.2,
     18.5
    ],
    [
     "2019-03",
     28.8,
     26.2,
     41.2,
     18.5
    ],
    [
     "2019-04",
     29,
     26.8,
     41.2,
     18.5
    ],
    [
     "2019-05",
     29.8,
     28.5,
     41.2,
     18.5
    ],
    [
     "2019-06",
     32.7,
     35,
     41.2,
     18.5
    ],
    [
     "2019-07",
     33.2,
     36.1,
     41.2,
     18.5
    ],
    [
     "2019-08",
     33.4,
     36.5,
     41.2,
     18.5
    ],
    [
     "2019-09",
     33.7,
     37.2,
     41.2,
     18.5
    ],
    [
     "2019-10",
     31.7,
     32.8,
     41.2,
     18.5
    ],
    [
     "2019-11",
     31.6,
     32.4,
     41.2,
     18.5
    ],
    [
     "2019-12",
     32.5,
     34.4,
     41.2,
     18.5
    ],
    [
     "2020-01",
     32.8,
     34.9,
     41.2,
     19.1
    ],
    [
     "2020-02",
     31.2,
     31.3,
     41.2,
     19.1
    ],
    [
     "2020-03",
     28.7,
     25.6,
     41.2,
     19.1
    ],
    [
     "2020-04",
     31.8,
     32.6,
     41.2,
     19.1
    ],
    [
     "2020-05",
     33.7,
     36.8,
     41.2,
     19.1
    ],
    [
     "2020-06",
     32.8,
     34.9,
     41.2,
     19.1
    ],
    [
     "2020-07",
     31.6,
     32.2,
     41.2,
     19.1
    ],
    [
     "2020-08",
     31.1,
     31.1,
     41.2,
     19.1
    ],
    [
     "2020-09",
     30.3,
     29.2,
     41.2,
     19.1
    ],
    [
     "2020-10",
     30.2,
     29,
     41.2,
     19.1
    ],
    [
     "2020-11",
     30.1,
     28.8,
     41.2,
     19.1
    ],
    [
     "2020-12",
     30.5,
     29.6,
     41.2,
     19.1
    ],
    [
     "2021-01",
     30.3,
     28.8,
     41.2,
     20
    ],
    [
     "2021-02",
     31,
     30.2,
     41.2,
     20
    ],
    [
     "2021-03",
     31.5,
     31.5,
     41.2,
     20
    ],
    [
     "2021-04",
     30.2,
     28.6,
     41.2,
     20
    ],
    [
     "2021-05",
     29.6,
     27.2,
     41.2,
     20
    ],
    [
     "2021-06",
     29.9,
     27.8,
     41.2,
     20
    ],
    [
     "2021-07",
     31,
     30.4,
     41.2,
     20
    ],
    [
     "2021-08",
     31.3,
     31,
     41.2,
     20
    ],
    [
     "2021-09",
     32,
     32.6,
     41.2,
     20
    ],
    [
     "2021-10",
     31.7,
     31.9,
     41.2,
     20
    ],
    [
     "2021-11",
     32.7,
     34,
     41.2,
     20
    ],
    [
     "2021-12",
     32.6,
     33.8,
     41.2,
     20
    ],
    [
     "2022-01",
     33.1,
     34.4,
     41.2,
     21.2
    ],
    [
     "2022-02",
     32.8,
     33.6,
     41.2,
     21.2
    ],
    [
     "2022-03",
     32.1,
     32.1,
     41.2,
     21.2
    ],
    [
     "2022-04",
     32.5,
     33,
     41.2,
     21.2
    ],
    [
     "2022-05",
     31.9,
     31.7,
     41.2,
     21.2
    ],
    [
     "2022-06",
     33,
     34,
     41.2,
     21.2
    ],
    [
     "2022-07",
     33,
     34.1,
     41.2,
     21.2
    ],
    [
     "2022-08",
     33.1,
     34.3,
     41.2,
     21.2
    ],
    [
     "2022-09",
     32.3,
     32.6,
     41.2,
     21.2
    ],
    [
     "2022-10",
     32.1,
     32.1,
     41.2,
     21.2
    ],
    [
     "2022-11",
     30.8,
     29.2,
     41.2,
     21.2
    ],
    [
     "2022-12",
     31.3,
     30.3,
     41.2,
     21.2
    ],
    [
     "2023-01",
     29.9,
     29.4,
     41.2,
     17.3
    ],
    [
     "2023-02",
     29.4,
     28.3,
     41.2,
     17.3
    ],
    [
     "2023-03",
     28.8,
     27,
     41.2,
     17.3
    ],
    [
     "2023-04",
     30.3,
     30.2,
     41.2,
     17.3
    ],
    [
     "2023-05",
     29.9,
     29.3,
     41.2,
     17.3
    ],
    [
     "2023-06",
     29.8,
     29.2,
     41.2,
     17.3
    ],
    [
     "2023-07",
     29.8,
     29.1,
     41.2,
     17.3
    ],
    [
     "2023-08",
     29.2,
     27.8,
     41.2,
     17.3
    ],
    [
     "2023-09",
     29.6,
     28.7,
     41.2,
     17.3
    ],
    [
     "2023-10",
     29.8,
     29.1,
     41.2,
     17.3
    ],
    [
     "2023-11",
     29.5,
     28.4,
     41.2,
     17.3
    ],
    [
     "2023-12",
     30.1,
     29.8,
     41.2,
     17.3
    ],
    [
     "2024-01",
     30.4,
     30.9,
     41.2,
     16.5
    ],
    [
     "2024-02",
     30,
     30.1,
     41.2,
     16.5
    ],
    [
     "2024-03",
     30.4,
     31,
     41.2,
     16.5
    ],
    [
     "2024-04",
     29,
     27.7,
     41.2,
     16.5
    ],
    [
     "2024-05",
     30.2,
     30.4,
     41.2,
     16.5
    ],
    [
     "2024-06",
     30.3,
     30.8,
     41.2,
     16.5
    ],
    [
     "2024-07",
     31,
     32.2,
     41.2,
     16.5
    ],
    [
     "2024-08",
     30.3,
     30.8,
     41.2,
     16.5
    ],
    [
     "2024-09",
     30,
     30,
     41.2,
     16.5
    ],
    [
     "2024-10",
     29.5,
     29,
     41.2,
     16.5
    ],
    [
     "2024-11",
     29.8,
     29.6,
     41.2,
     16.5
    ],
    [
     "2024-12",
     30.1,
     30.2,
     41.2,
     16.5
    ],
    [
     "2025-01",
     30.5,
     31.8,
     41.2,
     15.4
    ],
    [
     "2025-02",
     30.4,
     31.6,
     41.2,
     15.4
    ],
    [
     "2025-03",
     49.2,
     73.3,
     41.2,
     15.4
    ],
    [
     "2025-04",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-05",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-06",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-07",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-08",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-09",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-10",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-11",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2025-12",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-01",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-02",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-03",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-04",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-05",
     61.2,
     100,
     41.2,
     15.4
    ],
    [
     "2026-06",
     57.8,
     92.4,
     41.2,
     15.4
    ]
   ]
  },
  {
   "family": "steel-flat-rolled",
   "label": "Steel flat-rolled products",
   "latest": {
    "period": "2026-06",
    "rri": 59.5,
    "band": "building case",
    "tariffScore": 99.7,
    "levelScore": 100,
    "trendScore": 98.9,
    "dependenceScore": 37,
    "concentrationScore": 14.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -0.1,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 43.55,
    "exportRatio": 0.63,
    "hhi": 1410,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 88,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-02",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-03",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-04",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-05",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-06",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-07",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-08",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-09",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-10",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-11",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2014-12",
     20.3,
     15,
     37,
     9.6
    ],
    [
     "2015-01",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-02",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-03",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-04",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-05",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-06",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-07",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-08",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-09",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-10",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-11",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2015-12",
     20.4,
     15,
     37,
     10.1
    ],
    [
     "2016-01",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-02",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-03",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-04",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-05",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-06",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-07",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-08",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-09",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-10",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-11",
     21,
     15,
     37,
     12.5
    ],
    [
     "2016-12",
     21,
     15,
     37,
     12.5
    ],
    [
     "2017-01",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-02",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-03",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-04",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-05",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-06",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-07",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-08",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-09",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-10",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-11",
     20.6,
     15,
     37,
     11
    ],
    [
     "2017-12",
     20.6,
     15,
     37,
     11
    ],
    [
     "2018-01",
     21.3,
     15,
     37,
     13.9
    ],
    [
     "2018-02",
     21.3,
     15,
     37,
     13.9
    ],
    [
     "2018-03",
     22.4,
     17.4,
     37,
     13.9
    ],
    [
     "2018-04",
     24.7,
     22.6,
     37,
     13.9
    ],
    [
     "2018-05",
     28.5,
     30.9,
     37,
     13.9
    ],
    [
     "2018-06",
     50.3,
     79.4,
     37,
     13.9
    ],
    [
     "2018-07",
     49,
     76.5,
     37,
     13.9
    ],
    [
     "2018-08",
     49,
     76.5,
     37,
     13.9
    ],
    [
     "2018-09",
     48.5,
     75.4,
     37,
     13.9
    ],
    [
     "2018-10",
     47.7,
     73.6,
     37,
     13.9
    ],
    [
     "2018-11",
     46.3,
     70.5,
     37,
     13.9
    ],
    [
     "2018-12",
     48.4,
     75.2,
     37,
     13.9
    ],
    [
     "2019-01",
     45.9,
     68.2,
     37,
     16.5
    ],
    [
     "2019-02",
     47.4,
     71.6,
     37,
     16.5
    ],
    [
     "2019-03",
     47.5,
     71.8,
     37,
     16.5
    ],
    [
     "2019-04",
     45.7,
     67.8,
     37,
     16.5
    ],
    [
     "2019-05",
     40.6,
     56.4,
     37,
     16.5
    ],
    [
     "2019-06",
     23.1,
     17.5,
     37,
     16.5
    ],
    [
     "2019-07",
     22.8,
     16.9,
     37,
     16.5
    ],
    [
     "2019-08",
     21.1,
     13.1,
     37,
     16.5
    ],
    [
     "2019-09",
     20.1,
     10.8,
     37,
     16.5
    ],
    [
     "2019-10",
     19.9,
     10.4,
     37,
     16.5
    ],
    [
     "2019-11",
     20.7,
     12.1,
     37,
     16.5
    ],
    [
     "2019-12",
     19.8,
     10.2,
     37,
     16.5
    ],
    [
     "2020-01",
     19.4,
     7.8,
     37,
     19.3
    ],
    [
     "2020-02",
     19.9,
     8.9,
     37,
     19.3
    ],
    [
     "2020-03",
     21,
     11.2,
     37,
     19.3
    ],
    [
     "2020-04",
     22,
     13.4,
     37,
     19.3
    ],
    [
     "2020-05",
     25.9,
     22.2,
     37,
     19.3
    ],
    [
     "2020-06",
     27.9,
     26.7,
     37,
     19.3
    ],
    [
     "2020-07",
     28.6,
     28.2,
     37,
     19.3
    ],
    [
     "2020-08",
     28.6,
     28.1,
     37,
     19.3
    ],
    [
     "2020-09",
     30.9,
     33.2,
     37,
     19.3
    ],
    [
     "2020-10",
     29.1,
     29.3,
     37,
     19.3
    ],
    [
     "2020-11",
     30.1,
     31.4,
     37,
     19.3
    ],
    [
     "2020-12",
     29.8,
     30.9,
     37,
     19.3
    ],
    [
     "2021-01",
     24.2,
     19.4,
     37,
     17.6
    ],
    [
     "2021-02",
     28.7,
     29.3,
     37,
     17.6
    ],
    [
     "2021-03",
     29,
     30,
     37,
     17.6
    ],
    [
     "2021-04",
     24,
     18.9,
     37,
     17.6
    ],
    [
     "2021-05",
     26.5,
     24.4,
     37,
     17.6
    ],
    [
     "2021-06",
     26.2,
     23.7,
     37,
     17.6
    ],
    [
     "2021-07",
     26.1,
     23.5,
     37,
     17.6
    ],
    [
     "2021-08",
     26.3,
     23.9,
     37,
     17.6
    ],
    [
     "2021-09",
     26.6,
     24.6,
     37,
     17.6
    ],
    [
     "2021-10",
     27,
     25.6,
     37,
     17.6
    ],
    [
     "2021-11",
     29.8,
     31.7,
     37,
     17.6
    ],
    [
     "2021-12",
     30.2,
     32.6,
     37,
     17.6
    ],
    [
     "2022-01",
     32.1,
     38.2,
     37,
     15.4
    ],
    [
     "2022-02",
     27.6,
     28,
     37,
     15.4
    ],
    [
     "2022-03",
     27.9,
     28.8,
     37,
     15.4
    ],
    [
     "2022-04",
     29.6,
     32.5,
     37,
     15.4
    ],
    [
     "2022-05",
     23.5,
     19.1,
     37,
     15.4
    ],
    [
     "2022-06",
     22.7,
     17.2,
     37,
     15.4
    ],
    [
     "2022-07",
     23,
     17.9,
     37,
     15.4
    ],
    [
     "2022-08",
     25.3,
     23.1,
     37,
     15.4
    ],
    [
     "2022-09",
     24.2,
     20.6,
     37,
     15.4
    ],
    [
     "2022-10",
     24.4,
     21.1,
     37,
     15.4
    ],
    [
     "2022-11",
     20,
     11.3,
     37,
     15.4
    ],
    [
     "2022-12",
     21.4,
     14.3,
     37,
     15.4
    ],
    [
     "2023-01",
     21.3,
     11.9,
     37,
     19.3
    ],
    [
     "2023-02",
     22.6,
     14.9,
     37,
     19.3
    ],
    [
     "2023-03",
     23.6,
     17.1,
     37,
     19.3
    ],
    [
     "2023-04",
     22.1,
     13.8,
     37,
     19.3
    ],
    [
     "2023-05",
     23.2,
     16.1,
     37,
     19.3
    ],
    [
     "2023-06",
     23.3,
     16.5,
     37,
     19.3
    ],
    [
     "2023-07",
     24.4,
     18.9,
     37,
     19.3
    ],
    [
     "2023-08",
     24.6,
     19.2,
     37,
     19.3
    ],
    [
     "2023-09",
     23.5,
     16.8,
     37,
     19.3
    ],
    [
     "2023-10",
     23.5,
     16.9,
     37,
     19.3
    ],
    [
     "2023-11",
     26.9,
     24.3,
     37,
     19.3
    ],
    [
     "2023-12",
     23.2,
     16.2,
     37,
     19.3
    ],
    [
     "2024-01",
     25.6,
     23.7,
     37,
     15.2
    ],
    [
     "2024-02",
     25.5,
     23.6,
     37,
     15.2
    ],
    [
     "2024-03",
     25,
     22.5,
     37,
     15.2
    ],
    [
     "2024-04",
     26.6,
     25.9,
     37,
     15.2
    ],
    [
     "2024-05",
     27.9,
     28.9,
     37,
     15.2
    ],
    [
     "2024-06",
     27.5,
     27.9,
     37,
     15.2
    ],
    [
     "2024-07",
     27.9,
     28.9,
     37,
     15.2
    ],
    [
     "2024-08",
     28.7,
     30.7,
     37,
     15.2
    ],
    [
     "2024-09",
     29.2,
     31.8,
     37,
     15.2
    ],
    [
     "2024-10",
     25.6,
     23.8,
     37,
     15.2
    ],
    [
     "2024-11",
     28.4,
     30.1,
     37,
     15.2
    ],
    [
     "2024-12",
     28.1,
     29.4,
     37,
     15.2
    ],
    [
     "2025-01",
     24.8,
     22.5,
     37,
     14.1
    ],
    [
     "2025-02",
     25,
     23.1,
     37,
     14.1
    ],
    [
     "2025-03",
     28.8,
     31.5,
     37,
     14.1
    ],
    [
     "2025-04",
     49.1,
     76.6,
     37,
     14.1
    ],
    [
     "2025-05",
     52.6,
     84.3,
     37,
     14.1
    ],
    [
     "2025-06",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-07",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-08",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-09",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-10",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-11",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2025-12",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-01",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-02",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-03",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-04",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-05",
     59.6,
     100,
     37,
     14.1
    ],
    [
     "2026-06",
     59.5,
     99.7,
     37,
     14.1
    ]
   ]
  },
  {
   "family": "steel-long-products",
   "label": "Steel bar, rod, and wire",
   "latest": {
    "period": "2026-06",
    "rri": 65.5,
    "band": "building case",
    "tariffScore": 97.6,
    "levelScore": 100,
    "trendScore": 92.1,
    "dependenceScore": 64.8,
    "concentrationScore": 8.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -0.3,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 37.75,
    "exportRatio": 0.352,
    "hhi": 840,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 77.1,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-02",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-03",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-04",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-05",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-06",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-07",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-08",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-09",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-10",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-11",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2014-12",
     29.2,
     15,
     64.8,
     12.1
    ],
    [
     "2015-01",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-02",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-03",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-04",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-05",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-06",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-07",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-08",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-09",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-10",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-11",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2015-12",
     29.3,
     15,
     64.8,
     12.6
    ],
    [
     "2016-01",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-02",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-03",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-04",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-05",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-06",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-07",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-08",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-09",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-10",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-11",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2016-12",
     29,
     15,
     64.8,
     11.3
    ],
    [
     "2017-01",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-02",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-03",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-04",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-05",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-06",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-07",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-08",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-09",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-10",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-11",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2017-12",
     28.7,
     15,
     64.8,
     10
    ],
    [
     "2018-01",
     28.5,
     15,
     64.8,
     9.2
    ],
    [
     "2018-02",
     28.5,
     15,
     64.8,
     9.2
    ],
    [
     "2018-03",
     29.9,
     18.2,
     64.8,
     9.2
    ],
    [
     "2018-04",
     35.5,
     30.6,
     64.8,
     9.2
    ],
    [
     "2018-05",
     35.6,
     30.9,
     64.8,
     9.2
    ],
    [
     "2018-06",
     55.6,
     75.3,
     64.8,
     9.2
    ],
    [
     "2018-07",
     55.2,
     74.4,
     64.8,
     9.2
    ],
    [
     "2018-08",
     56.9,
     78.1,
     64.8,
     9.2
    ],
    [
     "2018-09",
     59,
     82.7,
     64.8,
     9.2
    ],
    [
     "2018-10",
     55.9,
     75.9,
     64.8,
     9.2
    ],
    [
     "2018-11",
     55,
     73.9,
     64.8,
     9.2
    ],
    [
     "2018-12",
     53.9,
     71.4,
     64.8,
     9.2
    ],
    [
     "2019-01",
     51.9,
     67.1,
     64.8,
     9.1
    ],
    [
     "2019-02",
     53.4,
     70.4,
     64.8,
     9.1
    ],
    [
     "2019-03",
     54.4,
     72.6,
     64.8,
     9.1
    ],
    [
     "2019-04",
     51.7,
     66.7,
     64.8,
     9.1
    ],
    [
     "2019-05",
     49.4,
     61.6,
     64.8,
     9.1
    ],
    [
     "2019-06",
     36.4,
     32.6,
     64.8,
     9.1
    ],
    [
     "2019-07",
     29.8,
     18,
     64.8,
     9.1
    ],
    [
     "2019-08",
     30.6,
     19.7,
     64.8,
     9.1
    ],
    [
     "2019-09",
     29.5,
     17.2,
     64.8,
     9.1
    ],
    [
     "2019-10",
     29.1,
     16.3,
     64.8,
     9.1
    ],
    [
     "2019-11",
     28.7,
     15.5,
     64.8,
     9.1
    ],
    [
     "2019-12",
     29,
     16.2,
     64.8,
     9.1
    ],
    [
     "2020-01",
     30.6,
     15.7,
     64.8,
     16.5
    ],
    [
     "2020-02",
     32,
     18.7,
     64.8,
     16.5
    ],
    [
     "2020-03",
     30.4,
     15.2,
     64.8,
     16.5
    ],
    [
     "2020-04",
     31.7,
     18.1,
     64.8,
     16.5
    ],
    [
     "2020-05",
     35.2,
     25.9,
     64.8,
     16.5
    ],
    [
     "2020-06",
     34.3,
     23.9,
     64.8,
     16.5
    ],
    [
     "2020-07",
     38.2,
     32.6,
     64.8,
     16.5
    ],
    [
     "2020-08",
     38.7,
     33.7,
     64.8,
     16.5
    ],
    [
     "2020-09",
     33.3,
     21.7,
     64.8,
     16.5
    ],
    [
     "2020-10",
     35.8,
     27.2,
     64.8,
     16.5
    ],
    [
     "2020-11",
     37.7,
     31.3,
     64.8,
     16.5
    ],
    [
     "2020-12",
     33.2,
     21.3,
     64.8,
     16.5
    ],
    [
     "2021-01",
     37.4,
     31.4,
     64.8,
     15.5
    ],
    [
     "2021-02",
     35.7,
     27.6,
     64.8,
     15.5
    ],
    [
     "2021-03",
     37.2,
     30.8,
     64.8,
     15.5
    ],
    [
     "2021-04",
     34.9,
     25.7,
     64.8,
     15.5
    ],
    [
     "2021-05",
     34.9,
     25.7,
     64.8,
     15.5
    ],
    [
     "2021-06",
     38,
     32.7,
     64.8,
     15.5
    ],
    [
     "2021-07",
     32.4,
     20.3,
     64.8,
     15.5
    ],
    [
     "2021-08",
     32.4,
     20.3,
     64.8,
     15.5
    ],
    [
     "2021-09",
     37.5,
     31.6,
     64.8,
     15.5
    ],
    [
     "2021-10",
     38.9,
     34.6,
     64.8,
     15.5
    ],
    [
     "2021-11",
     33.5,
     22.7,
     64.8,
     15.5
    ],
    [
     "2021-12",
     33.6,
     22.8,
     64.8,
     15.5
    ],
    [
     "2022-01",
     30.8,
     17.4,
     64.8,
     14
    ],
    [
     "2022-02",
     31.9,
     19.9,
     64.8,
     14
    ],
    [
     "2022-03",
     33.8,
     24.2,
     64.8,
     14
    ],
    [
     "2022-04",
     32.9,
     22.2,
     64.8,
     14
    ],
    [
     "2022-05",
     34.1,
     24.9,
     64.8,
     14
    ],
    [
     "2022-06",
     31.4,
     18.9,
     64.8,
     14
    ],
    [
     "2022-07",
     36.9,
     31,
     64.8,
     14
    ],
    [
     "2022-08",
     33.4,
     23.2,
     64.8,
     14
    ],
    [
     "2022-09",
     31.6,
     19.2,
     64.8,
     14
    ],
    [
     "2022-10",
     28.7,
     12.8,
     64.8,
     14
    ],
    [
     "2022-11",
     30.1,
     16,
     64.8,
     14
    ],
    [
     "2022-12",
     30.4,
     16.6,
     64.8,
     14
    ],
    [
     "2023-01",
     30.7,
     17.5,
     64.8,
     13.5
    ],
    [
     "2023-02",
     29.3,
     14.5,
     64.8,
     13.5
    ],
    [
     "2023-03",
     30.5,
     17,
     64.8,
     13.5
    ],
    [
     "2023-04",
     32.8,
     22.2,
     64.8,
     13.5
    ],
    [
     "2023-05",
     32.9,
     22.5,
     64.8,
     13.5
    ],
    [
     "2023-06",
     34.5,
     25.9,
     64.8,
     13.5
    ],
    [
     "2023-07",
     32.8,
     22.2,
     64.8,
     13.5
    ],
    [
     "2023-08",
     34,
     24.8,
     64.8,
     13.5
    ],
    [
     "2023-09",
     34,
     24.9,
     64.8,
     13.5
    ],
    [
     "2023-10",
     33,
     22.6,
     64.8,
     13.5
    ],
    [
     "2023-11",
     30.6,
     17.2,
     64.8,
     13.5
    ],
    [
     "2023-12",
     32.6,
     21.8,
     64.8,
     13.5
    ],
    [
     "2024-01",
     30.8,
     18.1,
     64.8,
     13
    ],
    [
     "2024-02",
     33.9,
     24.9,
     64.8,
     13
    ],
    [
     "2024-03",
     35.8,
     29.2,
     64.8,
     13
    ],
    [
     "2024-04",
     34.1,
     25.3,
     64.8,
     13
    ],
    [
     "2024-05",
     34,
     25.2,
     64.8,
     13
    ],
    [
     "2024-06",
     30,
     16.3,
     64.8,
     13
    ],
    [
     "2024-07",
     32.2,
     21.1,
     64.8,
     13
    ],
    [
     "2024-08",
     32.5,
     21.9,
     64.8,
     13
    ],
    [
     "2024-09",
     32.1,
     20.8,
     64.8,
     13
    ],
    [
     "2024-10",
     31.3,
     19.2,
     64.8,
     13
    ],
    [
     "2024-11",
     31.6,
     19.9,
     64.8,
     13
    ],
    [
     "2024-12",
     31.9,
     20.4,
     64.8,
     13
    ],
    [
     "2025-01",
     33.5,
     26.6,
     64.8,
     8.4
    ],
    [
     "2025-02",
     32.5,
     24.3,
     64.8,
     8.4
    ],
    [
     "2025-03",
     39.8,
     40.6,
     64.8,
     8.4
    ],
    [
     "2025-04",
     52.1,
     67.9,
     64.8,
     8.4
    ],
    [
     "2025-05",
     57.2,
     79.2,
     64.8,
     8.4
    ],
    [
     "2025-06",
     65.8,
     98.4,
     64.8,
     8.4
    ],
    [
     "2025-07",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2025-08",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2025-09",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2025-10",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2025-11",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2025-12",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-01",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-02",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-03",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-04",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-05",
     66.5,
     100,
     64.8,
     8.4
    ],
    [
     "2026-06",
     65.5,
     97.6,
     64.8,
     8.4
    ]
   ]
  },
  {
   "family": "steel-pipe-tube",
   "label": "Steel pipe and tube",
   "latest": {
    "period": "2026-06",
    "rri": 69.6,
    "band": "strong case",
    "tariffScore": 94.2,
    "levelScore": 100,
    "trendScore": 80.6,
    "dependenceScore": 84.7,
    "concentrationScore": 7.1,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -2.6,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 43.01,
    "exportRatio": 0.153,
    "hhi": 710,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 74.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-02",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-03",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-04",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-05",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-06",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-07",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-08",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-09",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-10",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-11",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2014-12",
     34.4,
     15,
     84.7,
     8.8
    ],
    [
     "2015-01",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-02",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-03",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-04",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-05",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-06",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-07",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-08",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-09",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-10",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-11",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2015-12",
     34.1,
     15,
     84.7,
     7.6
    ],
    [
     "2016-01",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-02",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-03",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-04",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-05",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-06",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-07",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-08",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-09",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-10",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-11",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2016-12",
     34.4,
     15,
     84.7,
     9.1
    ],
    [
     "2017-01",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-02",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-03",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-04",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-05",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-06",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-07",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-08",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-09",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-10",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-11",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2017-12",
     34.3,
     15,
     84.7,
     8.5
    ],
    [
     "2018-01",
     33.9,
     15,
     84.7,
     6.9
    ],
    [
     "2018-02",
     33.9,
     15,
     84.7,
     6.9
    ],
    [
     "2018-03",
     34.6,
     16.6,
     84.7,
     6.9
    ],
    [
     "2018-04",
     36.2,
     20.2,
     84.7,
     6.9
    ],
    [
     "2018-05",
     42.2,
     33.5,
     84.7,
     6.9
    ],
    [
     "2018-06",
     58.1,
     68.7,
     84.7,
     6.9
    ],
    [
     "2018-07",
     60.2,
     73.4,
     84.7,
     6.9
    ],
    [
     "2018-08",
     61.1,
     75.5,
     84.7,
     6.9
    ],
    [
     "2018-09",
     61,
     75.2,
     84.7,
     6.9
    ],
    [
     "2018-10",
     62.2,
     78,
     84.7,
     6.9
    ],
    [
     "2018-11",
     62.3,
     78.1,
     84.7,
     6.9
    ],
    [
     "2018-12",
     60.5,
     74.2,
     84.7,
     6.9
    ],
    [
     "2019-01",
     57.4,
     67.3,
     84.7,
     7
    ],
    [
     "2019-02",
     58.3,
     69.3,
     84.7,
     7
    ],
    [
     "2019-03",
     59.7,
     72.3,
     84.7,
     7
    ],
    [
     "2019-04",
     57.1,
     66.6,
     84.7,
     7
    ],
    [
     "2019-05",
     55.8,
     63.7,
     84.7,
     7
    ],
    [
     "2019-06",
     44,
     37.4,
     84.7,
     7
    ],
    [
     "2019-07",
     38.7,
     25.6,
     84.7,
     7
    ],
    [
     "2019-08",
     37.4,
     22.7,
     84.7,
     7
    ],
    [
     "2019-09",
     36.4,
     20.5,
     84.7,
     7
    ],
    [
     "2019-10",
     35.9,
     19.4,
     84.7,
     7
    ],
    [
     "2019-11",
     36,
     19.6,
     84.7,
     7
    ],
    [
     "2019-12",
     34.9,
     17.2,
     84.7,
     7
    ],
    [
     "2020-01",
     37.3,
     21.5,
     84.7,
     9
    ],
    [
     "2020-02",
     36.3,
     19.1,
     84.7,
     9
    ],
    [
     "2020-03",
     36.1,
     18.7,
     84.7,
     9
    ],
    [
     "2020-04",
     38.3,
     23.6,
     84.7,
     9
    ],
    [
     "2020-05",
     39.5,
     26.2,
     84.7,
     9
    ],
    [
     "2020-06",
     39.5,
     26.2,
     84.7,
     9
    ],
    [
     "2020-07",
     39,
     25.1,
     84.7,
     9
    ],
    [
     "2020-08",
     40.3,
     28.1,
     84.7,
     9
    ],
    [
     "2020-09",
     40.4,
     28.3,
     84.7,
     9
    ],
    [
     "2020-10",
     41.9,
     31.7,
     84.7,
     9
    ],
    [
     "2020-11",
     41,
     29.7,
     84.7,
     9
    ],
    [
     "2020-12",
     38.9,
     25,
     84.7,
     9
    ],
    [
     "2021-01",
     40.4,
     27,
     84.7,
     11.4
    ],
    [
     "2021-02",
     37.9,
     21.4,
     84.7,
     11.4
    ],
    [
     "2021-03",
     38.2,
     22,
     84.7,
     11.4
    ],
    [
     "2021-04",
     38.5,
     22.7,
     84.7,
     11.4
    ],
    [
     "2021-05",
     40.6,
     27.4,
     84.7,
     11.4
    ],
    [
     "2021-06",
     40.3,
     26.7,
     84.7,
     11.4
    ],
    [
     "2021-07",
     40.3,
     26.7,
     84.7,
     11.4
    ],
    [
     "2021-08",
     44,
     34.9,
     84.7,
     11.4
    ],
    [
     "2021-09",
     41.1,
     28.5,
     84.7,
     11.4
    ],
    [
     "2021-10",
     42.4,
     31.4,
     84.7,
     11.4
    ],
    [
     "2021-11",
     42.7,
     32.1,
     84.7,
     11.4
    ],
    [
     "2021-12",
     44.9,
     36.9,
     84.7,
     11.4
    ],
    [
     "2022-01",
     41.2,
     30.5,
     84.7,
     8.2
    ],
    [
     "2022-02",
     41.5,
     31.3,
     84.7,
     8.2
    ],
    [
     "2022-03",
     43,
     34.5,
     84.7,
     8.2
    ],
    [
     "2022-04",
     38.3,
     24.2,
     84.7,
     8.2
    ],
    [
     "2022-05",
     39.7,
     27.1,
     84.7,
     8.2
    ],
    [
     "2022-06",
     44,
     36.7,
     84.7,
     8.2
    ],
    [
     "2022-07",
     40.2,
     28.2,
     84.7,
     8.2
    ],
    [
     "2022-08",
     40.9,
     29.8,
     84.7,
     8.2
    ],
    [
     "2022-09",
     43.3,
     35.1,
     84.7,
     8.2
    ],
    [
     "2022-10",
     39.1,
     25.8,
     84.7,
     8.2
    ],
    [
     "2022-11",
     43.2,
     34.9,
     84.7,
     8.2
    ],
    [
     "2022-12",
     40.7,
     29.5,
     84.7,
     8.2
    ],
    [
     "2023-01",
     38.9,
     25.6,
     84.7,
     8
    ],
    [
     "2023-02",
     40.3,
     28.7,
     84.7,
     8
    ],
    [
     "2023-03",
     41.5,
     31.4,
     84.7,
     8
    ],
    [
     "2023-04",
     39.2,
     26.3,
     84.7,
     8
    ],
    [
     "2023-05",
     40.2,
     28.5,
     84.7,
     8
    ],
    [
     "2023-06",
     37.1,
     21.6,
     84.7,
     8
    ],
    [
     "2023-07",
     38.3,
     24.3,
     84.7,
     8
    ],
    [
     "2023-08",
     37.8,
     23,
     84.7,
     8
    ],
    [
     "2023-09",
     35.7,
     18.4,
     84.7,
     8
    ],
    [
     "2023-10",
     39.2,
     26.2,
     84.7,
     8
    ],
    [
     "2023-11",
     36,
     19,
     84.7,
     8
    ],
    [
     "2023-12",
     36.6,
     20.4,
     84.7,
     8
    ],
    [
     "2024-01",
     36.9,
     20.8,
     84.7,
     8.4
    ],
    [
     "2024-02",
     38.1,
     23.5,
     84.7,
     8.4
    ],
    [
     "2024-03",
     37.5,
     22.1,
     84.7,
     8.4
    ],
    [
     "2024-04",
     40.1,
     27.9,
     84.7,
     8.4
    ],
    [
     "2024-05",
     37,
     21.1,
     84.7,
     8.4
    ],
    [
     "2024-06",
     40.3,
     28.5,
     84.7,
     8.4
    ],
    [
     "2024-07",
     39.8,
     27.2,
     84.7,
     8.4
    ],
    [
     "2024-08",
     39.2,
     25.9,
     84.7,
     8.4
    ],
    [
     "2024-09",
     38.9,
     25.3,
     84.7,
     8.4
    ],
    [
     "2024-10",
     37.8,
     22.9,
     84.7,
     8.4
    ],
    [
     "2024-11",
     39.8,
     27.2,
     84.7,
     8.4
    ],
    [
     "2024-12",
     42.7,
     33.7,
     84.7,
     8.4
    ],
    [
     "2025-01",
     39.1,
     26.4,
     84.7,
     7.1
    ],
    [
     "2025-02",
     45.2,
     40,
     84.7,
     7.1
    ],
    [
     "2025-03",
     50.3,
     51.4,
     84.7,
     7.1
    ],
    [
     "2025-04",
     61.3,
     75.9,
     84.7,
     7.1
    ],
    [
     "2025-05",
     62.7,
     79,
     84.7,
     7.1
    ],
    [
     "2025-06",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-07",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-08",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-09",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-10",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-11",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2025-12",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-01",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-02",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-03",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-04",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-05",
     72.2,
     100,
     84.7,
     7.1
    ],
    [
     "2026-06",
     69.6,
     94.2,
     84.7,
     7.1
    ]
   ]
  },
  {
   "family": "steel-springs-chain",
   "label": "Springs, chain, and wire mesh",
   "latest": {
    "period": "2026-06",
    "rri": 53.2,
    "band": "building case",
    "tariffScore": 71.5,
    "levelScore": 100,
    "trendScore": 4.9,
    "dependenceScore": 55.3,
    "concentrationScore": 17.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -12.8,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 35.1,
    "exportRatio": 0.447,
    "hhi": 1770,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 87.4,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2014-02",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2014-03",
     28.5,
     16.3,
     55.3,
     18.3
    ],
    [
     "2014-04",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2014-05",
     28.5,
     16.3,
     55.3,
     18.3
    ],
    [
     "2014-06",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2014-07",
     28.5,
     16.3,
     55.3,
     18.3
    ],
    [
     "2014-08",
     28.6,
     16.5,
     55.3,
     18.3
    ],
    [
     "2014-09",
     28.5,
     16.3,
     55.3,
     18.3
    ],
    [
     "2014-10",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2014-11",
     28.5,
     16.2,
     55.3,
     18.3
    ],
    [
     "2014-12",
     28.5,
     16.4,
     55.3,
     18.3
    ],
    [
     "2015-01",
     28.9,
     16.6,
     55.3,
     19.3
    ],
    [
     "2015-02",
     28.8,
     16.3,
     55.3,
     19.3
    ],
    [
     "2015-03",
     28.9,
     16.7,
     55.3,
     19.3
    ],
    [
     "2015-04",
     28.8,
     16.3,
     55.3,
     19.3
    ],
    [
     "2015-05",
     28.8,
     16.3,
     55.3,
     19.3
    ],
    [
     "2015-06",
     28.6,
     16,
     55.3,
     19.3
    ],
    [
     "2015-07",
     28.8,
     16.3,
     55.3,
     19.3
    ],
    [
     "2015-08",
     28.6,
     16,
     55.3,
     19.3
    ],
    [
     "2015-09",
     28.7,
     16.1,
     55.3,
     19.3
    ],
    [
     "2015-10",
     28.6,
     16,
     55.3,
     19.3
    ],
    [
     "2015-11",
     28.7,
     16.2,
     55.3,
     19.3
    ],
    [
     "2015-12",
     28.7,
     16.2,
     55.3,
     19.3
    ],
    [
     "2016-01",
     29.3,
     16.4,
     55.3,
     21.4
    ],
    [
     "2016-02",
     29.3,
     16.3,
     55.3,
     21.4
    ],
    [
     "2016-03",
     29.2,
     16.2,
     55.3,
     21.4
    ],
    [
     "2016-04",
     29.2,
     16.2,
     55.3,
     21.4
    ],
    [
     "2016-05",
     29.2,
     16.2,
     55.3,
     21.4
    ],
    [
     "2016-06",
     29.4,
     16.6,
     55.3,
     21.4
    ],
    [
     "2016-07",
     29.3,
     16.3,
     55.3,
     21.4
    ],
    [
     "2016-08",
     29.3,
     16.4,
     55.3,
     21.4
    ],
    [
     "2016-09",
     29.2,
     16.2,
     55.3,
     21.4
    ],
    [
     "2016-10",
     29.4,
     16.5,
     55.3,
     21.4
    ],
    [
     "2016-11",
     29.5,
     16.7,
     55.3,
     21.4
    ],
    [
     "2016-12",
     29.3,
     16.4,
     55.3,
     21.4
    ],
    [
     "2017-01",
     29.1,
     16.4,
     55.3,
     20.7
    ],
    [
     "2017-02",
     29.1,
     16.4,
     55.3,
     20.7
    ],
    [
     "2017-03",
     29.1,
     16.2,
     55.3,
     20.7
    ],
    [
     "2017-04",
     29.1,
     16.2,
     55.3,
     20.7
    ],
    [
     "2017-05",
     29.1,
     16.3,
     55.3,
     20.7
    ],
    [
     "2017-06",
     29,
     16.1,
     55.3,
     20.7
    ],
    [
     "2017-07",
     29.1,
     16.3,
     55.3,
     20.7
    ],
    [
     "2017-08",
     29.1,
     16.4,
     55.3,
     20.7
    ],
    [
     "2017-09",
     29.2,
     16.5,
     55.3,
     20.7
    ],
    [
     "2017-10",
     29.1,
     16.3,
     55.3,
     20.7
    ],
    [
     "2017-11",
     29,
     16.1,
     55.3,
     20.7
    ],
    [
     "2017-12",
     29.2,
     16.5,
     55.3,
     20.7
    ],
    [
     "2018-01",
     29.3,
     16.6,
     55.3,
     20.8
    ],
    [
     "2018-02",
     29.2,
     16.4,
     55.3,
     20.8
    ],
    [
     "2018-03",
     29.2,
     16.4,
     55.3,
     20.8
    ],
    [
     "2018-04",
     29.3,
     16.6,
     55.3,
     20.8
    ],
    [
     "2018-05",
     29.2,
     16.4,
     55.3,
     20.8
    ],
    [
     "2018-06",
     29.3,
     16.6,
     55.3,
     20.8
    ],
    [
     "2018-07",
     29.3,
     16.7,
     55.3,
     20.8
    ],
    [
     "2018-08",
     29.2,
     16.4,
     55.3,
     20.8
    ],
    [
     "2018-09",
     29.2,
     16.5,
     55.3,
     20.8
    ],
    [
     "2018-10",
     32.4,
     23.6,
     55.3,
     20.8
    ],
    [
     "2018-11",
     32.9,
     24.7,
     55.3,
     20.8
    ],
    [
     "2018-12",
     34.1,
     27.3,
     55.3,
     20.8
    ],
    [
     "2019-01",
     32.6,
     24.6,
     55.3,
     19.7
    ],
    [
     "2019-02",
     32,
     23.2,
     55.3,
     19.7
    ],
    [
     "2019-03",
     31.7,
     22.6,
     55.3,
     19.7
    ],
    [
     "2019-04",
     31.9,
     23,
     55.3,
     19.7
    ],
    [
     "2019-05",
     32.4,
     24.1,
     55.3,
     19.7
    ],
    [
     "2019-06",
     35.5,
     31,
     55.3,
     19.7
    ],
    [
     "2019-07",
     36.4,
     33.1,
     55.3,
     19.7
    ],
    [
     "2019-08",
     35.7,
     31.5,
     55.3,
     19.7
    ],
    [
     "2019-09",
     36.1,
     32.4,
     55.3,
     19.7
    ],
    [
     "2019-10",
     35,
     29.9,
     55.3,
     19.7
    ],
    [
     "2019-11",
     34.7,
     29.3,
     55.3,
     19.7
    ],
    [
     "2019-12",
     35.8,
     31.7,
     55.3,
     19.7
    ],
    [
     "2020-01",
     36.3,
     33.5,
     55.3,
     18.5
    ],
    [
     "2020-02",
     34.6,
     29.8,
     55.3,
     18.5
    ],
    [
     "2020-03",
     32.4,
     24.9,
     55.3,
     18.5
    ],
    [
     "2020-04",
     38.5,
     38.5,
     55.3,
     18.5
    ],
    [
     "2020-05",
     39.5,
     40.6,
     55.3,
     18.5
    ],
    [
     "2020-06",
     34.9,
     30.3,
     55.3,
     18.5
    ],
    [
     "2020-07",
     34,
     28.5,
     55.3,
     18.5
    ],
    [
     "2020-08",
     35.4,
     31.5,
     55.3,
     18.5
    ],
    [
     "2020-09",
     34,
     28.5,
     55.3,
     18.5
    ],
    [
     "2020-10",
     34.1,
     28.7,
     55.3,
     18.5
    ],
    [
     "2020-11",
     33.3,
     26.9,
     55.3,
     18.5
    ],
    [
     "2020-12",
     33.7,
     27.7,
     55.3,
     18.5
    ],
    [
     "2021-01",
     33,
     26.6,
     55.3,
     17.7
    ],
    [
     "2021-02",
     33.8,
     28.3,
     55.3,
     17.7
    ],
    [
     "2021-03",
     35.1,
     31.3,
     55.3,
     17.7
    ],
    [
     "2021-04",
     31.5,
     23.3,
     55.3,
     17.7
    ],
    [
     "2021-05",
     31.6,
     23.5,
     55.3,
     17.7
    ],
    [
     "2021-06",
     34.7,
     30.3,
     55.3,
     17.7
    ],
    [
     "2021-07",
     33.9,
     28.7,
     55.3,
     17.7
    ],
    [
     "2021-08",
     33.3,
     27.4,
     55.3,
     17.7
    ],
    [
     "2021-09",
     33.6,
     28,
     55.3,
     17.7
    ],
    [
     "2021-10",
     33.4,
     27.5,
     55.3,
     17.7
    ],
    [
     "2021-11",
     34.7,
     30.4,
     55.3,
     17.7
    ],
    [
     "2021-12",
     34,
     28.9,
     55.3,
     17.7
    ],
    [
     "2022-01",
     33.7,
     28.5,
     55.3,
     17.3
    ],
    [
     "2022-02",
     35.8,
     33,
     55.3,
     17.3
    ],
    [
     "2022-03",
     33.7,
     28.4,
     55.3,
     17.3
    ],
    [
     "2022-04",
     34,
     29,
     55.3,
     17.3
    ],
    [
     "2022-05",
     34.2,
     29.6,
     55.3,
     17.3
    ],
    [
     "2022-06",
     33.2,
     27.3,
     55.3,
     17.3
    ],
    [
     "2022-07",
     34.1,
     29.4,
     55.3,
     17.3
    ],
    [
     "2022-08",
     35.1,
     31.6,
     55.3,
     17.3
    ],
    [
     "2022-09",
     34.4,
     30,
     55.3,
     17.3
    ],
    [
     "2022-10",
     33.1,
     27.1,
     55.3,
     17.3
    ],
    [
     "2022-11",
     33,
     26.8,
     55.3,
     17.3
    ],
    [
     "2022-12",
     33.4,
     27.8,
     55.3,
     17.3
    ],
    [
     "2023-01",
     33.1,
     27.3,
     55.3,
     16.9
    ],
    [
     "2023-02",
     32.2,
     25.3,
     55.3,
     16.9
    ],
    [
     "2023-03",
     31.3,
     23.3,
     55.3,
     16.9
    ],
    [
     "2023-04",
     33.2,
     27.6,
     55.3,
     16.9
    ],
    [
     "2023-05",
     32.1,
     25.1,
     55.3,
     16.9
    ],
    [
     "2023-06",
     32.5,
     25.9,
     55.3,
     16.9
    ],
    [
     "2023-07",
     32.2,
     25.4,
     55.3,
     16.9
    ],
    [
     "2023-08",
     31.7,
     24.1,
     55.3,
     16.9
    ],
    [
     "2023-09",
     32.5,
     25.9,
     55.3,
     16.9
    ],
    [
     "2023-10",
     33.3,
     27.8,
     55.3,
     16.9
    ],
    [
     "2023-11",
     32,
     24.9,
     55.3,
     16.9
    ],
    [
     "2023-12",
     32.7,
     26.3,
     55.3,
     16.9
    ],
    [
     "2024-01",
     32.6,
     25.9,
     55.3,
     17.4
    ],
    [
     "2024-02",
     32.4,
     25.4,
     55.3,
     17.4
    ],
    [
     "2024-03",
     32.8,
     26.3,
     55.3,
     17.4
    ],
    [
     "2024-04",
     30.9,
     22.1,
     55.3,
     17.4
    ],
    [
     "2024-05",
     33.3,
     27.4,
     55.3,
     17.4
    ],
    [
     "2024-06",
     33,
     26.9,
     55.3,
     17.4
    ],
    [
     "2024-07",
     33.2,
     27.2,
     55.3,
     17.4
    ],
    [
     "2024-08",
     32.9,
     26.5,
     55.3,
     17.4
    ],
    [
     "2024-09",
     32.5,
     25.7,
     55.3,
     17.4
    ],
    [
     "2024-10",
     32,
     24.6,
     55.3,
     17.4
    ],
    [
     "2024-11",
     32.3,
     25.2,
     55.3,
     17.4
    ],
    [
     "2024-12",
     33.4,
     27.6,
     55.3,
     17.4
    ],
    [
     "2025-01",
     34.7,
     30.5,
     55.3,
     17.7
    ],
    [
     "2025-02",
     34.4,
     29.7,
     55.3,
     17.7
    ],
    [
     "2025-03",
     54.1,
     73.6,
     55.3,
     17.7
    ],
    [
     "2025-04",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-05",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-06",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-07",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-08",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-09",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-10",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-11",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2025-12",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2026-01",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2026-02",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2026-03",
     66,
     100,
     55.3,
     17.7
    ],
    [
     "2026-04",
     60.9,
     88.7,
     55.3,
     17.7
    ],
    [
     "2026-05",
     62.6,
     92.3,
     55.3,
     17.7
    ],
    [
     "2026-06",
     53.2,
     71.5,
     55.3,
     17.7
    ]
   ]
  },
  {
   "family": "steel-structures",
   "label": "Fabricated structural steel",
   "latest": {
    "period": "2026-06",
    "rri": 75.9,
    "band": "strong case",
    "tariffScore": 97.7,
    "levelScore": 100,
    "trendScore": 92.2,
    "dependenceScore": 98.2,
    "concentrationScore": 9.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": 3.3,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 34.3,
    "exportRatio": 0.018,
    "hhi": 990,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-02",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-03",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-04",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-05",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-06",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-07",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-08",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-09",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-10",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-11",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2014-12",
     40.2,
     15,
     98.2,
     15.8
    ],
    [
     "2015-01",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-02",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-03",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-04",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-05",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-06",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-07",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-08",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-09",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-10",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-11",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2015-12",
     40.2,
     15,
     98.2,
     16.1
    ],
    [
     "2016-01",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-02",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-03",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-04",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-05",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-06",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-07",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-08",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-09",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-10",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-11",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2016-12",
     40.1,
     15,
     98.2,
     15.7
    ],
    [
     "2017-01",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-02",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-03",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-04",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-05",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-06",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-07",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-08",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-09",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-10",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-11",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2017-12",
     40.4,
     15,
     98.2,
     16.6
    ],
    [
     "2018-01",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-02",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-03",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-04",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-05",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-06",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-07",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-08",
     40.8,
     15,
     98.2,
     18.4
    ],
    [
     "2018-09",
     44.6,
     23.4,
     98.2,
     18.4
    ],
    [
     "2018-10",
     48.2,
     31.4,
     98.2,
     18.4
    ],
    [
     "2018-11",
     45.9,
     26.3,
     98.2,
     18.4
    ],
    [
     "2018-12",
     46.8,
     28.4,
     98.2,
     18.4
    ],
    [
     "2019-01",
     44.6,
     26.6,
     98.2,
     12.8
    ],
    [
     "2019-02",
     44.3,
     25.8,
     98.2,
     12.8
    ],
    [
     "2019-03",
     43,
     22.9,
     98.2,
     12.8
    ],
    [
     "2019-04",
     44.3,
     25.9,
     98.2,
     12.8
    ],
    [
     "2019-05",
     44.2,
     25.7,
     98.2,
     12.8
    ],
    [
     "2019-06",
     44.2,
     25.6,
     98.2,
     12.8
    ],
    [
     "2019-07",
     43.6,
     24.2,
     98.2,
     12.8
    ],
    [
     "2019-08",
     43,
     22.9,
     98.2,
     12.8
    ],
    [
     "2019-09",
     41.5,
     19.6,
     98.2,
     12.8
    ],
    [
     "2019-10",
     39.9,
     16,
     98.2,
     12.8
    ],
    [
     "2019-11",
     40.4,
     17.3,
     98.2,
     12.8
    ],
    [
     "2019-12",
     40.3,
     17,
     98.2,
     12.8
    ],
    [
     "2020-01",
     40.4,
     17.6,
     98.2,
     12.2
    ],
    [
     "2020-02",
     40.3,
     17.2,
     98.2,
     12.2
    ],
    [
     "2020-03",
     38.9,
     14.2,
     98.2,
     12.2
    ],
    [
     "2020-04",
     40.1,
     16.8,
     98.2,
     12.2
    ],
    [
     "2020-05",
     41.2,
     19.3,
     98.2,
     12.2
    ],
    [
     "2020-06",
     40.3,
     17.2,
     98.2,
     12.2
    ],
    [
     "2020-07",
     40.6,
     17.9,
     98.2,
     12.2
    ],
    [
     "2020-08",
     40.4,
     17.5,
     98.2,
     12.2
    ],
    [
     "2020-09",
     41,
     18.9,
     98.2,
     12.2
    ],
    [
     "2020-10",
     42.2,
     21.5,
     98.2,
     12.2
    ],
    [
     "2020-11",
     42.9,
     23.2,
     98.2,
     12.2
    ],
    [
     "2020-12",
     43.4,
     24.3,
     98.2,
     12.2
    ],
    [
     "2021-01",
     45.7,
     28.7,
     98.2,
     13.1
    ],
    [
     "2021-02",
     44.8,
     26.7,
     98.2,
     13.1
    ],
    [
     "2021-03",
     45.3,
     28,
     98.2,
     13.1
    ],
    [
     "2021-04",
     44.3,
     25.6,
     98.2,
     13.1
    ],
    [
     "2021-05",
     42.9,
     22.5,
     98.2,
     13.1
    ],
    [
     "2021-06",
     44.3,
     25.7,
     98.2,
     13.1
    ],
    [
     "2021-07",
     44.5,
     26.1,
     98.2,
     13.1
    ],
    [
     "2021-08",
     44.8,
     26.9,
     98.2,
     13.1
    ],
    [
     "2021-09",
     43.7,
     24.4,
     98.2,
     13.1
    ],
    [
     "2021-10",
     42.9,
     22.6,
     98.2,
     13.1
    ],
    [
     "2021-11",
     43,
     22.9,
     98.2,
     13.1
    ],
    [
     "2021-12",
     43.5,
     24,
     98.2,
     13.1
    ],
    [
     "2022-01",
     42.9,
     22.7,
     98.2,
     12.8
    ],
    [
     "2022-02",
     42.9,
     22.7,
     98.2,
     12.8
    ],
    [
     "2022-03",
     41.9,
     20.6,
     98.2,
     12.8
    ],
    [
     "2022-04",
     43,
     22.9,
     98.2,
     12.8
    ],
    [
     "2022-05",
     42.2,
     21.2,
     98.2,
     12.8
    ],
    [
     "2022-06",
     41.7,
     20.1,
     98.2,
     12.8
    ],
    [
     "2022-07",
     41.8,
     20.4,
     98.2,
     12.8
    ],
    [
     "2022-08",
     41.4,
     19.5,
     98.2,
     12.8
    ],
    [
     "2022-09",
     41.4,
     19.5,
     98.2,
     12.8
    ],
    [
     "2022-10",
     41.3,
     19.2,
     98.2,
     12.8
    ],
    [
     "2022-11",
     41.4,
     19.5,
     98.2,
     12.8
    ],
    [
     "2022-12",
     41,
     18.6,
     98.2,
     12.8
    ],
    [
     "2023-01",
     41.2,
     19.6,
     98.2,
     11.5
    ],
    [
     "2023-02",
     41,
     19.2,
     98.2,
     11.5
    ],
    [
     "2023-03",
     40,
     17.1,
     98.2,
     11.5
    ],
    [
     "2023-04",
     41.2,
     19.6,
     98.2,
     11.5
    ],
    [
     "2023-05",
     41,
     19.2,
     98.2,
     11.5
    ],
    [
     "2023-06",
     40.2,
     17.5,
     98.2,
     11.5
    ],
    [
     "2023-07",
     40.6,
     18.4,
     98.2,
     11.5
    ],
    [
     "2023-08",
     40.6,
     18.3,
     98.2,
     11.5
    ],
    [
     "2023-09",
     40.8,
     18.9,
     98.2,
     11.5
    ],
    [
     "2023-10",
     40.8,
     18.9,
     98.2,
     11.5
    ],
    [
     "2023-11",
     40.6,
     18.3,
     98.2,
     11.5
    ],
    [
     "2023-12",
     41.2,
     19.7,
     98.2,
     11.5
    ],
    [
     "2024-01",
     41.4,
     21,
     98.2,
     10
    ],
    [
     "2024-02",
     41.1,
     20.3,
     98.2,
     10
    ],
    [
     "2024-03",
     41.3,
     20.7,
     98.2,
     10
    ],
    [
     "2024-04",
     40.5,
     19,
     98.2,
     10
    ],
    [
     "2024-05",
     40.4,
     18.8,
     98.2,
     10
    ],
    [
     "2024-06",
     41.6,
     21.4,
     98.2,
     10
    ],
    [
     "2024-07",
     41.3,
     20.7,
     98.2,
     10
    ],
    [
     "2024-08",
     41,
     20.1,
     98.2,
     10
    ],
    [
     "2024-09",
     41.8,
     21.9,
     98.2,
     10
    ],
    [
     "2024-10",
     41.2,
     20.5,
     98.2,
     10
    ],
    [
     "2024-11",
     41.4,
     21,
     98.2,
     10
    ],
    [
     "2024-12",
     40.9,
     19.9,
     98.2,
     10
    ],
    [
     "2025-01",
     42.8,
     24.2,
     98.2,
     9.9
    ],
    [
     "2025-02",
     42,
     22.4,
     98.2,
     9.9
    ],
    [
     "2025-03",
     52.7,
     46.1,
     98.2,
     9.9
    ],
    [
     "2025-04",
     67.4,
     78.7,
     98.2,
     9.9
    ],
    [
     "2025-05",
     67.3,
     78.5,
     98.2,
     9.9
    ],
    [
     "2025-06",
     72.6,
     90.3,
     98.2,
     9.9
    ],
    [
     "2025-07",
     76.9,
     100,
     98.2,
     9.9
    ],
    [
     "2025-08",
     75.9,
     97.6,
     98.2,
     9.9
    ],
    [
     "2025-09",
     72.8,
     90.7,
     98.2,
     9.9
    ],
    [
     "2025-10",
     76.9,
     100,
     98.2,
     9.9
    ],
    [
     "2025-11",
     75.5,
     96.8,
     98.2,
     9.9
    ],
    [
     "2025-12",
     75.5,
     96.8,
     98.2,
     9.9
    ],
    [
     "2026-01",
     76.8,
     99.6,
     98.2,
     9.9
    ],
    [
     "2026-02",
     76.9,
     100,
     98.2,
     9.9
    ],
    [
     "2026-03",
     73.4,
     92.2,
     98.2,
     9.9
    ],
    [
     "2026-04",
     76.9,
     100,
     98.2,
     9.9
    ],
    [
     "2026-05",
     76.9,
     100,
     98.2,
     9.9
    ],
    [
     "2026-06",
     75.9,
     97.7,
     98.2,
     9.9
    ]
   ]
  },
  {
   "family": "switchgear-connectors",
   "label": "Switchgear, connectors, and controls",
   "latest": {
    "period": "2026-06",
    "rri": 42.1,
    "band": "building case",
    "tariffScore": 30.3,
    "levelScore": 28.6,
    "trendScore": 34.2,
    "dependenceScore": 81.6,
    "concentrationScore": 15.9,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -11.1,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 8.59,
    "exportRatio": 0.184,
    "hhi": 1590,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 76.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     39.6,
     24.8,
     81.6,
     15.9
    ],
    [
     "2020-02",
     38.7,
     22.8,
     81.6,
     15.9
    ],
    [
     "2020-03",
     38.7,
     22.7,
     81.6,
     15.9
    ],
    [
     "2020-04",
     40.2,
     26.1,
     81.6,
     15.9
    ],
    [
     "2020-05",
     40.6,
     26.9,
     81.6,
     15.9
    ],
    [
     "2020-06",
     39.9,
     25.5,
     81.6,
     15.9
    ],
    [
     "2020-07",
     40,
     25.7,
     81.6,
     15.9
    ],
    [
     "2020-08",
     39.9,
     25.5,
     81.6,
     15.9
    ],
    [
     "2020-09",
     39.8,
     25.3,
     81.6,
     15.9
    ],
    [
     "2020-10",
     39.9,
     25.5,
     81.6,
     15.9
    ],
    [
     "2020-11",
     40.2,
     26,
     81.6,
     15.9
    ],
    [
     "2020-12",
     40.2,
     26.2,
     81.6,
     15.9
    ],
    [
     "2021-01",
     40.7,
     27.7,
     81.6,
     14.9
    ],
    [
     "2021-02",
     40.9,
     28.2,
     81.6,
     14.9
    ],
    [
     "2021-03",
     40.8,
     28,
     81.6,
     14.9
    ],
    [
     "2021-04",
     39.8,
     25.8,
     81.6,
     14.9
    ],
    [
     "2021-05",
     39.8,
     25.7,
     81.6,
     14.9
    ],
    [
     "2021-06",
     40.1,
     26.5,
     81.6,
     14.9
    ],
    [
     "2021-07",
     40,
     26.3,
     81.6,
     14.9
    ],
    [
     "2021-08",
     40.7,
     27.8,
     81.6,
     14.9
    ],
    [
     "2021-09",
     40.8,
     28,
     81.6,
     14.9
    ],
    [
     "2021-10",
     40.1,
     26.5,
     81.6,
     14.9
    ],
    [
     "2021-11",
     39.9,
     26,
     81.6,
     14.9
    ],
    [
     "2021-12",
     40,
     26.2,
     81.6,
     14.9
    ],
    [
     "2022-01",
     39.9,
     25.7,
     81.6,
     15.5
    ],
    [
     "2022-02",
     39.4,
     24.5,
     81.6,
     15.5
    ],
    [
     "2022-03",
     39.3,
     24.4,
     81.6,
     15.5
    ],
    [
     "2022-04",
     39.2,
     24.2,
     81.6,
     15.5
    ],
    [
     "2022-05",
     39.4,
     24.6,
     81.6,
     15.5
    ],
    [
     "2022-06",
     39.6,
     24.9,
     81.6,
     15.5
    ],
    [
     "2022-07",
     39.7,
     25.3,
     81.6,
     15.5
    ],
    [
     "2022-08",
     39.7,
     25.3,
     81.6,
     15.5
    ],
    [
     "2022-09",
     39.3,
     24.4,
     81.6,
     15.5
    ],
    [
     "2022-10",
     39.3,
     24.3,
     81.6,
     15.5
    ],
    [
     "2022-11",
     39.3,
     24.3,
     81.6,
     15.5
    ],
    [
     "2022-12",
     39.3,
     24.3,
     81.6,
     15.5
    ],
    [
     "2023-01",
     39.4,
     23.7,
     81.6,
     17.1
    ],
    [
     "2023-02",
     39.2,
     23.1,
     81.6,
     17.1
    ],
    [
     "2023-03",
     38.7,
     22,
     81.6,
     17.1
    ],
    [
     "2023-04",
     39.2,
     23.3,
     81.6,
     17.1
    ],
    [
     "2023-05",
     39.4,
     23.6,
     81.6,
     17.1
    ],
    [
     "2023-06",
     38.8,
     22.3,
     81.6,
     17.1
    ],
    [
     "2023-07",
     38.7,
     22,
     81.6,
     17.1
    ],
    [
     "2023-08",
     38.2,
     21.1,
     81.6,
     17.1
    ],
    [
     "2023-09",
     38.5,
     21.6,
     81.6,
     17.1
    ],
    [
     "2023-10",
     38.4,
     21.5,
     81.6,
     17.1
    ],
    [
     "2023-11",
     38.5,
     21.7,
     81.6,
     17.1
    ],
    [
     "2023-12",
     38.6,
     21.8,
     81.6,
     17.1
    ],
    [
     "2024-01",
     39,
     22.9,
     81.6,
     16.7
    ],
    [
     "2024-02",
     38.4,
     21.6,
     81.6,
     16.7
    ],
    [
     "2024-03",
     39,
     22.9,
     81.6,
     16.7
    ],
    [
     "2024-04",
     38.5,
     21.9,
     81.6,
     16.7
    ],
    [
     "2024-05",
     38.6,
     22.1,
     81.6,
     16.7
    ],
    [
     "2024-06",
     38.8,
     22.6,
     81.6,
     16.7
    ],
    [
     "2024-07",
     39,
     23,
     81.6,
     16.7
    ],
    [
     "2024-08",
     39.1,
     23.2,
     81.6,
     16.7
    ],
    [
     "2024-09",
     38.9,
     22.7,
     81.6,
     16.7
    ],
    [
     "2024-10",
     38.9,
     22.7,
     81.6,
     16.7
    ],
    [
     "2024-11",
     38.8,
     22.6,
     81.6,
     16.7
    ],
    [
     "2024-12",
     39.2,
     23.4,
     81.6,
     16.7
    ],
    [
     "2025-01",
     38.9,
     23.3,
     81.6,
     15.9
    ],
    [
     "2025-02",
     39,
     23.5,
     81.6,
     15.9
    ],
    [
     "2025-03",
     45.1,
     36.9,
     81.6,
     15.9
    ],
    [
     "2025-04",
     53.3,
     55.1,
     81.6,
     15.9
    ],
    [
     "2025-05",
     55.9,
     61,
     81.6,
     15.9
    ],
    [
     "2025-06",
     53.2,
     55,
     81.6,
     15.9
    ],
    [
     "2025-07",
     54.4,
     57.6,
     81.6,
     15.9
    ],
    [
     "2025-08",
     55.6,
     60.4,
     81.6,
     15.9
    ],
    [
     "2025-09",
     57.1,
     63.6,
     81.6,
     15.9
    ],
    [
     "2025-10",
     57,
     63.5,
     81.6,
     15.9
    ],
    [
     "2025-11",
     56.9,
     63.2,
     81.6,
     15.9
    ],
    [
     "2025-12",
     56.5,
     62.3,
     81.6,
     15.9
    ],
    [
     "2026-01",
     56.6,
     62.5,
     81.6,
     15.9
    ],
    [
     "2026-02",
     52.6,
     53.6,
     81.6,
     15.9
    ],
    [
     "2026-03",
     44.7,
     36.1,
     81.6,
     15.9
    ],
    [
     "2026-04",
     41.7,
     29.4,
     81.6,
     15.9
    ],
    [
     "2026-05",
     41,
     27.9,
     81.6,
     15.9
    ],
    [
     "2026-06",
     42.1,
     30.3,
     81.6,
     15.9
    ]
   ]
  },
  {
   "family": "tanks-vessels",
   "label": "Tanks, vessels, and gas cylinders",
   "latest": {
    "period": "2026-06",
    "rri": 45.9,
    "band": "building case",
    "tariffScore": 96.5,
    "levelScore": 100,
    "trendScore": 88.3,
    "dependenceScore": 0,
    "concentrationScore": 9.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -1.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 40.17,
    "exportRatio": 1.031,
    "hhi": 970,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 83.8,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-02",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-03",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-04",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-05",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-06",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-07",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-08",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-09",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-10",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-11",
     10,
     15,
     0,
     13.1
    ],
    [
     "2014-12",
     10,
     15,
     0,
     13.1
    ],
    [
     "2015-01",
     10,
     15,
     0,
     13
    ],
    [
     "2015-02",
     10,
     15,
     0,
     13
    ],
    [
     "2015-03",
     10,
     15,
     0,
     13
    ],
    [
     "2015-04",
     10,
     15,
     0,
     13
    ],
    [
     "2015-05",
     10,
     15,
     0,
     13
    ],
    [
     "2015-06",
     10,
     15,
     0,
     13
    ],
    [
     "2015-07",
     10,
     15,
     0,
     13
    ],
    [
     "2015-08",
     10,
     15,
     0,
     13
    ],
    [
     "2015-09",
     10,
     15,
     0,
     13
    ],
    [
     "2015-10",
     10,
     15,
     0,
     13
    ],
    [
     "2015-11",
     10,
     15,
     0,
     13
    ],
    [
     "2015-12",
     10,
     15,
     0,
     13
    ],
    [
     "2016-01",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-02",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-03",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-04",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-05",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-06",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-07",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-08",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-09",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-10",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-11",
     10,
     15,
     0,
     13.1
    ],
    [
     "2016-12",
     10,
     15,
     0,
     13.1
    ],
    [
     "2017-01",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-02",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-03",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-04",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-05",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-06",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-07",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-08",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-09",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-10",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-11",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2017-12",
     10.5,
     15,
     0,
     14.8
    ],
    [
     "2018-01",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-02",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-03",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-04",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-05",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-06",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-07",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-08",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-09",
     10.3,
     15,
     0,
     14
    ],
    [
     "2018-10",
     12.5,
     20.1,
     0,
     14
    ],
    [
     "2018-11",
     13,
     21.1,
     0,
     14
    ],
    [
     "2018-12",
     14.6,
     24.7,
     0,
     14
    ],
    [
     "2019-01",
     13.1,
     21.9,
     0,
     13
    ],
    [
     "2019-02",
     12.4,
     20.4,
     0,
     13
    ],
    [
     "2019-03",
     12.5,
     20.5,
     0,
     13
    ],
    [
     "2019-04",
     12.7,
     21.1,
     0,
     13
    ],
    [
     "2019-05",
     13.6,
     22.9,
     0,
     13
    ],
    [
     "2019-06",
     18,
     32.7,
     0,
     13
    ],
    [
     "2019-07",
     18.4,
     33.7,
     0,
     13
    ],
    [
     "2019-08",
     18.6,
     34.1,
     0,
     13
    ],
    [
     "2019-09",
     18.3,
     33.5,
     0,
     13
    ],
    [
     "2019-10",
     17.3,
     31.2,
     0,
     13
    ],
    [
     "2019-11",
     17,
     30.6,
     0,
     13
    ],
    [
     "2019-12",
     17.7,
     32,
     0,
     13
    ],
    [
     "2020-01",
     19.7,
     36.8,
     0,
     12.5
    ],
    [
     "2020-02",
     17.3,
     31.6,
     0,
     12.5
    ],
    [
     "2020-03",
     12.7,
     21.2,
     0,
     12.5
    ],
    [
     "2020-04",
     17,
     30.8,
     0,
     12.5
    ],
    [
     "2020-05",
     18.4,
     34,
     0,
     12.5
    ],
    [
     "2020-06",
     16.5,
     29.8,
     0,
     12.5
    ],
    [
     "2020-07",
     14.6,
     25.5,
     0,
     12.5
    ],
    [
     "2020-08",
     16.4,
     29.4,
     0,
     12.5
    ],
    [
     "2020-09",
     13.3,
     22.5,
     0,
     12.5
    ],
    [
     "2020-10",
     19,
     35.2,
     0,
     12.5
    ],
    [
     "2020-11",
     13.4,
     22.9,
     0,
     12.5
    ],
    [
     "2020-12",
     14.2,
     24.6,
     0,
     12.5
    ],
    [
     "2021-01",
     13.1,
     23,
     0,
     10.9
    ],
    [
     "2021-02",
     16,
     29.6,
     0,
     10.9
    ],
    [
     "2021-03",
     15.5,
     28.3,
     0,
     10.9
    ],
    [
     "2021-04",
     14.1,
     25.2,
     0,
     10.9
    ],
    [
     "2021-05",
     14.2,
     25.4,
     0,
     10.9
    ],
    [
     "2021-06",
     11.8,
     20.1,
     0,
     10.9
    ],
    [
     "2021-07",
     13.8,
     24.7,
     0,
     10.9
    ],
    [
     "2021-08",
     13,
     22.9,
     0,
     10.9
    ],
    [
     "2021-09",
     13.7,
     24.3,
     0,
     10.9
    ],
    [
     "2021-10",
     12.3,
     21.2,
     0,
     10.9
    ],
    [
     "2021-11",
     12.9,
     22.7,
     0,
     10.9
    ],
    [
     "2021-12",
     13.4,
     23.8,
     0,
     10.9
    ],
    [
     "2022-01",
     13.4,
     23.7,
     0,
     10.8
    ],
    [
     "2022-02",
     12.9,
     22.7,
     0,
     10.8
    ],
    [
     "2022-03",
     13.7,
     24.5,
     0,
     10.8
    ],
    [
     "2022-04",
     14.2,
     25.5,
     0,
     10.8
    ],
    [
     "2022-05",
     13.2,
     23.3,
     0,
     10.8
    ],
    [
     "2022-06",
     14.2,
     25.6,
     0,
     10.8
    ],
    [
     "2022-07",
     13.8,
     24.7,
     0,
     10.8
    ],
    [
     "2022-08",
     13.1,
     23.1,
     0,
     10.8
    ],
    [
     "2022-09",
     12.7,
     22.2,
     0,
     10.8
    ],
    [
     "2022-10",
     13.1,
     23.1,
     0,
     10.8
    ],
    [
     "2022-11",
     12.3,
     21.4,
     0,
     10.8
    ],
    [
     "2022-12",
     12.9,
     22.7,
     0,
     10.8
    ],
    [
     "2023-01",
     12.8,
     22.8,
     0,
     10.1
    ],
    [
     "2023-02",
     12.9,
     23,
     0,
     10.1
    ],
    [
     "2023-03",
     11.4,
     19.7,
     0,
     10.1
    ],
    [
     "2023-04",
     12.7,
     22.6,
     0,
     10.1
    ],
    [
     "2023-05",
     12.3,
     21.7,
     0,
     10.1
    ],
    [
     "2023-06",
     11.5,
     20,
     0,
     10.1
    ],
    [
     "2023-07",
     11.5,
     20,
     0,
     10.1
    ],
    [
     "2023-08",
     10.6,
     17.9,
     0,
     10.1
    ],
    [
     "2023-09",
     11.5,
     19.9,
     0,
     10.1
    ],
    [
     "2023-10",
     10.9,
     18.6,
     0,
     10.1
    ],
    [
     "2023-11",
     11.2,
     19.2,
     0,
     10.1
    ],
    [
     "2023-12",
     11.7,
     20.3,
     0,
     10.1
    ],
    [
     "2024-01",
     11,
     18.7,
     0,
     10.2
    ],
    [
     "2024-02",
     12.3,
     21.6,
     0,
     10.2
    ],
    [
     "2024-03",
     11.9,
     20.7,
     0,
     10.2
    ],
    [
     "2024-04",
     11.1,
     18.9,
     0,
     10.2
    ],
    [
     "2024-05",
     12,
     20.9,
     0,
     10.2
    ],
    [
     "2024-06",
     11.9,
     20.7,
     0,
     10.2
    ],
    [
     "2024-07",
     12.2,
     21.4,
     0,
     10.2
    ],
    [
     "2024-08",
     13.6,
     24.5,
     0,
     10.2
    ],
    [
     "2024-09",
     12.8,
     22.8,
     0,
     10.2
    ],
    [
     "2024-10",
     13.2,
     23.7,
     0,
     10.2
    ],
    [
     "2024-11",
     12.2,
     21.4,
     0,
     10.2
    ],
    [
     "2024-12",
     11.2,
     19.2,
     0,
     10.2
    ],
    [
     "2025-01",
     12.1,
     21.5,
     0,
     9.7
    ],
    [
     "2025-02",
     12.9,
     23.2,
     0,
     9.7
    ],
    [
     "2025-03",
     24.3,
     48.5,
     0,
     9.7
    ],
    [
     "2025-04",
     40.7,
     85,
     0,
     9.7
    ],
    [
     "2025-05",
     42.2,
     88.3,
     0,
     9.7
    ],
    [
     "2025-06",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2025-07",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2025-08",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2025-09",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2025-10",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2025-11",
     45.4,
     95.6,
     0,
     9.7
    ],
    [
     "2025-12",
     46.9,
     98.9,
     0,
     9.7
    ],
    [
     "2026-01",
     45.8,
     96.3,
     0,
     9.7
    ],
    [
     "2026-02",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2026-03",
     41.3,
     86.3,
     0,
     9.7
    ],
    [
     "2026-04",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2026-05",
     47.4,
     100,
     0,
     9.7
    ],
    [
     "2026-06",
     45.9,
     96.5,
     0,
     9.7
    ]
   ]
  },
  {
   "family": "technical-ceramics",
   "label": "Technical and refractory ceramics",
   "latest": {
    "period": "2026-06",
    "rri": 25.3,
    "band": "weak case",
    "tariffScore": 35.4,
    "levelScore": 31.4,
    "trendScore": 44.6,
    "dependenceScore": 16.6,
    "concentrationScore": 17.6,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.9,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 9.43,
    "exportRatio": 0.834,
    "hhi": 1760,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 89,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     17.9,
     18.9,
     16.6,
     17.8
    ],
    [
     "2014-02",
     17.9,
     18.9,
     16.6,
     17.8
    ],
    [
     "2014-03",
     17.8,
     18.7,
     16.6,
     17.8
    ],
    [
     "2014-04",
     18,
     19.1,
     16.6,
     17.8
    ],
    [
     "2014-05",
     18.2,
     19.5,
     16.6,
     17.8
    ],
    [
     "2014-06",
     18,
     19.1,
     16.6,
     17.8
    ],
    [
     "2014-07",
     18.1,
     19.3,
     16.6,
     17.8
    ],
    [
     "2014-08",
     18.1,
     19.2,
     16.6,
     17.8
    ],
    [
     "2014-09",
     18.2,
     19.4,
     16.6,
     17.8
    ],
    [
     "2014-10",
     18.3,
     19.7,
     16.6,
     17.8
    ],
    [
     "2014-11",
     18,
     19.1,
     16.6,
     17.8
    ],
    [
     "2014-12",
     17.9,
     18.8,
     16.6,
     17.8
    ],
    [
     "2015-01",
     19,
     19.7,
     16.6,
     20.5
    ],
    [
     "2015-02",
     18.5,
     18.6,
     16.6,
     20.5
    ],
    [
     "2015-03",
     19.1,
     20,
     16.6,
     20.5
    ],
    [
     "2015-04",
     18.3,
     18.1,
     16.6,
     20.5
    ],
    [
     "2015-05",
     17.9,
     17.4,
     16.6,
     20.5
    ],
    [
     "2015-06",
     18.2,
     17.9,
     16.6,
     20.5
    ],
    [
     "2015-07",
     18.2,
     17.9,
     16.6,
     20.5
    ],
    [
     "2015-08",
     17.8,
     17.1,
     16.6,
     20.5
    ],
    [
     "2015-09",
     18,
     17.5,
     16.6,
     20.5
    ],
    [
     "2015-10",
     17.6,
     16.6,
     16.6,
     20.5
    ],
    [
     "2015-11",
     17.9,
     17.4,
     16.6,
     20.5
    ],
    [
     "2015-12",
     18.3,
     18.1,
     16.6,
     20.5
    ],
    [
     "2016-01",
     18.2,
     17.5,
     16.6,
     21.5
    ],
    [
     "2016-02",
     18.9,
     18.9,
     16.6,
     21.5
    ],
    [
     "2016-03",
     18.2,
     17.5,
     16.6,
     21.5
    ],
    [
     "2016-04",
     18.8,
     18.7,
     16.6,
     21.5
    ],
    [
     "2016-05",
     18.5,
     18.2,
     16.6,
     21.5
    ],
    [
     "2016-06",
     18.4,
     17.9,
     16.6,
     21.5
    ],
    [
     "2016-07",
     18.1,
     17.2,
     16.6,
     21.5
    ],
    [
     "2016-08",
     18.5,
     18.1,
     16.6,
     21.5
    ],
    [
     "2016-09",
     18.1,
     17.3,
     16.6,
     21.5
    ],
    [
     "2016-10",
     18.5,
     18.1,
     16.6,
     21.5
    ],
    [
     "2016-11",
     18.2,
     17.4,
     16.6,
     21.5
    ],
    [
     "2016-12",
     18.6,
     18.3,
     16.6,
     21.5
    ],
    [
     "2017-01",
     18.9,
     18.2,
     16.6,
     22.8
    ],
    [
     "2017-02",
     18.6,
     17.7,
     16.6,
     22.8
    ],
    [
     "2017-03",
     18.8,
     18.1,
     16.6,
     22.8
    ],
    [
     "2017-04",
     18.6,
     17.7,
     16.6,
     22.8
    ],
    [
     "2017-05",
     18.6,
     17.6,
     16.6,
     22.8
    ],
    [
     "2017-06",
     18.7,
     17.9,
     16.6,
     22.8
    ],
    [
     "2017-07",
     18.7,
     17.8,
     16.6,
     22.8
    ],
    [
     "2017-08",
     18.4,
     17.2,
     16.6,
     22.8
    ],
    [
     "2017-09",
     18.4,
     17.2,
     16.6,
     22.8
    ],
    [
     "2017-10",
     18.8,
     18,
     16.6,
     22.8
    ],
    [
     "2017-11",
     18.8,
     18.1,
     16.6,
     22.8
    ],
    [
     "2017-12",
     18.9,
     18.3,
     16.6,
     22.8
    ],
    [
     "2018-01",
     18.3,
     17.8,
     16.6,
     21.2
    ],
    [
     "2018-02",
     18.2,
     17.6,
     16.6,
     21.2
    ],
    [
     "2018-03",
     18.2,
     17.6,
     16.6,
     21.2
    ],
    [
     "2018-04",
     18.2,
     17.7,
     16.6,
     21.2
    ],
    [
     "2018-05",
     18.3,
     17.9,
     16.6,
     21.2
    ],
    [
     "2018-06",
     18.5,
     18.2,
     16.6,
     21.2
    ],
    [
     "2018-07",
     18.7,
     18.6,
     16.6,
     21.2
    ],
    [
     "2018-08",
     18.4,
     18,
     16.6,
     21.2
    ],
    [
     "2018-09",
     18.7,
     18.8,
     16.6,
     21.2
    ],
    [
     "2018-10",
     19.9,
     21.3,
     16.6,
     21.2
    ],
    [
     "2018-11",
     19.7,
     21,
     16.6,
     21.2
    ],
    [
     "2018-12",
     20.4,
     22.5,
     16.6,
     21.2
    ],
    [
     "2019-01",
     19.6,
     21,
     16.6,
     20.5
    ],
    [
     "2019-02",
     19.2,
     20.2,
     16.6,
     20.5
    ],
    [
     "2019-03",
     19.4,
     20.7,
     16.6,
     20.5
    ],
    [
     "2019-04",
     19.9,
     21.7,
     16.6,
     20.5
    ],
    [
     "2019-05",
     19.8,
     21.6,
     16.6,
     20.5
    ],
    [
     "2019-06",
     21.3,
     24.8,
     16.6,
     20.5
    ],
    [
     "2019-07",
     21.2,
     24.7,
     16.6,
     20.5
    ],
    [
     "2019-08",
     21.2,
     24.6,
     16.6,
     20.5
    ],
    [
     "2019-09",
     20.8,
     23.7,
     16.6,
     20.5
    ],
    [
     "2019-10",
     20.1,
     22.2,
     16.6,
     20.5
    ],
    [
     "2019-11",
     20.3,
     22.7,
     16.6,
     20.5
    ],
    [
     "2019-12",
     21.3,
     24.9,
     16.6,
     20.5
    ],
    [
     "2020-01",
     20.9,
     24.5,
     16.6,
     19.4
    ],
    [
     "2020-02",
     19.4,
     21.2,
     16.6,
     19.4
    ],
    [
     "2020-03",
     19.8,
     22.2,
     16.6,
     19.4
    ],
    [
     "2020-04",
     20.5,
     23.6,
     16.6,
     19.4
    ],
    [
     "2020-05",
     21.8,
     26.6,
     16.6,
     19.4
    ],
    [
     "2020-06",
     20.4,
     23.5,
     16.6,
     19.4
    ],
    [
     "2020-07",
     19.1,
     20.7,
     16.6,
     19.4
    ],
    [
     "2020-08",
     19.3,
     21,
     16.6,
     19.4
    ],
    [
     "2020-09",
     20.6,
     23.9,
     16.6,
     19.4
    ],
    [
     "2020-10",
     19.2,
     20.9,
     16.6,
     19.4
    ],
    [
     "2020-11",
     18.9,
     20.2,
     16.6,
     19.4
    ],
    [
     "2020-12",
     20.6,
     24,
     16.6,
     19.4
    ],
    [
     "2021-01",
     19.3,
     22,
     16.6,
     17.7
    ],
    [
     "2021-02",
     20,
     23.5,
     16.6,
     17.7
    ],
    [
     "2021-03",
     20.2,
     23.9,
     16.6,
     17.7
    ],
    [
     "2021-04",
     18.9,
     21.1,
     16.6,
     17.7
    ],
    [
     "2021-05",
     19.2,
     21.7,
     16.6,
     17.7
    ],
    [
     "2021-06",
     20.5,
     24.7,
     16.6,
     17.7
    ],
    [
     "2021-07",
     19.5,
     22.5,
     16.6,
     17.7
    ],
    [
     "2021-08",
     19.8,
     23.2,
     16.6,
     17.7
    ],
    [
     "2021-09",
     19.3,
     21.9,
     16.6,
     17.7
    ],
    [
     "2021-10",
     19.8,
     23.2,
     16.6,
     17.7
    ],
    [
     "2021-11",
     20,
     23.5,
     16.6,
     17.7
    ],
    [
     "2021-12",
     19.1,
     21.6,
     16.6,
     17.7
    ],
    [
     "2022-01",
     19.4,
     22.2,
     16.6,
     17.9
    ],
    [
     "2022-02",
     17.9,
     18.8,
     16.6,
     17.9
    ],
    [
     "2022-03",
     18.6,
     20.3,
     16.6,
     17.9
    ],
    [
     "2022-04",
     19.3,
     21.9,
     16.6,
     17.9
    ],
    [
     "2022-05",
     18.7,
     20.6,
     16.6,
     17.9
    ],
    [
     "2022-06",
     18.5,
     20,
     16.6,
     17.9
    ],
    [
     "2022-07",
     19,
     21.3,
     16.6,
     17.9
    ],
    [
     "2022-08",
     19.7,
     22.7,
     16.6,
     17.9
    ],
    [
     "2022-09",
     19.3,
     21.8,
     16.6,
     17.9
    ],
    [
     "2022-10",
     18.7,
     20.5,
     16.6,
     17.9
    ],
    [
     "2022-11",
     19.2,
     21.7,
     16.6,
     17.9
    ],
    [
     "2022-12",
     18.6,
     20.3,
     16.6,
     17.9
    ],
    [
     "2023-01",
     19.5,
     21.5,
     16.6,
     19.5
    ],
    [
     "2023-02",
     19.9,
     22.4,
     16.6,
     19.5
    ],
    [
     "2023-03",
     20,
     22.6,
     16.6,
     19.5
    ],
    [
     "2023-04",
     19.4,
     21.2,
     16.6,
     19.5
    ],
    [
     "2023-05",
     19.4,
     21.2,
     16.6,
     19.5
    ],
    [
     "2023-06",
     19.5,
     21.5,
     16.6,
     19.5
    ],
    [
     "2023-07",
     19.3,
     20.9,
     16.6,
     19.5
    ],
    [
     "2023-08",
     19.6,
     21.7,
     16.6,
     19.5
    ],
    [
     "2023-09",
     18.9,
     20,
     16.6,
     19.5
    ],
    [
     "2023-10",
     19.7,
     21.8,
     16.6,
     19.5
    ],
    [
     "2023-11",
     19.5,
     21.5,
     16.6,
     19.5
    ],
    [
     "2023-12",
     19.3,
     20.9,
     16.6,
     19.5
    ],
    [
     "2024-01",
     19.6,
     22.2,
     16.6,
     18.5
    ],
    [
     "2024-02",
     18,
     18.7,
     16.6,
     18.5
    ],
    [
     "2024-03",
     18.2,
     19,
     16.6,
     18.5
    ],
    [
     "2024-04",
     19.4,
     21.7,
     16.6,
     18.5
    ],
    [
     "2024-05",
     19.8,
     22.6,
     16.6,
     18.5
    ],
    [
     "2024-06",
     22.3,
     28.3,
     16.6,
     18.5
    ],
    [
     "2024-07",
     19.4,
     21.7,
     16.6,
     18.5
    ],
    [
     "2024-08",
     19,
     20.9,
     16.6,
     18.5
    ],
    [
     "2024-09",
     19.2,
     21.3,
     16.6,
     18.5
    ],
    [
     "2024-10",
     18.9,
     20.6,
     16.6,
     18.5
    ],
    [
     "2024-11",
     19.6,
     22.1,
     16.6,
     18.5
    ],
    [
     "2024-12",
     20.6,
     24.4,
     16.6,
     18.5
    ],
    [
     "2025-01",
     19.7,
     22.9,
     16.6,
     17.6
    ],
    [
     "2025-02",
     20.5,
     24.8,
     16.6,
     17.6
    ],
    [
     "2025-03",
     21.4,
     26.6,
     16.6,
     17.6
    ],
    [
     "2025-04",
     27.9,
     41.2,
     16.6,
     17.6
    ],
    [
     "2025-05",
     35.8,
     58.6,
     16.6,
     17.6
    ],
    [
     "2025-06",
     31.2,
     48.5,
     16.6,
     17.6
    ],
    [
     "2025-07",
     33.3,
     53.2,
     16.6,
     17.6
    ],
    [
     "2025-08",
     32.7,
     51.9,
     16.6,
     17.6
    ],
    [
     "2025-09",
     37.2,
     61.9,
     16.6,
     17.6
    ],
    [
     "2025-10",
     37.1,
     61.5,
     16.6,
     17.6
    ],
    [
     "2025-11",
     37.6,
     62.7,
     16.6,
     17.6
    ],
    [
     "2025-12",
     37.1,
     61.7,
     16.6,
     17.6
    ],
    [
     "2026-01",
     37.8,
     63.1,
     16.6,
     17.6
    ],
    [
     "2026-02",
     35.4,
     57.9,
     16.6,
     17.6
    ],
    [
     "2026-03",
     29.7,
     45.2,
     16.6,
     17.6
    ],
    [
     "2026-04",
     27.1,
     39.3,
     16.6,
     17.6
    ],
    [
     "2026-05",
     23.2,
     30.8,
     16.6,
     17.6
    ],
    [
     "2026-06",
     25.3,
     35.4,
     16.6,
     17.6
    ]
   ]
  },
  {
   "family": "transformers-power",
   "label": "Transformers and power supplies",
   "latest": {
    "period": "2026-06",
    "rri": 49.6,
    "band": "building case",
    "tariffScore": 47.1,
    "levelScore": 41.9,
    "trendScore": 59.3,
    "dependenceScore": 88.2,
    "concentrationScore": 7.8,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -1.9,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.56,
    "exportRatio": 0.118,
    "hhi": 780,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 76,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2020-01",
     42.1,
     28.4,
     88.2,
     11.5
    ],
    [
     "2020-02",
     40.8,
     25.4,
     88.2,
     11.5
    ],
    [
     "2020-03",
     40,
     23.7,
     88.2,
     11.5
    ],
    [
     "2020-04",
     41.3,
     26.6,
     88.2,
     11.5
    ],
    [
     "2020-05",
     42.1,
     28.4,
     88.2,
     11.5
    ],
    [
     "2020-06",
     41.7,
     27.5,
     88.2,
     11.5
    ],
    [
     "2020-07",
     41.5,
     27.1,
     88.2,
     11.5
    ],
    [
     "2020-08",
     41.9,
     27.9,
     88.2,
     11.5
    ],
    [
     "2020-09",
     41.9,
     28,
     88.2,
     11.5
    ],
    [
     "2020-10",
     41.6,
     27.3,
     88.2,
     11.5
    ],
    [
     "2020-11",
     42.3,
     28.8,
     88.2,
     11.5
    ],
    [
     "2020-12",
     41.8,
     27.7,
     88.2,
     11.5
    ],
    [
     "2021-01",
     42.8,
     30.5,
     88.2,
     10.4
    ],
    [
     "2021-02",
     43.1,
     31.3,
     88.2,
     10.4
    ],
    [
     "2021-03",
     42.7,
     30.4,
     88.2,
     10.4
    ],
    [
     "2021-04",
     41.3,
     27.1,
     88.2,
     10.4
    ],
    [
     "2021-05",
     40.8,
     26.1,
     88.2,
     10.4
    ],
    [
     "2021-06",
     41.4,
     27.5,
     88.2,
     10.4
    ],
    [
     "2021-07",
     42,
     28.8,
     88.2,
     10.4
    ],
    [
     "2021-08",
     42.6,
     30,
     88.2,
     10.4
    ],
    [
     "2021-09",
     42.9,
     30.7,
     88.2,
     10.4
    ],
    [
     "2021-10",
     42.7,
     30.3,
     88.2,
     10.4
    ],
    [
     "2021-11",
     42.2,
     29.2,
     88.2,
     10.4
    ],
    [
     "2021-12",
     42.9,
     30.7,
     88.2,
     10.4
    ],
    [
     "2022-01",
     41.8,
     28.6,
     88.2,
     10
    ],
    [
     "2022-02",
     40.8,
     26.2,
     88.2,
     10
    ],
    [
     "2022-03",
     40.8,
     26.2,
     88.2,
     10
    ],
    [
     "2022-04",
     40.3,
     25.3,
     88.2,
     10
    ],
    [
     "2022-05",
     40.3,
     25.1,
     88.2,
     10
    ],
    [
     "2022-06",
     41.6,
     28,
     88.2,
     10
    ],
    [
     "2022-07",
     41,
     26.7,
     88.2,
     10
    ],
    [
     "2022-08",
     41.3,
     27.4,
     88.2,
     10
    ],
    [
     "2022-09",
     40.3,
     25.3,
     88.2,
     10
    ],
    [
     "2022-10",
     39.6,
     23.6,
     88.2,
     10
    ],
    [
     "2022-11",
     39.7,
     23.9,
     88.2,
     10
    ],
    [
     "2022-12",
     39.4,
     23.1,
     88.2,
     10
    ],
    [
     "2023-01",
     37.9,
     20.5,
     88.2,
     8.9
    ],
    [
     "2023-02",
     38.2,
     21.1,
     88.2,
     8.9
    ],
    [
     "2023-03",
     38,
     20.6,
     88.2,
     8.9
    ],
    [
     "2023-04",
     39.2,
     23.4,
     88.2,
     8.9
    ],
    [
     "2023-05",
     38.9,
     22.8,
     88.2,
     8.9
    ],
    [
     "2023-06",
     37.8,
     20.2,
     88.2,
     8.9
    ],
    [
     "2023-07",
     37.9,
     20.5,
     88.2,
     8.9
    ],
    [
     "2023-08",
     37.9,
     20.4,
     88.2,
     8.9
    ],
    [
     "2023-09",
     38.2,
     21.1,
     88.2,
     8.9
    ],
    [
     "2023-10",
     37.8,
     20.3,
     88.2,
     8.9
    ],
    [
     "2023-11",
     37.5,
     19.6,
     88.2,
     8.9
    ],
    [
     "2023-12",
     38.2,
     21.2,
     88.2,
     8.9
    ],
    [
     "2024-01",
     39,
     23.2,
     88.2,
     8.5
    ],
    [
     "2024-02",
     38.3,
     21.5,
     88.2,
     8.5
    ],
    [
     "2024-03",
     37.5,
     19.7,
     88.2,
     8.5
    ],
    [
     "2024-04",
     37.3,
     19.3,
     88.2,
     8.5
    ],
    [
     "2024-05",
     37.9,
     20.7,
     88.2,
     8.5
    ],
    [
     "2024-06",
     38.3,
     21.6,
     88.2,
     8.5
    ],
    [
     "2024-07",
     38.4,
     21.9,
     88.2,
     8.5
    ],
    [
     "2024-08",
     38.3,
     21.6,
     88.2,
     8.5
    ],
    [
     "2024-09",
     38.3,
     21.5,
     88.2,
     8.5
    ],
    [
     "2024-10",
     38.5,
     22,
     88.2,
     8.5
    ],
    [
     "2024-11",
     38.6,
     22.2,
     88.2,
     8.5
    ],
    [
     "2024-12",
     38.8,
     22.6,
     88.2,
     8.5
    ],
    [
     "2025-01",
     38.7,
     22.9,
     88.2,
     7.8
    ],
    [
     "2025-02",
     39.1,
     23.8,
     88.2,
     7.8
    ],
    [
     "2025-03",
     41.2,
     28.5,
     88.2,
     7.8
    ],
    [
     "2025-04",
     48.6,
     44.9,
     88.2,
     7.8
    ],
    [
     "2025-05",
     52.9,
     54.5,
     88.2,
     7.8
    ],
    [
     "2025-06",
     51.5,
     51.4,
     88.2,
     7.8
    ],
    [
     "2025-07",
     52.9,
     54.4,
     88.2,
     7.8
    ],
    [
     "2025-08",
     56.8,
     63,
     88.2,
     7.8
    ],
    [
     "2025-09",
     59.8,
     69.8,
     88.2,
     7.8
    ],
    [
     "2025-10",
     61,
     72.5,
     88.2,
     7.8
    ],
    [
     "2025-11",
     60,
     70.1,
     88.2,
     7.8
    ],
    [
     "2025-12",
     60.7,
     71.8,
     88.2,
     7.8
    ],
    [
     "2026-01",
     60.9,
     72.2,
     88.2,
     7.8
    ],
    [
     "2026-02",
     56.6,
     62.7,
     88.2,
     7.8
    ],
    [
     "2026-03",
     46.8,
     40.9,
     88.2,
     7.8
    ],
    [
     "2026-04",
     49.4,
     46.7,
     88.2,
     7.8
    ],
    [
     "2026-05",
     48.8,
     45.4,
     88.2,
     7.8
    ],
    [
     "2026-06",
     49.6,
     47.1,
     88.2,
     7.8
    ]
   ]
  },
  {
   "family": "turbines",
   "label": "Turbines and fluid-power drives",
   "latest": {
    "period": "2026-06",
    "rri": 33.9,
    "band": "weak case",
    "tariffScore": 17,
    "levelScore": 10.2,
    "trendScore": 32.9,
    "dependenceScore": 79.7,
    "concentrationScore": 9.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -9.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 3.07,
    "exportRatio": 0.203,
    "hhi": 940,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 82.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2014-02",
     33.7,
     15.6,
     79.7,
     11
    ],
    [
     "2014-03",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2014-04",
     33.6,
     15.5,
     79.7,
     11
    ],
    [
     "2014-05",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2014-06",
     33.8,
     15.9,
     79.7,
     11
    ],
    [
     "2014-07",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2014-08",
     33.8,
     15.8,
     79.7,
     11
    ],
    [
     "2014-09",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2014-10",
     33.7,
     15.6,
     79.7,
     11
    ],
    [
     "2014-11",
     33.7,
     15.6,
     79.7,
     11
    ],
    [
     "2014-12",
     33.7,
     15.7,
     79.7,
     11
    ],
    [
     "2015-01",
     33.5,
     15.7,
     79.7,
     10
    ],
    [
     "2015-02",
     33.4,
     15.6,
     79.7,
     10
    ],
    [
     "2015-03",
     33.8,
     16.5,
     79.7,
     10
    ],
    [
     "2015-04",
     33.4,
     15.6,
     79.7,
     10
    ],
    [
     "2015-05",
     33.4,
     15.5,
     79.7,
     10
    ],
    [
     "2015-06",
     33.3,
     15.2,
     79.7,
     10
    ],
    [
     "2015-07",
     33.3,
     15.4,
     79.7,
     10
    ],
    [
     "2015-08",
     33.3,
     15.3,
     79.7,
     10
    ],
    [
     "2015-09",
     33.4,
     15.6,
     79.7,
     10
    ],
    [
     "2015-10",
     33.4,
     15.5,
     79.7,
     10
    ],
    [
     "2015-11",
     33.3,
     15.4,
     79.7,
     10
    ],
    [
     "2015-12",
     33.5,
     15.7,
     79.7,
     10
    ],
    [
     "2016-01",
     33.3,
     15.8,
     79.7,
     9.2
    ],
    [
     "2016-02",
     33.2,
     15.5,
     79.7,
     9.2
    ],
    [
     "2016-03",
     33.1,
     15.3,
     79.7,
     9.2
    ],
    [
     "2016-04",
     33.1,
     15.4,
     79.7,
     9.2
    ],
    [
     "2016-05",
     33.1,
     15.3,
     79.7,
     9.2
    ],
    [
     "2016-06",
     33.2,
     15.5,
     79.7,
     9.2
    ],
    [
     "2016-07",
     33.2,
     15.6,
     79.7,
     9.2
    ],
    [
     "2016-08",
     33.2,
     15.5,
     79.7,
     9.2
    ],
    [
     "2016-09",
     33.3,
     15.7,
     79.7,
     9.2
    ],
    [
     "2016-10",
     33.3,
     15.7,
     79.7,
     9.2
    ],
    [
     "2016-11",
     33.2,
     15.6,
     79.7,
     9.2
    ],
    [
     "2016-12",
     33.2,
     15.6,
     79.7,
     9.2
    ],
    [
     "2017-01",
     33.3,
     15.8,
     79.7,
     9.1
    ],
    [
     "2017-02",
     33.3,
     15.8,
     79.7,
     9.1
    ],
    [
     "2017-03",
     33.2,
     15.5,
     79.7,
     9.1
    ],
    [
     "2017-04",
     33.2,
     15.6,
     79.7,
     9.1
    ],
    [
     "2017-05",
     33.3,
     15.7,
     79.7,
     9.1
    ],
    [
     "2017-06",
     33.2,
     15.5,
     79.7,
     9.1
    ],
    [
     "2017-07",
     33.1,
     15.4,
     79.7,
     9.1
    ],
    [
     "2017-08",
     33.2,
     15.5,
     79.7,
     9.1
    ],
    [
     "2017-09",
     33.1,
     15.3,
     79.7,
     9.1
    ],
    [
     "2017-10",
     33,
     15.1,
     79.7,
     9.1
    ],
    [
     "2017-11",
     33,
     15.2,
     79.7,
     9.1
    ],
    [
     "2017-12",
     33.1,
     15.3,
     79.7,
     9.1
    ],
    [
     "2018-01",
     33.1,
     15.2,
     79.7,
     9.3
    ],
    [
     "2018-02",
     33.1,
     15.3,
     79.7,
     9.3
    ],
    [
     "2018-03",
     33.2,
     15.4,
     79.7,
     9.3
    ],
    [
     "2018-04",
     33.2,
     15.4,
     79.7,
     9.3
    ],
    [
     "2018-05",
     33,
     15.1,
     79.7,
     9.3
    ],
    [
     "2018-06",
     33.1,
     15.3,
     79.7,
     9.3
    ],
    [
     "2018-07",
     33.5,
     16.1,
     79.7,
     9.3
    ],
    [
     "2018-08",
     33.6,
     16.3,
     79.7,
     9.3
    ],
    [
     "2018-09",
     33.5,
     16.2,
     79.7,
     9.3
    ],
    [
     "2018-10",
     34.2,
     17.7,
     79.7,
     9.3
    ],
    [
     "2018-11",
     34.2,
     17.8,
     79.7,
     9.3
    ],
    [
     "2018-12",
     34.4,
     18.1,
     79.7,
     9.3
    ],
    [
     "2019-01",
     34.5,
     17.6,
     79.7,
     10.6
    ],
    [
     "2019-02",
     34.1,
     16.7,
     79.7,
     10.6
    ],
    [
     "2019-03",
     34,
     16.5,
     79.7,
     10.6
    ],
    [
     "2019-04",
     34.3,
     17.3,
     79.7,
     10.6
    ],
    [
     "2019-05",
     34.3,
     17.1,
     79.7,
     10.6
    ],
    [
     "2019-06",
     34.3,
     17.2,
     79.7,
     10.6
    ],
    [
     "2019-07",
     34.3,
     17.3,
     79.7,
     10.6
    ],
    [
     "2019-08",
     34.8,
     18.2,
     79.7,
     10.6
    ],
    [
     "2019-09",
     35,
     18.7,
     79.7,
     10.6
    ],
    [
     "2019-10",
     34.6,
     17.9,
     79.7,
     10.6
    ],
    [
     "2019-11",
     34.6,
     17.9,
     79.7,
     10.6
    ],
    [
     "2019-12",
     34,
     16.5,
     79.7,
     10.6
    ],
    [
     "2020-01",
     34,
     18.2,
     79.7,
     7.6
    ],
    [
     "2020-02",
     34,
     18.1,
     79.7,
     7.6
    ],
    [
     "2020-03",
     33.9,
     17.9,
     79.7,
     7.6
    ],
    [
     "2020-04",
     34.7,
     19.7,
     79.7,
     7.6
    ],
    [
     "2020-05",
     34.4,
     19.2,
     79.7,
     7.6
    ],
    [
     "2020-06",
     34,
     18.2,
     79.7,
     7.6
    ],
    [
     "2020-07",
     34.8,
     20,
     79.7,
     7.6
    ],
    [
     "2020-08",
     34.6,
     19.6,
     79.7,
     7.6
    ],
    [
     "2020-09",
     34.6,
     19.5,
     79.7,
     7.6
    ],
    [
     "2020-10",
     34,
     18.3,
     79.7,
     7.6
    ],
    [
     "2020-11",
     33.8,
     17.7,
     79.7,
     7.6
    ],
    [
     "2020-12",
     34,
     18.1,
     79.7,
     7.6
    ],
    [
     "2021-01",
     34,
     18,
     79.7,
     8.1
    ],
    [
     "2021-02",
     33.9,
     17.7,
     79.7,
     8.1
    ],
    [
     "2021-03",
     34.3,
     18.6,
     79.7,
     8.1
    ],
    [
     "2021-04",
     33.5,
     16.7,
     79.7,
     8.1
    ],
    [
     "2021-05",
     33.8,
     17.4,
     79.7,
     8.1
    ],
    [
     "2021-06",
     33.7,
     17.3,
     79.7,
     8.1
    ],
    [
     "2021-07",
     33.3,
     16.4,
     79.7,
     8.1
    ],
    [
     "2021-08",
     33.8,
     17.5,
     79.7,
     8.1
    ],
    [
     "2021-09",
     33.4,
     16.5,
     79.7,
     8.1
    ],
    [
     "2021-10",
     33.8,
     17.5,
     79.7,
     8.1
    ],
    [
     "2021-11",
     33.9,
     17.7,
     79.7,
     8.1
    ],
    [
     "2021-12",
     33.9,
     17.7,
     79.7,
     8.1
    ],
    [
     "2022-01",
     34.4,
     17.7,
     79.7,
     9.9
    ],
    [
     "2022-02",
     34.3,
     17.6,
     79.7,
     9.9
    ],
    [
     "2022-03",
     34.1,
     17.1,
     79.7,
     9.9
    ],
    [
     "2022-04",
     33.9,
     16.8,
     79.7,
     9.9
    ],
    [
     "2022-05",
     33.9,
     16.7,
     79.7,
     9.9
    ],
    [
     "2022-06",
     34.1,
     17.2,
     79.7,
     9.9
    ],
    [
     "2022-07",
     34,
     16.9,
     79.7,
     9.9
    ],
    [
     "2022-08",
     34.1,
     17.2,
     79.7,
     9.9
    ],
    [
     "2022-09",
     34.2,
     17.4,
     79.7,
     9.9
    ],
    [
     "2022-10",
     33.9,
     16.6,
     79.7,
     9.9
    ],
    [
     "2022-11",
     34,
     17,
     79.7,
     9.9
    ],
    [
     "2022-12",
     33.9,
     16.7,
     79.7,
     9.9
    ],
    [
     "2023-01",
     33.9,
     16.6,
     79.7,
     10
    ],
    [
     "2023-02",
     33.7,
     16.3,
     79.7,
     10
    ],
    [
     "2023-03",
     33.9,
     16.7,
     79.7,
     10
    ],
    [
     "2023-04",
     34.1,
     17.1,
     79.7,
     10
    ],
    [
     "2023-05",
     34,
     16.8,
     79.7,
     10
    ],
    [
     "2023-06",
     34,
     16.8,
     79.7,
     10
    ],
    [
     "2023-07",
     34.1,
     17,
     79.7,
     10
    ],
    [
     "2023-08",
     33.8,
     16.5,
     79.7,
     10
    ],
    [
     "2023-09",
     33.8,
     16.5,
     79.7,
     10
    ],
    [
     "2023-10",
     34,
     16.9,
     79.7,
     10
    ],
    [
     "2023-11",
     33.7,
     16.2,
     79.7,
     10
    ],
    [
     "2023-12",
     34,
     16.8,
     79.7,
     10
    ],
    [
     "2024-01",
     33.9,
     16.8,
     79.7,
     9.6
    ],
    [
     "2024-02",
     34,
     17,
     79.7,
     9.6
    ],
    [
     "2024-03",
     33.8,
     16.7,
     79.7,
     9.6
    ],
    [
     "2024-04",
     34,
     17.1,
     79.7,
     9.6
    ],
    [
     "2024-05",
     34.1,
     17.2,
     79.7,
     9.6
    ],
    [
     "2024-06",
     34.1,
     17.4,
     79.7,
     9.6
    ],
    [
     "2024-07",
     34.1,
     17.3,
     79.7,
     9.6
    ],
    [
     "2024-08",
     34,
     17.1,
     79.7,
     9.6
    ],
    [
     "2024-09",
     34,
     17.1,
     79.7,
     9.6
    ],
    [
     "2024-10",
     34,
     17.1,
     79.7,
     9.6
    ],
    [
     "2024-11",
     33.9,
     16.9,
     79.7,
     9.6
    ],
    [
     "2024-12",
     34.2,
     17.5,
     79.7,
     9.6
    ],
    [
     "2025-01",
     34.2,
     17.6,
     79.7,
     9.4
    ],
    [
     "2025-02",
     34.3,
     17.9,
     79.7,
     9.4
    ],
    [
     "2025-03",
     36,
     21.7,
     79.7,
     9.4
    ],
    [
     "2025-04",
     41.1,
     32.9,
     79.7,
     9.4
    ],
    [
     "2025-05",
     45.1,
     41.9,
     79.7,
     9.4
    ],
    [
     "2025-06",
     43.6,
     38.5,
     79.7,
     9.4
    ],
    [
     "2025-07",
     43.5,
     38.3,
     79.7,
     9.4
    ],
    [
     "2025-08",
     45.1,
     41.8,
     79.7,
     9.4
    ],
    [
     "2025-09",
     45.4,
     42.5,
     79.7,
     9.4
    ],
    [
     "2025-10",
     44.2,
     39.9,
     79.7,
     9.4
    ],
    [
     "2025-11",
     43,
     37.3,
     79.7,
     9.4
    ],
    [
     "2025-12",
     42.7,
     36.6,
     79.7,
     9.4
    ],
    [
     "2026-01",
     44.2,
     39.9,
     79.7,
     9.4
    ],
    [
     "2026-02",
     41.7,
     34.2,
     79.7,
     9.4
    ],
    [
     "2026-03",
     38.1,
     26.4,
     79.7,
     9.4
    ],
    [
     "2026-04",
     34.7,
     18.8,
     79.7,
     9.4
    ],
    [
     "2026-05",
     34,
     17.1,
     79.7,
     9.4
    ],
    [
     "2026-06",
     33.9,
     17,
     79.7,
     9.4
    ]
   ]
  },
  {
   "family": "valves",
   "label": "Valves and fluid controls",
   "latest": {
    "period": "2026-06",
    "rri": 30.4,
    "band": "weak case",
    "tariffScore": 38,
    "levelScore": 41.8,
    "trendScore": 29.1,
    "dependenceScore": 36.6,
    "concentrationScore": 9.4,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -14,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 12.55,
    "exportRatio": 0.634,
    "hhi": 940,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 79.9,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     22.7,
     19.5,
     36.6,
     11.6
    ],
    [
     "2014-02",
     22.6,
     19.3,
     36.6,
     11.6
    ],
    [
     "2014-03",
     22.5,
     19.2,
     36.6,
     11.6
    ],
    [
     "2014-04",
     22.6,
     19.3,
     36.6,
     11.6
    ],
    [
     "2014-05",
     22.6,
     19.3,
     36.6,
     11.6
    ],
    [
     "2014-06",
     22.6,
     19.4,
     36.6,
     11.6
    ],
    [
     "2014-07",
     22.6,
     19.3,
     36.6,
     11.6
    ],
    [
     "2014-08",
     22.6,
     19.4,
     36.6,
     11.6
    ],
    [
     "2014-09",
     22.6,
     19.4,
     36.6,
     11.6
    ],
    [
     "2014-10",
     22.5,
     19.2,
     36.6,
     11.6
    ],
    [
     "2014-11",
     22.5,
     19.1,
     36.6,
     11.6
    ],
    [
     "2014-12",
     22.6,
     19.4,
     36.6,
     11.6
    ],
    [
     "2015-01",
     22.7,
     19.5,
     36.6,
     11.9
    ],
    [
     "2015-02",
     22.5,
     19,
     36.6,
     11.9
    ],
    [
     "2015-03",
     22.7,
     19.5,
     36.6,
     11.9
    ],
    [
     "2015-04",
     22.6,
     19.3,
     36.6,
     11.9
    ],
    [
     "2015-05",
     22.7,
     19.4,
     36.6,
     11.9
    ],
    [
     "2015-06",
     22.6,
     19.1,
     36.6,
     11.9
    ],
    [
     "2015-07",
     22.6,
     19.3,
     36.6,
     11.9
    ],
    [
     "2015-08",
     22.6,
     19.1,
     36.6,
     11.9
    ],
    [
     "2015-09",
     22.6,
     19.1,
     36.6,
     11.9
    ],
    [
     "2015-10",
     22.5,
     19,
     36.6,
     11.9
    ],
    [
     "2015-11",
     22.6,
     19.2,
     36.6,
     11.9
    ],
    [
     "2015-12",
     22.7,
     19.4,
     36.6,
     11.9
    ],
    [
     "2016-01",
     22.8,
     19.5,
     36.6,
     12.1
    ],
    [
     "2016-02",
     22.8,
     19.6,
     36.6,
     12.1
    ],
    [
     "2016-03",
     22.5,
     18.9,
     36.6,
     12.1
    ],
    [
     "2016-04",
     22.6,
     19.1,
     36.6,
     12.1
    ],
    [
     "2016-05",
     22.6,
     19.2,
     36.6,
     12.1
    ],
    [
     "2016-06",
     22.8,
     19.5,
     36.6,
     12.1
    ],
    [
     "2016-07",
     22.7,
     19.3,
     36.6,
     12.1
    ],
    [
     "2016-08",
     22.7,
     19.3,
     36.6,
     12.1
    ],
    [
     "2016-09",
     22.7,
     19.3,
     36.6,
     12.1
    ],
    [
     "2016-10",
     22.7,
     19.4,
     36.6,
     12.1
    ],
    [
     "2016-11",
     22.7,
     19.3,
     36.6,
     12.1
    ],
    [
     "2016-12",
     22.7,
     19.4,
     36.6,
     12.1
    ],
    [
     "2017-01",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-02",
     22.8,
     19.3,
     36.6,
     12.7
    ],
    [
     "2017-03",
     22.8,
     19.1,
     36.6,
     12.7
    ],
    [
     "2017-04",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-05",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-06",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-07",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-08",
     22.9,
     19.4,
     36.6,
     12.7
    ],
    [
     "2017-09",
     22.9,
     19.5,
     36.6,
     12.7
    ],
    [
     "2017-10",
     22.9,
     19.4,
     36.6,
     12.7
    ],
    [
     "2017-11",
     22.8,
     19.3,
     36.6,
     12.7
    ],
    [
     "2017-12",
     23,
     19.7,
     36.6,
     12.7
    ],
    [
     "2018-01",
     23.2,
     19.7,
     36.6,
     13.3
    ],
    [
     "2018-02",
     23.2,
     19.8,
     36.6,
     13.3
    ],
    [
     "2018-03",
     23.1,
     19.5,
     36.6,
     13.3
    ],
    [
     "2018-04",
     23,
     19.4,
     36.6,
     13.3
    ],
    [
     "2018-05",
     23.1,
     19.5,
     36.6,
     13.3
    ],
    [
     "2018-06",
     23.2,
     19.7,
     36.6,
     13.3
    ],
    [
     "2018-07",
     24.7,
     23,
     36.6,
     13.3
    ],
    [
     "2018-08",
     25.1,
     24,
     36.6,
     13.3
    ],
    [
     "2018-09",
     25.6,
     25.1,
     36.6,
     13.3
    ],
    [
     "2018-10",
     27.8,
     29.9,
     36.6,
     13.3
    ],
    [
     "2018-11",
     28.1,
     30.6,
     36.6,
     13.3
    ],
    [
     "2018-12",
     28.9,
     32.4,
     36.6,
     13.3
    ],
    [
     "2019-01",
     27.4,
     30.2,
     36.6,
     11.4
    ],
    [
     "2019-02",
     26.6,
     28.4,
     36.6,
     11.4
    ],
    [
     "2019-03",
     25.8,
     26.5,
     36.6,
     11.4
    ],
    [
     "2019-04",
     26.3,
     27.8,
     36.6,
     11.4
    ],
    [
     "2019-05",
     27.1,
     29.4,
     36.6,
     11.4
    ],
    [
     "2019-06",
     29.1,
     34,
     36.6,
     11.4
    ],
    [
     "2019-07",
     28.7,
     33.1,
     36.6,
     11.4
    ],
    [
     "2019-08",
     28.6,
     32.8,
     36.6,
     11.4
    ],
    [
     "2019-09",
     29.4,
     34.5,
     36.6,
     11.4
    ],
    [
     "2019-10",
     28.3,
     32.2,
     36.6,
     11.4
    ],
    [
     "2019-11",
     27.5,
     30.3,
     36.6,
     11.4
    ],
    [
     "2019-12",
     27.8,
     31.1,
     36.6,
     11.4
    ],
    [
     "2020-01",
     29.2,
     34.1,
     36.6,
     11.4
    ],
    [
     "2020-02",
     27.2,
     29.8,
     36.6,
     11.4
    ],
    [
     "2020-03",
     24.7,
     24.2,
     36.6,
     11.4
    ],
    [
     "2020-04",
     28.1,
     31.7,
     36.6,
     11.4
    ],
    [
     "2020-05",
     29.8,
     35.4,
     36.6,
     11.4
    ],
    [
     "2020-06",
     27.8,
     31,
     36.6,
     11.4
    ],
    [
     "2020-07",
     27.5,
     30.3,
     36.6,
     11.4
    ],
    [
     "2020-08",
     27.7,
     30.9,
     36.6,
     11.4
    ],
    [
     "2020-09",
     27.4,
     30.2,
     36.6,
     11.4
    ],
    [
     "2020-10",
     27,
     29.3,
     36.6,
     11.4
    ],
    [
     "2020-11",
     27.7,
     30.9,
     36.6,
     11.4
    ],
    [
     "2020-12",
     27.4,
     30.2,
     36.6,
     11.4
    ],
    [
     "2021-01",
     27.8,
     30.8,
     36.6,
     11.7
    ],
    [
     "2021-02",
     28.7,
     32.8,
     36.6,
     11.7
    ],
    [
     "2021-03",
     29.9,
     35.5,
     36.6,
     11.7
    ],
    [
     "2021-04",
     27.4,
     29.9,
     36.6,
     11.7
    ],
    [
     "2021-05",
     27.2,
     29.6,
     36.6,
     11.7
    ],
    [
     "2021-06",
     28.4,
     32.1,
     36.6,
     11.7
    ],
    [
     "2021-07",
     28.8,
     33,
     36.6,
     11.7
    ],
    [
     "2021-08",
     29.3,
     34.3,
     36.6,
     11.7
    ],
    [
     "2021-09",
     28.9,
     33.4,
     36.6,
     11.7
    ],
    [
     "2021-10",
     28.8,
     33,
     36.6,
     11.7
    ],
    [
     "2021-11",
     28.3,
     32,
     36.6,
     11.7
    ],
    [
     "2021-12",
     29.1,
     33.8,
     36.6,
     11.7
    ],
    [
     "2022-01",
     29.2,
     34.4,
     36.6,
     11.1
    ],
    [
     "2022-02",
     28.6,
     33,
     36.6,
     11.1
    ],
    [
     "2022-03",
     27.8,
     31.2,
     36.6,
     11.1
    ],
    [
     "2022-04",
     27.6,
     30.8,
     36.6,
     11.1
    ],
    [
     "2022-05",
     28.2,
     32,
     36.6,
     11.1
    ],
    [
     "2022-06",
     27.7,
     30.9,
     36.6,
     11.1
    ],
    [
     "2022-07",
     27.9,
     31.4,
     36.6,
     11.1
    ],
    [
     "2022-08",
     27.8,
     31.2,
     36.6,
     11.1
    ],
    [
     "2022-09",
     27.3,
     30.2,
     36.6,
     11.1
    ],
    [
     "2022-10",
     26.6,
     28.6,
     36.6,
     11.1
    ],
    [
     "2022-11",
     26.8,
     29,
     36.6,
     11.1
    ],
    [
     "2022-12",
     26.1,
     27.5,
     36.6,
     11.1
    ],
    [
     "2023-01",
     26.5,
     28.8,
     36.6,
     10.1
    ],
    [
     "2023-02",
     25.8,
     27.3,
     36.6,
     10.1
    ],
    [
     "2023-03",
     24.6,
     24.6,
     36.6,
     10.1
    ],
    [
     "2023-04",
     26.5,
     28.8,
     36.6,
     10.1
    ],
    [
     "2023-05",
     25.9,
     27.5,
     36.6,
     10.1
    ],
    [
     "2023-06",
     25.6,
     26.8,
     36.6,
     10.1
    ],
    [
     "2023-07",
     25.9,
     27.5,
     36.6,
     10.1
    ],
    [
     "2023-08",
     25.2,
     26,
     36.6,
     10.1
    ],
    [
     "2023-09",
     26,
     27.8,
     36.6,
     10.1
    ],
    [
     "2023-10",
     26.1,
     28,
     36.6,
     10.1
    ],
    [
     "2023-11",
     25.9,
     27.6,
     36.6,
     10.1
    ],
    [
     "2023-12",
     26.8,
     29.5,
     36.6,
     10.1
    ],
    [
     "2024-01",
     27.2,
     30.5,
     36.6,
     10.1
    ],
    [
     "2024-02",
     27,
     29.9,
     36.6,
     10.1
    ],
    [
     "2024-03",
     26.7,
     29.4,
     36.6,
     10.1
    ],
    [
     "2024-04",
     25.1,
     25.8,
     36.6,
     10.1
    ],
    [
     "2024-05",
     26.4,
     28.6,
     36.6,
     10.1
    ],
    [
     "2024-06",
     26.7,
     29.4,
     36.6,
     10.1
    ],
    [
     "2024-07",
     26.8,
     29.6,
     36.6,
     10.1
    ],
    [
     "2024-08",
     27.1,
     30.1,
     36.6,
     10.1
    ],
    [
     "2024-09",
     26.6,
     29.1,
     36.6,
     10.1
    ],
    [
     "2024-10",
     26.2,
     28.3,
     36.6,
     10.1
    ],
    [
     "2024-11",
     26.2,
     28.1,
     36.6,
     10.1
    ],
    [
     "2024-12",
     27.3,
     30.6,
     36.6,
     10.1
    ],
    [
     "2025-01",
     27.1,
     30.7,
     36.6,
     9.4
    ],
    [
     "2025-02",
     26.4,
     29,
     36.6,
     9.4
    ],
    [
     "2025-03",
     32.4,
     42.4,
     36.6,
     9.4
    ],
    [
     "2025-04",
     40.1,
     59.4,
     36.6,
     9.4
    ],
    [
     "2025-05",
     47.5,
     75.9,
     36.6,
     9.4
    ],
    [
     "2025-06",
     44.4,
     69.1,
     36.6,
     9.4
    ],
    [
     "2025-07",
     47.1,
     75,
     36.6,
     9.4
    ],
    [
     "2025-08",
     47,
     74.9,
     36.6,
     9.4
    ],
    [
     "2025-09",
     49.2,
     79.6,
     36.6,
     9.4
    ],
    [
     "2025-10",
     49.2,
     79.8,
     36.6,
     9.4
    ],
    [
     "2025-11",
     47.6,
     76.2,
     36.6,
     9.4
    ],
    [
     "2025-12",
     47.7,
     76.3,
     36.6,
     9.4
    ],
    [
     "2026-01",
     48.9,
     79.1,
     36.6,
     9.4
    ],
    [
     "2026-02",
     45.4,
     71.3,
     36.6,
     9.4
    ],
    [
     "2026-03",
     36,
     50.4,
     36.6,
     9.4
    ],
    [
     "2026-04",
     32.1,
     41.6,
     36.6,
     9.4
    ],
    [
     "2026-05",
     28.9,
     34.7,
     36.6,
     9.4
    ],
    [
     "2026-06",
     30.4,
     38,
     36.6,
     9.4
    ]
   ]
  },
  {
   "family": "welding-equipment",
   "label": "Welding equipment",
   "latest": {
    "period": "2026-06",
    "rri": 32.4,
    "band": "weak case",
    "tariffScore": 36.6,
    "levelScore": 34.3,
    "trendScore": 41.9,
    "dependenceScore": 44.4,
    "concentrationScore": 10.3,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -8.5,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 10.29,
    "exportRatio": 0.556,
    "hhi": 1030,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 87.3,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2014-02",
     24.5,
     16.5,
     44.4,
     14.9
    ],
    [
     "2014-03",
     24.4,
     16.3,
     44.4,
     14.9
    ],
    [
     "2014-04",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2014-05",
     24.4,
     16.3,
     44.4,
     14.9
    ],
    [
     "2014-06",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2014-07",
     24.4,
     16.3,
     44.4,
     14.9
    ],
    [
     "2014-08",
     24.5,
     16.5,
     44.4,
     14.9
    ],
    [
     "2014-09",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2014-10",
     24.3,
     16.1,
     44.4,
     14.9
    ],
    [
     "2014-11",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2014-12",
     24.3,
     16.2,
     44.4,
     14.9
    ],
    [
     "2015-01",
     24,
     15.7,
     44.4,
     14.3
    ],
    [
     "2015-02",
     24,
     15.8,
     44.4,
     14.3
    ],
    [
     "2015-03",
     24.2,
     16.2,
     44.4,
     14.3
    ],
    [
     "2015-04",
     24.2,
     16.2,
     44.4,
     14.3
    ],
    [
     "2015-05",
     24.2,
     16.2,
     44.4,
     14.3
    ],
    [
     "2015-06",
     24.2,
     16.2,
     44.4,
     14.3
    ],
    [
     "2015-07",
     24,
     15.8,
     44.4,
     14.3
    ],
    [
     "2015-08",
     24,
     15.9,
     44.4,
     14.3
    ],
    [
     "2015-09",
     24.1,
     16,
     44.4,
     14.3
    ],
    [
     "2015-10",
     24.5,
     16.8,
     44.4,
     14.3
    ],
    [
     "2015-11",
     24.4,
     16.6,
     44.4,
     14.3
    ],
    [
     "2015-12",
     24.3,
     16.5,
     44.4,
     14.3
    ],
    [
     "2016-01",
     24.4,
     16.2,
     44.4,
     15.2
    ],
    [
     "2016-02",
     24.4,
     16.2,
     44.4,
     15.2
    ],
    [
     "2016-03",
     24.3,
     16,
     44.4,
     15.2
    ],
    [
     "2016-04",
     24.3,
     16,
     44.4,
     15.2
    ],
    [
     "2016-05",
     24.2,
     15.7,
     44.4,
     15.2
    ],
    [
     "2016-06",
     24.4,
     16.2,
     44.4,
     15.2
    ],
    [
     "2016-07",
     24.7,
     16.8,
     44.4,
     15.2
    ],
    [
     "2016-08",
     24.2,
     15.7,
     44.4,
     15.2
    ],
    [
     "2016-09",
     24.2,
     15.8,
     44.4,
     15.2
    ],
    [
     "2016-10",
     24.2,
     15.8,
     44.4,
     15.2
    ],
    [
     "2016-11",
     24.3,
     16,
     44.4,
     15.2
    ],
    [
     "2016-12",
     24.3,
     16,
     44.4,
     15.2
    ],
    [
     "2017-01",
     24.5,
     16,
     44.4,
     15.9
    ],
    [
     "2017-02",
     24.5,
     15.9,
     44.4,
     15.9
    ],
    [
     "2017-03",
     24.5,
     16,
     44.4,
     15.9
    ],
    [
     "2017-04",
     24.4,
     15.8,
     44.4,
     15.9
    ],
    [
     "2017-05",
     24.5,
     15.9,
     44.4,
     15.9
    ],
    [
     "2017-06",
     24.4,
     15.7,
     44.4,
     15.9
    ],
    [
     "2017-07",
     24.5,
     15.9,
     44.4,
     15.9
    ],
    [
     "2017-08",
     24.7,
     16.4,
     44.4,
     15.9
    ],
    [
     "2017-09",
     24.7,
     16.4,
     44.4,
     15.9
    ],
    [
     "2017-10",
     24.5,
     16.1,
     44.4,
     15.9
    ],
    [
     "2017-11",
     24.4,
     15.7,
     44.4,
     15.9
    ],
    [
     "2017-12",
     24.4,
     15.7,
     44.4,
     15.9
    ],
    [
     "2018-01",
     24.5,
     16.8,
     44.4,
     14.3
    ],
    [
     "2018-02",
     24.3,
     16.5,
     44.4,
     14.3
    ],
    [
     "2018-03",
     24.3,
     16.5,
     44.4,
     14.3
    ],
    [
     "2018-04",
     24.2,
     16.3,
     44.4,
     14.3
    ],
    [
     "2018-05",
     24.6,
     17.1,
     44.4,
     14.3
    ],
    [
     "2018-06",
     24.4,
     16.6,
     44.4,
     14.3
    ],
    [
     "2018-07",
     25.6,
     19.4,
     44.4,
     14.3
    ],
    [
     "2018-08",
     27,
     22.4,
     44.4,
     14.3
    ],
    [
     "2018-09",
     27.4,
     23.4,
     44.4,
     14.3
    ],
    [
     "2018-10",
     26.6,
     21.5,
     44.4,
     14.3
    ],
    [
     "2018-11",
     27.2,
     22.8,
     44.4,
     14.3
    ],
    [
     "2018-12",
     27,
     22.4,
     44.4,
     14.3
    ],
    [
     "2019-01",
     27.5,
     23.9,
     44.4,
     13.7
    ],
    [
     "2019-02",
     26.2,
     21,
     44.4,
     13.7
    ],
    [
     "2019-03",
     25.7,
     20,
     44.4,
     13.7
    ],
    [
     "2019-04",
     25.9,
     20.4,
     44.4,
     13.7
    ],
    [
     "2019-05",
     26.4,
     21.5,
     44.4,
     13.7
    ],
    [
     "2019-06",
     26.3,
     21.3,
     44.4,
     13.7
    ],
    [
     "2019-07",
     26.5,
     21.6,
     44.4,
     13.7
    ],
    [
     "2019-08",
     24.7,
     17.6,
     44.4,
     13.7
    ],
    [
     "2019-09",
     25.7,
     19.8,
     44.4,
     13.7
    ],
    [
     "2019-10",
     25.5,
     19.4,
     44.4,
     13.7
    ],
    [
     "2019-11",
     24.9,
     18.2,
     44.4,
     13.7
    ],
    [
     "2019-12",
     25.1,
     18.5,
     44.4,
     13.7
    ],
    [
     "2020-01",
     24.5,
     16.8,
     44.4,
     14.5
    ],
    [
     "2020-02",
     24.9,
     17.6,
     44.4,
     14.5
    ],
    [
     "2020-03",
     24,
     15.7,
     44.4,
     14.5
    ],
    [
     "2020-04",
     25.1,
     18.1,
     44.4,
     14.5
    ],
    [
     "2020-05",
     25.9,
     19.8,
     44.4,
     14.5
    ],
    [
     "2020-06",
     25.6,
     19.3,
     44.4,
     14.5
    ],
    [
     "2020-07",
     26.8,
     22,
     44.4,
     14.5
    ],
    [
     "2020-08",
     26.8,
     22,
     44.4,
     14.5
    ],
    [
     "2020-09",
     25.6,
     19.2,
     44.4,
     14.5
    ],
    [
     "2020-10",
     26.8,
     21.9,
     44.4,
     14.5
    ],
    [
     "2020-11",
     26.6,
     21.5,
     44.4,
     14.5
    ],
    [
     "2020-12",
     27.5,
     23.4,
     44.4,
     14.5
    ],
    [
     "2021-01",
     26.6,
     22.4,
     44.4,
     12.7
    ],
    [
     "2021-02",
     26.5,
     22.2,
     44.4,
     12.7
    ],
    [
     "2021-03",
     27.3,
     24,
     44.4,
     12.7
    ],
    [
     "2021-04",
     25.6,
     20.2,
     44.4,
     12.7
    ],
    [
     "2021-05",
     26.6,
     22.5,
     44.4,
     12.7
    ],
    [
     "2021-06",
     27.7,
     25,
     44.4,
     12.7
    ],
    [
     "2021-07",
     26.7,
     22.6,
     44.4,
     12.7
    ],
    [
     "2021-08",
     27.8,
     25.1,
     44.4,
     12.7
    ],
    [
     "2021-09",
     29.1,
     27.9,
     44.4,
     12.7
    ],
    [
     "2021-10",
     27,
     23.4,
     44.4,
     12.7
    ],
    [
     "2021-11",
     27.7,
     24.9,
     44.4,
     12.7
    ],
    [
     "2021-12",
     26.3,
     21.8,
     44.4,
     12.7
    ],
    [
     "2022-01",
     27.1,
     24,
     44.4,
     11.9
    ],
    [
     "2022-02",
     27,
     23.7,
     44.4,
     11.9
    ],
    [
     "2022-03",
     26.2,
     21.9,
     44.4,
     11.9
    ],
    [
     "2022-04",
     26.6,
     23,
     44.4,
     11.9
    ],
    [
     "2022-05",
     25.5,
     20.5,
     44.4,
     11.9
    ],
    [
     "2022-06",
     24.8,
     19,
     44.4,
     11.9
    ],
    [
     "2022-07",
     25.7,
     20.8,
     44.4,
     11.9
    ],
    [
     "2022-08",
     25.9,
     21.4,
     44.4,
     11.9
    ],
    [
     "2022-09",
     25.4,
     20.3,
     44.4,
     11.9
    ],
    [
     "2022-10",
     27.1,
     23.9,
     44.4,
     11.9
    ],
    [
     "2022-11",
     25.1,
     19.5,
     44.4,
     11.9
    ],
    [
     "2022-12",
     24.7,
     18.6,
     44.4,
     11.9
    ],
    [
     "2023-01",
     24.7,
     19.1,
     44.4,
     11.3
    ],
    [
     "2023-02",
     25.6,
     21.1,
     44.4,
     11.3
    ],
    [
     "2023-03",
     25.1,
     19.9,
     44.4,
     11.3
    ],
    [
     "2023-04",
     25.6,
     21.1,
     44.4,
     11.3
    ],
    [
     "2023-05",
     26.7,
     23.4,
     44.4,
     11.3
    ],
    [
     "2023-06",
     25.9,
     21.6,
     44.4,
     11.3
    ],
    [
     "2023-07",
     24.9,
     19.4,
     44.4,
     11.3
    ],
    [
     "2023-08",
     25,
     19.6,
     44.4,
     11.3
    ],
    [
     "2023-09",
     24.5,
     18.6,
     44.4,
     11.3
    ],
    [
     "2023-10",
     25.3,
     20.4,
     44.4,
     11.3
    ],
    [
     "2023-11",
     23.9,
     17.2,
     44.4,
     11.3
    ],
    [
     "2023-12",
     25.1,
     19.9,
     44.4,
     11.3
    ],
    [
     "2024-01",
     24.9,
     19.9,
     44.4,
     10.5
    ],
    [
     "2024-02",
     24.5,
     19,
     44.4,
     10.5
    ],
    [
     "2024-03",
     25,
     20.1,
     44.4,
     10.5
    ],
    [
     "2024-04",
     27.7,
     26.1,
     44.4,
     10.5
    ],
    [
     "2024-05",
     25,
     20.2,
     44.4,
     10.5
    ],
    [
     "2024-06",
     26.7,
     23.8,
     44.4,
     10.5
    ],
    [
     "2024-07",
     26,
     22.3,
     44.4,
     10.5
    ],
    [
     "2024-08",
     26.6,
     23.7,
     44.4,
     10.5
    ],
    [
     "2024-09",
     26.6,
     23.7,
     44.4,
     10.5
    ],
    [
     "2024-10",
     24.9,
     19.8,
     44.4,
     10.5
    ],
    [
     "2024-11",
     25.4,
     21,
     44.4,
     10.5
    ],
    [
     "2024-12",
     27.3,
     25.2,
     44.4,
     10.5
    ],
    [
     "2025-01",
     26.8,
     24.3,
     44.4,
     10.3
    ],
    [
     "2025-02",
     25.3,
     20.9,
     44.4,
     10.3
    ],
    [
     "2025-03",
     29.1,
     29.4,
     44.4,
     10.3
    ],
    [
     "2025-04",
     32.6,
     37.1,
     44.4,
     10.3
    ],
    [
     "2025-05",
     39.9,
     53.4,
     44.4,
     10.3
    ],
    [
     "2025-06",
     40.9,
     55.6,
     44.4,
     10.3
    ],
    [
     "2025-07",
     45.5,
     65.7,
     44.4,
     10.3
    ],
    [
     "2025-08",
     46.8,
     68.7,
     44.4,
     10.3
    ],
    [
     "2025-09",
     44.5,
     63.6,
     44.4,
     10.3
    ],
    [
     "2025-10",
     48,
     71.3,
     44.4,
     10.3
    ],
    [
     "2025-11",
     45.6,
     65.9,
     44.4,
     10.3
    ],
    [
     "2025-12",
     44.9,
     64.5,
     44.4,
     10.3
    ],
    [
     "2026-01",
     45.3,
     65.4,
     44.4,
     10.3
    ],
    [
     "2026-02",
     41.6,
     57.2,
     44.4,
     10.3
    ],
    [
     "2026-03",
     36.8,
     46.4,
     44.4,
     10.3
    ],
    [
     "2026-04",
     37.2,
     47.4,
     44.4,
     10.3
    ],
    [
     "2026-05",
     34.1,
     40.5,
     44.4,
     10.3
    ],
    [
     "2026-06",
     32.4,
     36.6,
     44.4,
     10.3
    ]
   ]
  },
  {
   "family": "wire-cable",
   "label": "Insulated wire and cable",
   "latest": {
    "period": "2026-06",
    "rri": 50.1,
    "band": "building case",
    "tariffScore": 41.2,
    "levelScore": 37.7,
    "trendScore": 49.4,
    "dependenceScore": 83,
    "concentrationScore": 26.7,
    "termsUsed": [
     "tariff",
     "importDependence",
     "concentration"
    ],
    "yoyRri": -5.7,
    "yoyRriIsFloorComparison": true,
    "effectiveRatePct": 11.3,
    "exportRatio": 0.17,
    "hhi": 2670,
    "concentrationYear": "2025",
    "concentrationValueCoveragePct": 84.2,
    "hhiIsLowerBound": true,
    "rriIsLowerBound": true
   },
   "points": [
    [
     "2014-01",
     41,
     18,
     83,
     31.9
    ],
    [
     "2014-02",
     40.8,
     17.5,
     83,
     31.9
    ],
    [
     "2014-03",
     40.8,
     17.5,
     83,
     31.9
    ],
    [
     "2014-04",
     40.8,
     17.6,
     83,
     31.9
    ],
    [
     "2014-05",
     40.8,
     17.5,
     83,
     31.9
    ],
    [
     "2014-06",
     40.8,
     17.5,
     83,
     31.9
    ],
    [
     "2014-07",
     40.8,
     17.6,
     83,
     31.9
    ],
    [
     "2014-08",
     40.8,
     17.6,
     83,
     31.9
    ],
    [
     "2014-09",
     40.8,
     17.7,
     83,
     31.9
    ],
    [
     "2014-10",
     40.8,
     17.6,
     83,
     31.9
    ],
    [
     "2014-11",
     40.8,
     17.7,
     83,
     31.9
    ],
    [
     "2014-12",
     40.8,
     17.7,
     83,
     31.9
    ],
    [
     "2015-01",
     41,
     17.7,
     83,
     32.4
    ],
    [
     "2015-02",
     40.7,
     17.2,
     83,
     32.4
    ],
    [
     "2015-03",
     41,
     17.8,
     83,
     32.4
    ],
    [
     "2015-04",
     41,
     17.7,
     83,
     32.4
    ],
    [
     "2015-05",
     41,
     17.8,
     83,
     32.4
    ],
    [
     "2015-06",
     40.9,
     17.6,
     83,
     32.4
    ],
    [
     "2015-07",
     40.9,
     17.6,
     83,
     32.4
    ],
    [
     "2015-08",
     40.9,
     17.6,
     83,
     32.4
    ],
    [
     "2015-09",
     40.8,
     17.4,
     83,
     32.4
    ],
    [
     "2015-10",
     40.8,
     17.3,
     83,
     32.4
    ],
    [
     "2015-11",
     40.8,
     17.3,
     83,
     32.4
    ],
    [
     "2015-12",
     41,
     17.7,
     83,
     32.4
    ],
    [
     "2016-01",
     40.8,
     17.3,
     83,
     32.4
    ],
    [
     "2016-02",
     40.9,
     17.6,
     83,
     32.4
    ],
    [
     "2016-03",
     40.7,
     17.1,
     83,
     32.4
    ],
    [
     "2016-04",
     40.8,
     17.3,
     83,
     32.4
    ],
    [
     "2016-05",
     40.8,
     17.4,
     83,
     32.4
    ],
    [
     "2016-06",
     40.7,
     17.1,
     83,
     32.4
    ],
    [
     "2016-07",
     40.8,
     17.4,
     83,
     32.4
    ],
    [
     "2016-08",
     40.8,
     17.3,
     83,
     32.4
    ],
    [
     "2016-09",
     40.8,
     17.4,
     83,
     32.4
    ],
    [
     "2016-10",
     40.8,
     17.4,
     83,
     32.4
    ],
    [
     "2016-11",
     40.7,
     17.2,
     83,
     32.4
    ],
    [
     "2016-12",
     40.9,
     17.5,
     83,
     32.4
    ],
    [
     "2017-01",
     40.5,
     17.7,
     83,
     30.7
    ],
    [
     "2017-02",
     40.4,
     17.4,
     83,
     30.7
    ],
    [
     "2017-03",
     40.4,
     17.3,
     83,
     30.7
    ],
    [
     "2017-04",
     40.5,
     17.6,
     83,
     30.7
    ],
    [
     "2017-05",
     40.5,
     17.6,
     83,
     30.7
    ],
    [
     "2017-06",
     40.4,
     17.5,
     83,
     30.7
    ],
    [
     "2017-07",
     40.5,
     17.7,
     83,
     30.7
    ],
    [
     "2017-08",
     40.6,
     17.9,
     83,
     30.7
    ],
    [
     "2017-09",
     40.5,
     17.7,
     83,
     30.7
    ],
    [
     "2017-10",
     40.5,
     17.7,
     83,
     30.7
    ],
    [
     "2017-11",
     40.5,
     17.6,
     83,
     30.7
    ],
    [
     "2017-12",
     40.6,
     17.8,
     83,
     30.7
    ],
    [
     "2018-01",
     40.9,
     17.7,
     83,
     32.3
    ],
    [
     "2018-02",
     40.8,
     17.5,
     83,
     32.3
    ],
    [
     "2018-03",
     40.8,
     17.3,
     83,
     32.3
    ],
    [
     "2018-04",
     40.8,
     17.3,
     83,
     32.3
    ],
    [
     "2018-05",
     40.8,
     17.5,
     83,
     32.3
    ],
    [
     "2018-06",
     40.8,
     17.5,
     83,
     32.3
    ],
    [
     "2018-07",
     42.2,
     20.6,
     83,
     32.3
    ],
    [
     "2018-08",
     42.3,
     20.7,
     83,
     32.3
    ],
    [
     "2018-09",
     42.5,
     21.2,
     83,
     32.3
    ],
    [
     "2018-10",
     44.9,
     26.6,
     83,
     32.3
    ],
    [
     "2018-11",
     44.9,
     26.4,
     83,
     32.3
    ],
    [
     "2018-12",
     45.6,
     28.1,
     83,
     32.3
    ],
    [
     "2019-01",
     44.8,
     26,
     83,
     32.7
    ],
    [
     "2019-02",
     44.1,
     24.4,
     83,
     32.7
    ],
    [
     "2019-03",
     43.6,
     23.4,
     83,
     32.7
    ],
    [
     "2019-04",
     44,
     24.2,
     83,
     32.7
    ],
    [
     "2019-05",
     44.8,
     26,
     83,
     32.7
    ],
    [
     "2019-06",
     46.5,
     29.9,
     83,
     32.7
    ],
    [
     "2019-07",
     46.5,
     29.8,
     83,
     32.7
    ],
    [
     "2019-08",
     46,
     28.8,
     83,
     32.7
    ],
    [
     "2019-09",
     46.3,
     29.4,
     83,
     32.7
    ],
    [
     "2019-10",
     44.7,
     25.9,
     83,
     32.7
    ],
    [
     "2019-11",
     44.4,
     25.1,
     83,
     32.7
    ],
    [
     "2019-12",
     44.6,
     25.7,
     83,
     32.7
    ],
    [
     "2020-01",
     44.1,
     25.9,
     83,
     30.1
    ],
    [
     "2020-02",
     42.6,
     22.5,
     83,
     30.1
    ],
    [
     "2020-03",
     42.6,
     22.7,
     83,
     30.1
    ],
    [
     "2020-04",
     48,
     34.7,
     83,
     30.1
    ],
    [
     "2020-05",
     48.8,
     36.3,
     83,
     30.1
    ],
    [
     "2020-06",
     44,
     25.8,
     83,
     30.1
    ],
    [
     "2020-07",
     43.4,
     24.5,
     83,
     30.1
    ],
    [
     "2020-08",
     43.5,
     24.7,
     83,
     30.1
    ],
    [
     "2020-09",
     43.2,
     24,
     83,
     30.1
    ],
    [
     "2020-10",
     43.2,
     23.9,
     83,
     30.1
    ],
    [
     "2020-11",
     43.5,
     24.6,
     83,
     30.1
    ],
    [
     "2020-12",
     43.6,
     24.8,
     83,
     30.1
    ],
    [
     "2021-01",
     44.2,
     26.7,
     83,
     29
    ],
    [
     "2021-02",
     44,
     26.3,
     83,
     29
    ],
    [
     "2021-03",
     43.6,
     25.5,
     83,
     29
    ],
    [
     "2021-04",
     41.3,
     20.4,
     83,
     29
    ],
    [
     "2021-05",
     41.5,
     20.7,
     83,
     29
    ],
    [
     "2021-06",
     43.2,
     24.5,
     83,
     29
    ],
    [
     "2021-07",
     43.7,
     25.7,
     83,
     29
    ],
    [
     "2021-08",
     44.1,
     26.5,
     83,
     29
    ],
    [
     "2021-09",
     44,
     26.4,
     83,
     29
    ],
    [
     "2021-10",
     43.4,
     24.9,
     83,
     29
    ],
    [
     "2021-11",
     43.3,
     24.7,
     83,
     29
    ],
    [
     "2021-12",
     43.8,
     25.8,
     83,
     29
    ],
    [
     "2022-01",
     43.1,
     25.1,
     83,
     27.5
    ],
    [
     "2022-02",
     42.5,
     23.8,
     83,
     27.5
    ],
    [
     "2022-03",
     42.8,
     24.5,
     83,
     27.5
    ],
    [
     "2022-04",
     42.8,
     24.4,
     83,
     27.5
    ],
    [
     "2022-05",
     42.6,
     24,
     83,
     27.5
    ],
    [
     "2022-06",
     42.6,
     24.1,
     83,
     27.5
    ],
    [
     "2022-07",
     42.5,
     23.8,
     83,
     27.5
    ],
    [
     "2022-08",
     42.7,
     24.2,
     83,
     27.5
    ],
    [
     "2022-09",
     42.4,
     23.6,
     83,
     27.5
    ],
    [
     "2022-10",
     42.2,
     23.2,
     83,
     27.5
    ],
    [
     "2022-11",
     41.8,
     22.2,
     83,
     27.5
    ],
    [
     "2022-12",
     41.7,
     22.1,
     83,
     27.5
    ],
    [
     "2023-01",
     41.8,
     21.4,
     83,
     29.1
    ],
    [
     "2023-02",
     41.7,
     21.1,
     83,
     29.1
    ],
    [
     "2023-03",
     41.3,
     20.2,
     83,
     29.1
    ],
    [
     "2023-04",
     41.9,
     21.7,
     83,
     29.1
    ],
    [
     "2023-05",
     41.8,
     21.4,
     83,
     29.1
    ],
    [
     "2023-06",
     41.7,
     21.2,
     83,
     29.1
    ],
    [
     "2023-07",
     41.9,
     21.6,
     83,
     29.1
    ],
    [
     "2023-08",
     41.5,
     20.8,
     83,
     29.1
    ],
    [
     "2023-09",
     42.2,
     22.2,
     83,
     29.1
    ],
    [
     "2023-10",
     42,
     21.8,
     83,
     29.1
    ],
    [
     "2023-11",
     42.3,
     22.6,
     83,
     29.1
    ],
    [
     "2023-12",
     42.7,
     23.3,
     83,
     29.1
    ],
    [
     "2024-01",
     43.1,
     24,
     83,
     29.6
    ],
    [
     "2024-02",
     42.1,
     21.7,
     83,
     29.6
    ],
    [
     "2024-03",
     42.1,
     21.8,
     83,
     29.6
    ],
    [
     "2024-04",
     42.2,
     22.1,
     83,
     29.6
    ],
    [
     "2024-05",
     42.4,
     22.4,
     83,
     29.6
    ],
    [
     "2024-06",
     42.6,
     22.9,
     83,
     29.6
    ],
    [
     "2024-07",
     43.1,
     24,
     83,
     29.6
    ],
    [
     "2024-08",
     43.1,
     24,
     83,
     29.6
    ],
    [
     "2024-09",
     42.9,
     23.5,
     83,
     29.6
    ],
    [
     "2024-10",
     42.7,
     23,
     83,
     29.6
    ],
    [
     "2024-11",
     42.7,
     23.2,
     83,
     29.6
    ],
    [
     "2024-12",
     44,
     26,
     83,
     29.6
    ],
    [
     "2025-01",
     42.8,
     24.9,
     83,
     26.7
    ],
    [
     "2025-02",
     42.5,
     24.2,
     83,
     26.7
    ],
    [
     "2025-03",
     47.3,
     34.9,
     83,
     26.7
    ],
    [
     "2025-04",
     55,
     52.1,
     83,
     26.7
    ],
    [
     "2025-05",
     58.4,
     59.5,
     83,
     26.7
    ],
    [
     "2025-06",
     55.8,
     53.8,
     83,
     26.7
    ],
    [
     "2025-07",
     57.3,
     57.2,
     83,
     26.7
    ],
    [
     "2025-08",
     61.7,
     66.9,
     83,
     26.7
    ],
    [
     "2025-09",
     62.6,
     69,
     83,
     26.7
    ],
    [
     "2025-10",
     62.9,
     69.7,
     83,
     26.7
    ],
    [
     "2025-11",
     63.1,
     70.1,
     83,
     26.7
    ],
    [
     "2025-12",
     63.3,
     70.5,
     83,
     26.7
    ],
    [
     "2026-01",
     61.7,
     66.9,
     83,
     26.7
    ],
    [
     "2026-02",
     59,
     61,
     83,
     26.7
    ],
    [
     "2026-03",
     52.7,
     46.9,
     83,
     26.7
    ],
    [
     "2026-04",
     50.2,
     41.4,
     83,
     26.7
    ],
    [
     "2026-05",
     48.3,
     37.1,
     83,
     26.7
    ],
    [
     "2026-06",
     50.1,
     41.2,
     83,
     26.7
    ]
   ]
  }
 ],
 "description": "The Reshoring Readiness Index: a transparent 0-100 monthly screening score per U.S. manufacturing import family from tariff pressure, import dependence, and sourcing concentration. When the retained-source board is incomplete, its HHI and the monotone RRI are explicitly lower bounds rather than full-market scores.",
 "methodology": {
  "version": "2.0.0",
  "formula": "RRI = 0.45 x TariffScore + 0.30 x ImportDependenceScore + 0.25 x ConcentrationScore, weights renormalized over available terms.",
  "tariffScore": "0.7 x levelScore + 0.3 x trendScore; levelScore = min(effective rate, 30%)/30 x 100; trendScore maps the year-over-year change clamped to +/-10pp onto 0-100 (flat = 50, no year-ago observation = neutral 50).",
  "importDependenceScore": "(1 - min(exports/imports, 1)) x 100 from the latest shared trade-balance year; currently a single-year snapshot held constant across the series, deepening into a history as export years accumulate.",
  "concentrationScore": "Named-source HHI lower bound / 100 (0-100), computed per calendar year from retained top sources against the year's true family import total; months past the last completed year use the latest available year. Latest rows expose source-value coverage and whether HHI/RRI are lower bounds.",
  "bands": "< 34 weak case, 34-66 building case, >= 67 strong case.",
  "pointShape": "points are [period, rri, tariffScore, dependenceScore, concentrationScore].",
  "weights": {
   "tariff": 0.45,
   "importDependence": 0.3,
   "concentration": 0.25
  },
  "caveats": "A transparent screening indicator built from public USITC trade data, not sourcing advice. The tariff term uses an observed effective calculated-duty rate, not an entry-specific legal rate or cash-paid amount. Concentration is matched to the month's calendar year (latest completed year for newer months); import dependence is currently a latest-year snapshot applied across the series and will deepen into a true history as export years accumulate. The named-top-sources HHI is a floor. Validate any decision with your own landed-cost and capacity numbers."
 },
 "license": "CC BY 4.0 with attribution to MFG Calcs; underlying USITC data is public domain."
}
